Traffic Incident Managementat the Big Dig
Presenter:Kevin A Duffy-CA/T Manager of Emergency Planning & [email protected]
DifficultyKeeping the Roadways Traversing Boston Open and
Flowing at Pre Construction Levels
Daily Use of Project Footprint Areas: 339,000(minimum)
Traffic Incident Managementat the Big Dig
Solution:Disseminate information quickly; simplify response, and execute with perfection
Critical Elements of Success
Strategic
1.Great emphasis on traffic planning and congestion prevention
All lane alterations are scripted, using a three phase sign off, involving Construction, Traffic Engineering, and state/local authorities
Every effort in planning yielded one less incident
Strategic (continued)
•Established Traffic Disruptions as part of Project- wide Emergency Response System
Guarantees that a quick, efficient method is continually in place to mitigate traffic difficulties
As part of the ERS, multiple resources are dedicated to a traffic disruption, minimizing the time and scope of a traffic disruption. These include a field engineer, and a traffic engineer, along with emergency services.
Including Traffic in the ERS Provided a Structure of Communication and Incident Management Control Among Non- Traffic Personnel.
Field Staff Receive Instruction on Clearing Self- Created Disruptions.
All Staff must Submit to Annual Refresher Training
Strategic (continued)
Strategic (continued)
Non project related disruptions were handled through the same assessment criteria and communications links to external agencies as would be used for injuries, utility disruptions etc.
Critical links were found by analyzing these non related events
Continually Functional Operations Center
The CA/T Ops Center Operates 24/7 Due to Construction Demands. A Less Ambitious Construction Project Would Only Require a Center Operating Around That Specific Construction Schedule
TacticalApplication of measures to minimize disruption
Tactical
Video Monitoring• A picture is worth a thousand words• Sharing images with decision makers via
intranet link
Rapid identification and classification of a traffic disruption• Occurring when a disruption is noticed by a
construction engineer, operations monitor, or external notification
• Classification to ensure standard response•
Tactical
Primary notification is delivered to a single point of contact in the field, who will coordinate the response
•One point of coordination is a traffic engineer
Immediate independent notification of a Traffic Engineer when a disruption is reported or identified
•Notification is made by the operations center, ensuring the passage of information
Tactical
Exercise program with training and drills• All personnel will be ready for the real disruption