Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
1
TOWN MUNICIPAL COUNCIL,
ANNIGERI.
Public Disclosure Schedule
2011-12
2
Content
Sl.no Particulars Page. no
1 Urban planning including town planning 4-5
2 Regulation of Land- use and Construction of Buildings 6-7
3 Planning for Economic and Social development 8-9
4 Roads and Bridges 10-11
5 Water Supply- Domestic, Industrial and Commercial 12-15
6 Public Health, Sanitation, Conservancy and SWM 16-24
8 Urban forestry, protection of environment and ecology 25-26
10 Slum Improvement & Up-gradation 26-28
11 Urban Poverty Alleviation 29
12 Provision of urban amenities and facilities- parks, gardens and playgrounds 30-31
13 Promotion of cultural, educational, and aesthetic aspects 32-33
14 Burials and burial grounds, cremations, cremation grounds and electric
crematoriums 34-35
15 Cattle pounds, prevention of cruelty to animals 36
16 Vital Statistics including registration of births and deaths 37-38
17 Public amenities including street lighting, parking lots, bus stops and public
conveniences 39-40
18 Regulation of slaughter houses and tanneries 41-42
3
Formats for Disclosure
4
Functions under 12th Schedule
1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
(i) Report and Maps of
Master Plans including
Zoning Regulations
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
Table 1.1
(ii) Maps of Planning
Districts
Plan in force now ULB 1. Annually
2. To be
notified as
and when
changes done
1. Town
Planning
Authority
2. Urban
Development
Authority
(UDA)
3. Municipal
Planning
Authority (iii) Details of
provisional and finally
approved layouts
(Survey No, name of
owner, Site details)
Previous three
financial years
including current
year
ULB Half Yearly Table.1.2
1 Urban
Planning
including
town
Planning
4. ULB (iv) Report and maps of
Comprehensive
Development Plan (CDP)
Current plan ULB 1. Annually
2. To be
notified as
and when
changes done
5
Table 1.1: Report and Maps of Master Plans including Zoning Regulations
(Please fill in following information)
Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and
CDP
Enclosure in PDF
1 NIL Enclosure NIL Enclosure
2 NIL Enclosure NIL Enclosure
3 NIL Enclosure NIL Enclosure
Table 1.2: Number of provisional and final approved layouts
(Please fill in following information)
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
2011-12 NIL NIL -
2010-11 NIL NIL -
2009-10 NIL NIL -
Format:
Details of Provisional and final approved layouts
Number of sites in the approved layout Sl. No Name of
Layout
Whether
provisional/approved 30*40 40*60 Odd sites
Name of the
owner/developer of the
layout
1 K.H.B Colony - Total 124 Sites K.H.B..H.B
2 R H
Kalappanavar
- 1 site (21780 sq.ft) R.H.Kalappanavar
6
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
(i) Details of Building
Commencement &
Completion Certificate
(Total application
received, total
permission granted,
location details)
Previous three
years including
current year
ULB Annually Table 2.1 (a)
&
Table.2.1 (b)
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB
(ii) Details of Industries
and commercial
complexes approved
(Survey No., Type,
Name of the owner)
Previous three
Financial years
including current
year
ULB Annually Table 2.2
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building plan approval
from past three years
Total number of License granted from past three years
Current FY
2011-12
Current FY – 1
2010-11
Current FY – 2
2009-10
Current FY
2011-12
Current FY
2010-11
Current FY – 1
2009-10
146 70 84 136 65 83
7
Table 2.1 (b): Details of the building plan approval for three years
Format for enclosure Ref Table 2.1.b
Table 2.2: Details of approved Industries/Commercial Areas
Current FY year 2011-12 Enclosure Attached
Current FY year 2010-11 Enclosure Attached
Current FY – 1- 2009-10 Enclosure attached.
Current FY year 2011-12 Enclosure Attached
Current FY year 2010-11 Enclosure Attached
Current FY – 1- 2009-10 Enclosure attached.
8
Format reference to table 2.2
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosur
e
(ULB/Wa
rd)
Frequenc
y of
Disclosur
e
Referenc
e
Remar
ks
3 Planning for
Economic and
Social
development
ULB List and brief of the Social and
Economic Development
Schemes. -eg; 18% scheme,
Ashraya and such other Govt.
programs
Details of budget allocation and
expenditure of these schemes
Details of Beneficiaries
Previous three
financial years
including current
year
ULB Annually Table 3.1
Table 3.1
List and brief of the social and economic Development Schemes for three years
2011-12
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 46.54 40.54 Please refer SL.No. 10.1 Enclosure
7.25% - - Please refer SL.No. 10.1 Enclosure
3% - - Please refer SL.No. 10.1 Enclosure
2010-11
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 22.75% 95.65 17.39 Enclosure
2 Ashraya - - Enclosure
20109-10
9
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 18% 47.19 20.55 Enclosure
10
4. ROADS & BRIDGES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Total Road Length
(type of road, its length
and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads
proposed & executed for
carpeting/ re-carpeting.
Current year ULB Annually Table 4.2
(a) and 4.2
(b)
4 Roads and
Bridges
ULBs & UDA
(iii) Percentage of
footpath to the total road
length of main roads
current status ULB Annually Table 4.3
Table 4.1: Road types
Total existing road length in kms
Water bound macadam (WBM) Bituminous Cement Concrete (CC) Mud road Total
15 4 2 1 22
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current financial year (2011-12)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in km
Water bound macadam (WBM) NA NA
Bituminous NA NA
11
Cement Concrete (CC) 850 Mtrs 4 Km
Mud road NA NA
Total 850 Mts 4 Km
Table 4.2.b: Details of roads approved & tendered for carpeting and re carpeting in current financial year (2011-12)
Road length Approved and tendered for carpeting, WBM, Bituminous and
CC road (newly surfacing of the roads)
Road length Approved and Tendered for re-
carpeting, WBM, Bituminous and CC road
Type of road Ward
Number
Street Name Length of road in Kms Type of
Road
Ward
Number
Street Name Length of road
in Kms
1) Cement Road 5 Station Road 200mts
2)CC Road 18 Dambalmath Road 350mts
3) CC Road 10 Vivekanand Road (Circle) 300mts
4km Road Recarpeting.
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction: 31.50 kms
Total length of the footpath built against main road: Nil kms
12
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Percentage of total
water supply (Surfaced,
Underground and
external source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of
connection &
percentage of Coverage
(Household/ public
stand posts/
Commercial and
Industrial Connection),
quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and
Timing for Water
Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water
Supply (percentage of
samples complied with
the Water Act norms)
current status ULB Level Half yearly Table 5.4 SLB
5 Water Supply-
Domestic,
Industrial and
Commercial
Water Board/
ULB
(v) Cost Recovery in
Water Supply Services
(Revenue Generated per
KL of water/Cost
incurred per KL of
Water Supplied)
Previous three
financial years
including
current year
ULB Level Annually Table 5.5 SLB
1 Service Level benchmarking by DMA, GoK
13
(vi) Water tariff Current status ULB Level Annually Table 5.6
Format 5.1 -Per capita production of water
Water supplied through Surface Source-------2.50 in MLD
Water Supplied through Underground Source-----Nil------in MLD
Water supplied through external source---- Nil ---in MLD
Format 5.2- Water Supply Coverage
Total Number of Households……5350…..in numbers
Number of house holds with direct water supply connections…2456…in numbers
Total number of Public Stand Posts ……15… in numbers
Total number of industrial connections… Nil ……in numbers
Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day (Normal
season)
2 – 3 Days in a Week 1 – 2 hours
14
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end--06--in Numbers/6 months
Number of water samples that meet potable water standards--06---in Numbers/6 months
Format 5.5- Cost recovery in water supply (same as in SLB)
Sl.No Expenditure Rs. in Lakh
2011-12 2010-11 2009-10 1 Total contractual (if outsourced) cost for Bore wells, O & M of piped
network, O & M of vented dam/ Impounding structure/ Jack well/ Intake
well, valves, replacement of distribution network, supplying of spare
materials, salaries of Contract labors, vehicles etc)
0.00 0.00 0.00
2 Total expenditure borne by ULB on Bore wells, O & M of piped network,
O & M of vented dam/ Impounding structure/ Jack well/ Intake well,
valves, replacement of distribution network, supplying of spare materials,
vehicles etc
5.00 40.00 10.36
3 Salaries of employees under water supply (Permanent and Daily wages 18.00 18.00 14.71
4 Purchase of items (for water treatment, for pumping machinery and spare
parts if any 6.00 5.00 2.03
5 Electricity Bill for water supply (Surface source and Ground water) 60.00 60.00 28.00
Revenue
1 Amount collected out of current year demand 14.91 15.00 6.15
2
Amount collected for providing new connection 5.31 1.50 0.85
15
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
Residential � Rs. 65.00 per month.
Commercial� Rs. 90.00 per month.
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Sl.
N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Street Sweeping
(road wise street
sweeping schedule)
Current status as
per action plan
ULB/Ward Half
Yearly
Table
6.(a).1 &
6.(a).2
SWM
Action
Plan
(ii) General statistics on
Solid Waste Management
(Generation quantity,
Details of the Secondary
Collection Points, landfill
location, user fee)
current status ULB Annually Table
6.(a).3.1&
6.(a).3.2
SWM MIB
(iii) Percentage of HH
covered under Door-to-
Door Collection
current status ULB Half
Yearly
Table
6.(a).4
SLB and
MIB
(iv) Percentage of
households participating
in segregation
current status ULB Half
Yearly
Table
6.(a).5
6 Public Health,
Sanitation,
Conservancy and
SWM
ULBs/ Water
Board/ UDA
(v) Extent of Scientific
treated and Disposal of
MSW (%)
current status ULB Annually Table
6.(a).5
SLB and
MIB
16
(vi) Cost recovery under
SWM (Revenue
generated per ton of SW/
Expenditure per ton of
SWM (in Rs.))
Previous three
financial years
including current
year
ULB Annually Table
6.(a).6
SLB
Sewerage & Drainage:
(vii) Percentage of
coverage of UGD
current status ULB Annually Table
6.(b).1
SLB
(viii) Percentage of Waste
Water Treated
current status ULB Annually Table
6.(b).2
SLB
(ix) Percentage of extent
of reuse and recycle of
treated waste water
current status ULB Annually Table
6.(b).3
SLB
(x) Cost recovery under
UGD (Revenue generated
under UGD/ Expenditure
under UGD (in Rs.))
previous three
financial years
including current
year
ULB Annually Table
6.(b).4
SLB
Storm Water Drains
(xi) Statistics of storm
Water Drains ( location,
length and its cleaning
frequency)
current status ULB Annually Table
6.(c).1
(xii) % age roadside
drains to road length (
Paved and unpaved)
current status ULB Annually Table
6.(c).2
SLB
(xiii) Incidences of
Water Logging and
Flooding (No.s of cases
current status ULB Annually Table
6.(c).3
SLB
17
per year/ total number of
identified points)
Public Health (if applicable)
(xiv) No of Municipal
Hospitals and its location
details
Current Status ULB Annually Table
6.(d).1.1
And 1.2
(xv) Facilities available &
OPD Timings
Current Status ULB Annually
(xvi) Number of cases of
vector Born Diseases per
1000 population
ULB Annually Table
6.(d).2
(xvii) Number of cases of
Water Born Diseases per
1000 population
Annually
18
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the
contractor
Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in
Rs. In lakhs
NA NA NA NA NA
Table 6(a).2
Street Sweeping Schedule
Package
number
ward
number
Road ID
if
avaliable
Road name Road length in
Kms
Sun Mon Tue Wed Thu Fri Sat
A* type NA NA NA NA NA NA NA NA
..
…
A type 9.125 � � � � � � �
..
…
B type 11.82 � �
..
…
C type 19.348 �
..
…
D type NA NA NA NA NA NA NA NA
..
Labour
Outsourcing
1 to 23
…
Source: SWM Action Plan
Table 6(a).3.1
19
Details Handled by SHG
(No.s)
Handled by Service Provider, if
applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Non slum Household’s 2500 NA 2000 NA
Slum Household’s NA NA NA NA
commercial establishments NA NA 206 NA
Bulk generators NA NA 4 NA
Expected User fee generation (demand) 6.00 lakhs per/Annual.
Table.6 (a) 3.2
General statistics on Solid Waste Management
Total Quantity of waste
generated in the city per
day(TPD)
Total Quantity of waste
Collected (TPD)
User fee Slab details
enclosed
Resolution date
passed from
Council
Land fill location Number of
secondary
transportation
vehicles under
SWM
10.00 9.00 Rs.10 /month if Land
move 1000 Sqt &
Rs.15 /month up to
1500 Sqmt.
April 2008 Hallikeri Raod 3 Tractor.
Secondary storage
containers Location Map
--
Source: SWM Action Plan
Table 6(a).4
Number of Households participating in segregation 00
20
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites…8.5…..in tones/day
Total waste processed in scientific manner…2.5……in tones/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure In Rs Lakhs Sl.No
Details 2011-12 2010-11 2009-10
1. Salary of the employees under SWM
30.74 26.00 -
2 Total Contractual cost if outsourced under MSWM
for hiring services, vehicles or equipments, O& M of
vehicles, fuel cost, labour cost etc.
18.00 18.00 -
3 Total expenditure borne by ULB on SWM for O &M
of vehicles, purchase of tools and equipments,
insurance cost for vehicles, landfill management
cost like tipping fee etc.
4.00 10.00 -
Revenue
1 Total Revenue generated under SWM
5.5 5.75 --
21
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections…NIl…...in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant… NIl…in MLD
Quantity of waste water treated…… NIl ……….in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water… NIl …..in MLD (when mouse is moved on MLD then
it should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure In Rs Lakhs
1. Electricity bill for sewage treatment plant NIl
2 Total salaries of ULB employees working in STP & UGD system NIl
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items,
repair and replacement of spares, labour cost etc.)
NIl
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.)
NIl
Revenue
1 Total revenue collected from UGD NIl
22
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
NA
Table.6 (c) 2
Length of road side drains
22 KMS
Table.6 (c) 3
Number of water logging and flooding cases per year……in numbers 0
Total number of identified points….in Numbers 0
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Detail of facilities Name of the Municipal
hospitals
Location details
Number of
beds
Number of
staff
OPD2
Timings of
the OPD
Lab Facility
(yes/No)
Others if any
None of the Hospital run by the Town Municipal Council, Annigeri.
23
Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
02 20
Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned
24
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
Trees (if applicable)
(i) Number of tree cut/uprooted
to the number of existing trees
current
status
ULB Half Yearly
(ii) Number of sapling planted
to the number of trees
cut/uprooted to the number of
existing trees
Current year ULB Half Yearly
Table 8.1
Water bodies (if applicable)
8 Urban
forestry,
protection of
environment
and ecology
ULB
(iii) Existing number, New
Proposals for Revival of water
bodies, budget and expenditure
current
status
ULB Annual Table 8.2
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
NA NA NA
Table 8.2
Urban forestry
Total Number of Planted trees Total Number of trees cut/uprooted Total Number of Trees.
NA NA NA
25
Table.8.3
Protection of Environment and Ecology
Sl. No Name existing water bodies
like lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in Rs.
in lakhs
Expenditure
met in Rs. in
Lakhs
1 Ambigeri Keri, Kudi Keri,
Dullavan Keri
No -- --
9. SLUM IMPROVEMENT & UP-GRADATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Details on declared
and undeclared slums
(numbers, location,
number of households,
population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum
improvement schemes
(schemes, slums
benefited, budget and
expenditure)
Previous three
financial years
including current
year
ULB/Ward Half yearly Table 10.2.
19 Slum
Improvement &
Up-gradation
ULB/UDA
(iii) Beneficiary list under
each scheme
current status ULB/Ward Half yearly Table 10.2
26
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply &
sanitation (% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
Table 9.1 Details on declared and undeclared slums (Input Screen & Output screen are same) Details of declared slums 3 Details of un declared slums 2
Format for enclosure as mentioned in table 9.1
Details of declared and undeclared slums
Name of the slum Declared/ Undeclared Extent in Sq. mt Population Number of Households
Harijankeri Declared 1909.48 610 130
Madargeri Declared 3566.67 553 91
Vaddargeri Oni Declared 688.63 250 53
Valmiki Nagar Undeclared 1300 583 75
Haranshikari Undeclared 1200 365 60
27
Table.9.2 Details of slum improvement Schemes (Input & Output Screen are same)
2011-12
Total Number of Name of the slum Improvement Schemes Slums Beneficiaries
Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
-- -- -- -- -- -- 2010-11
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
-- Slums Beneficiaries -- -- -- -- -- -- 2009-10
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries
-- -- -- -- -- --
Table 9.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of
households with
direct water
supply
connections
(numeric)
Total number
of public
taps/mini
water cisterns
(numeric)
Total length
of roads
paved and
unpaved in
Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road
side
drains in
Kms
Total
number of
HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
60 4 1.20 NA 1.40 1 1 150
28
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
10. URBAN POVERTY ALLEVIATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be
Disclosed
Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remar
ks
11 Urban Poverty
Alleviation
ULBs
/DMA/UDA
(i) Details of the
Urban Poverty
Alleviation
Schemes (eg.
Components of
SJSRY )
Current status ULB Annually Table 11.1
Table 10.1 Details of Urban Poverty Alleviation
Name of Schemes
under urban
poverty alleviation
(multiple entries)
Budget for
the schemes
Expenditure
met for the
scheme
Number of beneficiaries
under the scheme
list of the beneficiaries to be
enclosed
22.75% -- -- 94 ( Enclosure)
7.5% -- -- 119 ( Enclosure)
3% -- -- 16 ( Enclosure)
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
29
11. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
Playground/ Parks/Gardens
(i) Percentage of area
under parks and gardens
to the total ULB area
Current status ULB Annually Table 12.1
(ii) Percentage of
developed parks and
gardens (%)
Current status ULB Annually Table 12.1
12 Provision of
urban amenities
and facilities-
parks, gardens
and playgrounds
ULBs/UDAs
(iii) Number, Location,
Area, Amenities, details
of the maintaining agency
Current Status ULB Annually Table 12.2
(a) and 12.2
(b)
Table.11.1. Area reserved under Parks & Gardens
1. Total ULB area…11.11…in Sq.kms
2. Area reserved under Parks & Gardens…5541.91.. in Sq.meters
3. Area of developed parks and gardens …1268.98…in sq. mts
30
Table.11.2 (a) Amenities under parks & Gardens
Amenities available under each park (yes/no) Contact details of the
Maintaining Agency
Locations of
the park
Park Area in
sq. mt
Children
play area
Seating
facility
Track for
walking/joggin
g
Facility for
exercise
Name Contact
number(n
umeric)
Near
Municipalty
3000 sq.mt No No No No NA NA
Table 11.3.(b) Play ground details Locations of the
playgrounds
playground Area in sq. mt Contact details of the Maintaining
Agency
NA NA NA NA
31
12. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Details of Community
halls, Cultural Centers,
marriage halls, municipal
educational institutes
Current Status ULB Annually Table 13.1
(a) and 13.1.
(b)
13 Promotion of
cultural,
educational, and
aesthetic aspects
ULBs
(ii) Details of
advertisement hoardings,
rates, revenue generated
Current Status ULB Annually Table 13.2.1
and 13.2.2
Table 12.1.a Details of cultural Centers
Community halls/Auditorium Details
Name Address Booking office address
and contact details
S.M.Patil Saba Bhavan Gadag Road, Annigeri Maintained by Private
sector
Shadi Mahal Market Road, Annigeri - do -
32
Table 12.1 (b) Details of educational institutes (only if applicable)
Table12.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
NA NA NA NA
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes(in
numbers)
Name Address Numbers
Balawadi Janta Plot Area, Annigeri 1) Teacher & 1) Balawadi Aya.
33
13. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Numbers, type,
Location of burial
grounds and cremation
facilities available, fee
charged if any
Current Status ULB Annually Table 14.1
(a). and
14.1(b)
13 Burials and
burial grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Table.13.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Facilities available in the Crematoriums ( Yes / No)
Maintaining agency
Name of the
Community burial
ground with
locations
Name and
location of
the
Crematorium
s/Burial
ground
Electric Burning Burial Availabil
ity of
wood
Water
facility
Cleaning
facility
Others
if any Name Contact
details
Lingayth Community,
Guddannaya Ajja Matta 1.0 km
NA Yes Yes Yes Yes Yes -- Cost bourn by
individual
Muslim Community – Manakwad
Road 1.50 km
NA Yes Yes Yes Yes Yes -- Cost bourn by individual
All other community – Other
community
NA Yes Yes Yes Yes Yes -- Cost bourn by individual
34
Table 13.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
NA NA
Table 13.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Contact details
to hire the
vehicle
Maintaining agency Number of hearse vehicles
available
Fee details for the vehicle(
in Rs)
Contact Number Name Contact
Number
NA NA NA NA NA
35
14. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) Numbers of stray
animals, vaccinated
Current Status ULB Annually Table 15.1
(a) and 15.1
(b)
15 Cattle ponds,
prevention of
cruelty to
animals
ULBs
(ii) List of ‘Kanji
House’ (care centers
for stray animals).
Current Status ULB Annually Table 15.1
(a)
Table.14.1.1 Details of stray animals (input & output screen are same)
Number of stray animals
Dogs Cows Pig Others if applicable
Number of stray dogs
vaccinated
Location of Kanji House
(care centers for Stray
animals) if applicable
NA NA NA NA NA NA
Table 14.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals Near Railway station
Road,Annigeri.
List of Animal Welfare Association (if available) NA
Name and location of NGOs working for animal welfare( if available) NA
36
15. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) General information
pertaining to city
(population, area,
households etc.)
Current Status
and recent census
details
ULB Annually Table 16.1 City
website
(ii) List of citizen
service centers with
location
Current status ULB Annually Table 16.2
(iii) Total Births and
Deaths recorded along
with Birth and Death
rates.
Current status ULB Half
Yearly
Table 16.3
16 Vital Statistics
including
registration of
births and
deaths
ULBs
(iv) Citizen Charter to
be published
Current status ULB Annually Table 16.4
Table 15.1: City General information as per recent census details (should be added in their respective ULB website
City General information
Present
population
Present area in
sq.km
Total number
of households
Population
density
Total male
population
Total female
population
Total SC/ST
Population
Total Slum
population
Literacy rate
25710 11.11 5031 163 13070 12640 3081 2704 -
Table 15.2: List of Citizen Service centers
Sl. No Address of the Citizen Service centers if applicable
1 PGR(Helpline) – Town Municipal Council, Annigeri. � 08380-222516
37
Table 15.3: Details of Birth & Death
Total births recorded Total deaths recorded
445 213
Table 15.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format
Officer incharge Service Details Period of catering
the service
Procedure to
Apply Designation Contact Number
Birth Certificate 3
Death certificate 3
Junior Health Inspector
Property(Khatha) Change
Application
45
Khatha Certificate 7
R I (In charge)
Building Permission 30
Application
Form
R I (In charge)
08380-222740
Trade License 30 - do - Junior Health Inspector - do -
Enclosure if already citizen
charter being maintained
-
38
16. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC CONVENIENCES
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
(i) number of street lights Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/
Km of Road Length
(No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency
maintaining street lights
(name and contact details)
Current status ULB Annually Table 17.2
(v) List of Authorized
Parking Areas along with
parking capacities and fee
Current status ULB Annually Table 17.3
16 Public amenities
including street
lighting, parking
lots, bus stops
and public
conveniences
ULBs
(vi) Number and locations
of bus stops and public
toilets (Community and
commercial) with its user
charge.
Current status ULB Annually Table 17.4
Table.16.1: Details of streetlights
Types of streetlights with number Total number of streetlights
Tube light High Mast Incandescent Mercury vapor Sodium vapor
1300 970 5 4 NA 326
39
Table.16.2: No. of streetlights / Km of Road Length (No.s)
Total number of streetlights
1300
Table 16.3: Details of Agency Maintaining Streetlight
details of the agency Maintaining the streetlights Package Number Wards Covered
Name Phone Number
1 23 Bhuvaneshwari Electrical ,
Sasvinalli, Tq: Navalgund
9480552948
Table.16.4: Details of Parking Lots
Details of parking lots
NA
Format
Parking Capacity Fee Slab Parking lot location
Two
wheeler
Four
wheeler
Two
wheeler
Four
wheeler
NA NA NA NA NA
40
Table.16.5 Details of toilets
Table16.5: Details of Bus stop
Location of Public toilets User charges for Pay and Use toilets in Rs.
Pay and use toilets Community based
Toilets
Pay and use toilets Community based Toilets
1 8 NA 8
Public toilets Community Toilets
Location Fee slab Location Fee slab
-- -- 1) Hospeti Oni, By pass Road, Annigeri
2) Ambedkar Nagar
3) Valmiki Nagar
4) Jannath Nagar
5) Ganesh Nagar
6) Keri Oni
7) Jadgeri Oni
8) Near Janata Plot
Fee collected and
maintained by
themselves.
Location of Bus stop( As Enclosure)
Annigeri Gadag – Navalgund Road.
41
17. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Table.18.1(a): list of Slaughter houses
Number of Slaughter Houses
Functional
Number of slaughter houses
Non functional
NA
NA
Table 18.1 (b): Details of Slaughter House
Facilities Location of
the
slaughter
House
Whether the
Slaughter
house is been
regulated by
KSCB
(Yes/No)
Capacity Number of
animals
slaughtered
per week
Washing Medical
Examin
ation
Remo
val of
Waste
Others
if any
NA No NA NA NA NA NA NA
Sl.No Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remar
ks
18 Regulation of
slaughter houses
and tanneries
ULBs (i) Number,
Location of
Slaughter House /
Tanneries along
with facilities
available and
capacity
Current status ULB Annually Table
17.1(a)
and (b)