    METHOD STATEMENT (MARINE PILING)

    For marine piling, working platform is either floating barge or fixedjack up platform. Normally floating barge are kept in position usingsuitable anchors and maintaining them according to tidal variation oflocation or used spud barge. Jack up platform stands on its leg restingon sea-bed, so tidal variation does not effect on working.

    Before starting any work and mobilization of piling equipment, roughbathymetric survey to be done to estimate water depth as well as sea-bed profile on that particular area. If accurate local bathymetric data isalready available then this step may be skipped.

  • Mobilization to be done considering factors like depth of water, tidalvariations, nature of sea wave and current etc.

    Approximate position of piling location is worked out using marinesurvey system (Say DGPS system) using atleast 2 known points onshore. After tracing position of piling location piling working platform tobe shifted and set at that location.

    Temporary guide casing then lowered and installed in to sea-bed.Once guide casing is fixed, center of casing is checked and maintainthe accuracy of piling.

    Once this set-up is complete, it becomes ready for piling work. Firstguide casing of suitable diameter is embedded into sea bedsufficiently to ensure no drifting of bottom. Then drilling etc completedas like on shore piling work.