50
TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGES Kurt Smith, PE & Jack Kane, PE - ARCADIS Jim Donnell, PE - City of Toledo September 28, 2017

TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGESKurt Smith, PE & Jack Kane, PE - ARCADIS

Jim Donnell, PE - City of ToledoSeptember 28, 2017

Page 2: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Purpose:h

20 MGD Redundancy- Allow basin maintenance year round

yt

20 MGD Capacity- Address OEPA significant deficiency

Collins Park WTP – 40 MGD Plant Addition

Page 3: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

Collins Park WTP – Process Flow Schematic

Page 4: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

DES

IGN

CO

NSI

DER

ATIO

NS

• Pumped rapid mix

• Flocculation

• Sedimentation

• Effluent troughs

• Algae skimmers

• Recarbonation

• Ozone connection

• GAC Filters

CH

ALL

ENG

ES • Tight site constraints• Other contractors• Utility relocations• Security

• Maintenance of plant operations (MOPO)• Interconnections to

existing East Plant

• Preservation of Lagoon E

CO

ST S

AVIN

GS

MEA

SUR

ES • Sedimentation basin size reduction

• 3D CAD benefits• Design• Construction• Post Construction

• Prequalification of contractors

• Low bids

Collins Park WTP – 40 MGD Plant Addition

Page 5: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

VERTICAL RAPID MIXER ALTERNATIVE

RAPID MIX PUMP

Page 6: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

WATER CHAMP RAPID MIX ALTERNATIVE

Page 7: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

PUMPED RAPID MIXING SYSTEM

10” DISCHARGE

12” SUCTION

RAPID MIX PUMP

• Rapid mix pump rated for 2,000 gpm at 37’ head with 30 Hp motor

East Plant

Page 8: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

PUMPED RAPID MIXING SYSTEM• East & West Plant rapid mix channels rated for 80 MGD each

OVER BAFFLE

UNDER BAFFLE

8’ X 15.5’ CHANNEL (TYPICAL)

ALUM FEED

Page 9: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

PUMPED RAPID MIXING SYSTEM• Mixing energy exceeds 10-States Standards G-value of 750 fps/ft

ALUM FEED10” DISCHARGE PIPE

INJECTION DIFFUSER NOZZLE

Page 10: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

PUMPED RAPID MIXING SYSTEM

RAPID MIX PUMP

West Plant

Page 11: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

FLOCCULATION BASINS

10” DISCHARGE PIPE

BASIN 7 FLOC DRIVES

LIME SLURRY SPLITTER BOX

SODA ASH SPLITTER BOX

BASIN 8FLOC BASIN

Page 12: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

FLOCCULATION BASINS

ALUM FEED10” DISCHARGE PIPE

INJECTION DIFFUSER NOZZLE

Basins 1 – 6 Upgrades• Equipment

interchangeable with Basins 7 & 8

Page 13: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SEDIMENTATION BASINS

10” DISCHARGE PIPE

Basins 1 – 6 Upgrades• Equipment interchangeable

with Basins 7 & 8

SLUDGE CROSS COLLECTOR

SLUDGE DRAGS

Page 14: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

EFFLUENT LAUNDER BUILDING

10” DISCHARGE PIPE

INJECTION DIFFUSER NOZZLE

EFFLUENT SUBMERGED

ORIFICE WEIRS (TYPICAL)

Page 15: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

EFFLUENT LAUNDER BUILDING

10” DISCHARGE PIPE

INJECTION DIFFUSER NOZZLE

FLOATABLES ALGAE SKIMMERS

(TYPICAL)

Page 16: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

RECARBONATION BASINS

10” DISCHARGE PIPE

INJECTION DIFFUSER NOZZLE

CO2 DIFFUSERS(TYPICAL)

Page 17: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

OZONE FACILITY CONNECTION

10” DISCHARGE PIPE

KNOCKOUT WALL FOR OZONE INFLUENT CONDUIT

SETTLED WATER CONDUIT GATES FOR

OZONE EFFLUENT CONDUIT

Page 18: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

GAC Filters

INJECTION DIFFUSER NOZZLE

Filter Media Pilot• 12” Sand

Effective size• 0.45 – 0.55 mm

• 24” GAC Effective size

• 1.0 – 1.2 mm

Underdrains• Leopold XA

– IMS 200 caps

Page 19: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs

– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000– TOTAL $ 70,600,000

• Schedule Basin 7 & Basin 8

• Operational by April 2020

Page 20: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs

– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000

• Other Concurrent Projects– CPEU $ 17,000,000

• Schedules Basin 7 & Basin 8

• Operational by April 2020 CPEU

• Operational by Sept. 2018

Page 21: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs

– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000

• Other Concurrent Projects– CPEU $ 17,000,000– Ozone $ 40,000,000– TOTAL $127,600,000

• Schedules CPEU

• Operational by Sept. 2018 Basin 7 & Basin 8

• Operational by April 2020 Ozone Facility

• Operational by July 2020

Page 22: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS• Additional Concurrent Projects

CPEU• Operational by Sept. 2018

Basin 7 & Basin 8• Operational by April 2020

Ozone Facility• Operational by July 2020

– Lagoon E Spent Lime Removal• Completion by April 2018

– Maintenance Facility• Completion by December 2018

– Basins 1 – 6 Upgrades• Start Construction Jan. 2020

Page 23: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – SECURITY & SOLUTIONS

Page 24: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – SECURITY & SOLUTIONS

Page 25: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

MAINTENANCE OF PLANT OPERATIONS (MOPO)

Page 26: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

PRESERVATION OF LAGOON E

Page 27: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

PRESERVATION OF LAGOON E & UTILITY RELOCATIONS

LIMITS OF EXISTING LAGOON E 2:1 SLOPE STRUCTURAL EMBANKMENT

BASIN 8 50 FEET

Page 28: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

PRESERVATION OF LAGOON E

EXISTING LAGOON CAPACITY

REDUCED FROM 41.8 MG TO 33 MG

OR 21% REDUCTION

Page 29: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

SEDIMENTATION BASIN SIZE REDUCTION

SPACE SAVINGS

FOR OZONE FACILITY

• Negotiations with OEPA– Based on historic plant

performance– Based on old design text

books 4 hours without sludge equipment

– Based on conservatism of 10-States Standards

• Cost Savings Benefits– Detention time reduced from

4 hours to 3 hours• ~ $5.8 M savings

– Provides space savings for new Ozone Facility

Page 30: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

3D CAD BENEFITSDESIGN PHASE- Excellent 3D visualization- Interactive tool with Owner

- Design progress meetings- Freedom Navisworks software (for the novice)

- Clash detection to:- Improve quality of bidding documents- Minimize change orders

- Bidding Phase- Provide to Contractors

Page 31: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

3D CAD BENEFITS CONSTRUCTION PHASE (CONTRACTOR)

- Quicker orientation of project estimators, managers & trades

- More efficient coordination of trade disciplines to resolves conflicts

- Decreases errors and corrections in field

- Higher reliability of expected field conditions and plan drawings

- Allows for more prefabrication offsite with higher quality and lower cost

- Reduce RFI’s and expedite construction schedule

- Creates a safer workplace

- Construction sequencing

Page 32: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

3D CAD BENEFITS POST CONSTRUCTION

- Develop 3D views for O&M Manuals

- CMMS (computerized maintenance management system)

- Add asset information to model for O&M/asset management

- Freedom Navisworks software (for the novice)- Interactive tool for operator and safety training

Page 33: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

PREQUALIFICATION OF CONTRACTORSPrequalification Process- Received 6 proposals- Short listed to 4 Contractors to bid

Evaluation Process- Bonding- Verifiable statement confirming financial wherewithal- Planned approach to the project- References- Construction Experience

- Water/wastewater projects- Large excavation

- Workforce & Workload- Corporate Health, Safety & Environmental Program

Control Quality and Risk Reduction

Page 34: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

LOW BIDSCONSTRUCTION BID RESULTS

BASIN 7 AND BASIN 8 PROJECTS

Description Basin 7 Basin 8

Engineer’s Estimate $37,740,000 $32,820,000

Average of Bids $36,337,865 $33,319,259

Low Bid $28,387,750 $26,694,200

Cost Below Average of Bids $7,950,115 $6,625,059

% Below Average of Bids 21.9% 19.9%

Page 35: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Thank you!

Page 36: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

3D CAD BENEFITS

Page 37: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

DES

IGN

CO

NSI

DER

ATIO

NS

• Pumped rapid mix

• Flocculation

• Sedimentation

• Effluent troughs

• Algae skimmers

• Recarbonation

• Ozone connection

• GAC Filters

CH

ALL

ENG

ES • Tight site constraints• Other contractors• Utility relocations• Security

• Maintenance of plant operations• Interconnections to

existing East Plant

• Preservation of Lagoon E

CO

ST S

AVIN

GS

MEA

SUR

ES • Sedimentation basin size reduction

• 3D CAD benefits• Design• Construction• Post-construction

• Pre-qualification of contractors

• Low bids

Collins Park WTP – 40 MGD Plant Addition

Page 38: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

DES

IGN

CO

NSI

DER

ATIO

NS

• Pumped rapid mix

• Flocculation

• Sedimentation

• Effluent troughs

• Algae skimmers

• Recarbonation

• Ozone connection

• GAC Filters

CH

ALL

ENG

ES • Tight site constraints• Other contractors• Utility relocations• Security

• Maintenance of plant operations• Interconnections to

existing East Plant

• Preservation of Lagoon E

CO

ST S

AVIN

GS

MEA

SUR

ES • Sedimentation basin size reduction

• 3D CAD benefits• Design• Construction• Post-construction

• Pre-qualification of contractors

• Low bids

Collins Park WTP – 40 MGD Plant Addition

Page 39: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

TitleText DESIGN PHASE

Page 40: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

TitleText

Page 41: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Title

Text

Page 42: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

TitleText

COST SAVINGSSDFD

SDFDSFSDFSDFDSFSDF

Page 43: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS

• Probable Project Costs– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000

• Other Concurrent Projects– CPEU $ 17,000,000– Ozone $ 40,000,000– TOTAL $127,600,000

• Schedules CPEU

• Operational by Sept. 2018 Basin 7 & Basin 8

• Operational by April 2020

Page 44: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

SITE CONSTRAINTS – OTHER CONTRACTORS

• Schedule Ozone Facility

• Operational by July 2020

• Probable Project Costs– Ozone Facility $37,200,000

Page 45: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

TitleText

Page 46: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

TitleText

Page 47: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

Page 48: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Kurt SmithProject Manager

• Probable Project Costs– Basin 7 $48,700,000– Basin 8 $43,400,000– TOTAL $92,100,000

Page 49: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Paragraph level• First level bullet

– Second level bullet• Third level bullet

Template Layout Tips

Logo protection zone

Text and images should not extend past blue lines. (Full size images would be an exception)

The grid is laid out in six columns and is designed to provide a flexible layout while still allowing for breathing room and white space.

To turn the guides on and off: right click > grids and guides > guides or Alt + F9.

To get bullets use ‘Increase list level’ or Shift + Alt + →

Page 50: TOLEDO COLLINS PARK WTP 40 MGD PLANT …...presentation (not behind any of the other layouts, especially not behind the title or divider layouts) • The small ‘Paste’ clipboard

© Arcadis 2017

Guidance• Always ensure that if you are presented with an ‘Enable Content’ and / or

‘Enable Editing’ option/s on opening a document, that you DO enable the content and / or editing by clicking on the buttons presented

• There are sixteen layouts in each master (one with logo, and another without) to choose from to suit your needs and help keep your presentation consistent

• Incorporating slides from another presentation:

• Click on ‘New Slide’ on the ‘Slides’ ribbon group, under the ‘Home’ ribbon tab and scroll down and choose the layout you want to use

• Copy your slides (Ctrl + C) and insert a new blank slide layout in your new presentation and paste your slides (Ctrl + V) into your new presentation (not behind any of the other layouts, especially not behind the title or divider layouts)

• The small ‘Paste’ clipboard icon will appear at the bottom of the slides you have copied in, click on the arrow on the icon and choose ‘use destination theme’, this will ensure that your slides will use the correct colour pallet throughout the document

• You may need to correct some colour combinations, any other anomalies, and choose the layout design you require for each slide –i.e., Title and Content, Title only, Blank etc and a certain amount of tidying will normally be required

• You can also use the ‘Keep Source Formatting’ option – but ensure that you change the colour palette for the slides you have copied in to our Arcadis Brand palette.

• If you are still having problems try opening a blank new PowerPoint document (Ctrl +N) and paste your slides into this before pasting it into the new template

• Alternatively, you may need to copy each of the elements of the design into the new template individually using the ‘Paste Special / Unformatted Text’ option and reapply formatting in the new template – this may be long winded, but can often be safer and ensures more consistent application of the branding

• Kickers / takeaways should be short, sharp and to the point, the text size is set and should not be made smaller – if you do not need to use a kicker, please just delete the text box