1 Introduction Yara International (Yara) is a chemical company that specialises in the manufacture of agricultural products and environmental agents including fertiliser products (such as potash). To support this, Yara has started a subsidiary company called Yara Dallol BV, which is involved in the exploration and development of a potash mine in the Danakil Depression of Ethiopia. Yara Dallol BV are working together with Novopro Projects Inc. (Novopro), a Canadian Engineering Company, to develop a potash mine in their aforementioned concessions. Yara is proposing to extract potash through a process called solution mining (refer to page 3 for further details on this process). POTASH PROJECT Background Information Document Purpose of this document This document serves to provide you with a brief introduction to the proposed Yara Dallol Potash Project (proposed Project) and the manner in which stakeholders can become involved in the Environmental and Social Impact Assessment (ESIA process) currently being undertaken. Additional documents will be available at various stages during the ESIA process to provide stakeholders with information, and further opportunities to raise issues of concern and suggestions for enhanced benefits. 1 8 Registration and Comment Sheet To register and provide comments please contact: Samuel Hailu TS Environmental Technology Telephone: +251911373167 Email: [email protected] Nomsa Fulbrook-Bhembe Environmental Resources Management Telephone: +44 7824 825 250 Email: [email protected] Yara Dallol BV, 3rd floor, Oasis building (near Edna Mall,) Addis Ababa, Ethiopia Tel +251 11 6631089 Fax +251 11 6630967 Please also find further information regarding the ESIA on the ESIA project website: http://www.erm.com/Yara-Dallol-BV-Potash-Project-EIA. Please formally register me as stakeholder and provide further information and notifications during ESIA process Yes No I would like to receive my notifications by: Email Post Fax Comments: Please fill-in your contact details below for the project database: Title and Name Organisation Telephone Fax Cell phone Email Postal Address Thank you for your participation YARA DALLOL POTASH PROJECT

To register and provide comments please contact · 1 Introduction Yara International (Yara) is a chemical company that specialises in the manufacture of agricultural products and

Embed Size (px)

Citation preview

1

IntroductionYara International (Yara) is a chemical company that specialises in the manufacture of agricultural products and environmental agents including fertiliser products (such as potash). To support this, Yara has started a subsidiary company called Yara Dallol BV, which is involved in the exploration and development of a potash mine in the Danakil Depression of Ethiopia. Yara Dallol BV are working together with Novopro Projects Inc. (Novopro), a Canadian Engineering Company, to develop a potash mine in their aforementioned concessions.

Yara is proposing to extract potash through a process called solution mining (refer to page 3 for further details on this process).

POTASH PROJECT Background Information Document

Purpose of this documentThis document serves to provide you with a brief introduction to the proposed Yara Dallol Potash Project (proposed Project) and the manner in which stakeholders can become involved in the Environmental and Social Impact Assessment (ESIA process) currently being undertaken. Additional documents will be available at various stages during the ESIA process to provide stakeholders with information, and further opportunities to raise issues of concern and suggestions for enhanced benefits.

18

Registration and Comment SheetTo register and provide comments please contact:

Samuel Hailu TS Environmental Technology Telephone: +251911373167 Email: [email protected]

Nomsa Fulbrook-Bhembe Environmental Resources ManagementTelephone: +44 7824 825 250 Email: [email protected]

Yara Dallol BV, 3rd floor, Oasis building (near Edna Mall,) Addis Ababa, EthiopiaTel +251 11 6631089 Fax +251 11 6630967

Please also find further information regarding the ESIA on the ESIA project website: http://www.erm.com/Yara-Dallol-BV-Potash-Project-EIA.

Please formally register me as stakeholder and provide further information and notifications during ESIA process Yes No

I would like to receive my notifications by: Email Post Fax

Comments:

Please fill-in your contact details below for the project database:

Title and Name

Organisation

Telephone Fax

Cell phone Email

Postal Address

Thank you for your participation

YARA DALLOL POTASH PROJECT

The proposed Project is called the Yara Dallol Potash Project, and is located in the Danakil Depression in the Afar region (Zone 2, Dallol Woreda). The total area of the proposed Project covers a 62km2 area.

The proposed Project has existed for over three years, and has operated under different names including Sainik, Ethiopotash BV and Musley Potash Project. The proposed Project has had different names because ownership of the mining concession has changed.

0 5 10 15 20 25

Kilometres

")")n¡

Bn¡

!

!

!

!!!

!

!

!

!

!

!

!

!!

!

!

!

!

Lake Assale

Lake Afrera

Mount Dallol

Ashe Ale

Artisanal Salt Mining Area

Berahale

Tahasuli

Fiea

Bada

Badle

Musley

AmbuleTasule

Mororo

Asgubi

Asabuya

Armdeli

Asabolo

Kahniyeb

Alai lai

Gahratula

Hamad Ela

40°45'0"E

40°45'0"E

40°40'0"E

40°40'0"E

40°35'0"E

40°35'0"E

40°30'0"E

40°30'0"E

40°25'0"E

40°25'0"E

40°20'0"E

40°20'0"E

40°15'0"E

40°15'0"E

40°10'0"E

40°10'0"E

40°5'0"E

40°5'0"E

40°0'0"E

40°0'0"E

39°55'0"E

39°55'0"E

39°50'0"E

39°50'0"E

39°45'0"E

39°45'0"E

39°40'0"E

39°40'0"E

39°35'0"E

39°35'0"E

39°30'0"E

39°30'0"E

39°25'0"E

39°25'0"E

14°4

0'0"

N

14°4

0'0"

N

14°3

5'0"

N

14°3

5'0"

N

14°3

0'0"

N

14°3

0'0"

N

14°2

5'0"

N

14°2

5'0"

N

14°2

0'0"

N

14°2

0'0"

N

14°1

5'0"

N

14°1

5'0"

N

14°1

0'0"

N

14°1

0'0"

N

14°5

'0"N

14°5

'0"N

14°0

'0"N

14°0

'0"N

13°5

5'0"

N

13°5

5'0"

N

13°5

0'0"

N

13°5

0'0"

N

13°4

5'0"

N

13°4

5'0"

N

13°4

0'0"

N

13°4

0'0"

N

13°3

5'0"

N

13°3

5'0"

N

13°3

0'0"

N

13°3

0'0"

N

SIZE:

TITLE:

DATE: Feb 2014

DRAWN: ML

CHECKED: NF

APPROVED: ME

PROJECT: 0226051

DRAWING: REV:

A3

Area of Influence Map

Area of Influence Map.mxd 0

CLIENT:

±SCALE:

H:\T

eam

\GIS

\Pro

ject

\022

6051

G&B

\Map

ping

\mxd

\Are

a of

Influ

ence

Map

.mxd

Projection: Geographic, Datum: WGS84Source: UN, Esri Data, LANDSAT 30mInset Map, Esri Data & Maps

SCALE: 1 : 250 000

It is unlawful for any firm or individual to reproduce copyrighted maps, graphics or drawings, in whole or in part, without permission of the copyright owner, ERM Southern Africa (Pty) Ltd ·

Legend

! Villages

") Parsons Mine Relics

B Artisanal Salt Mining Area

n¡ Mount Dallol

n¡ Ashe Ale

Non Perennial Rivers

Gravel Roads

New Government Road

Yara Dallol BV License Region

Yara Dallol BV Study Area

ERMERM Southern AfricaUnit 6, St Helier Office Parkc/o St Helier Road and Forbes DriveGillits, 3640,Durban, South Africa

2

The Solution Mining Process

Associated Infrastructure for the Proposed Project

Machinery & equipment Processing plant Fuel station Access & haul roads

Evaporation ponds Electric power line Construction & operation camp Vehicles

In addition t o associated infrastructure, Yara Dallol B V will also ha ve other r esources needs including land t o build the abovementioned infrastructure and water for the solution mining process, as well as for the overall operation of the proposed Project.

Workers will also be required for the proposed Project. Currently it is expected that approximately 370 and 580 people will be employed during the c onstruction and oper ational phases, which includes a mix ture of sk illed labour and unsk illed labour. Where possible Yara Dallol BV will look to recruit people from the local area, and elsewhere in the Afar region.

3

BACKGROUND INFORMATION DOCUMENT

Drilling to inject water about 200m under-ground and dissolve potash deposit

Caverns created underground containing salty potash solution. The solution is pumped to the surface

Solution flows through pipelines to evaporation ponds

Solar Evaporation

Tractor harvests crude potash and transfers to processing plant

Potash product is transferred to the Port of Tadjourah in Djibouti

6

1 2 3

Solution dries in evaporation ponds and

leaves potash crystals

4Processing to separate the

potash from waste and produce a high purity

potash product

5

YARA DALLOL POTASH PROJECT

5

The ESIA process is being undertaken in terms of the Environmental Policy of Ethiopia 1997 and Environmental Impact Assessment Proclamation, 299/2002. The ESIA is divided into five key phases, namely: Screening, Scoping, Baseline data collection, Impact Assessment and Disclosure, see below.

Stakeholder EngagementAn important part of the ESIA process is to speak and listen to the people who may be affected by or interested in the proposed Project. This is called Stakeholder Engagement and it will be undertaken throughout the ESIA process. Stakeholder views will be considered to improve the proposed Project where possible.

ERM and TS Environmental Technology are independent consultants who will run the engagement process. Our team will try to make sure engagement is open to all people, especially people who will be affected by the proposed Project. This will be done in a way that is culturally appropriate.

How can you be involved?

If you have any comments or concerns, and would like to register as a stakeholder you can get involved by:

• Attending workshops and public meetings held during the ESIA process;

• Visiting the ESIA project website: http://www.erm.com/Yara-Dallol-BV-Potash-Project-EIA.

• Contacting ERM and TS Environmental Technology for further information (see contact details on page 6); and

• Registering as an interested or affected stakeholder in the proposed Project. Registration will allow you to receive further communication about the ESIA process and the proposed Project.

BACKGROUND INFORMATION DOCUMENT

Screening Scoping

Baseline Disclosure Data Collection

Impact Assessment

Stakeholder engagement takes place throughout the ESIA process

Screening is the first step. It defines what issues will be considered in the ESIA process

Baseline Data Collection is to collect information to

understand the environment and people in the area before the proposed Project begins.

Scoping identifies the likely changes (impacts) that will happen because

of the proposed Project.

We are now in the Scoping phase

The Impact Assessment describes and assesses how the proposed Project could affect the local environment and people, both negatively and positively, how significant the changes (impacts) are likely to be, and how the impacts could be managed.

During Disclosure the ESIA report is submitted to the Government for review and decision making.

4

The Environmental and Social Impact Assessment ProcessThe ESIA will identify the most important changes (impacts) that the proposed Project may bring about. The proposed Project may bring about changes to the natural environment and the people. Some of the types of impacts that may occur are shown below. These impacts will be studied and understood in more detail through the Baseline Studies and Impact Assessment phases in the ESIA. During the Impact Assessment phase mitigation measures will be developed to avoid and / or reduce the types of impacts. In addition recommendations will also be developed to support any positive impacts.

Risk of air emissions Risk of noise emissions Use of water resources

Risk of disruption to local livelihoods

Risk of disturbance and damage to ecology

Risk of increase in population Risk of traffic cidents Risk of poor labour

standards

Risk of changes to the views of the area

Risk of disturbance to cultural heritage & archaeology

Risk of disruption to local transportation routes

Increased income generating opportunities (employment &

procurement of goods & services)

Management of ImpactsVarious Baseline Studies will be undertaken as part of the ESIA Process. The Baseline and associated Impact Assessment studies will suggest ways to reduce the negative impacts and support the positive impacts.

This will be done through the development of mitigation measures to avoid or reduce negative impacts. Recommendations will also be developed to support the positive impacts of the proposed Project.

YARA DALLOL POTASH PROJECT

BACKGROUND INFORMATION DOCUMENT

An ESIA aims to answer fi e key questions:

Baseline

What is the current environmental and social situation?

Prediction

What will the proposed project’s impacts be? How will conditions in the

environment and society change as a consequence of the proposed project?

Evaluation

Are the impacts significant? If so, how significant?

Mitigation

If an impact is significant, what can be done to avoid, reduce, remedy

or compensate for the adverse effects, or enhance the benefits?

Residual impact

What will the residual impacts be after the mitigation?

How significant will these be?

1

2

3

4

5

7

The Project Stages• The proposed Project has been in the Development stage for approximately three years. The Development stage of the

proposed Project has involved completion of seismic surveys, core drilling, and preliminary environmental and social studies.

• Currently the proposed Project is in the Feasibility stage. The Feasibility stage involves test mining, the completion of an Environmental and Social Impact Assessment (ESIA), as well as other studies to determine whether the proposed Project is viable.

• If the Feasibility studies show that the proposed Project is viable, the proposed Project will enter into the Detailed Engineering stage. In the Detailed Engineering stage the design for the proposed Project will be finalised before progressing into the Construction Phase.

• It is anticipated that the proposed Project will start Operation, with first potash production by end 2017. The Life of the Mine is anticipated at 18 years.

Feasibility studies Engineering & construction

2010 2013 2015 2017 2018

Development stage 2014 2016 Operations drilling, exploration drilling,

hydrogeological studies etc.

Why Do An ESIA?Before proceeding Yara Dallol BV must assess how the proposed Project is likely to affect the local natural environment and surrounding communities through an ESIA process.

What Is An ESIA?An Environmental and Social Impact Assessment (ESIA) is being carried out to understand how the proposed Project might change existing environmental and social conditions, either positively or negatively.

The ESIA process will also iden+fy ways of minimizing any negative impacts and maximizing benefits (positive impacts) related to the proposed Project.

The ESIA report will, also further advise if and how the proposed Project can be developed in a sustainable manner, as well as assist the Ethiopian officials with the permiKng process.

Who Will Carry Out The ESIA?In compliance with the Environmental Policy of Ethiopia 1997 and Environmental Impact Assessment Proclamation, 299/2002, Yara Dallol BV is required to submit an ESIA report to the Ethiopian government for consideration. Environmental Resources Management (ERM) is an independent consulting firm that is conducting the ESIA for the proposed Project together with Ethiopian consultants TS Environmental Technology and ESSD, the social and environmental consultants, respectively.