13
To provide essential services that protect public health, preserve the environment and support sustainable growth of the community

To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

To provide essential services that protect public health, preserve the environment and support sustainable growth of the community

Page 2: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Jeff Hall, Mayor

Division of Water & Wastewater

Providing essential services that protect public health, preserve the environment and support sustainable growth of

the community has been the mission of the City of Newark, Division of Water and Wastewater. Doing this while

providing quality and reliable service at reasonable rates has been a long-standing goal. We feel the work that was

completed in 2015 certainly reflects that goal and also shows what a vital role water and wastewater infrastructure

plays in the future of our community. One of the best illustrations of our mission is the Downtown Renovation

Project. While the major portion of the work is related to piping systems it will also help the overall City with

economic growth which will help sustain the downtown, improve infrastructure and help us reduce combined

sewer overflows.

Work on Phase 2 of the Long-Term Control Plan work began in 2015 with the updated modeling of the sewer

system and some initial evaluations of the system. This project will provide critical direction for the Division and

will determine the next major projects to be completed. Initial work also began on selection of engineering

services for upgrading and anaerobic digester system at the Wastewater Treatment Plant. With a focused,

deliberate approach to these projects, we should be able to keep rates low while attaining compliance with EPA

requirements.

We are continuing to upgrade the water system with the replacement of waterlines on Wilrich Road, Yorkshire

Road, 30th

Street and Lawnview Avenue. At the treatment plant, improving our dredging systems has assured a

good volume of water to the plant for treatment. Plans for 2016 include beginning the design of a riverbank

filtration system which will ultimately improve our cost of operation and provide a reliable and even safer water

source with better water quality. We must continue to work toward upgrading our infrastructure in order to

maintain a reliable system in the future.

As we continue to struggle with the challenges of our aging infrastructure, we are presented with opportunities to

assist the City in moving forward. All this comes at a great cost. However, with a solid financial plan and

improving infrastructure we can continue to allow the City to be sustainable and grow into the future. All of this

can be attained while still providing reliable service at an affordable rate.

Roger Loomis

Public Utilities Superintendent

34 S. 5th

Street P.O. Box 4100 Newark, Ohio 43058-4100

Roger A. Loomis Utilities Superintendent 740-670-7945 Fax 740-349-6794

Joe Hickman Project Manager

740-670-7947

[email protected]

Page 3: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

2

Wastewater Department Water Department

Active Customers 16,981 Active Customers 18,483 Million Gallons Treated 2,764 Total Volume Billed (MG) 1,935 Miles of Sewer Line 182 Total Water Produced (MG) 2,798 Miles of Combined Line 57 Miles of Water Line 195 Lift Stations 16 Booster Stations 3 Storage Facilities 2

Expenses: (excluding capital items and projects)

Revenues:

Sewer Water

Rental (sewer service) $3,023,588 Sales $5,319,782

Administration $1,183,333 Bulk Water $ 14,520

Debt Retirement $2,532,866 Delinquent $ 200,055

Surcharge $ 538,060 Meters $ 20,540

Capacity Fees $ 23,418 Permits $ 8,860

Trucked Wastes $ 255,435 Capacity Fees $ 39,955

Transfers $ 408,952 Deposits $ 190,498

Miscellaneous* $ 417,846 On Account $ 336,908

Miscellaneous* $1,131,453

Totals $8,383,498 Totals $7,262,571 Includes $782,910 in transfers from sewer fund and $206,486 from stormwater for water administration costs.

Debt Service Cover Ratio Wastewater - 3.46 (29%) Water – 3.84 (26%)

Water Rate Comparison for 6000 Gallons of Usage (8 Units): Newark Granville Heath Johnstown Lancaster

Water $21.60 $29.28 $45.28 $48.28 $49.64

Wastewater $23.99 $37.02 $43.49 $47.00 $65.72

Total $45.59 $66.30 $88.77 $95.28 $115.36

Water – Operating Expenses

Administration $1,799,657

Treatment $2,442,112

Distribution $1,211,825

Meter Shop $ 237,330

Debt Retirement $1,923,744

Total $7,614,668

Wastewater – Operating Expenses

Administration $1,811,011

Treatment $2,216,098

Sewer Maintenance $ 590,366

Environmental Lab $ 298,508

Debt Retirement $2,447,798

Total $7,363,781

Financial Pages

Page 4: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

3

Current Wastewater/Water Debt Schedule

Wastewater Debt Schedule – January 2016

Debt Amount Rate Source Annual Amt.

Jones/Linwood (due 2022) $28,066 0 OPWC $4,318 Idlewilde–Phase 1 (due 2023) $24,443 0 OPWC $3,260 Idlewilde–Phase 2 (due 2025) $302,053 0 OPWC $33,562 LR Interceptor (due 2026) $1,900,791 3.25/0 OWDA – DEFA/OPWC

1,588,030/312,761 $208,158

WWTP Electrical (due 2027) $1,679,820 0.61 OWDA – DEFA $151,478 HRTS (due 2031 ) $12,141,440 4.14 OWDA $1,094,693 CSO 7 Project* (due 2028) $320,027 3.36 OWDA – DEFA $31,566

CSO 1006-1013 (due 2031) $1,729,370 3.25 OWDA – DEFA $139,469

Project Bond 2012# $467,500 4.5 Bond $32,873

CSO 1030 Project^(due 2034) $1,415,267 2.45 OWDA – DEFA $102,290

Raccoon Creek (due 2024) 6,556,012 2.64 OWDA – DEFA $499,981 Aeration Energy (due 2025) 1,960,913 2.48 OWDA – DEFA $141,892 Channel/Postal (due 2034) $364,040 0.0 OPWC $20,803

Downtown Renovation# $5,451,619 2.01/1.0

OWDA-DEFA/ODOD 4,503,725/947,894*

N/A

Total – 2016 $33,393,467 Total Payments $2,464,343

# In Progress – ODOD portion is stormwater debt (amount list is total project debt)

*Wastewater pays 27% of this total loan – amount is wastewater portion

^ Split 65 Wastewater/35 Stormwater – Amount is wastewater portion

Total Loans – OWDA $33,393,467

Payments $2,341,094

Total Loans – OPWC $ 1,031,363 0% interest loans

Payments $ 90,376

* The total for this loan is approximately at $1,950,000 – This included about $800,000 for stormwater planning costs that were

rolled into this loan. The balance will be split 65/35.

Water Debt Schedule

Debt Amount Source Annual Amt.

WTP Debt (due 2018) $4,480,000 4.5 Bonds $1,495,000 Generator (due 2022) $844,917 3.53 WSRLF – DEFA $78,181 AMR System (due 2023) $1,887,239 3.77 OWDA $151,372 HB 300 Debt (due 2017) $53,704 3.95 Bond (Siemens) $55,677 Water Bond 2012 1,795,000 4.5 Bond $156,660 Downtown Renovation $4,000,000 4.0 Bond $50,000 Total Debt/Payments $13,060,860 $1,914,903

Page 5: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

4

The Division of Water and Wastewater is made up of six departments at four different

base locations throughout the City. Other Facilities include 16 Sanitary Lift Stations,

3 Water Booster Stations, 2 Water Storage Facilities and 2 Auxiliary Water Wells.

Water Administration Office &

Meter Shop:

Downtown Newark, 34 South 5th Street

Water Treatment Plant: North Newark on the North Fork of the

Licking River, 164 Waterworks Road.

Wastewater Treatment Plant: East Newark on the Licking River at East

Main Street and Ecology Row.

Water Distribution & Sewer

Maintenance Complex: East Newark, 1275 East Main Street.

Major Facilities

Page 6: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

5

pH 8.83 S.U.

Phen. Alk. 4.0 mg/L Total Alkalinity 47.3 mg/L

Stability 0.44 mg/L Hardness 123 mg/L

Phosphorus 0.89 mg/L

Free Chlorine 1.15 mg/L Combined Chlorine 0.04 mg/L

Fluoride 0.93 mg/L Nitrate 1.81 mg/L

Turbidity 0.07 NTU

TOC (raw) 2.79 mg/L

TOC (finished) 1.71 mg/L

Ohio EPA Chemical Monitoring Averages for 2015

Major Projects Completed in 2015

Filters 2 – 4 Effluent Valves were replaced

River Dredge was repaired & Operational

Completed final (9th) year of #1 lime lagoon

cleaning Totaling 193,329 cu.yds. Installed filter effluent Cl2 analyzers.

Replaced 2nd sodium hypochlorite tank lids

Middle flocculation basin chain and sprocket

replacement.

Repaired Recarbonation and Settling basin

concrete walls Repaired #2 finished water pump (5 MGD)

Paint Lab cabinets New Bulk Water Station installed & Operational

Major Project Goals for 2016 Filters 1 Effluent valve replacement.

Source water monitoring programming for Factory

Link.

Start hauling lime sludge from #3 lime lagoon

Increase the performance reliability and security of

WTP Network and computing system for plant SCADA and Data collecting and storing

Replace Rapid Mixer/motor

Lime Silo Painting

Loading the Dredge into the North Fork

Licking River

Water Treatment Plant

Production Data for 2015

Daily Average Production 7.47 MGD

Yearly Total Production 2,733.7 MG

Visit our website for more information on your water

http://www.newarkohio.net/city-services/water-

wastewater-main

Page 7: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

2015 Plant Operation Data Annual Average

Ave.

Flow

MGD

Raw

Suspended

Solids

mg/l

Final

Suspended

Solids

mg/l

% Removal

Suspended

Solids

Raw

CBOD

mg/l

Final

CBOD

mg/l

% Removal

CBOD

Raw

Ammonia

mg/l

Final

Ammonia

mg/l

% Removal

Ammonia

7.8 135 5.9 95.6% 118 4.0 96.6% 9.5 1.8 81.0%

Major Projects Completed in 2015

Painted beams and HVAC ductwork in ceiling of

Dewatering Building

Painted final clarifier #2

Replaced one influent gate for #3 final clarifier

tank

Completed Anaerobic Digester Upgrade Study and

sent out RFSOQ’s for engineering.

Painted ½ of the plant security fencing

Began working on Phase II of our Long Term Control

Plan

Replaced plant pickup truck, plant car, and upgraded

one of our mowers to a zero-turn style.

Wastewater Treatment Plant

Major Project Goals for 2016

Replace three servers that run our plant SCADA

system

Complete engineering for Anaerobic Digester

Upgrade.

Paint another final clarifier

Continue to upgrade outdoor lighting with LED

fixtures

Continue asphalt and concrete repairs

Continue painting plant equipment

Continue working on Phase II of our Long Term

Control Plan

Final Clarifier Painting Final Clarifier Gate

Replacement

6

Page 8: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

WWTP 2016 Projects

Phase II of our Long Term Control Plan requires us to characterize our sewer system

through modeling and other means as appropriate for a range of storm events to

determine the CSO occurrences and impacts remaining after the CSO reduction projects

that have been completed so far. We are required to evaluate controls necessary to

achieve 90, 95, 99 and 100 percent capture of these remaining overflows. This is

currently being performed with detailed flow monitoring in our collection system, along

with strategic rain gauge monitoring. An updated collection system model will be created

that will serve as the basis for future projects.

The anaerobic digesters were last renovated 28 years ago, and are well past

their life expectancy. Over the years we have sandblasted and re-painted the interior

metal structures, along with replacing some of the water and gas lines. Also, we re-coated

the roofs. The Anaerobic Digester Upgrade Project will include new systems for mixing,

heating, and covers, including gas storage. These digesters are important for their ability

to reduce the amount of organic material to be hauled out, for treating this organic

material to make it suitable for land application, and to produce biogas which is scrubbed

and used for plant heating needs along with the sale of it to our local natural gas utility.

Anaerobic Digester #3 Digester Complex Overview

Long Term Control Plan Phase II Flow Monitoring Schematic

7

Page 9: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

8

[Type a quote fr Accomplishments – 2015

Recuperated $76,343.80 through liens placed on real estate taxes.

Hosted a Customer Service Skills Training session presented by COTC’s Workforce Development Innovation Center. Our focus was on public sector customer service skills and gaining public trust.

Customer Service answered 16,679 phone calls with an average wait time of 1:16. Busiest phone day was 2/2/15 with 140 answered calls. Mondays are the busiest day of the week with 11:00am -11:59am being the busiest time of day.

Switched from a Neopost Postage Machine to Stamps.com, requiring less time managing hardware and software for our postage needs.

Equipped all office work stations with new PC’s replacing Thin Clients. This drastically reduced calls to AlphaLink for technical support, and increased office productivity.

Goals – 2016

Select a new utility billing Customer Information System to replace current Eden billing software.

With the addition of a new CIS, establish a user friendly online payment portal , plus implement a kiosk system.

Increase the functionality of our AMI system by acquiring data analytics software, upgrading Data Collector Units and replacing current programming devises with Tough Pads.

Continue Customer Service Skills Training workshops to assist us with our goal of providing exceptional customer service.

Water Office

Account Delinquency Report

Amount Delinquent as of 12-31-2015 (> 90 days) $209,000

Amount Delinquent as of 12-31-2014 (>90 days) $226,000

Delinquent Collection: Delinquent amounts are being collected through

withholding of services, placing liens on properties and in-house collection

services.

Top 5 Consumers of Water & Wastewater Services

Owens 455,902 gpd

Anomatic 367,870 gpd

Tamarack Farms Dairy 171,880 gpd

Licking Memorial Hospital 98,826 gpd

Mobile Power Wash (Industrial Water) 88,005 gpd

Page 10: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

9

2015 Accomplishments Renewed 152 water services.

Installed 693’ of 6” water main along Quentin Road North.

Installed 9 new water taps.

Disconnected 12 abandoned water services.

Repaired 41 water main breaks.

Fire Hydrants: Replaced 19, Repaired 125, Painted 850

Completed annual Fire Hydrant flushing program.

Flow tested 37 Fire Hydrants.

Valves: Repaired 80, Replaced 13, Worked 687

Recorded 5,623 curb box location in GPS.

Watermain Replacement on Lawnview.

Goals for 2016 Upgrade water main on Woodlawn and 25

th from Buckeye Ave. to West Main St.

Continue to upgrade old galvanized water services.

Continue fire hydrant flushing in warmer months.

Resume valve maintenance program.

Continue to re-paint fire hydrants to make each more presentable and quickly

identifiable with color-coded hydrant “bonnets”. Color-coded bonnets quickly identify

critical fire flow rates.

Continue GPS programming eventually recording all water curb box locations.

Line stop installation on the Square on some 100+ year old pipe.

WATER DISTRIBUTION

Page 11: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

10

Accomplishments 2015 Responded to 9 plugged sewer orders on city mains.

Responded to 41 sewer orders that were on property owners.

Televised just under 130,000 feet (24.6 miles!) of sewer mains.

Pressure cleaned (“jet”) more than 200,000 feet (37+ miles!) of sewer mains.

Inspected CSO’s 73 times after every moderate to heavy rain event.

Manholes Worked, 187 repaired or replaced.

Manhole Inspections Worked, 1,404.

Goals for 2016

Continue televising sewer mains to determine if repairs are needed in an effort to reduce

the chances of a catastrophic sewer failure.

Complete upgrade of sanitary and storm lift stations with SCADA monitoring system.

Continue to monitor CSO’s for Long Term Control Plan (LTCP).

Continue with preventive maintenance work on manholes and sewer mains to provide

customers with reliable and uninterrupted service.

Continue to be heavily involved in the Downtown Renovation – Phase I.

Continue to be heavily involved in the LTCP – Phase II.

SEWER MAINTENANCE

Page 12: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

10

SAFETY

Safety continues to play an important role in our daily activities within the

Division of Water and Wastewater. In 2015, the division incurred 6 accidents while

working 103,186.75 hours. Two of the 6 injuries were recorded as “lost time” accidents

resulting in employees missing 17 days of work. Those injuries were an injured shoulder

due to a fall and an injured back. One recordable accident was due to results of our

annual hearing evaluations and an employee received additional training as required by

OSHA.

In 2015, the Ohio Environment Association again recognized two of our

departments for their safety programs. The Sewer Maintenance Department received the

2014 OWEA Safety Award for Collections with 1-9 employees and the Wastewater

Treatment Plant received the 2014 OWEA Safety Award for Treatment with 10-20

employees. The OWEA Safety Award is presented each year for having a

comprehensive safety program that is actively used in the workplace. This award

indicates firm adherence for sound safety work practices.

Training also continues to be an important part of our daily duties. Training

whether done under the category of “Safety” or “Educational” are tracked and then used

as “contact hours” in order for employees to re-new individual job required OEPA

licenses. During 2015, the Division of Water and Wastewater made available 60.75

contact hours through 58 in-house educational training sessions which totaled 461.75

man hours. Safety training accounted for 261.5 of those hours. Some of this year’s

topics included Hearing Safety, How heat affects the body, and OSHA’s new Globally

Harmonized System, which replaces our old Hazard Communication Plan. This past year

employees were once again offered the chance the receive Adult and Child CPR Training

including the use of an Automatic External Defibrillator (AED). A total of 27 employees

signed up for this voluntary training. Employees again received a refresher in Confined

Space Entry Procedures. Confined spaces are a serious danger in the water and

wastewater industry and yearly refresher training is a top priority.

In an effort to keep current with new equipment and products the Division uses many

resources. Webcast training from the Ohio and US EPA, the Water Environment

Federation, and the American Water Works Association are used to help address those

comprehensive issues. Working with our online training provider, 360water.com,

employees have access to training that is site specific to the Newark Water and

Wastewater Treatment Plants. Our online training website contains 31 wastewater and 7

water site specific courses. We also provide 3 training courses on our asset management

program, Lucity and 24 general utility topics. This past year employees earned 198 hours

of EPA approved training from use of this website.

Page 13: To provide essential services that protect public health ... · At the treatment plant, improving our dredging systems has assured a good volume of water to the plant for treatment

Annual Report 2015

11

Over 30 Years of Service Stan Vinning Wastewater 1974

Don Dyar Water Plant 1977 & 11 Roger Loomis Water Office 1985

Avg. Age as of 12/2015 – 48.06

Avg. Years of Service with the City - 15.35

*includes service time outside

Division of Water and Wastewater

20 to 24 Years of Service Phil Tudor Wastewater 1991 Ben Roberts Dist./Collection 1991* Darin Wise Wastewater 1991 Jeff Krauskopf Wastewater 1992 Bryan Curry Wastewater 1993 David Wells Distribution 1993 Elizabeth Beckman Water Office 1995* Russ Livingston Water 1995 Joe Hickman Water Office 75 & 06

Retired - 2015 Harry Shannon Collection 30+ years Terry Barnhart Collection 13+ years

25 to 29 Years of Service Mark Wachter Water Plant 1986 John Kreager Dist./Collection 1986 John Johnston Meter Shop 1986 Mark Butler Meter Shop 1986 Dave Moran Meter Shop 1987 Randy McDaniel Env. Lab 1988 Ed Nutter Water Office 1988 Jon Moulton Wastewater 1989 Trent Johnson Meter Shop 1990 Nancy Taylor WW Lab 1990 Trent Johnson Meter Shop 1990 John Johnston Meter Shop 1986

Human Resources

15 to 19 Years of Service

Jeff Postle Distribution 1996 Paula Glosser Water Office 1996* Teresa Robb Water Office 1996* Andrea Beichler Water Office 1997 Cindy Veatch Water Office 1997 Lori Bane Water Office 1997* Ed Metzger Water 1997 Tammi Gall Water 1998 Sherry Koklich WTP/WWTP 1999 Catherine Austin Water Office 2000 Keith Hampshire Water 2000

10 to 14 Years of Service

Mary Hull Water Office 2001* Clint White Wastewater 2001 Drew Forgrave Dist/Collection 2003 Ron Supplee Collection 2003 Bill Charles Water 2004 Jeremy Moore Distribution 2004 James Robb Collection 2004

Angela Reischman WW Lab 2004 Trophy Iler Collection 2005* Shawn Wagner Water 2005 Jay Fisher Wastewater 2005*