2
t L l. |l.(u lrrea t30d ili^ -r^ --t r\dl ilu L_,i Work i- ----- ----- i Sanr-'tion date No. & Date 5*nrii*n nf cornpetent /i,uthority rruitir tire Lr6r6sntage of subject wark.(shail not be mo;-e than 49o/o af the contract 11, , Schecjule date of completionof work i--; i t2 i Actualdate of completir:n of wor-k i -- i sqLE vl I i-- l"J er:st of work completed by Marn Contractor ii t---l ti i'nj + li J 1( r t.--l Scope of- work with main items Cost L-_i Overhauling and replacement of spares of Pump Check .Valve alongwith its hydro-pneumatic actuator of IFS main Pump at Love Grove \A ruTF. SCR/L444 of 03^01.2017 Rs.1,28,52,779/- Six months SAPPO No, 4100029306 dated 25.01 -----. 7ALV I il:i.c8.2017 08.08.20x7 Rs. 1,76,01,7791- Rs.1,26,01 ,279.AA i I i I i I -_---_- '] i Cost oi rryork Contracto;- completed by

tL l. |l.(u lrrea t30d...MUNICIPAL CORPORATION OF GREATER MUMBAI Name of Work Sanction date No. & Date Contract cost period of the Contractor cf the sub contractor ... SAP PO No, 4100029306

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: tL l. |l.(u lrrea t30d...MUNICIPAL CORPORATION OF GREATER MUMBAI Name of Work Sanction date No. & Date Contract cost period of the Contractor cf the sub contractor ... SAP PO No, 4100029306

tL

l. |l.(u lrrea t30d

i l i ^ - r ^ - - tr \ d l i l u L _ , i Work

i - - - - - - - - - - -

i Sanr- ' t ion date No. & Date

5*nrii*n nf cornpetent /i,uthority rruitirt ire Lr6r6sntage of subject wark.(shailnot be mo;-e than 49o/o af the contract

11, , Schecjule date of complet ion of worki - - ;

i t2 i Actual date of completir:n of wor-ki - -

i s q L E v l

Ii - -

l " J

er:st of work completed by MarnContractori i

t---lt i

i 'nj+l iJ 1 ( rt . - - l

Scope of- work with main i temsCost

L-_i

Overhauling and replacement of sparesof Pump Check .Valve alongwith itshydro-pneumatic actuator of IFS mainPump at Love Grove \A ruTF.

SCR/L444 of 03^01.2017

Rs. 1,28,52,779/-

Six months

SAP PO No, 4100029306 da ted 25 .01-----.7 A L V I

i l : i .c8.2017

08.08.20x7

Rs. 1 ,76 ,01 ,7791-

Rs.1,26,01 ,279.AA