CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN CASSIA COUNTY, IDAHO COUNTY ADMINISTRATION PLANNING & ZONING / BUILDING DEPARTMENT Courthouse Room #4, 1459 Overland Avenue, Burley, Idaho 83318 Phone (208) 878-7302 • Fax: (208) 878-3510 CASSIA COUNTY, IDAHO COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Amd. Feb. 2010, Amd. Nov. 2012. TABLE OF CONTENTS Summary .................................................................................................. 2 Introduction ................................................................................................. 2 Purposes of the Plan ...................................................................................... 4 Guidelines .................................................................................................... 5 Components ................................................................................................. 6 Goals, Policies, and Implementation Activities................................................... 9 A. Property Rights ............................................................................. 12 B. Population .................................................................................... 15 C. School Facilities and Transportation................................................. 19 D. Economic Development.................................................................. 23 E. Land Use ..................................................................................... 27 F. Natural Resources ......................................................................... 31 G. Hazardous Areas .......................................................................... 34 H. Public Services, Facilities and Utilities .............................................. 36 I. Transportation ............................................................................. 43 J. Recreation ................................................................................... 44 K. Special Areas or Sites ................................................................... 48 L. Housing ....................................................................................... 44 M. Community Design ........................................................................ 47 N. Agriculture ................................................................................... 49 O. Implementation ............................................................................ 54 APPENDICES ................................................................................................ 58 A. Comprehensive Plan Notes ............................................................ 59 Comprehensive Plan Map ................................................................60 B. Other Maps for Information ........................................................... 61 School Districts Map ..................................................................... 62 Fire Districts Map ......................................................................... 63 Map of Highway Districts................................................................ 64 C. Resolution No. 2006-09-1, Adopting Plan .................................... 65-67 D. Ordinance No. 2009-10-01, Amendment ...................................... 68-71 E. Ordinance No. 2010-01-01, Amendment ...................................... 72-75 F. Ordinance No. 2012-11-01, Amendment ...................................... 76-79

TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80

TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN

CASSIA COUNTY, IDAHO

COUNTY ADMINISTRATION

PLANNING & ZONING / BUILDING DEPARTMENT

Courthouse Room #4, 1459 Overland Avenue, Burley, Idaho 83318

Phone (208) 878-7302 • Fax: (208) 878-3510

CASSIA COUNTY, IDAHO COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Amd. Feb. 2010, Amd. Nov. 2012.

TABLE OF CONTENTS

Summary .................................................................................................. 2 Introduction ................................................................................................. 2

Purposes of the Plan ...................................................................................... 4 Guidelines .................................................................................................... 5 Components ................................................................................................. 6

Goals, Policies, and Implementation Activities ................................................... 9 A. Property Rights ............................................................................. 12

B. Population .................................................................................... 15 C. School Facilities and Transportation ................................................. 19 D. Economic Development .................................................................. 23

E. Land Use ..................................................................................... 27 F. Natural Resources ......................................................................... 31

G. Hazardous Areas .......................................................................... 34 H. Public Services, Facilities and Utilities .............................................. 36 I. Transportation ............................................................................. 43

J. Recreation ................................................................................... 44 K. Special Areas or Sites ................................................................... 48

L. Housing ....................................................................................... 44 M. Community Design ........................................................................ 47 N. Agriculture ................................................................................... 49

O. Implementation ............................................................................ 54 APPENDICES ................................................................................................ 58

A. Comprehensive Plan Notes ............................................................ 59 Comprehensive Plan Map ................................................................ 60

B. Other Maps for Information ........................................................... 61 School Districts Map ..................................................................... 62 Fire Districts Map ......................................................................... 63

Map of Highway Districts ................................................................ 64

C. Resolution No. 2006-09-1, Adopting Plan .................................... 65-67

D. Ordinance No. 2009-10-01, Amendment ...................................... 68-71

E. Ordinance No. 2010-01-01, Amendment ...................................... 72-75

F. Ordinance No. 2012-11-01, Amendment ...................................... 76-79

Page 2: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

SUMMARY

The Cassia County, Idaho Comprehensive Plan, Revised 2006 (Plan) is a document guiding the future development of the county, based on stated

long-term goals of the county. The Plan is the result of public input, study and analysis of existing physical, economic, environmental and social conditions

and a projection of what future conditions are likely to be. The Plan addresses the fourteen planning components set forth in the Local Land Use Planning

Act, at Idaho Code Section 67-6508.

This Plan serves as a guide for making land use changes, preparation of implementing land use ordinances, preparation of budget programs and the

rate, timing and location of future growth. The purpose of this Plan is to promote the orderly development of the county; to conserve and stabilize the

value of property; and otherwise promote the public health, safety and

general welfare of the county.

This Plan replaces the Comprehensive Plan approved by the Cassia County Board of Commissioners in July 1992. However, this plan does not replace the

Cassia County Interim Land Use Policy Plan, adopted by the Board of Commissioners for Cassia County as Resolution No. 93-8-1.

INTRODUCTION

The Cassia County, Idaho Comprehensive Plan indicates, in a general way,

how the county should develop in the next 20 to 25 years. Using this document as a foundation, the county will adopt, administer and amend

zoning and subdivision ordinances, which are more technical standards and

procedures that govern development activities and which implement the policies in this plan.

The purpose of this plan is to accommodate this modest growth in the most

efficient, economical and well-planned manner that is possible and to encourage such growth to occur. As a general estimate, this plan can

accommodate a minimum of 30,000 or more people.

About 60% of the new residents of Cassia County are expected to settle in or around one of the established communities in the next few years. The bulk of

the remainder of the new residents is expected to seek housing in the areas along the Snake River and in "Country Living" environments in the rural areas

of the county. As the County approaches the target date (year 2025) for this

Page 3: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Comprehensive Plan, it may be necessary to consider other planning

mechanisms in order to accommodate an accelerating population growth rate. Additionally, the Cassia County Planning and Zoning Commission (the

Commission) and the Board of Cassia County Commissioners (the Board) should have the opportunity and flexibility to consider large scale

developments that are not able to be accommodated within the existing plan.

New Cassia County residents will expect to have schools, roads, emergency services, a choice of places to live, and places to work and shop. Meanwhile,

the people who already live here will expect improvement in their services, development of parks, less crowded schools, and efficient emergency services.

Everyone will want clean air, clean water and reasonable taxes.

Even though they would like more and better services, citizens have limited resources to spend on government. Provision of services may be severely

constrained in the future, due to the limited resources of local government.

Plans are made in an effort to make the most of these limited resources, to guide land use decisions, to protect the public interest, and to provide for wise

investment for the future of Cassia County.

It is recognized that growth requires appropriate planning regulations to limit any negative impacts from such changes and to encourage the positive effects

of quality development in our communities. Therefore, setting forth a recommendation for a land use plan is difficult and requires compromise.

This plan is adopted with the intention that equitable policies and procedures

have been prepared to protect the rights and liberties of all citizens, and that those who inherit Cassia County will not regret the decisions of the present

generation.

In 1993, the Board of Commissioners for Cassia County, Idaho adopted

Resolution No. 93-8-1 which is the Cassia County Interim Land Use Policy Plan. This interim plan addresses Federal and State land use management

issues directly and is intended to be used as a positive guide for citizens of the County and the Federal and State land management agencies in their

development and implementation of policies and plans for Federal and State land uses and activities. Recognizing that this interim plans calls for

permanency, the Board of County Commissioners has detailed the Cassia County Public Lands Committee with the assignment to update this interim

plan and propose a permanent plan for the land use and management for federal and state managed lands within Cassia County. For the present the

interim plan will be considered in conjunction and cooperation with this Comprehensive Plan for overall planning within the County. As the interim

plan gives way to a permanent public land planning document, then that plan

Page 4: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

will be considered in planning activities. Cassia County’s significant amount of

federal and state managed land clearly requires this cooperative approach to planning to ensure that the rights of the citizens of this county are protected.

However, in no way should either plan supplant the other within its sphere of influence. This Comprehensive Plan, as derived from the Local Land Use

Planning act is primarily applicable to private lands. The interim plan or its successor is not derived from the Local Land Use Planning Act and is primarily

applicable to federal and state managed lands.

PURPOSES of the PLAN

• LEGISLATIVE: To meet the requirements of the Local Land Use

Planning Act, Idaho Code, Title 67, Chapter 65 and to aid in establishing zoning regulations consistent with the comprehensive

plan.

• POLICYMAKING: To outline Cassia County citizens’ intentions

regarding the rights and expectations of landowners, enterprise and local governments.

• EDUCATION: To inform people about Cassia County’s goals, policies,

rationale, and implementation activities.

• COORDINATION: To establish a basis for coordinating with landowners, enterprise and local governments within Cassia County

and to establish a county position on regional growth and development issues.

The specific purpose of this Plan, as required by Idaho Code Section 67-6502,

is to promote the health, safety and general welfare of the people of the

county as follows:

(a) To protect property rights, property values and the use of

property.

(b) To ensure that adequate public facilities and services are provided

to the people at reasonable cost.

(c) To ensure that the economy of the county is protected and

enhanced.

Page 5: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

(d) To ensure that the important environmental features of the county

are protected and enhanced.

(e) To encourage the protection of prime agricultural, forestry and

mining lands for production of food, fiber and minerals.

(f) To encourage urban and urban-type development within or near

incorporated cities.

(g) To avoid undue concentration of population and overcrowding of

land.

(h) To ensure that the development on land is commensurate with the

physical characteristics of the land.

(i) To protect life and property in areas subject to natural

hazards and disasters.

(j) To protect fish, wildlife and recreation resources.

(k) To avoid undue water and air pollution.

(l) To allow local school districts to participate in community planning

and development to address school needs and impacts on an

ongoing basis.

GUIDELINES

• The comprehensive plan should be used by all individuals and

government agencies whose duties, responsibilities or activities relate to matters covered by the plan.

• The comprehensive plan is not intended to, and does not, take any land

for public purposes, cloud the title to any property, or require any land to be transferred to any person or entity.

• The comprehensive plan map is not precise and does not show, or intend

to show, the exact outline of zoning districts or the exact location of

future streets or public facilities. The plan shows the general location, character and extent of land use patterns. Specific consideration and

determinations are made by established laws, ordinances and procedures. The map should be very general and less specific.

Page 6: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

The Idaho Supreme Court said the Local Land Use Planning Act (Act) was

promulgated to ensure the orderly and effective development of land to the benefit of Idaho citizens. The Act indicates that a comprehensive plan and a

zoning ordinance are distinct concepts serving different purposes.

A comprehensive plan reflects the desirable future situations for the land within a jurisdiction. See Idaho Code (I.C.) 67-6508. A comprehensive plan

does not operate as legally controlling zoning law, but rather serves to guide and advise the governmental agencies responsible for making zoning

decisions. The governmental agencies refer to the comprehensive plan as a general guide in instances involving zoning decisions.

Cassia County must look at all facets of the comprehensive plan and assure

that the land fits within all of the various considerations set forth in the plan. A proposed development must generally comply with the overall goals and

policies of the comprehensive plan; it is not required to agree with all

provisions in the comprehensive plan. A requested development cannot be denied solely for non-compliance with the comprehensive plan.

A zoning ordinance is a more detailed list of criteria, rules, procedures and

enforcement provisions that reflects the uses allowed or permitted for various parcels within the jurisdiction. See I.C. 67-6511.

COMPONENTS

The Plan includes discussion of the following planning components as required by the Local Land Use Planning Act (I.C. 67-6508):

(a) Property Rights - An analysis of provisions which may be necessary to

insure that land use policies, restrictions, conditions and fees do not violate

private property rights, adversely impact property values, or create unnecessary technical limitations on the use of property and analysis as

prescribed under the declarations of purpose in Chapter 80, Title 67, Idaho Code.

(b) Population - A population analysis of past, present and future trends in

population including such characteristics as total population, age, sex and income.

(c) School Facilities and Transportation - An analysis of public school capacity

and transportation considerations associated with future development.

Page 7: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

(d) Economic Development - An analysis of the economic base of the area

including employment, industries, economies, jobs and income levels.

(e) Land Use - An analysis of natural land types, existing land covers and uses and the intrinsic suitability of lands for uses such as agriculture, forestry,

mineral exploration and extraction, preservation, recreation, housing, commerce, industry and public facilities. A map shall be prepared indicating

suitable projected land uses for the jurisdiction.

(f) Natural Resources - An analysis of the uses of rivers and other waters, forests, range, soils, harbors, fisheries, wildlife, minerals, thermal waters,

beaches, watersheds and shorelines.

(g) Hazardous Areas - An analysis of known hazards as may result from susceptibility to surface ruptures from faulting, ground shaking, ground

failure, landslides or mudslides; avalanche hazards resulting from

development in the known or probable path of snow slides and avalanches and floodplain hazards.

(h) Public Services, Facilities and Utilities - An analysis showing general plans

for sewage, drainage, power plant sites, utility transmission corridors, water supply, fire stations and firefighting equipment, health and welfare facilities,

libraries, solid waste disposal sites, schools, public safety facilities and related services. The plan may also show locations of civic centers and public

buildings.

(i) Transportation - An analysis, prepared in coordination with the local jurisdiction(s) having authority over the public highways and streets, showing

the general locations and widths of a system of major traffic thoroughfares and other traffic ways and of streets and the recommended treatment thereof.

This component may also make recommendations on building line setbacks,

control of access, street naming and numbering and a proposed system of public or other transit lines and related facilities including rights-of-way,

terminals, future corridors, viaducts and grade separations. The component may also include port, harbor, aviation and other related transportation

facilities.

(j) Recreation - An analysis showing a system of recreation areas, including parks, parkways, trail ways, riverbank greenbelts, beaches, playgrounds and

other recreation areas and programs.

Page 8: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

(k) Special Areas or Sites - An analysis of areas, sites, or structures of

historical, archeological, architectural, ecological, wildlife, or scenic significance.

(l) Housing - An analysis of housing conditions and needs; plans for

improvement of housing standards; and plans for the provision of safe, sanitary and adequate housing, including the provision for low-cost

conventional housing, the siting of manufactured housing and mobile homes in subdivisions and parks and on individual lots which are sufficient to

maintain a competitive market for each of those housing types and to address the needs of the community.

(m) Community Design - An analysis of needs for governing landscaping,

building design, tree planting, signs and suggested patterns and standards for community design, development and beautification.

(n) Implementation - An analysis to determine actions, programs, budgets, ordinances, or other methods including scheduling of public expenditures to

provide for the timely execution of the various components of the plan.

The following items are addressed in succeeding sections where each of the planning components is discussed in detail.

• GOAL statements are expressions of desired outcomes. They are

broad directions that establish ideal future conditions toward which policies are oriented.

• POLICY statements are expressions of guiding principles, including

reasons and intent.

• IMPLEMENTATION ACTIVITIES are ways for implementing policies

to achieve goals. Identification of all possible alternatives for achieving a desired result is not feasible and, in many instances, it

will be necessary to conduct more detailed studies prior to commencing a project.

GOALS, POLICIES, AND IMPLEMENTATION ACTIVITIES

The goals, policies, and implementation activities of the Cassia County

Comprehensive Plan express the following principles or strategies for Cassia County's future development:

Page 9: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

A. Planning: The Comprehensive Plan is the culmination of a process which involved the general public, private interest groups, the

Commission and the Board. The County supports the planning process as a way of meeting the County's needs and making our community a

good place to live. The growth of Cassia County makes it mandatory to visualize and pursue a direction and to wisely use our resources. This

planning process is necessary to guide growth and ensure jobs are provided, public facilities are available and natural resources are

preserved. This planning process began in 2001 when citizen advisory sub-committees were formed to review the 1992 Comprehensive Plan.

These committees were formed from a balanced cross-section of citizens in the county and their given purpose was to review the current plan

and suggest amendments, where needed, to continue to meet the fundamental goals and policies to guide this region's growth over the

next twenty years.

B. Regional Context: The Comprehensive Plan Serves as the

regional or area wide policy guide which will complement and strengthen the implementation of city comprehensive plans. First, the

County Comprehensive Plan recognizes city-adopted comprehensive plans and county-adopted specific plans for planned communities and

subdivisions and endorses those plans as the policy framework within Cassia County. Second, direct County policies are oriented toward Rural

Areas, Snake River frontage, City of Rocks National Reserve, and Access areas, Resort Areas, and Wildlife Management Areas. Third, area wide

concerns are addressed which are intergovernmental in nature, such as: historic and geologic sites, transportation plans, water quality programs,

solid waste disposal, wastewater management, and the preservation of the cultural and historic values and uses of the land in the county.

These various categories are covered in the Plan to give it a regional or

area wide context. Development proposals which create regional impacts and have far-reaching effects within Cassia County and

adjoining areas should be considered only through amendments to this Plan.

C. Economic Base: The County continues to recognize and

encourage agriculture as its primary economic base, and will also encourage development of a strong economic base with further

economic development, job opportunities and the provision of needed industrial-commercial services. The County will encourage clean and

well-planned commercial and industrial development within the County to be located in or around existing cities. Such industrial-commercial

development should contribute optimum income flow to the local

Page 10: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

economy, conform to environmental quality standards and to public

facility standards, and not use prime agricultural land unless absolutely required.

D. Rural Areas: The County will encourage agricultural activities and

will limit uses that are not compatible with such activities. As development, especially residential development occurs in the Rural

Areas conflicts will arise. To allow limited development in the Rural Areas while minimizing any detrimental impacts on agricultural land

uses is an important goal of the Commission and the Board and is expressed in this Plan. Urban development is only appropriate in Rural

Areas if converted from this designation to an Area of City Impact.

For purposes of this Comprehensive Plan and to accommodate implementing the rural areas section of the Comprehensive Plan the

following definitions may be used:

Agriculture - The production, keeping or maintenance, for sale, lease or

personal use, of plants and animals useful to man, including but not limited to grain and seed crops; dairy animals and products; livestock;

grazing; and fruits and vegetables.

Agricultural land - Land that is used for agricultural purposes but is less productive or limited in types of crops that may be grown on it due to soil

type, slope, lack of water, climate, size of parcel and compatibility of adjacent uses.

Established Communities - Those communities within the County which

have a United States Post Office in them, whether or not they are incorporated municipalities.

Farm - A parcel of land used for agricultural purposes, primarily for soil dependent cultivation of crops or for the raising of livestock.

Non-Farm - A parcel of land utilized for limited residential development, a

commercial or industrial use dependent on a rural setting, or a division of a large acreage farm for a residential site.

Prime Agricultural Land - Land which is particularly well suited to

agricultural purposes due to characteristics such as soil type, slope, access to irrigation, size of parcel and compatibility of adjacent uses.

Rangeland - Land which is desert, semi-arid or forest and is used

primarily for grazing. It is predominately in public ownership and used

Page 11: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

for various public purposes and is primarily located outside of fire and

irrigation districts. Rangeland will also include wildlife management areas.

E. Quality Development: The County will encourage quality

residential, commercial and industrial developments to occur or expand within Cassia County. Flexible land use regulations are available and will

be periodically reviewed to insure that desirable land planning, engineering and architectural design standards are available to create

such an environment within Cassia County. The county wishes to maintain or improve the quality of life for all residents.

F. Amendments: The County will support changes to the

Comprehensive Plan if it can be demonstrated that an error was made or changes in conditions have occurred, that a public need exists, and

that the amendment is the preferable alternative from a public

perspective. In an area like Cassia County, it is expected that changes in land use will be necessary and desirable in response to population

growth pressures and unexpected local situations.

Page 12: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

A. PROPERTY RIGHTS

It is the intent of this plan to insure that the implementation of land use policies,

restrictions, conditions and fees do not act so as to violate private property rights, adversely impact property values or create unnecessary technical

limitations on the use of property. To accomplish this intent requires the balance of the interests and needs of the entire community.

A.1 Goal

To balance property rights of all individuals when making land-use and

planning decisions.

A.2 Policies

A.2-1 Regulatory Compliance: It is the policy of Cassia County to comply

with the requirements and provisions of the Idaho Code.

In the 1994 Legislative Session, the Idaho Regulatory Takings Act (I.C. 67-8001, -8002 and -8003) was adopted to establish a process to better provide

that land use policies, restrictions, conditions and fees do not violate private property rights, adversely impact property values, or create unnecessary

technical limitations on the use of private property.

A.2-2 Private Property Rights: To comply with I.C. 67-6508 and 67-8003, agency or local government staff must use the following questions1 in

reviewing the potential impact of a regulatory or administrative action on specific property. The public review process used for evaluating proposed

regulations is another tool that the agency or local government should use aggressively to safeguard rights of private property owners. If property is

subject to regulatory jurisdiction of multiple governmental agencies, each

agency or local government should be sensitive to the cumulative impacts of the various regulatory restrictions.

Although a question may be answered affirmatively, it does not mean that

there has been a "taking." Rather, it means there could be a constitutional issue and that the proposed action should be carefully reviewed with legal

counsel.

1. Does the regulation or action result in a permanent or temporary or physical occupation of private property?

1 These questions are taken from the “Idaho Regulatory Takings Act Guidelines”

published by the Office of the Attorney General, September 2002.

Page 13: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

2. Does the regulation or action require a property owner to dedicate a

portion of property or to grant an easement?

3. Does the regulation deprive the owner of all economically viable uses

of the property?

4. Does the regulation have a significant impact on the landowner's

economic interest?

5. Does the regulation deny a fundamental attribute of ownership?

6. (a) Does the regulation serve the same purpose that would be served by directly prohibiting the use or action; and

(b) Does the condition imposed substantially advance that purpose?

A regulation may go too far and may result in a "taking" claim where it does not substantially advance a legitimate government purpose. Likewise,

regulatory actions that closely resemble, or have the effects of a physical invasion or occupation of property, are more likely to be found to be a

"taking". The greater the deprivation of use, the greater the likelihood that a

"taking" will be found.

A.2-3 Landowner Property Rights: Encourage the protection of the property

rights of landowners to the extent possible. Real property rights include:

a. The right to own real property.

b. The right to possess and use real property, (according to local and state law).

c. The right to invite others onto or exclude others from the real property.

d. The right to dispose of an interest in the real property (lease, easement, mortgage, gift, inheritance, sell or deed, etc.).

e. The right to enjoyment of the real property.

Within a zoning classification, property rights allow for the highest and best

use of the land. To achieve additional or different land uses, a landowner has the right to apply to rezone, i.e. change to a different zoning classification of

the property.

Infringements of property rights are a problem. Intrusions should be eliminated or mitigated. Claims of absolute property rights may infringe on a

neighbor’s property rights.

Page 14: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

There are two forms of land-use restrictions which are enforced differently.

Covenants, conditions and restrictions (CC&Rs) can be enforced by the property owner’s association or owners of other lots within the subdivision and

shall not be used as criteria in making zoning or permitting decisions by the local government.

Zoning laws are different than CC&RS. CC&Rs is a contract usually between

owners of subdivision lots that is filed and recorded with the county and encumbers the owner's property with land-use and building restrictions.

Zoning laws are enforced by local government officials and can be enforced through criminal prosecution or civil lawsuits.

Both CC&Rs and zoning ordinances affect the legally permissible uses of the

land. Both must be complied with and neither provides an excuse for violating the other.

Page 15: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

B. POPULATION

The population of the county has increased in slowed and cycled measures over

the years. The population change from 1970 to 1980 was 14.2 percent; 1980 to 1990 was 0.5 percent; 1990 to 2000 was 9.6 percent; and the latest

available numbers indicate 1.4 percent growth from 2000 to 2002.

The county’s most dense population area is in the north central portion of the county in, around, and between the Cities of Burley and Declo. The 2000

population figures showed that 262 people lived in Albion, 9,074 lived in that part of Burley in Cassia County, 338 lived in Declo, 177 lived in Malta and 668

lived in Oakley.

Population Trends for County and Cities: 2

Entity 1980 1990 2000 2002

Cassia County 19,427 19,532 21,416 21,720

City trends

Albion 286 305 262 na

Burley (part) 8,525 8,420 9,074 na

Declo 276 279 338 na

Malta 196 171 177 na

Oakley 663 635 668 na

In the 1980’s the county suffered a net migration of 2,780 people, which slowed

to a net migration of 439 in the 1990’s. In 2002, net migration is indicated as being 312. During the decade of the 1990’s, the county’s total births were

3,875, with death loss being at 1,552. The trend is that births are declining and deaths are slightly increasing with an overall aging population in the county.

The average number of persons per household has decreased from 3.16 in 1970 to 2.99 in 2000. The county retains a rural flavor with 56.1% of the population

residing in rural areas and 43.9% living in urban areas. 3

U.S. Bureau of the Census and Idaho Power presented a 2002 Economic

Forecast, including data on population density of Idaho Counties. It holds out the following forecast for Cassia County population growth:

County 1980

Population

1990

Population

2000

Population

2010

Population

2020

Population

Cassia 19,427 19,532 21,416 23,552 25,457

2 County Profiles of Idaho: CASSIA, Idaho Department of Commerce 3 Id.

Page 16: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

The Idaho Department of Commerce maintains age demographic component

changes applicable to Cassia County, which is as follows:4

Age Demographics 1980 1990 2000

Median Age 25.3 29.2 31.1

Under 18 years (%) 38.4 36.6 34.1

18 to 64 years (%) 52.1 51.0 53.1

65 years + (%) 9.6 12.4 12.7

Review of the 2000 U.S. Census provides that in 1990 the County’s population was 9,823 male (50.29%) and 9,709 female (49.71%). In 2000, the male

population was 10,774 and the female population was 10,642, a negligible percentage change in the gender make up of the county.

The Idaho Department of Commerce and Labor further profiles Cassia

County’s income as follows:

INCOME 1980 1990 1995 2001

Per Capita Personal Income $8,059 $16,535 $17,539 $22,121

Percent of National Average 79.1% 84.5% 75.4% 72.7%

Percent of State Average 92.3% 104.3% 90.3% 90.3%

B.1 Goal

B.1-1: Encourage Wise Land-Use Planning: Population, demographics and projections are included in the comprehensive plan to assist businesses,

governmental entities, service providers and others in identifying needs in the county and planning for future private and public development. The goal of

this section, as well as the entire comprehensive plan, is to encourage and facilitate wise land-use planning which will help to ensure that projected

growth in the County will be managed to provide satisfactory living, business and agricultural environments.

B.1-2 Reinforce Established Communities as Residential Development

Centers: The County seeks to reinforce the trend for established communities to accommodate a substantial percentage of Cassia County's future population

by the year 2020. However, as the County approaches the year 2020, it also

recognizes the need to consider other planning mechanisms such as Planned Communities in order to accommodate population growth. Additionally, the

County should have the opportunity and flexibility to consider large scale developments that cannot be accommodated within existing Cities. Most

4 Id.

Page 17: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

growth would therefore be served by central sewers, water systems, schools,

emergency services and other urban public facilities and services. The County sees a need therefore to encourage growth to center in and around

established communities, or fully developed, full service rural subdivision developments.

B.2 Policies

B.2-1 Orderly Growth: Population in Cassia County is projected to increase

in slow and measured terms. Population increases will call for increased needs for housing, jobs and services. Planning efforts for utilities, roads and other

services will become increasingly important as growth intensifies density of use within the County’s borders. This policy mandates orderly and rational

growth patterns that provide for preservation of prime agricultural lands and prudent use of natural resource areas as well as allowing for residential and

commercial growth.

The US Department of Commerce predicts that Idaho will be the sixth fastest

growing state (based on percentage of change) in the nation through 2025 with a projected increase of 575,000 people. The population of Cassia County

has steadily increased with about 10% growth occurring from 1980 through 2000. US Census figures project a higher growth rate of about 19% in the

County over the next 15 to 20 years. The mix of rural and urban populations has remained steady over the past 20 years, with about 44 % of the

population choosing urban dwelling, with 56 % opting for a more rural setting. The major growth continues to be in and around Burley, and along the Snake

River Corridor.

B.2-2 An Aging Population: Cassia County, along with the rest of the nation, will need to look ahead towards the aging of its population with plans for

adequate housing and health-care for the elderly. This policy requires orderly,

appropriate development of senior citizen housing and nursing homes, as well as services aimed at enabling seniors to remain independent as long as is

feasible. Home health care services and public transportation provisions should be facilitated to assist in this goal.

Census information indicates a growth in the numbers of the elderly of Cassia

County, the State of Idaho and the United States, as the “Baby Boom” generation moves through middle age and into their “golden years”.

B.2-3 Residential Development Location: Approximately three-quarters of

new residential development shall occur within the Cities, areas of City Impact, or along the Snake River Corridor areas.

Page 18: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

B.2-4 Development outside of “Urban” areas: Development which occurs

outside of a City or an Area of City Impact is required to comply with this plan. Due to the tensions often arising between residential and agricultural

pursuits, residential development, especially of subdivisions should be discouraged in prime agricultural areas, and likewise, agricultural pursuits

should be discouraged in developed residential areas.

B.2-5 Major Developments outside City Areas of Impact: The County recognizes the need to fully assess the land use, public service, environmental

and transportation impacts associated with any major new private or public development or activity center outside of areas of city impact. Where such

development creates or encourages unanticipated employment and/or population shifts away from existing Cities identified within the Cassia County

Comprehensive Plan an assessment of these impacts shall be made by any prospective developer. All such major new public or private developments or

activity centers outside areas of city impact shall be evaluated as

Comprehensive Plan Amendments.

Page 19: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

C. SCHOOL FACILITIES AND TRANSPORTATION

Cassia County has one school district within its boundaries, which is Cassia County Joint School District #151. Cassia County Joint School District 151, the 9th largest district in the state, encompasses most of Cassia County plus

small portions of Oneida and Twin Falls Counties. Within these 2,500 square miles are 16 schools with a total enrollment of approximately 5,000 students.

All schools are on a semester schedule and are accredited through the Northwest Accreditation Association and/or the State Department of

Education. The district employs certified staff of over 320, 85 of whom have advanced degrees. Ancillary and auxiliary personnel bring the total number of

employees to about 650. Small portions of the County involve three other

school district participation, they are: Murtaugh School District in the Northwestern part of the County; Minidoka School District in the North-central

Jackson area of the County; and American Falls School District in the Northeastern part of the County. A map is included in the appendices

showing district boundaries.

New Secondary Schools opened in Burley (1999), Declo (1998), and in Oakley (1997). New elementary schools opened in Burley (1995), Oakley (1992), and

Malta (1991). A new Professional Technical Academy opened in Burley (1998) along with a Newcomer Center (1998). There are eight elementary, four

junior high, and five high schools. Overall, the school buildings are in good

condition.

The location and names of the County’s school complexes are:

Albion Albion Elementary School

Almo Almo Elementary School

Burley Burley Junior High School

Burley Senior High School Cassia Education Center (Alternative School)

Dworshak Elementary School Mountain View Elementary School

Newcomer Center

White Pine Elementary School Declo

Declo Elementary School Declo Junior High School

Declo Senior High School

Page 20: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Malta

Raft River Elementary School Raft River Junior-Senior High School

Oakley Oakley Elementary School

Oakley Junior-Senior High School School enrollment has steadily decreased over the past several years:5

SCHOOL YEAR ENROLLMENT

90 – 91 5,257 91 – 92 5,398

92 – 93 5,411

93 – 94 5,392 94 – 95 5,361

95 – 96 5,295 96 – 97 5,214

97 – 98 5,035 98 – 99 4,864

99 – 00 4,733

From 1990 to 2000 the districts saw a decrease of 524 children, a 10%

decrease. Enrollment is tied directly to the availability of jobs, which is tied to the most prominent industry – agriculture. However, recent indications from

the School District Central Office projects 2006-2007 enrollment to be approximately 5, 128, up from 5,058 in 2005-1006.

Transportation is provided by the school district's bus system. The bus routes have been set, currently run at about 50% capacity and are not expected to

change significantly with future growth. All of the children living more than one and one half miles from their school, which may be outside of the city limits, are

eligible to be bussed to school, the remainder walk or are transported by private methods.

Post secondary education is available to Cassia County residents through the

College of Southern Idaho located in Twin Falls, Boise State University located in Boise and Idaho State University located in Pocatello. In addition, courses from

the University of Idaho, BSU and ISU are offered at the Twin Falls CSI campus and on their campus extension, located in Burley. Degrees and technical prep

credits can be earned from the Burley campus, part of which is the Cassia Regional Technical Center.

5 Historical Enrollment by School District, Idaho Department of Education

Page 21: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

The University of Idaho, in cooperation with the county, offers extension

services, including educational programs. This office serves as the local gateway to the educational resources of the University. While extension

education is an informal, out-of-school program, it is also delivered in cooperation with other agencies. The local program is designed to fit local

needs and currently emphasizes irrigation management, farm financial management, crop management, master gardening, food preservation, clothing

construction and the 4-H program.

C. 1 Goal

Education is a very high priority with county residents. Because of the more rural and open space nature of the county, most schools are located in cities

or near town sites and it has not been the county's practice to map future school locations, but to facilitate the school districts’ needs.

The goal of the county is to coordinate with the school districts on issues, such as subdivision planning, zoning for growth and transportation. Coordination on

these issues will assure schools are planned and available when needed, are optimally located and transportation issues are properly interfaced.

C.2 Policies

C.2-1 Coordination with School Districts: Ensure information on

comprehensive planning matters and planning issues is coordinated between school districts and the Cassia County Planning and Zoning Department.

This policy focuses on the need to locate new school facilities in places that

are in harmony with evolving land use activities and to maintain land use harmony around existing school facilities.

C.2-2 Land Uses: The integrity of school facilities will be protected by prudent selection of neighboring land uses.

This policy recognizes that the educational processes must be uninterrupted

and thus school facilities should be protected against the introduction of land uses that may result in conditions incompatible with student life, educational

activities and safety.

C.2-3 Transportation Safe and efficient transportation corridors will be planned, implemented, and monitored in coordination with the school districts.

Regularly maintained roads are also essential to effective school transportation.

Page 22: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

School zones present challenges for pedestrian safety and vehicular speed

control. As traffic increases or other traffic changes take place, school zones need continual monitoring. This transportation element is addressed more

fully in the Cassia County Transportation Plan.

Page 23: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

D. ECONOMIC DEVELOPMENT

D.1 Goal

Encourage beneficial and appropriate development of additional employment

opportunities and economic diversity in Cassia County, which will ensure a benefit to the county, and more importantly, its residents.

Population:

Cassia County has experienced slow growth over the last ten years. In 1992

the population was 20,150, and by 2002 had risen to 21,720, a growth rate of eight (8) percent. One reason set forth for this slow growth is the County’s

heavy dependence on agriculture, and notable lack of a diversified economy. The net result is that there are not many high paying jobs that attract new

residents to the area.6

Labor Force and Employment:

Cassia County is heavily dependent on agriculture and agriculture related

industries. This presents a challenge in looking to the future, recent food processing plant closures and frequent plant maintenance layoffs impact the

county’s employment rates. However, the area has significant attributes such as a hardworking workforce, good access to major transportation, and

excellent workforce training facilities at the College of Southern Idaho and the Cassia Regional Technical Center.7

Significant efforts have been underway to enhance networking of the business

sector, financial institutions, and government entities through the Mini-Cassia Economic Development Commission. These efforts will create economic

diversity and new jobs for this area.

Cassia County Employment By Industry8

Industry Type 1980 1985 1990 2000

Farm 1,979 1,731 1,616 1,879

Ag.Serv, Forest, Fish, & Other 378 342 495 610

Manufacturing 1,558 1,354 1,615 1,286

Mining 55 37 49 127

6 Cassia County Profile, prepared by Gregory Rogers, Regional Labor Economist,

Idaho Commerce & Labor, January, 2006. 7 Id. 8 County Profiles of Idaho - Cassia, Idaho Department of Commerce and Labor

Page 24: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Industry Type, continued 1980 1985 1990 2000

Construction 423 417 407 642

Transport, Comm., Public Utilities 313 277 298 660

Wholesale Trade 592 510 456 514

Retail Trade 1,637 1,535 1,712 2,239

Finance, Insur, & Real Estate 556 540 594 733

Services 1,415 1,531 1,784 2,659

Federal Civilian 234 196 175 179

Federal Military 128 114 125 87

State & Local Government 951 986 1,112 1,444

Total Employment 10,219 9,570 10,438 13,059

D.2 Policies

D.2-1 Economic Growth: Plan for economic growth that is consistent with

and supports industry in Cassia County.

This policy recognizes that agriculture comprises a significant share of the local economy.

D. 2-2 Commercial and Industrial Expansion: Carry out a program on a

continuing basis to fully explore commercial and industrial expansion potentials that are beneficial to the county.

Primary employers that provide good wages, benefits, safe conditions,

advancements and stability are a strength to the community. Demographic sources show that the number of people below the age of 18 years has

declined over the past 20 years and is projected to continue this trend into the near future. Continuing employment opportunities are particularly

important because the group of people between the ages of 18 and 64 years

is the fastest growing age group in the county. The median age is also rising steadily. US Census projections indicate that the increase in population will

ensure that for the next 10 to 15 years, the work force in Cassia County will remain about the same in numbers.

D.2-3 Growth vs. Quality of Life: Encourage industrial and commercial

growth in the county but ensure it is not at the expense of the quality of life of its residents. "Quiet use and enjoyment of property" should be protected as

specified in Component A, Property Rights.

The citizens of Cassia County value their homes and their property rights. Many future controversies can be avoided through respect for one another's

property rights and proven consistent zoning standards.

Page 25: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Implementation Activities

Ensure that industrial and commercial growth:

1. Is sensitive to the natural environment.

2. Does not contaminate or pollute the surrounding air, water or soil. 3. Is compatible with surrounding land uses.

4. Is free from objectionable or dangerous conditions that could negatively impact the surrounding area.

5. Controls negative impacts such as, but not limited to: noise, odor, dust, vibrations, etc.

6. Is such that negative impacts, as much as possible, do not leave the boundaries of the commercial or industrial zones.

7. Is required to provide buffers to protect the aesthetic value of the area.

8. Routes traffic away from residential neighborhoods.

D.2-4 Organize Industrial and Commercial Development: Industrial and

commercial development should be accomplished in an organized, planned and attractive manner.

The County and the communities that are part thereof will benefit from

orderliness and attractive development. Property rights will be protected. Less controversy between residents, developers and county officials will be an

asset to all concerned.

Implementation Activities

1. Programs must be followed to place industrial and commercial expansion in proper balance with other land uses and prevent

fragmented development.

2. Commercial and industrial zones should have a reasonable supply of land for the market demand.

3. Plan for growth that could realistically happen. Avoid too large of a land supply as it invites fragmentation, diminishes the value of the

property and restricts its use and development.

D.2-5 Future Housing: Plan for future housing by encouraging the

development of quality housing that is safe, sanitary and affordable and abide by fair housing standards. Encourage the development of higher density

housing near the population centers or where services are available.

Page 26: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

New residents do not just pay taxes and consume services; they contribute to

the economic base of the community.

D.2-6 Education: Encourage and support a strong educational system.

Educational and skill levels help determine the types of industries that locate or the businesses that can be initiated. The types of jobs available in turn

influence the educational level of the community.

Page 27: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

E. LAND USE

The data on this page provides recent information on land ownership and land

use in Cassia County.

Cassia County Land Ownership and Land Use9

9 County Profiles of Idaho-Cassia, Idaho Commerce and Labor Department

Page 28: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

E.1 Goal

Assure the Plan is consistent with state statutes regarding land use while

offering citizens’ flexibility as provided under the Idaho Statutory scheme. Cassia County recognizes Idaho Code Title 67, Chapter 65 which is known as

the "Local Land Use Planning Act" as a primary source of guidance in local land use decisions. It also recognizes Idaho’s "Right to Farm Act", found at

Idaho Code Title 22, Chapter 45, along with any and all other statutes within the State of Idaho pertaining to land use. The county’s goal is to ensure

orderly development within the scope outlined and to promote public health, welfare and safety.

It is recognized that strong town centers are to be encouraged. Transitional

residential-type development should be encouraged to locate in areas adjacent to municipalities.

E.2 Policies

E.2-1 Agricultural Lands Planning Issues: See Section “N” hereinafter for Agricultural Analysis.

E.2-2 Areas of City Impact: In accordance with Idaho Code Section 67-6526, area of city impact agreements have been and are continuing to be negotiated

and adopted between Cassia County and various incorporated municipalities lying within the boundaries of Cassia County. The purpose of defining an area

of impact is to identify the land area surrounding the city limits of each city which may be developed at a future time or for which specific development

controls or limitations may be required to prevent unacceptable impacts on the city (airport areas, watersheds, floodplains, etc...).

These area of impact agreements take the form of ordinances and resolutions providing for the application of an agreed upon comprehensive plan and

implementing ordinances within each of the areas of city impact, and, as a result of negotiation, are changed from time to time.

The governing boards of Cassia County and of each incorporated city therein

will also adopt maps identifying the boundaries of the areas of city impact within the unincorporated area of the county. Reference must be made to the

Cassia County Comprehensive Plan Map located at the Cassia County Courthouse for the most current location of the boundaries of these areas of

city impact.

Page 29: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

The County holds legal jurisdiction over areas of city impact. However, based

upon the recognition that impact areas are those most likely to be annexed in a city’s growth, the County will give deference to City directions regarding the

substantive planning and regulations of the impact area, while retaining its procedural approach to the application of regulations. The County will strive

for land use and density policies which will accommodate the future growth goals of the County and City, as well as the other goals and objectives of this

plan.

Cassia County hereby adopts the policy and goal of implementing Area of Impact agreements for each incorporated municipality.

E.2-3 Residential or Residential-Type Development: Residential growth

should be encouraged in and near established communities where public investments have already been made in the necessary facilities, services and

utilities. Two specific objectives of this policy are:

1. The area should provide for residential living that is safe, convenient

and attractive.

2. That residential development not within areas of city impact be limited to large lots, and shall not develop at usual urban densities,

unless central water and central sewer are made available.

This policy is intended to encourage sequential residential development to facilitate county/city cooperation in planning and to help implement other

policies of this plan. Residential areas are generally described as those areas adjacent to or in close proximity to cities, where existing or contemplated

development is occurring.

Subdivision development is encouraged to take place within the city impact

areas and rural centers where public infrastructure, services and facilities are available or where they are planned and will be provided in the near future.

E.2-4 Commercial Zones: To insure that business establishments have

sufficient land to conduct orderly and well-planned development. The size and dimensions of sites should be adequate for buildings, off-street parking,

loading and on-site vehicular circulation that will permit street access at appropriate locations for safety.

These zones are intended for a wide variety of retail, repair services and

professional businesses that are required for urban and rural areas of the county. These zones should provide general patterns and guidelines for county

commercial development that can be applied to local governments through

Page 30: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

zoning. It should allow for major and minor business concentrations and

commercial development of arterials that will have a minimum adverse effect upon surrounding and adjacent streets.

Commercial areas must be preserved for business use by limiting residential,

industrial and other incompatible uses.

E.2-5 Industrial Zones: Provide for industrial zones that are suitable for the purpose, properly located with respect to transportation and other land uses

and for industrial demands. Each established community should be encouraged to plan for industrial development in its own area. Locations for

industrial uses are best located in accordance with existing transportation and utility systems.

Regulation of industrial development should be put into place to ensure that

the environmental quality of the industrial area is maintained and

strengthened as industry develops and evolves. Appropriate guidance will encourage industry in areas that will not adversely impact residential or

agricultural areas. Separation will also offer buffering areas between conflicting uses.

Additional Land Use Policies

E.2-6 Use of Information: Use data, expertise and other available information from all pertinent sources when considering land use change

proposals.

This policy recognizes that there are numerous resources available from the public and private sectors to facilitate the presentation, analysis, deliberation

and resolution of land use proposals where consideration is being given to

changes in land use patterns away from agriculture. This policy also recognizes that population growth and the resulting

development activity should occur where public infrastructure, service and facilities are available or where they are planned and will be provided in the

near future.

E.2-7 Cooperation: Cooperate with the municipalities of the county; adjusting areas of city impact in harmony with each city's trade area,

geographic factors, water and sewer service areas and areas that can reasonably expect to be annexed in the near future. Also, encourage federal

and state land use management agencies to maintain access to state and federally managed lands within the county that support agricultural activities.

Page 31: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

F. NATURAL RESOURCES

F. 1 Goal

This plan recognizes the importance of Natural Resources in Cassia County

and provides implementation tools necessary to utilize, conserve and protect them. The natural resources component of the plan consists of an analysis of

the utilization of the natural resources that exist in Cassia County. One of the most important ongoing planning challenges, however, is to adequately

conserve and balance the use of natural resources of Cassia County with population growth and the protection of the lifestyle that makes the county an

attractive place to live.

F.2 Policies

F.2-1 Agricultural Land: Agricultural land uses in Cassia County provide an

economic base that should be encouraged. Urbanization of large tracts of land could rapidly eliminate the economic base of the agricultural land.

F.2-2 Water Quality and Water Quantity: Water is the life-blood of Cassia

County and all efforts to protect, enhance, conserve and maintain the quality and quantity of ground and surface water resources of Cassia County must be

taken for the benefit of providing drinking water, irrigation water, and means for recreation, fish and wildlife survival.

Steps to control run off and integrate it into a watershed management plan

will reduce erosion and flood hazards, while maintaining the area’s water quality and utilizing recharge capabilities.

Cassia County is a part of the Middle Snake Regional Water Resource

Commission, along with its neighboring counties: Gooding, Jerome, Lincoln,

Minidoka and Twin Falls. This Commission has developed a “Coordinated Water Resource Management Plan” that has been adopted by each county to

manage efforts to preserve and improve water quality and enhance water quantity. It is the policy of Cassia County to implement the goals, objectives

and policies specified in the current revision of that plan. Cassia County has also developed a Groundwater Quality Management Plan in concert with the

Idaho Department of Environmental Quality. This plan will also be implemented to provide direction and guidance in formulating regulations to

address groundwater quality issues.

F.2-3 Mineral Resources: A review of available mineral deposits indicates a large number of sand and gravel deposits that have produced in the past or

Page 32: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

are producing currently. Also, rock quarries, especially in the southern part of

the County are in current production.

The county policy, generally, is to promote extraction of mineral resources with mitigation of the impact to neighboring uses, when compatible with

surrounding land uses; and mandate restoration plans for existing and new mining projects. The plans should include that all lands mined be restored to

their original state as closely as possible. Exhausted sites should be rehabilitated for reuse in accordance with adopted

regulations and plans.

Mined ground should be reclaimed to be as consistent as possible with the surrounding natural landscape condition or appearance. The area that has

been mined should be protected from future soil erosion. Also existing water resources should be protected from pollution due to

mining operations. This will be implemented by requiring new projects to have

reclamation plans and restoration programs prior to commencement of operations.

The following criteria should be carefully considered in any application for

mineral extraction:

a. Prime agricultural land should be avoided;

b. The site should be located to avoid unreasonable impacts on surrounding uses from noise, transportation, dust and odors;

c. The integrity of the natural area should be protected with minimal

disturbance of the riparian vegetation;

d. Sand, gravel or other ore/material hauling operations should avoid

routes which adversely impact residential neighborhoods;

e. Operations should be designed and operated so as to avoid degradation of air and water resources;

f. Adverse visual impacts shall be mitigated through landscape buffering

techniques;

g. Stockpiling and permanent structures shall not be located in the floodway;

h. Operations should not disrupt agricultural operations;

Page 33: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

i. Local access roads utilized by the operation shall be capable of handling

the heavy vehicular traffic generated by the site; and

j. Extraction should only be permitted in areas where it is documented that there are good sand and gravel, or other mineral resources.

F.2-4 Wildlife: Large areas of Cassia County are well suited for wildlife

habitat. The County will protect, maintain and enhance fish and wildlife resources of Cassia County and their associated habitats for present and

future generations. However, these efforts shall not be at the expense of, or adversely impact, reasonable agricultural activities.

This will be implemented by cooperating with other government agencies to

establish land use policies and to resolve potential problems that may arise concerning land use changes. These land use policies will be established in

cooperation with the Bureau of Land Management and/or the United States

Forest Service and any other relevant agency and shall preserve the traditional custom and culture of the County, especially those customs and

cultures that pertain to agricultural activities.

F.2-5 Soils: Of the total 1,638,400 acres of land in Cassia County, 27.7% or 453,000 acres are utilized in agricultural pursuits. Soil surveys (Soil Survey

of Cassia County, Eastern Part-issued August 1994 and Western Part-issued September 1981) identify the capability of the soils for the varied land uses.

It can be used as a general guide in managing a watershed, an area of range, a wildlife area or in planning other developmental activities, as well as the

capability of soils for other agricultural purposes. These Soil Surveys are conducted by the United States Department of Agriculture Soil Conservation

Service, in cooperation with the United States Department of the Interior, Bureau of Land Management; Idaho Soil Conservation Commission; and

University of Idaho, College of Agriculture. The County hereby recognizes the

value of these surveys, and adopts them as an analytical tool in presentation, analysis, deliberation and resolution of proposals for, or changes in, land use

planning.

Page 34: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

G. HAZARDOUS AREAS

G.1 Goal

Cassia County has the responsibility to protect its citizens from known or

anticipated hazardous conditions. Part of that responsibility includes controlling building and development in potentially hazardous areas. This

section of the plan is required (Idaho Code 67-6508) to include an analysis of known hazards as may result from susceptibility to surface ruptures from

faulting, ground shaking, ground failure, landslides or mudslides; avalanche hazards resulting from development in the known or probable path of snow

slides and avalanches and floodplain hazards.

G.2 Policies

G.2-1 Flood: To adhere to and enforce Federal Emergency Management

Agency (FEMA) requirements in floodplain areas of Cassia County. Specific building requirements for these floodplain areas of Cassia County have been

implemented

Cassia County has periodic mild to severe flooding problems. Along the Birch Creek and Goose Creek Drainages near Oakley; Marsh Creek and Land Creek

in Albion; Cassia and Connor Creek Drainages along with Raft River in the Malta-Raft River Area; and along the Snake River, and other principal

tributaries, potential for flood exists, due mainly to heavy rain, rapid snowmelt or ice jams. FEMA has determined flood zones, which are mapped

out for Cassia County.

G.2-2 Storm: To protect life and property from severe storm damage as much as practical. Encourage the various highway districts within the County

to maintain adequate snow removal equipment to cope with most winter road

problems. Also, to encourage the various highway districts to maintain road and drainage systems to handle runoff from storms. Provide fire protection

within the county to fight storm-caused fires.

Various storms affect the life and economy of the county. High winds occur frequently. Hail and lightning storms occur with crop loss and damage from

range fires. Severe snowstorms continue to plague the area.

G.2-3 Seismic Activity: Enforce building codes to assure new construction meets currently accepted standards required to resist earthquake damage.

Cassia County is not very seismically active. The major portion of the county lies in the Snake River Plain, which serves to deaden shocks from fault

Page 35: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

movements in other locations; therefore, the county as it involves population

centers is considered relatively aseismic.

G.2-4 Hazardous Materials: Limit public exposure to hazardous materials during transportation, storage and use as much as is reasonably practical.

Many substances classified as hazardous materials are used, stored or

transported within Cassia County on a continuing basis. A partial listing of those substances includes herbicides, pesticides, gasoline and other fuels,

battery acid, explosives, certain chemical fertilizers, industrial chemicals, household chemicals and radioactive materials.

Many hazardous materials incidents are reported each year in Idaho involving spillage, leakage, fire or explosion. Vehicular transportation was involved in

the majority of reported incidents, followed by rail transportation. The substances involved in most cases were Class B poisons, flammable liquids

and corrosive liquids. Other incidents occurred along major transportation

routes throughout Idaho and included radiological transport incidents reported at or near the Idaho National Laboratory (INL).

Although no major disasters in this state are known to have been caused by

hazardous materials, the potential for a serious incident continues to exist. Transportation routes, transportation terminals and storage locations appear

to be the major area of concern, particularly where they are in close proximity to populated and/or newly developed areas.

G.2-5 Landslide, Mudslide, Avalanche: Control building and development in

areas of the county that may be prone to landslide, mudslide, or avalanche due to flood, unstable geologic conditions, soil conditions, or topography.

County ordinances must include standards for work or development on or near hillsides. These ordinances shall include prevention of erosion and

protection of people and property downhill. Hillside development shall be

bonded to guarantee hillside restoration. Hillsides shall be considered sensitive areas to be protected from runoff, erosion and pollution. In areas with existing

development on hazardous areas, additional safeguards should be imposed through ordinances. Certain areas of the county may be prone to landslide,

mudslide, or avalanche due to flood, unstable geologic conditions, soil conditions, or topography. Soil movement due to any of these occurrences

could result in property damage and/or personal injury.

Page 36: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

H. PUBLIC SERVICES, FACILITIES, AND UTILITIES

H.1 Goal

Provide current level of service and plan for expanded public services, facilities

and utilities to assure adequate capacities needed to meet the demand of an increasing population.

This policy underscores the need to carefully consider both the site, and the

situation, of new developments and their impact on public services, facilities and infrastructure. Also, this policy recognizes that development agreements

will be needed on complex developments to assure that the project is completed as approved.

H.2 Policies

H.2-1 Purchase of Sites: Encourage purchase of public facility sites as far in advance of actual need as possible.

This policy should serve to secure proper locations as well as confirm planning

policies regarding the stability of surrounding land uses and zoning patterns for the future.

H.2-2 Solid Waste: Manage the disposal of solid waste in a manner that will

protect the public health, safety and welfare and will not contaminate the land, air, water or visual resources. Encourage recycling where practical.

H.2.3 Facility Construction: Encourage public services to plan and construct

facilities in harmony with the comprehensive plan, the development codes and ordinances of the county.

H.2.4 Coordination: Coordinate planning for public services, facilities and utilities with the municipalities of the county and with irrigation companies

and drainage districts to prevent interference with the delivery and drainage of irrigation water.

This policy recognizes that costs for these services are extensive. Cooperation

to have multiple use of facilities and services is of importance to all taxpayers in the county.

Implementation Activities

1. Encourage the location of governmental, civic, social and cultural facilities in complexes or groupings that will best serve the public and

provide attractive places for the activities to be undertaken by the

Page 37: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

county and its citizens. These centers of activity are already established

in the municipalities of the county and should continue to be enlarged and improved as future needs arise. Rural Centers, which are in rural

settings of the county, may provide locations for fire protection district fire stations, emergency quick response units, post offices, libraries or

other public facilities of a similar nature.

H.2-5 Septic Systems: Community septic systems should be encouraged and used, if available, and engineering studies indicate it to be the most

efficient and effective method to handle the waste.

Community septic systems are monitored by the Idaho Department of Environmental Quality. Monitoring is desired at every opportunity to ensure

the water table is not contaminated by septic systems.

Implementation Activities

1. Obtain input from the South Central District Health Department since it is the local authority on septic systems.

2. Enforce the requirements for new developments to meet water and sewer regulations of local, county, state and federal agencies.

3. Require new subdivisions in areas of city impact to connect to the city sewer system if the connection is available at the subdivision site. If it is

not, require the subdivision design to provide for a future connection if applicable.

H.2-6 Community Wells or Water Systems: In every appropriate situation,

community wells or water systems will be encouraged.

1. Enforce the requirements for new developments to meet water and

sewer regulations of local, county, state and federal agencies.

2. Require new subdivisions in areas of city impact to connect to the city

water system if the connection is available at the subdivision site. If it is

not, require the subdivision design to provide for a future connection.

Community wells or water systems are monitored by the Idaho Department of Environmental Quality. Monitoring of water quality is desired at every

opportunity.

Page 38: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

H.2-7 Public Facilities: Develop needed public facilities primarily in the

growing and unincorporated areas in Cassia County requiring urban services and facilities. This is especially important in the areas of city impact where the

cities will eventually annex the areas involved and integration with the municipal systems is an apparent planning need. Encourage city water and

sewer to be expanded into areas of city impact and especially to be in place prior to annexation.

H.2-8 Energy: Conserve all sources of energy and encourage the wise use of

those resources. Development of subdivisions and land use patterns should contribute to the conservation of energy. Development proposals should be

encouraged that implement, protect and enhance the use of solar, wind, geothermal and other alternative energy sources.

H.2-9 Future Capacity: Design and locate public buildings and facilities that

have capacities needed for the future, have ample land for expansion that has

been adequately evaluated for potential environmental impacts at the location involved.

Good long-term planning in this area will usually result in lower long-term

costs and more efficiently used public facilities.

A Brief Analysis of Public Services, Facilities and Utilities in Cassia County

Sewage Albion, Burley, and Declo have community sewer systems.

Drainage

The cities of Albion and Burley have storm water control. The county rural areas are naturally drained. The county works to promote the natural

drainage. Buildings and structures should not be built in natural drainages

Power Plant Sites

None. However, U.S. Geothermal is developing geothermal energy production near Malta; and two wind farm facilities are planned and permitted for

development near Burley Butte west of the City of Burley.

Electrical Transmission Corridors Major electrical transmission lines come from power plants located outside of

the county and from the Minidoka Dam-Lake Walcott Generation site. Several cooperatives distribute power throughout the County, such as Raft River

Electric and United Electric.

Page 39: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Cassia County will correlate with neighboring counties, local utilities and

interested citizens to develop transmission corridors through Cassia County. Cassia County recognizes that there is a need for improvement and

enhancement of the power transmission grid. Based upon this recognition, the County will be proactive in determining its destiny with regard to siting

transmission facilities in and through the County. The County will also fully access and seek to assert its rights to coordinate with federal and state land

management agencies to assure that local plans and interests are protected in utilization and management activities of federal lands for such corridors.

These transmission corridors will be determined based upon a number of pertinent factors including, but not necessarily limited to: minimization of

impact upon residences and existing residential development; and minimization of impact upon irrigated cropland, confined animal feeding

operations, environmentally sensitive areas, wetlands, housing developments, etc. The County shall also consider national reserves in determining corridors.

Essentially, it is the policy of the County that those uses benefitting the

general public should be sited on public land as much as possible. [Amended 10-05-2009, Ordinance 2009-10-01]

Water Supply

The cities of Albion, Burley, Declo, and Oakley have their own wells offering community water service. There are also residential community water systems

at, Del Rio Estates, Mobile Home Country Court, Riverside Trailer Park and Springdale Acres.

Rural locations have to supply their own well water.

Disaster Services and Emergency Preparedness

The Cassia County Emergency Services department plans and prepares for

emergencies. This planning is documented in the Cassia County Emergency Operations Plan, as adopted by the Board of County Commissioners.

Fire Stations and Fire Equipment

There are seven fire districts serving areas in Cassia County. A map indicating

coverage areas for each district is appended to this plan. Following is a brief analysis of each district:

ACE Fire Protection District in the Almo-Connor Creek-Elba area is

headquartered out of a recently constructed building at 2743 South Narrows Road, in Almo, Idaho. This structure has three large bays and a comfortable

training-meeting room. The area over the meeting room serves adequately for equipment and storage. 12 volunteers man one 500 gallon structure

truck; one 3000 gallon tanker and four brush trucks.

Page 40: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Albion Fire Protection District generally serves the Albion Valley area. The fire

station is located in the heart of the City of Albion at 120 East Market Street. The station is of recent construction, highlighting community and citizen

involvement to bring this steel, four-bay building to fruition. The station houses the Albion Quick Response Unit and one ambulance, in addition to one

structure fire truck, one wildland fire response truck, and a one ton truck with foam capabilities. The district also shares a 2000 gallon water tender with the

Albion Highway District. The District is served by eleven volunteer firefighters, who have been, and continue to be, trained in both structural and

wildland fire fighting methods.

Minidoka Fire Protection District, headquartered at 701 F. Street in Rupert, Minidoka County, Idaho serves the Jackson area. They bring two engines,

each with 1000 gallon capacity; one tanker with 3000 gallon capacity; and two brush rigs to fight structural and wildland fires. The District has 25

volunteers capable of turnout to this area of Cassia County.

North Cassia Rural Fire District serving the Burley, West Burley and Declo

areas is headquartered at 1235 Miller Avenue in Burley Idaho, with a Declo unit stationed there to serve the eastern part of the District. North Cassia

Rural utilizes one engine; one 3800 gallon tanker and a force of 25 volunteer firefighters. The Declo area is serviced by 2 engines; one 3000 gallon tanker;

one 200 gallon brush truck; and 13 volunteer firefighters.

Oakley Fire Protection District is headquartered at 315 East Main in Oakley, Idaho. The District has three engines; two tankers-one 4000 gallon and one

5000 gallon; two wildland trucks-one 1000 gallon and one 250 gallon; and 17 volunteer firefighters.

Raft River Rural Fire District in the Malta and Raft River area is located at 5

North, Malta, Idaho. The District is served by two 1000 gallon engines; one

750 gallon tanker truck; two Quick Attack four wheel drive pickups, each with 350 gallon capacity; and is manned by 16 volunteers.

Rock Creek Fire Protection District headquartered at 242 Hwy 30, Kimberly,

Idaho serves an area in the western border area of the County. They have the following available to respond to that area: three engines; two tankers of

1500 gallons each; two water-tenders-one 2000 gallon and one 3000 gallon; seven Class “A” pumpers-three 1000 gallon and four 750 gallon; two full-time

firefighters; and 40 volunteers.

Page 41: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Law Enforcement Facilities

The Cassia County Sheriff’s Office is the principal law enforcement agency in

Cassia County and each of its cities. The City of Albion, additionally, has a City Marshall on a part-time basis. The Cassia County Sheriff’s Office is

headquartered in Burley, but has assigned resident deputies in each of the following areas: Albion, Declo, Elba-Almo, Malta, and Oakley.

The Mini-Cassia Search and Rescue Unit is jointly operated between Cassia

and Minidoka Counties. They are capable of operating in a variety of rescue or search situations. They have the skills to operate in winter weather, water or

underwater conditions, or a variety of extraction operations. The Mini-Cassia Criminal Justice Center (hereinafter “MCCJC” serves as the

local adult detention facility for both Cassia and Minidoka Counties. The building was originally constructed for a 30 year lifetime and due to solid

operations and maintenance is in very good condition at the 15 year mark. It

operates under a joint powers agreement, which is overseen by an executive board. The MCCJC is a 190 bed facility located in Burley. This building was

put into operation in December 1991. Total staff employed is 29 sworn detention officers and civilian staff of six, and two-part-time sworn staff

members.

Health Facilities and Services

Cassia Regional Medical Center is a 25 bed, full-service hospital, built, owned and operated by Intermountain Health Care. It is JCAHO accredited. The

present building at 1501 Hiland Avenue in Burley, Idaho was opened for use in 1995. Cassia Regional Medical Center offers a full range of inpatient and

outpatient services. Ambulance service is available along with a helicopter pad. Services at the hospital include: a 24 hour per day, 365 day per year

emergency room department; a critical care unit providing intensive

specialized medical care to patients who may be in a life-threatening condition; a home care and hospice full service provider; imaging services

that are nationally accredited; occupational health services to assist businesses in reducing workers compensation costs and lost productivity;

physical, occupational and speech therapy; a sleep lab to enable diagnoses of a multitude of sleep disorders; a full spectrum of surgical services; and

women and newborn services.

The South Central District Health Department has a presence in Cassia County. Its mission is to prevent disease, disability, and premature death; to

promote healthy lifestyles; and to protect and promote the health and quality of our environment. This mission is accomplished through a variety of

services.

Page 42: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Solid Waste Disposal

Cassia County is responsible for providing solid waste disposal for the

residents in the county. Cassia County belongs to the Southern Idaho Regional Solid Waste District. The District is made up of seven (7) member

counties: Blaine, Cassia, Gooding, Jerome, Lincoln, Minidoka, and Twin Falls.

The county periodically adjusts the plans and modifies the process because of changes in regulations, costs and needs as they occur. Cassia County is home

to the landfill site for the district, which is located at Milner Butte in the western part of the County. There are also four transfer sites in the County,

located at Albion, Almo, Malta and Oakley. The four (4) sites collect waste to await transfer to the Milner Butte site. The solid waste transfer facilities are

located at four different locations for the efficiency and convenience of the Cassia County residents.

Other Public Services

Public libraries operate in the cities of Albion, Burley, Oakley, and the Almo-Elba-Malta area in the southern part of the county contracts with Box Elder

County, Utah for bookmobile services.

Natural gas distribution service is provided by Intermountain Gas Company.

Basic telephone service is provided to Cassia County by Qwest and Project Mutual Telephone. A variety of companies supply other telecommunications

services such as cellular phone, radio and internet.

A Veterans shuttle van runs from Burley to Boise to transport veterans to the Veterans Hospital in Boise, Idaho. It makes the run as often as needed,

provided that the veteran expressing need has an appointment at the Boise

V.A. hospital. The van drivers are all volunteers.

Page 43: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

I. TRANSPORTATION

I.1 Goal

Provide for the present and future transportation needs of the Cassia County

citizens and businesses through implementation of the Cassia County Transportation Plan.

The relationship between land use and transportation is critical when planning

for future transportation facilities. The way land is utilized influences the need for and location of new transportation facilities. Cassia County is a large rural

county, primarily agricultural, with the largest city, Burley, containing 9,180 residents. The need to plan for present and future needs of the transportation

system when making land use decisions is essential.

I.2 Policies

I.2-1 Cassia County Transportation Plan Implement the goals, objectives and policies specified in the most current

revision of the Cassia County Transportation Plan, which was developed in coordination with the local jurisdictions having authority over the public

highways and streets in, and throughout Cassia County. A map delineating highway district jurisdictions is found in the appendices of this plan.

Page 44: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

J. RECREATION and K. SPECIAL AREAS OR SITES

J.1 & K.1 Goal

The primary goal of this component is to encourage the maintenance and upgrading recreational facilities and programs, as well as special areas or sites

within Cassia County. Recreation and leisure activities are growing increasingly more important in enhancing quality of life.

J.2 & K.2 Policies

J.2-1 & K.2-1 Preservation: Encourage the preservation and improvement of areas with special interests or uses, within Cassia County.

Because the designation "Special Areas" applies to a somewhat limited portion

of Cassia County, it is important that these limited areas, within their boundaries, are maintained and available for use by the public. Special uses

may be defined as areas in Cassia County that may be of special interest

because of a historical, an unusual natural or a geological site.

J.2-2 & K.2-2 Planning: Provide an environment that offers a source of historic, cultural, or civic pride, as well as maintains the identity of the

communities and the area of special interest in Cassia County.

Land uses which are destructive to or incompatible with the preservation of historical and unique geological sites will be reviewed in order to determine

what steps may be needed to remove, reduce or prevent the negative impacts on the identified special site or area.

LIST OF HISTORICAL, GEOLOGICAL AND RECREATIONAL SITES:

1. California Trail Sites

2. Castle Rocks State Park

3. City of Rocks National Reserve

4. Milner Dam

5 Minidoka Dam

6. Oakley Dam – Goose Creek Reservoir

7. Oregon Trail

8. Pomerelle Ski Resort

9. Snake River

10. Starrh’s Ferry Site

Page 45: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

L. HOUSING

L.1 Goal

Provide a choice of housing and land sizes for Cassia County residents that

meet the market demand. The latest figures from the Idaho Department of Commerce and Labor records shows an increase of 650 housing units for a

total of 7,862 housing units representing a 9.0% growth from 1990 to 2000.)

The rural character of Cassia County is enhanced through encouraging the development of larger lots and particularly encouraging the residential growth

in the vicinity of established communities.

L.2 Policies

L.2-1 Adequate Housing: Strive to provide safe, sanitary and adequate

housing according to the needs of county residents. Provisions are needed for: low-cost conventional housing, employee housing,

the siting of manufactured housing and mobile homes in subdivisions and parks and on individual lots that are sufficient to maintain a competitive

market for each of those housing types in accordance with the provisions of the Local Land Use Planning Act (I.C. 67-6509 and 67-6509A and B.

L.2-2 Market: Support an open housing market free from discrimination as

required by the Fair Housing Act.

L.2-3 Substandard Property: Delay approval for development until owners upgrade substandard property conditions that are in violation of county

ordinances. This policy recognizes that substandard conditions may result in hazardous

conditions for inhabitants of units and that these conditions detract from the

overall appearance and habitability of an individual unit and the general area.

L.2-4 Hazards: Limit housing in areas that are hazardous. (See Component G, Hazardous Areas)

This policy supports actions limiting or prohibiting housing in places such as

flood prone areas and steep or unstable slope areas without an appropriate engineering evaluation.

L.2-5 Upgraded Housing: This policy recognizes the benefits that come to a

community when upgraded housing is developed.

As housing standards are improved, some of the following may occur:

Page 46: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

A. Community pride increases

B. Home values increase and retain value

C. Surrounding land and home values increase

D. Nice neighborhoods attract more housing

E. Nice neighborhoods attract more buyers

F. Larger businesses attracted that need appropriate housing for

employees

G. Higher-income families attracted

H. Tax base increases

I. Commercial demands increase

J. Economic development benefited

L.2-6 Protection: Protect existing residential development.

The homes in Cassia County are the refuge of the people. They hold their

most valuable assets: their children and loved ones. To most they represent one of their greatest financial assets.

Page 47: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

M. COMMUNITY DESIGN

M.1 Goal

Community design relates to the visual appearance and physical relationship

of both the natural and man-made environments within the county. Community Design plays a significant role when addressing “quality of life”

issues of its citizens. Community design focuses on landscaping, building design, tree planting and suggested patterns and standards for community

design, development and beautification.

The goal of Community Design is to enhance social, historical, cultural, economic and physical aspects of the county to meet the needs of county

residents.

Cassia County presently clusters of urbanization along its northern border, the

Snake River, including the cities of Burley and Declo. Other smaller population centers are Albion, Almo, Elba, Malta and Oakley. Other less

formal, but concentrated areas are scattered throughout the county. These smaller concentrations represent a development potential opposite to the

guiding principles of a concentration concept of growth patterns. The Plan encourages growth in or near the existing population centers. Typical

problems presented by high-density development outside existing population centers are the lack of public water and sewer systems, the potential health

problems and increased tension and constraint on agricultural activity.

M.2 Policies

M.2-1 County Appearance and Quality of Life: Encourage innovation and excellence in design for all new developments. Encourage visually attractive

and aesthetically pleasing development in the community.

Adequately landscape and buffer agriculture, commercial and industrial operations, as well as residential developments, thus making a positive

contribution to a well-planned place to live. Improve the visual characteristics of the county by establishing and enforcing location standards and setback

requirements. Protect the visual character of the county through the location of cell phone towers, wind generation towers, power transformers and

telephone facilities to less visible areas whenever possible. Institute other community design features that promote the health, safety and welfare efforts

among the citizens of the county.

This policy recognizes that certain land use activities with proper buffering and screening can add significantly to the appearance of the community and that

there are also detractions that occur when proper controls are not in place.

Page 48: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

This policy encourages improvement to the conditions that detract from the

vitality and appearance of the community including control of signs and billboards. In rural areas, special design and development conditions may be

required as related to large operations such as gravel extraction, agri-industry, residential areas and other activities, that could cause problems with

surrounding land uses.

The overall appearance of the county is important to area residents. A well-planned and appealing appearance enhances property values.

M.2-2 Infrastructure: Encourage development that minimizes county

infrastructure construction and maintenance costs and requires the development to support itself.

This policy recognizes that population growth and the resulting development

activity should occur, but with minimum added expense to the existing

taxpayers.

M.2-3 Impact Areas: Encourage the utilization of salable vacant land for residential lots within the areas of impact in the county, prior to approval of

new residential development within the county.

Cassia County recognizes the importance of orderly development and expansion of public services.

M.2-4 River Access: Access to the Snake River and to the various reservoirs

should be preserved through the review of new development contiguous to these bodies of water and assurance of the protection of public access points.

Access to the Snake River and reservoirs is an important part of the quality of

life in Cassia County.

Page 49: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

N. AGRICULTURE

N.1 Goal

Recognize that agricultural land is a valuable, non-renewable resource, and based upon that recognition to then promote the preservation of agricultural

ground for agricultural purposes. This plan seeks to encourage protection of agricultural uses, as well as the economic benefits that such uses provide to

the County.

In a study conducted in 2012 by the University of Idaho Extension, “Contribution of Agribusiness to Idaho’s Magic Valley Economy” it was found

that: “Agribusiness is a vertically integrated industrial complex engaged in the production and processing of food. The production and marketing

channels of the agribusiness industry extend from farm supplies to farmers and ranchers, then to food processors and to food retailers, and end with

domestic consumers or international markets. The farm is the intermediate link in the Magic Valley agribusiness complex, with backward links to farm

suppliers and service providers (fertilizer, seed, farm equipment, etc.) and

forward links to food processors (French fries, cheese, etc.). … Magic Valley agribusiness sold more than $7 billion of goods and services, generated $1.4

billion in Gross State Product …, and created over 15,000 jobs. Agribusiness exports ripple throughout the Magic Valley economy, creating indirect

economic activity in many other sectors. … [Taking] into account these ripple effects, agribusiness contributed close to $9 billion (60%) of total sales, over

2.5 billion (45%) of the region’s GSP, and close to 33,000 (37%) of Magic Valley jobs.”

This same study highlights that: “Irrigation has transformed the Magic Valley

desert including Cassia, Lincoln, Minidoka, Gooding, Jerome, and Twin Falls counties into the epicenter of Idaho’s agribusiness industry. Agriculture in the

Magic Valley provides jobs for the Valley’s residents and food for national and international markets. In 2010, total output (sales of goods and services)

from the Magic Valley economy exceeded $14 billion. Magic Valley’s gross

regional product (GRP) was $5.5 billion, with a total of 88,700 jobs. Using the gross measure for 2010, Magic Valley agribusinesses sold more than $7 billion

of goods and services, contributed $3.4 billion to Idaho’s gross state product, and created close to 15,000 jobs.”

While the above numbers cover all of the Magic Valley, it highlights the

involvement of Cassia County in the agriculture business, and the importance of that agricultural economy to the County.

Page 50: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Agriculture and agri-business is the backbone of Cassia County’s economy.

Therefore, it is of primary importance to preserve agriculture by ensuring that the industry is pursuing best practices and by protecting the agricultural

industry from non-agricultural pursuits that would detract from, diminish or increase the burden on agricultural operations.

Cassia County recognizes that prime agricultural land is a valuable, non-

renewable natural resource, and as such, promotes the preservation of this agricultural ground for agricultural purposes.

Agricultural land uses and agricultural activities in Cassia County provide an

economic base that should be maintained. Haphazard urbanization could erode the economic base produced by agricultural activity. The county should

encourage the protection of agricultural land for agricultural uses and cooperate with agricultural activities. To protect these resources in Cassia

County, the following goals are to be implemented:

1. Uniform application of zoning and subdivision regulations throughout the

planning area is given prime importance.

2. Compatibility of various land and natural resources use is to be considered

with the avoidance of conflicting uses.

3. Urban sprawl, the fragmentation of large tracts of agricultural land and

leapfrog residential development is to be discouraged.

4. Natural resources are to be prudently utilized and conserved.

Cassia County has a total acreage of 1,642,624. Of that total acreage, the United States Department of Agriculture’s 2007 Census of Agriculture has

determined that 644,740 acres of land is in farms. This is a decline of 13% from the 2002 census data. Correspondingly, the number of farms has

dropped from 692 in 2002 to 644 in 2007, with average farm size declining from 1,076 acres to 1,001 acres over the same timeframe.

However, data over that same time span from 2002 to 2007 would indicate

increased efficiencies and implementation of best practices as the market value of products have increased by 64% from $382,530,000 in 2002 to

$626,721,000 in 2007 (Crop sales accounting for 2007 value of $175,387,000, or 28%, and Livestock Sales attributing $451,334,000 or 72%

of the 2007 value).

Page 51: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

N.2 Policies

N.2-1 Agricultural Lands Planning Issues: There are two major issues in planning for agricultural lands:

1. The need to retain a maximum amount of prime agricultural land for farm

use and maintain the agricultural resource base; and

2. The need to protect agricultural activities from the adverse impacts created

by residential, commercial or industrial development.

With these things in mind, the county must regulate and guide private

development by establishing clear and uniform standards and conditions in

the zoning ordinance under which development may occur, and that protect the long term use of prime agricultural land.

N.2-1.1. Agricultural related uses dominate the greatest portion of Cassia

County's non-public lands. Agriculture and agribusiness enterprises are an important source of personal income in the county. The maintenance of

agricultural land and water resources and of viable farm units is essential to the county's continued prosperity. Idaho's Local Land Use Planning Act

authorizes counties "To encourage the protection of prime agricultural, forestry and mining lands for production of food, fiber and minerals". (I.C. 67-

6502. (e.)). Preservation of prime agricultural land is accomplished by:

a. Establishing zoning standards that protect the long term use of prime

agricultural land.

b. Approving development only if it can be clearly demonstrated that

such development will occur without serious detrimental impact to

agricultural land uses.

c. Discouraging residential subdivisions and development within the

prime agricultural land designations.

d. Establishing large residential lot sizes within the prime agricultural

zone, and limit residential units to single family dwellings and farm labor housing.

Page 52: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

N.2-1.2 Non-agricultural development shall only be approved if it can be

demonstrated that it will occur without serious detrimental impact to agricultural land uses. Dust, noise and odors normally associated with

agricultural pursuits are considered acceptable in the rural areas of the County. Adjacent non-agricultural development should not limit normal

agricultural pursuits. Non-agricultural related development should be encouraged to locate on land which is not designated as prime agricultural

land. Minimizing adverse impacts upon agricultural activity is accomplished by:

a. Encouraging agricultural industries related to the production, processing and sale of food and fiber.

b. Locating farm residences where they will have the least impact on agricultural pursuits.

c. Limit commercial and industrial development in prime agricultural areas to those related to agricultural pursuits, and located on non-

productive ground.

d. Encourage agriculturally related industries or industries which due to incompatibility or excessive space requirements cannot reasonably

locate elsewhere, to locate in the rural areas and on land not classified as prime agricultural land.

e. Schools, churches and other public or quasi-public uses, and utility uses of state-wide/regional significance, may be permitted in the rural

areas provided such uses primarily serve the needs of the rural community. Such uses should be encouraged to locate on land not

classified as prime agricultural land.

N.2-2 Concentrated Animal Feeding Operations (CAFO): CAFO operations

should be encouraged in areas classified as prime agriculture.

CAFO operations are an important part of Cassia County’s agri-economic base,

and with respect to the nature of their operations, separate regulations are needed to govern the siting and operation of these uses. In forming those

regulations, caution must be exercised to assert appropriate county control, while dove-tailing with, but not impinging upon, applicable state regulations of

CAFOs. It is important to regulate density in these operations to assure that the ability to produce waste, odors and other negative impacts does not

overrun the ability to manage those wastes, odors and negative impacts.

Page 53: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

N.2-3 Agricultural Industry: Agricultural industries related to the

production, processing, and sale of food and fiber should be allowed and encouraged in rural areas. Also, agriculturally oriented industry should be

permitted in rural farm areas where such location is necessary for successful operation. Agriculturally related industries or industries which due to

incompatibility or excessive space requirements cannot reasonably locate elsewhere, should be encouraged to locate in the rural areas on land not

classified as prime agricultural land, unless it qualifies as a non-farm development. The Commercial and industrial development in prime

agricultural areas shall be limited to agriculturally related establishments, and shall be sited on non-productive lands. Additionally, development

requirements for farm related activities and construction should be minimized, however, such regulations as imposed should provide for the public's general

health, safety and welfare.

N.2-4 Agricultural Industry Housing: Housing for those operating

agriculturally based activities must be carefully developed so as to not adversely impact agricultural pursuits. Therefore, the County must establish

criteria for farm residences for farmers, immediate relatives or farm workers, and encourage other residential development to take place in non-agricultural

areas.

N.2-5 Agricultural Related Activities: Activities in conjunction with a farm which provide additional income to the farm operation may be allowed

through conditional use procedures provided undue adverse impacts to adjacent properties and agricultural activities do not occur. (Amended 12-4-

2012, Ord. 2012-005518)

Page 54: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

O. IMPLEMENTATION

O.1 Goal

The most important aspect in the Comprehensive Plan is its implementation. The goal of the Cassia County Comprehensive plan is to effectively implement

the policies enumerated in Components A-M. The following items will be used to aid in that implementation. The Local Planning Act (Idaho Code Title 67,

Chapter 65) provides a road map for Idaho’s general-purpose local governments to implement planning tools including zoning, comprehensive

planning, regulation of subdivisions and other land use issues. Idaho Code (67-6508) states that the implementation component consists of an analysis

to determine actions, programs, budgets, ordinances or other methods, including scheduling of public expenditures, to provide for the timely

execution of the various components of the Comprehensive Plan. Implementation of the Cassia County Comprehensive Plan must include

review and updating of existing maps, ordinances, standards, programs,

budgets, provisions and codes on a regular basis. Idaho counties are empowered to implement their comprehensive plans through zoning

ordinances (I.C. 67-6511) and subdivision regulations (I.C. 67-6513). The Local Land Use Planning Act also provides specific authorization for special use

permits and other plan implementation tools. Background studies and public input also provide bases for the implementation strategies adopted in this

comprehensive plan. The Idaho Regulatory Guidelines, I.C. 67-8001 through 8003, are required to

be used by local governments to evaluate the impact of proposed administrative or regulatory actions on private property.

O.2 Policies

O.2-1 Zoning Ordinance: Provide a current, effective, zoning ordinance to

delineate the policies provided by the Cassia County Comprehensive Plan. However, existing uses of land and buildings, that were permitted and

approved under earlier ordinances, must be protected, even if they do not meet the requirements of an updated zoning ordinance.

A zoning ordinance and maps are the most useful tools for carrying out the

Comprehensive Plan. The zoning map shows the location of districts in which agricultural, communications-utilities, manufacturing, public assembly,

residential, services, sports facilities and parks, trade and retail, and transportation uses may be located to form a compatible arrangement of land

uses. The text of the ordinance establishes the conditions under which that land may be used to create stable land use development within the county.

Page 55: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

O.2-2 Spot Zoning: Guidelines for spot zoning may include the following

factors when determining land use.

1. Does the proposed zoning correct a mistake?

2. What is the size of the parcel or lot?

3. What is the zoning prior to and after the requested rezone?

4. What is the existing zoning of the adjacent properties?

5. What are the benefits and detriments to the subject property's

landowner resulting from the rezone?

6. What are the benefits and detriments to the neighboring property

owners resulting from the rezone?

7. What are the benefits and detriments to the community resulting from

the rezone?

8. What is the relationship between the zoning change and other

comprehensive plan policies?

9. Are there changed circumstances since the comprehensive plan was

adopted?

10. Is there compatibility with surrounding land uses?

11. Do the public benefits outweigh detriments to other landowners?

12. What is the effect on adjacent communities?

Spot zoning should be avoided. Rezoning decisions should be carefully analyzed and should not occur unless the advantages clearly outweigh the

disadvantages.

O.2-3 Subdivision Ordinance: Provide a current, effective, subdivision ordinance that dovetails with the zoning ordinance to delineate the policies

provided by the Cassia County Comprehensive Plan.

Subdivision regulations establish various standards for new subdivision development. An ordinance may require the subdivider, among other things,

to grade and pave streets and install water and sewer lines to county

specifications.

Subdivision regulations protect prospective homeowners by ensuring that they are not purchasing a substandard lot, that they will have access to a street

built to specifications and that they have adequate utilities. These regulations also seek to insure that a new subdivision will be an asset to the county

instead of a liability.

Page 56: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

O.2-4 Standards: Provide written standards for public and private

development and construction within Cassia County.

The Local Land Use Planning Act provides that a county may adopt standards for such things as building design; blocks; lots and tracts of land; yards,

courts, greenbelts, planting strips, parks and other open spaces; trees; signs; parking spaces; roadways, streets, lands, pathways, rights-of-way, grades,

alignments and intersections; lighting; easements or public utilities; access to streams, lakes and viewpoints; water systems; sewer systems; storm

drainage systems; street numbers and names; schools, hospitals and other public and private development. Reasonable standards that are based on

adopted goals and objectives and existing conditions will be upheld in court. Adopted standards can be used by the planning and zoning staff in reviewing

applications and by a developer in designing a project. The county benefits by improved appearance and the developer benefits by knowing what is

expected.

O.2-5 Capital Improvements Program and Budget: County planning will include a capital improvements program and budget plan to assure the

improvements required to implement the comprehensive plan are provided for.

A capital improvements program and budget is a method of identifying public

improvements, setting priorities and determining means of financing. This can be a very effective planning tool for phasing and timing public development

and construction.

O.2-6 Other Codes and Ordinances: Adopt and enforce use of other codes

and ordinances that will aid in public and private development and

construction within Cassia County.

A variety of codes and ordinances may be adopted to cover construction requirements for new development and improvements. These include:

1. International Building Code-- This usually amounts to the adoption of the International Building Code and the International Residential Code

as amended. This code has been adopted by the State of Idaho including Energy conservation standards and accessibility standards.

2. International Plumbing Code-- This has been adopted by the State of Idaho.

Page 57: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

3. National Electrical Code-- This has been adopted by the State of Idaho.

4. International Fire Code-- This has been adopted by the State of Idaho and Local Fire Districts.

O.2-7 Emergency Provisions: Adopt emergency provisions on a case-by-case basis to assure emergency or unplanned happenings are provided for within

the county.

The Local Land Use Planning Act, as embodied in Idaho Code, makes provision for emergency ordinances and moratoriums and for interim ordinances and

moratoriums that may be used by local units of government during the planning and zoning process.

O.2-8 Specific Implementation Goals: Provide specific goals to assure the

Comprehensive Plan and its supporting documentation receive regular review and are updated accordingly.

Specific goals are necessary to assure regular reviews and updates are

accomplished.

Implementation:

The Cassia County Planning and Zoning Commission should dedicate one meeting each year to review the policy statements adopted in this

comprehensive plan and their enforcement.

Annual review of area of city impact agreements should also be done.

The comprehensive plan should be updated at least every five years or more

often if needed as a result of the comments received at these reviews.

The background studies that support this comprehensive plan should be updated on a regular basis. Cassia County should also fund, or participate in

the funding of, additional planning studies as appropriate to support this comprehensive plan.

Page 58: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

APPENDICES

A. Comprehensive Plan Map Notes

According to the Local Land Use Planning Act “A map shall be prepared

indicating suitable projected land uses for the jurisdiction”. The Comprehensive Plan Map is included in the Plan to fulfill that requirement.

As such, the Comprehensive Plan Map 2024, prepared by Riedesel & Associates, Inc. on March 8, 2005, is not a zoning map and does not

necessarily reflect current county zone designations. Rather, it shows the “Broad Brush” picture of the desired growth patterns for the next twenty

years. Changes to current zone designations could result as desired growth patterns are followed.

B. Other Maps Included for Information

• School Districts Map

• Fire Districts Map

• Map of Highway Districts in Cassia County

C. Resolution No. 2006-09-1 of the Board of Commissioners for Cassia County,

Idaho, adopting the Cassia County Comprehensive Plan, Revised 2006.

D. Ordinance No. 2009-10-01 of the Board of Commissioners for Cassia County, Idaho amending the Cassia Comprehensive Plan.

E. Ordinance No. 2010-01-01 of the Board of Commissioners for Cassia County,

Idaho amending the Cassia Comprehensive Plan.

F. Ordinance No. 2012-11-01 of the Board of Commissioners for Cassia County, Idaho amending the Cassia Comprehensive Plan.

Page 59: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix A: Comprehensive Plan Map – 2024

Page 60: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 61: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix B:

1. School Districts Map

2. Fire Districts Map

3. Map of Highway Districts in Cassia County

Page 62: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 63: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 64: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 65: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix C: Resolution No. 2006-09-1, Adopting Cassia County Comprehensive Plan, Revised 2006.

Page 66: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 67: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 68: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix D: Ordinance No. 2009-10-01, Amending Cassia County Comprehensive Plan.

Page 69: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 70: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 71: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 72: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix E: Ordinance No. 2010-01-01, Amending Cassia County

Comprehensive Plan.

Page 73: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 74: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 75: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 76: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Appendix F: Ordinance No. 2012-11-01, Amending Cassia County Comprehensive Plan.

Page 77: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012

Page 78: TITLE 8 CASSIA COUNTY COMPREHENSIVE PLAN · 2016-10-05 · CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov.2012 Page 1 of 80 TITLE 8 CASSIA COUNTY COMPREHENSIVE

CASSIA COUNTY COMPREHENSIVE PLAN, Revised 2006, Amd. Oct. 2009, Feb. 2010, Nov. 2012