15
Test Infrastructure an Accelerator Researc TIARA-FAM http://www.eu-tiara.eu Final Annual Meetin R. Aleksan Nov. 25 th , 2013 1. Meeting Objectives 2. General Information 3. Deliverables/mileston 4. Conclusion

TIARA-FAM Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Embed Size (px)

Citation preview

Page 1: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Test Infrastructure and Accelerator Research Area

TIARA-FAMhttp://www.eu-tiara.eu Final Annual Meeting

R. AleksanNov. 25th, 2013

1. Meeting Objectives2. General Information3. Deliverables/milestones4. Conclusion

Page 2: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Thanks!

Heartily thanks to

Prof. Swapan Chattopadhyay Director CI

and

Prof. Peter McIntoshDeputy Director ASTeC

Prof. Susan SmithDirector ASTeC

and

for hosting TIARA

Page 3: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Meeting Objectives

Provide general information on TIARA Review and Finalize the Work

Deliverables, Achievements and Highlights Prepare the TIARA Final Report Exchange our views on how to strengthen further

accelerator R&D in Europe

Main objectives

Define the Strategy and Prepare the work for Implementing TIARA

Page 4: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

 1st day 2nd day 3rd day

Monday 25 Nov. Tuesday 26 Nov. Wed. 27 Nov.08:30

or 9:00

 

Plenary sessionHighlight talks

Plenary sessionGeneral interest talks

10:30 Break Break11:00

Plenary sessionHighlight talks

Plenary sessionWPs status

12:30Lunch Lunch

13:00 WP parallel sessions(only WP2, WP3, WP4)14:00

Plenary sessionHighlight talks

Plenary sessionWPs status

14:30 Break (14:30-15:00)15:00 Plenary session

Welcome and General Interest

Talks

Break (15:30-16:00) Adjourn (16:00)16:00 WP parallel sessions

end 18:15(only WP2,

WP3+WP4, WP5, WP7)

TGC meeting(16:15-19:30)16:30

TGC meeting

19:00 Adjourn (18:15) Adjourn19:30 Adjourn    19:30 Welcome coktail Social dinner TGC dinner

Lab Visit:Today at

16:30

FAM Agenda

Page 5: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Milestones

TIARA general activities

TIARA-Industry workshop : past June 17-19 in Uppsala

Other information

Result of consultation very positive as infrastructure for AS&T is identified by the EC as a priority item for IA (ranked A)

Estimated Work programme 2014-2015 Budget: ~580 M€

Finalization of the H2020 work programme 2014-2015, first call publication end 2013

Page 6: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Calls id. Type DeadlineINFRADEV-1-2014

andINFRADEV-4-2014/2015

Design Study

Cluster of infra. ESFRI+others

02/09/2014

INFRADEV-2-2015 and

INFRADEV-3-2015

Prep. Phase

Impl. ESFRI14/01/2015

Calls 2014 (M€)

2015 (M€)

Max. EC contr. (M€)

INFRADEV-1-2014 15 3INFRADEV-2-2015 14 5 (2)INFRADEV-3-2015 90 15INFRADEV-4-2014/2015 55 25 15

Horizon 2020: INFRADEV calls

Expected publication date 11 Dec. 2013

Developing new world-class research infrastructures

Page 7: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

The 4 Technical WPs in good shape

WP6: SVET Very low emittance achieved at SLS <1pm (world record) Improved diagnostics being installed a even better ey

WP7: ICTF Nominal RF amplifier power reached (2MW) @Daresbury Being installed in ICTF hall @RAL for MICE operation New DiacrodeAmplifier developed and tested successfully at Los

Alamos (3 MW)

WP8: HGA 2 New C-Band structures successfully constructed Being installed for high power tests on SPARC @LNF

WP9: TIHPAC Design of Multi-MW test Irradiation Facility completed Design of the versatile SC Cavity test Cryostat close to completion

Work Status

b

Excellent Infrastructure showcase

Final WP Reports n

eed to be done

Page 8: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Organizational 4 WPs

WP3: Infrastructures Survey and RI database established Finalization of the list of Infrastructures being part of TIARA Needs vs resources comparison and upgrades/ construction of new RI

being finalized

WP4: R&D programme Key Accel. Research Area and Key Tech. Issues been identified Final plan of the collaborative R&D Programme being finalized

WP5: Education and Training E&T Survey and resource database established Survey of Needs for Accel. Scientists done Recommendations for promoting Accel. Science and Tech. in Europe

done

Work Status

bb

b

WP2: Governance Legal statutes of TIARA are being drafted

Excellent studies highlighting TIARA

potential to str

engthen Accel. R&D

Final WP Reports n

eed to be done

Page 9: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 360

5

10

15

20

25

30

35

40

Scheduled Milestones vs months

Integral scheduled Milestonescumulative achieved

Month

Num

ber o

f Mile

ston

es

Milestones

2 Milestones missing

Page 10: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 360

5

10

15

20

25

30

35

40

45Scheduled deliverables vs months

Integral scheduled deliv-erables

Integral achieved

Month

num

ber o

f del

iver

able

s

15 deliverables needed(out of which 9 are late)

Deliverables

I am trustful that a large majority will come by the end but a few need careful attention

Page 11: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Num Nat Short name Description Due month

Dissemination level

D8.1 O SPARC-C Construction of accelerating structures 29 PUD3.5 R RUC Report on potential Upgrades and/or Construction of New R&D

Infrastructures in Europe.30 PU

D6.4 R FINAL_R Final report 30 PUD2.6 O MoA-ITI Memorandum of Agreement on Initial TIARA Infrastructures 33 COD3.6 R JTI Joining the TIARA distributed accelerator R&D Infrastructure

and defining structures for sustaining and maintaining the Infrastructure data base.

33 PU

D4.3 R TTR “Toward TIARA”. Final plan of the collaborative R&D Program. 33 PUD5.4 R PAR Recommendations for Promoting Accelerator Science and

Technology in Europe Report33 PU

D7.2 R RFAmp1-Test Report on commissioning of the first RF amplifier system in the ICTF Hall.

33 PU

D9.2 R TDCC Technical Design Report on the SC Cavity test Cryostat 33 PUD2.7 R MoU-FIE MoU on Financial Model and Engineering 34 COD2.8 R MoU-LID MoU on Legal Issues and Documents 34 COD8.2 R SPARC-T Installation, commissioning and test report of the C-band Linac at

SPARC 35 PU

D1.7 R FTR Final Report 36 COD2.9 O F-MoA Final Memorandum of Agreement 36 COD7.3 R RFSysVI-Spec Report on the design and specification of ICTF RF power

distribution system for MICE Step VI (full ICTF implementation)36 PU

D7.4 R RF_Ampl-DR Design report of a 3 MW power amplifier 36 PUD9.1 R TDIF Technical Design Report of the Multi-MW test Irradiation Facility 36 PU

6

Deliverables

Page 12: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Documentation

60 documents so far in databaseNote : Acknowledgements of the EC have to be included in all TIARA documentsParticularly important for conference papers and publications

Any conference papers and/or publications foreseen?

reports notes conference papers

publicationsWP1 5 2 0 0 WP2 9 0 0 0 WP3 5 1 0 0 WP4 5 0 0 0 WP5 4 0 0 0 WP6 4 3 6 1 WP7 4 0 0 0 WP8 4 2 3 0 WP9 2 0 0 0

Page 13: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Communication, Dissemination and Outreach

Many successful activities on CD&O TIARA Website Databases (infrastructure, education and training) Newsletter (with growing subscribers) Brochure and “Accelerator for Society” website (increasing

consultations) Workshops with industry …

… and also advertising material

Important to use them to promote TIARA

Page 14: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

FCC (TLEP/VHE-LHC)

Recommendations from European Strategy Group

Recommendation #2

High-priority large-scale scientific activities

d) To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update, when physics results from the LHC running at 14 TeV will be available.

CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron-positron high-energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide.

Page 15: TIARA-FAM  Final Annual Meeting R. Aleksan Nov. 25 th, 2013 1.Meeting Objectives 2.General Information 3.Deliverables/milestones

Conclusions

Accelerator science; a powerful mean toward scientific, technical

and industrial breakthroughs…

TIARA will strengthen further

The objectives of TIARA are very ambitious and challenging

The last 2 months are vital as we have to come to a concrete proposal for implementation

Overall Work is progressing very well, but there is still a lot to do for this endeavor to be successful