Letter of Credit Issuer Limits for ERCOT Creditworthiness Standards • WMS endorsed the limits – They are determined by the long-term issuer rating and
the Tangible Net Worth of the Issuer– Reviewing the limits is performed at least yearly– ERCOT’s posted presentation provides statistics regarding
the limits
• This is a voting Item for TAC recommendation– The limits need Finance and Audit Committee
approval
TAC Assignment List Update
WMS Assignments From The TACDate Assignment Status
8/28/14 11/3/11 - NPRR181, FIP Definition Revision, tabled
QMWG will start discussions at their next meeting
8/27/14 Maintenance/Improvement of operational checklist for Resource interconnection
Discussion ongoing at QMWG and will also be taken up at the Joint ROS/WMS meeting on October 6th
4/24/14 Evaluate concerns with bringing RUC units earlier than required because of start-up failures
Conduct a review of the RUC process in the newly created RUC Task Force. Optimize market based tools and minimize RUC.
2/24/14Related to NPRR598, Clarify Inputs to PRC and ORDC – address additional ORDC enhancements including addressing bandwidth oscillations
QMWG review to be conducted on operational data during emergency conditions.
2/27/14 Related to NPRR582, Refinements to Testing ERS – address testing requirements for all Resources. QMWG review ongoing
9/5/13 Review steps ERCOT utilizes in the CDR load forecasts
ERCOT’s analysis of incorporating ERS, Load Resources providing RRS, energy efficiency, and distributive generation in ongoing (~Fall 2014)
Structural review
• TAC directed WMS to combine the RATF responsibilities into the GATF
• WMS Chair’s understanding is that this would entail an update to the GATF charter
• WMS members raised some concern over combining the groups
Load Resources in SCED Update• The LRIS version 2 subgroup continues to work on
proposals to facilitate direct participation in the real-time market by DR QSEs– TAC endorsed LMP – volumetric G on 10/6/2011– The DSWG and LIS Subgroup have identified issues with LMP-VG
• requires assignment of the estimated curtailment back to the specific customer.
• Estimation of load drop for many individual loads (esp. residential) is near impossible
• Need to expand residential DR• Requires LSEs to bill customers for consumption that didn’t occur. PUCT
action likely required
Load Resources in SCED Update
• The LMP - $G approach is the leading alternative– Many details to work though
• What is a fair proxy for the purchase price representative of retail energy price?