0 The Performance of TPC NPPs in 2011 and The Status for Taiwan’s Stress Test upon EU’s Specification Taiwan Power Company June, 2012

The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

0

The Performance of TPC NPPs

in 2011 and

The Status for Taiwan’s Stress Test upon EU’s

Specification

Taiwan Power CompanyJune, 2012

Page 2: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

1

Outline

1. The Performance of TPC’s

NPPs

2.  Responses to Fukushima Accident in TPC’s NPPs

­­

Phase I : Assessment

­­

Phase II : Stress Test 

3. Summary

Page 3: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

2

1. The Performance of TPC NPPs

N

CHINSHAN

MAANSHAN(Westinghouse PWR --

951 MWe

×

2)

(GE BWR-4 --

636 MWe

×

2) KUOSHENG(GE BWR-6 --

985 MWe

×

2)

LUNGMEN(GE ABWR –

1350 MWe

x 2)under construction

Commercial in 1978, 1979

Commercial in 1981, 1983

Commercial in 1984, 1985

Page 4: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

Nuclear Generation: 40.5 billion kWh(company’s best record)

Capacity Factor:93.06% (company’s best record)

Reactor Scram:0 (company’s best record)

Taiwan Power Company 3

1. The Performance of TPC NPPs

in 2011

Page 5: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

4

1. The Performance of TPC NPPs­

Capacity & Gen

Page 6: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

399.8

392.6

384.0

363.3

369.1 370.0

340.9

380.1

373.7

379.4

324.7329.9

334.8339.3

348.5354.1

383.2

389.6

400.3405.292.17

87.95

78.07

85.98

75.09

76.57 76.79

82.72

81.07

82.32

84.52

87.06

79.78

86.9887.94

88.93

90.2889.01

92.32 93.06

310

330

350

370

390

410

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 10070

75

80

85

90

Capacity

Factor %

Capacity factor(Arithmetic Average)

GenerationBillion kWh

1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

1. The Performance of TPC NPPs­

Capacity factor

5

Page 7: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

6

“Zero Scram”

has been lasting for 30 months

1. The Performance of TPC NPPs­

Scram Record

Page 8: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

7

2.

Responses to Fukushima Accident ­

Comprehensive Safety Assessments (CSA)

(1) In the light of the Fukushima accident, ROC President declared that “the comprehensive safety assessments in operation and construction NPPs

shall be undertaken

immediately”

in 311 National Security Meeting.(2) On the basis of proposals made by AEC in April 19, 2011,

TPC plan out 2 Phase of CSA –

Assessments and Stress Test

Carried out Comprehensive Safety Assessments (CSA):

Page 9: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

8

2.

Responses to Fukushima Accident ­CSA

Carried out Comprehensive Safety Assessments (CSA):Be divided into two phases – Assessments and Stress Test.

(1) Phase I: Fully inspected/evaluated various aspects including site selection ,

design basis, maintenance and

operation, accident management, and worked out response programs to reinforce the capabilities of prevention and mitigation of Beyond Design Basis Accident .(CSA report)

(2) Phase II:Identify the robustness of design and

recognize cliff-edge effect and hidden weakness. Refer to EU Stress Test specification and adopt PRA methodology to recognize the cliff edge and verify the effectiveness of countermeasure developed in Phase I.(EU’s Stress Test)

Page 10: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

9

2.

Responses to Fukushima Accident­CSA 

Carried out Comprehensive Safety Assessments (CSA):

Phase Plan NPPs Schedule1 Assessments(11 items,

Seismic Review and Tsunami Review )-(CSA Report)

Plants in Operation

March ~ June , 2011(completed)

Lungmen May ~ December , 2011 (completed)

2 Stress Test (refer to EU stress test

spec.)-(Stress Test Report)

Plants in Operation

July , 2011~February , 2012 (completed)

Lungmen January ~April , 2012 (completed)

Schedule 2-Phase of CSA

Page 11: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

10

2.

Response to Fukushima Accident­CSA Techniques of CSA-Phase I

Inspect capabilities to cope with combined disasters(Reactor、CTMT、SFP)

DBA(Document, Drill, Training,

Environment Changes)

BDBA(Backup Resources,

Unexpected Condition)

Strengthen ProtectionSeismic/Tsunami

Typhoon, Flooding, Mudslide

EP Drill and Management

Enhance MitigationBack up Power

Back upWater Resources

SFP Make upPortable ResourcesStorage, Procedure

Develop Ultimate Response Guidelines

to enhance the defense depth coping with extreme disasters.

Page 12: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

11

According to the results of CSA, 96 key improvement items for operating plants and 67 items for Lungmen site have been developed.

Classified all items under 4 functions :1.Enhance earthquake-resistant capabilities 2.Enhance tsunami/flooding-protection capabilities3.Enhance mitigation resources-

Backup power supply

-

Water resources and injection-

Spent fuel pool cooling

-

Resources preparedness4.New authored Ultimate Response Guidelines (URG)

2.

Response to Fukushima Accident­CSA 

Page 13: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

In addition to Fukushima

designSeismic Category I

POST-FUKUSHIMA

Portable Equipment

12

Enhance mitigation resources – Electric power sourceLOOSP due

to earthquake

AC power supply DC power supply

Emergency D/G

5th (7Th)D/G

Air-cooledG/T

G/T blackout D/G

4.16kV power vehicle

480V portable D/G

Portable generato

r

Spare battery

SS

S S

S

S

S S

F F

FF

F

2.

Response to Fukushima Accident­CSA

Page 14: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

POST-FUKUSHIMA

Seismic Category I

Portable Supply (additional fire truck/pump)

13

Enhance mitigation resources – Diversify water resources

LUHS due to tsunami

AC power supply DC power supply

Design make-up system

RCIC/HPCIManual OP

RAW water make up

Creek/Well/Lake

Sea Water/Dam

Onsite Tank/Condenser

S S

SS

F F

F

F

Alternateheat sink

Reactor safety cooling

S

S

S S

S

2.

Response to Fukushima Accident­CSA

Page 15: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

14

General data about site/plant

Earthquake(Including

DBE+DBF)

Flooding(Including Tsunami)

Extreme natural hazards

Loss of electrical power and loss of ultimate heat sink

Severe accident

management

PRASSC Seismic

Margin

PRA SeismicEvent Tree

PRA TsunamiEvent Tree

Building Openings and

Equipment Elevation

Phase II:Stress Test (Follow EU)

Phase I:Inspect capabilities to cope with combined disasters

2.

Responses to Fukushima Accident­Stress Test Techniques of CSA-Phase II

Page 16: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

15

The Action to Verify the Safety Margin Against Natural Hazards(1)

According to EU Stress Test Specification, Implementing Stress

Test in TPC NPPs

to inspect defense in depth and safety margins and identify Cliff-edge Effect and effectiveness of countermeasures developed in CSA-Phase I. (2) Initiating events

EarthquakeFlooding

(3) Consequence of loss of safety functions from any initiating event conceivable at the plant siteLoss of electrical power, including station black out (SBO)Loss of the ultimate heat sink (UHS)Combination of both

Phase II:Stress Test2.

Responses to Fukushima Accident­Stress Test 

Page 17: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

16

(4) Severe accident management issuesMeans to protect from and to manage loss of core cooling functionMeans to protect from and to manage loss of cooling function in SPFMeans to protect from and to manage loss of containment integrity

(5) Assessment of Safety MarginsSpecify the event tree leading to significant damage to fuel based on findings from probabilistic risk assessments (PSA)Identify scenarios leading to significant damage to fuel, using results of assessment of safety margins in structures, systems and components as input conditions to decide the path the event tree deterministicallySpecify the Cliff Edge in the identified scenarios

Phase II:Stress Test2.

Responses to Fukushima Accident­Stress Test 

Event Tress

Page 18: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

17

(6) Cliff Edge To evaluate cliff edge effect to know potential week points of nuclear

power plants, and confirm effectiveness of countermeasures preventing a severe accident in light of defense in depth approach

(7) ProgressNPPs in Operation:Completed in February, 2012.Lungmen:Completed in April, 2012.

Phase II:Stress Test2.

Responses to Fukushima Accident­Stress Test 

Page 19: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

18

Result –

Identifying Cliff-edge Effect and confirming effectiveness of countermeasures developed in CSA-Phase I.

Plant Design Basis Cliff-edge as original design

CS 0.3g 1.05g(core support structure)

KS 0.4g 0.77g(RCIC DC Switchgear)

MS 0.4g 1.48g(DC Bus Switchgear)

2.

Responses to Fukushima Accident­Stress Test

Initiation Event: : Earthquake

Page 20: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

19

Plant Design Basis

Cliff-edge as original design Cliff-edge with countermeasure

CS 10.73run up(m)

11.2

m(RCIC)

12.20

m(installation gate with 1 meter height is under consideration)

KS 10.28run up(m)

12.30 m(RCIC)

13.30

m(installation gate with 1 meter height is under consideration)

MS 12.03run up(m)

15

m(DC Bus)

16.0

m(installation gate with 1 meter height is under consideration)

2.

Responses to Fukushima Accident­Stress Test 

Initiation Event: : Tsunami

Page 21: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

20

Plant Design Basis

Cliff-edge as original design

Countermeasure forCliff-edge

CS 8 hours 24

hours(isolate non-vital DC load)

With portable D/G

KS 8 hours 24

hours(isolate non-vital DC load)

With portable

MS 8 hours 8

hours(isolate non-vital DC load)

With portable D/G

2.

Responses to Fukushima Accident­Stress Test 

Initiation Event: : Station black out

Page 22: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

21

Plant Design Basis

Cliff-edge as original design

Countermeasure forCliff-edge

CS 8 hours40 hours (CST

storage

capacity)

With fresh water from reservoir(There

is no limitation for water supplying from creek or sea )

KS 8 hours

24

hours (CST

storage

capacity)

With fresh water from reservoir(There

is no limitation for water supplying from creek or sea )

MS 8 hours

40 hours (CST

storage

capacity)

With fresh water from reservoir(There

is no limitation for water supplying from creek or sea )

2.

Responses to Fukushima Accident­Stress Test 

Initiation Event: : Loss of ultimate heat sink

Page 23: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

22

1. Taipower NPPs’ performance keep hitting the new record high. 

2. Action items after 311 earthquake include:Launch comprehensive safety assessments.Multiplied and diversified emergency power and water suppliers.Newly authored “Ultimate Response Guidelines”against Beyond Design Basis Accident.

3.Refer to European practices; impose “Stress Test” on NPP and identify Cliff‐edge Effect and effectiveness of countermeasures developed in CSA‐Phase I.

3.

Summary

Page 24: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

23

Thank you for your attentionThank you for your attention

Page 25: The TPC NPPs in 2011 and The Stress Test upon EU’s ... · 0. The Performance of TPC NPPs in 2011 and. The Status for Taiwan’s Stress Test upon EU’s Specification. Taiwan Power

24

Lungmen NPP Seismic Event Tree