The Sunniberg Bridge. By: Andrew Kim and Pat Wong. - PowerPoint PPT Presentation
Citation preview
Bridge Name Bridge Type: Year: Total Length: Cost: Cost/Length Ratio
Sunniberg BridgePrestressed
concrete, extra-dosed
1998 526 m $16.6 mil $ 31500 /meter
King Hussein's BridgePrestressed
concrete, extra-dosed
1999 110 m $9.7 mil $ 88181 /meter
Odawara Blueway BridgePrestressed
concrete, extra-dosed
1994 270 m $18 mil $ 66666 /meter
Zakim Bunker Hill BridgeSteel, cable-stayed
2005 227 m $115 mil $ 506607/meter
ANZAC BridgePrestressed
concrete, cable-stayed
1996 805 m $62 mil $77018 /meter
“From an engineer’s point of view, it is inconceivable to accept flaws in the structural system and details of disproportionately high cost in return for architectural embellishment. The art of the structural engineer consists of balancing economy and elegance against each other on a case by case base, to achieve the desired objectives.”
• http://www.acsu.buffalo.edu/~bjackson/christianmenn.jpg• http://www.sucoflex.ch/ge/documents/Sunnibergbruecke_Klosters.pdf• http://www.deuring.ch/christian-menn/english/projekte_e/sunniberg_e.htm• http://www.eif.ch/fr/formations/genie/formations/deroulement-de.htm