33
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA FORWARD PLAN OF KEY DECISIONS JANUARY TO APRIL 2013 The Council is required by law to publish once a month a Forward Plan of Key Decisions proposed to be taken over the coming four months. Key decisions are defined as any executive-side matter that is not already delegated to officers which: (i) involves income or expenditure of £100,000 or more; and/or (ii) is likely to have a significant impact 1 on the community in one or more electoral wards. Notes: 1. For example (a) a decision to close a facility, alter services or carry out street works would be a key decision whereas (b) a matter which has no obvious impact on local people, such as an internal Council policy, would not. Where a decision is likely to have a significant impact, but only on a very small number of people, this will not be a key decision if it is under the financial threshold; however, in accordance with good practice, the decision-maker should ensure that those affected are informed in sufficient time for them to have an input into the decision-making process. 2. Responses to consultation documents or representations on external issues where the comments to be submitted are consistent with Council policy and/or are part of an on- going dialogue within that established policy will not constitute a key decision. However, where a significant or substantive new response is required, this will constitute a key decision.

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

THE ROYAL BOROUGH OF KENSINGTON AND

CHELSEA

FORWARD PLAN OF KEY DECISIONS

JANUARY TO APRIL 2013

The Council is required by law to publish once a month a Forward

Plan of Key Decisions proposed to be taken over the coming four

months. Key decisions are defined as any executive-side matter

that is not already delegated to officers which:

(i) involves income or expenditure of £100,000 or more; and/or

(ii) is likely to have a significant impact1 on the community in

one or more electoral wards.

Notes:

1. For example (a) a decision to close a facility, alter

services or carry out street works would be a key decision

whereas (b) a matter which has no obvious impact on

local people, such as an internal Council policy, would

not. Where a decision is likely to have a significant

impact, but only on a very small number of people, this

will not be a key decision if it is under the financial

threshold; however, in accordance with good practice, the

decision-maker should ensure that those affected are

informed in sufficient time for them to have an input into

the decision-making process.

2. Responses to consultation documents or representations

on external issues where the comments to be submitted are

consistent with Council policy and/or are part of an on-

going dialogue within that established policy will not

constitute a key decision. However, where a significant or

substantive new response is required, this will constitute a

key decision.

Page 2: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

3. In the case of any strategy or plan, the key decision or

decisions will be made at the meeting where the strategy

or plan is discussed - or through the individual Cabinet

Member decision route as appropriate. Subsequent

discussion and decisions about the finalising of any text

consequent upon such considerations will not be deemed

to be a key decision.

4. Grants of £20,000 or more to voluntary organisations are

deemed in normal circumstances to have a 'significant

impact on the community' and will therefore be key

decisions.

5. In any case of uncertainty, the matter in question shall be

treated as a key decision. Furthermore the Leader or any

Cabinet Member can give notice that they wish themselves

to take any executive-side decision within their portfolio

that would otherwise fall within an officer's delegated

authority (i.e. recall a specific delegated matter) subject to

the usual requirements around advance publicity on the

Forward Plan.

6. Any matter that does not fall within the above definition is

delegated to the relevant officer of the Authority - albeit

that any officer can, where he sees fit to do so, consult

with the relevant decision-taker prior to taking any

decision falling within his delegated authority.

The attached Forward Plan is a list of all such proposed decisions.

It represents a snapshot of the decisions in the system as at 2

January 2013. This document will be updated on the first working

day of each month. For more up-to-date information, please contact

the Council’s Cabinet Office on 020 7361 3950, or see the version

on the Council’s website at www.rbkc.gov.uk. This is updated

daily.

The Council also offers a weekly e-mail bulletin of current Key

Decisions listed in an easy to digest format. Please contact the

Cabinet Office if you would like to subscribe to this free service.

Page 3: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

Classification of Key Decisions Criteria

♦♦♦

High impact/high public interest: A key decision that is likely to have a major

impact on service users, residents or businesses and where there is prospect of

significant public interest. This decision would be expected to feature planned

consultation with the OSC and the public.

♦♦

High impact/low public interest: Such a key decision would meet all the above

criteria on impact, but would not be expected to be of particularly public interest.

This decision would be expected to feature planned consultation with the OSC and

the public.

Routine/low public interest: A key decision that is of a relatively routine nature

where the OSC would not wish to get involved.

Sir Merrick Cockell

Leader of the Council

Wednesday,2 January 2013

Page 4: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

Forward Plan of Key DecisionsJanuary-April 2013

Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and Environmental Health - Cllr Fiona Buxton (A); Cabinet Member for Civil Society - Cllr Rock Feilding-Mellen (C); Cabinet Member for Family and Children's Services and Education and Libraries - Cllr Elizabeth Campbell (S); Cabinet Member for Finance and IT - Cllr Warwick Lightfoot (F); Cabinet Member for Housing and Property - Cllr Tim Coleridge (H); Cabinet Member for Planning Policy - Cllr Tim Ahern (P); Deputy Leader and Cabinet Member for Environment, Transport and Leisure - Cllr Nicholas Paget-Brown (T); Leader - Cllr Sir Merrick Cockell (L); Full Cabinet (K).

Decision-rating details shown below as follows: ♦ - Routine/low public interest: A key decision that is of a relatively routine nature where the Scrutiny Committee would not wish to get involved.; ♦♦ - High impact/low public interest: Such a key decision would meet all the above criteria on impact, but would not be expected to be of particularly public interest. This decision would be expected to feature planned consultation with the Scrutiny Committee and the public.; ♦♦♦ - High impact/high public interest: A key decision that is likely to have a major impact on service users, residents or businesses and where there is prospect of significant public interest. This decision would be expected to feature planned consultation with the Scrutiny Committee and the public..

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Localising Council Tax BenefitRef: 03891/13/K/AThe Government intends to abolish the national Council Tax Benefit scheme and has asked Councils to replace it with their own local scheme.

The Cabinet will be asked to adopt a localised Council Tax Benefit scheme for 2013-14 which is identical other than in some minor administrative aspects to the current scheme. This means that claimants' award of Council Tax Support would be the same as their current entitlement to Council Tax Benefit.

Officer contact: Nicholas Holgate

Not before10 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦♦♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 1 of 30

Page 5: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Draft Budget ProposalsRef: 03910/13/K/AThis report presents the Council's Council Tax and revenue budget plans for 2013-14 and headlines from its capital investment programme for 2013-14 and beyond for comments. These financial plans are also presented to Scrutiny Committee in January and February 2012 in the form of the individual revenue budget and capital programme reports for the services. A draft version will be considered by Cabinet in January 2013 and a final version will be considered by Cabinet in February 2012 alongside the Council's Council Tax and Revenue Budget 2013-14 report and Capital Programme 2013-14 - 2015-16 before all three reports are recommended for approval in their final form by Council on 6 March 2013.

Officer contact: Nicholas Holgate/Tony Redpath

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦♦♦ Cabinet and Corporate Services Scrutiny Committee

Modernising Older People's Housing and Accommodation with Care Services StrategyRef: 03914/13/K/ATo agree the long term strategy for accommodation with care for older people and agree to a period of consultation on future proposals.

Officer contact: Stella Baillie

Not before11 Jan 13

Full CabinetThe Full Cabinet

The Health, Environmental Health amd Adult Social Care Scrutiny Committee will be consulted at its meeting on 24th January 2013.

No♦♦♦ Health, Environmental Health and Adult Social Care Scrutiny Committee

02-Jan-13 Page 2 of 30

Page 6: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Tenancy StrategyRef: 03816/12/H/AApproval to implement the Tenancy Strategy which sets out the broad objectives for social housing providers in the granting and issuing of social tenancies within the Royal Borough. (Gilly Tobin)

Not before14 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Public consultation Yes♦♦♦ Housing and Property Scrutiny Committee

Housing Revenue Account-Rent Report 2013/2014Ref: 03895/13/H/ATo approve the 2013-2014 HRA Budget and to approve an increase in rents and other charges for 2013/2014.

Steve Mellor

Not before18 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

TMO Board; TCC; Housing and Property Scrutiny Committee.

No♦♦♦ Housing and Property Scrutiny Committee

Housing StrategyRef: 03817/12/H/AApproval to implement the Housing Strategy which sets out how the Borough wants to improve both the quality of accommodation and the lives of people who live there.

Tony Heavey

Not before25 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Public consulations No♦♦♦ Housing and Property Scrutiny Committee

Closure to Traffic of Portobello RoadRef: 03920/13/T/ASeeking approval to make permanent the experimental traffic order relating to Portobello Road between Westbourne Grove and Lancaster Road, on Saturdays between 10am and 4pm.

Contact Officer: Kathryn King

Not before30 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

Local residents, ward members and other interested parties (as part of the statutory consultation process).

No♦♦♦ Public Realm Scrutiny Committee

02-Jan-13 Page 3 of 30

Page 7: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

The expenditure of capital receipt funds arising from the sale of Elm Park Gardens basementsRef: 03736/12/H/AWhere vacant basement areas at Elm Park Gardens have been sold to fund the development of other areas as affordable housing, a surplus has now arisen, which it is proposed to use to contribute to the creation of further new affordable homes, and the improvement of existing Council homes to the regeneration benefit of an area of North Kensington.

[Jane Trethewey]

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Residents of homes affected by the expenditure, the TMO, Ward Councillors, the Lancaster West Estate Management Board.

No♦♦ Housing and Property Scrutiny Committee

Policy for Intermediate HousingRef: 03818/12/H/AApproval to implement a policy for Intermediate Housing in order to create greater flexibility and widen opportunity to local residents working the the borough and others working in the borough and contributing to its economy.

Tony Heavey

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Public consultation Yes♦♦ Housing and Property Scrutiny Committee

02-Jan-13 Page 4 of 30

Page 8: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Procurement for the supply of desktop, portable computers, servers and associated equipment.Ref: 03792/12/F/AEnter into an agreement for the supply of desktops, portable computers, servers and associated equipment for a maximum of five years.

Contact Officer: Barry Goodall

Not before06 Jan 13

Cabinet Member for Finance and ITCllr Warwick Lightfoot

Computer and Communications Advisory Group

No♦♦ Cabinet and Corporate Services Scrutiny Committee

Electric vehicles charging pointsRef: 03690/12/T/ATo approve the installation of two on-street electric vehicle charging points

Contact officer:

Shirley Long

Not before06 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

OSC Public realm No♦♦ Public Realm Scrutiny Committee

Community Infrastructure Levy (CIL) Preliminay Draft Charging Schedule for Consultation.Ref: 03781/12/K/ATo consult on the Council's Community Infrastructure Levy Preliminary Draft Charging Schedule.

Contact Officer: Jon Medlin

Not before11 Jan 13

Full CabinetThe Full Cabinet

A public consultation on the preliminary draft charging schedule will run from mid-June for a period of four weeks. A further formal consultation period for a minimum of four weeks will take place on the Draft Charging Schedule, before an examination in public.

No♦♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 5 of 30

Page 9: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Youth Services: approval of business transfer to Employee-Led Mutual and award of service contractRef: 03846/13/K/ATo approve a business transfer agreement to set up an Employee-Led Mutual, to operate independently from the council, and award a service contract for youth services.Contact: Joanne Hay

Not before11 Jan 13

Full CabinetThe Full Cabinet

Cabinet took a decision on 19 July 2012 to proceed with this arrangement.

No♦♦ Cabinet and Corporate Services Scrutiny CommitteeFamily and Children's Services Scrutiny Committee

Tri-borough Passenger Transport ProcurementRef: 03866/12/K/AConsideration of business case and seeking of approval to proceed with the procurement of a tri-borough passenger transport service for children and adults.Contact: Steve Bywater

Not before11 Jan 13

Full CabinetThe Full Cabinet

None No♦♦ Cabinet and Corporate Services Scrutiny CommitteeFamily and Children's Services Scrutiny CommitteeHealth, Environmental Health and Adult Social Care Scrutiny Committee

Participation in Tri-Borough managed services frameworkRef: 03881/13/K/AWestminster, Hammersmith & Fulham and the Royal Borough have been running a competition for a single supplier for Human Resource and financial transactions. This report will seek Cabinet agreement to proceed with a tri-borough managed services framework.

Officer contact: Nicholas Holgate

This report will have a part B appendix.

Not before11 Jan 13

Full CabinetThe Full Cabinet

None No♦♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 6 of 30

Page 10: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Ellesmere House - Acceptance of Tender from Care UK for Remedial WorksRef: 03364/10/A/BApproval to accept a tender obtained by Care UK, the care provider at Ellesmere Home for Older People, for the remedial works to the home and day centre following the negotiated settlement between the Council and the developer of the home.

Joint decision with Councillor Warwick Lightfoot, Cabinet Member for Finance and IT.

Not before17 Jan 13

Cabinet Member for Adult Social Care, Public Health and Environmental HealthCllr Fiona Buxton

Care UK Ltd. No ‡♦♦ Health, Environmental Health and Adult Social Care Scrutiny Committee

Corporate Services Voluntary Sector Grants Programme 2013-14 & innovation funding 2013-16Ref: 03876/13/C/AAllocation of grants from the Corporate Services Voluntary Sector Grants Programme 2013-14 and innovation funding 2013-16.

Name of Contact Officer: Lucy Ashall

Not before01 Jan 13

Cabinet Member for Civil SocietyCllr Rock Feilding-Mellen

Members of the Cabinet and Corporate Services Scrutiny Committee (through a separate meeting of committee members)

Yes♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 7 of 30

Page 11: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Holmefield House and Greaves Tower - creation of new homesRef: 03681/12/H/AThe development of part of the basement of Holmefield House, and former Family and Children's Services offices in Greaves Tower to create new homes.The Key Decision seeks permission for the Council to provide a unilateral undertaking for each individual development in order to meet planning requirements.

Jane Trethewey

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Holmefield House residents, Residents' Association, TMO, Ward Councillors

No♦ Housing and Property Scrutiny Committee

Private Sector Tenant Protection from Eviction and Enforcement PolicyRef: 03684/12/H/A`The Tenancy Relation Service provices advice and assistance to private sector tenants in the borough who have been unlawfully evicted or are suffering from harassment, intimidation, abuse or threats to evict from their landlord. The policy sets out what the Tenancy Relation Service may do to prevent unlawful evictions and to support those who are unlawfully evicted. (Gilly Tobin)

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Housing advice agencies. No♦ Housing and Property Scrutiny Committee

02-Jan-13 Page 8 of 30

Page 12: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

81 Southern Row and Site at Kensal RoadRef: 03849/12/H/ATo approve appointment of consultant (Simon Rose)

There will be a part B Confidential appendix to this report which is not for publication by virtue of information relating to the financial or business affairs of any particular person (including the authority holding that information).

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

N/A No♦ Housing and Property Scrutiny Committee

Meanwhile Gardens, Kensal Road W10Ref: 03850/12/H/ATo approve the appointment of a consultant. (Simon Rose)

There will be a private part B appendix to this report which is not for publication by virtue of information relating to the financial or business affairs of any particular person (including the authority holding that information).

Not before02 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

N/A No♦ Housing and Property Scrutiny Committee

Use of Commuted Sums: 161 Barlby Road W10Ref: 03890/13/H/ASeeks approval to use commuted sums to convert property from three small bed sit units to single family house.

Stan Logan

Not before04 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

None No♦ Housing and Property Scrutiny Committee

02-Jan-13 Page 9 of 30

Page 13: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Release of additional funding to deliver Tri-Borough IT working arrangementsRef: 03743/12/F/ATo release reserve funding to finance the engagement of IT specialists and temporary staff to allow existing officers to be dedicated to Tri-Borough working projects.

Contact Officer: Barry Holloway

Not before06 Jan 13

Cabinet Member for Finance and ITCllr Warwick Lightfoot

Computer and Communications Group

No♦ Cabinet and Corporate Services Scrutiny Committee

Bi-Borough Pay and Display Machine Maintenance Services - Contract Award -Ref: 03855/12/T/ATo award a contact for the maintenance of Pay and Display Machine in conjunction with the London Borough of Hammersmith and Fulham (LBHF). This is to ensure that the pay and display equipment is properly maintained, that any damage or malfunction is speedily and professionally rectified, and that parts continue to be available for the machines.

There will be a private Part B appendix to this report which is not for publication by virtue of information relating to the financial or business affairs of any particular person (including the authority holding that information).

Contact Officer: Alex Mummery

Not before06 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

None No♦ Public Realm Scrutiny Committee

02-Jan-13 Page 10 of 30

Page 14: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Library Charges 2013-14Ref: 03899/13/S/ATo approve revised levels of fees and charges in libraries from 1 April 2013.contact: Jackie da Silva or Tony Rice

Not before07 Jan 13

Cabinet Member for Family and Children's Services and Education and LibrariesCllr Elizabeth Campbell

None No♦ Family and Children's Services Scrutiny Committee

Malton Road Hub W10-Appointment of iESE constructorRef: 03896/13/H/ATo approve appointment of iESE constructor

Sue Miller

There will be a part B Confidential appendix.

Not before08 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

None No♦ Housing and Property Scrutiny Committee

02-Jan-13 Page 11 of 30

Page 15: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Barlby Pri Sch, Waynflete Sq & Kensal Hse-appt of main contractor for refurbishment & adaptationRef: 03898/13/H/ATo approve the appointment of main contractor for refurbishment and adaptation works to develop specialist provision for children and young people with Special Educational Needs and in particular with regards to the proposed development of provision for primary aged pupils with autism in a unit attached to Barlby Primary School.

This will be a joint decision taken by Cabinet Members for Housing and Property & Family and Children's Services and Education and Libraries.

There will be Part B Confidential appendix.

Derek Harrison

Not before08 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

Full of LifeTMO

No♦ Family and Children's Services Scrutiny CommitteeHousing and Property Scrutiny Committee

02-Jan-13 Page 12 of 30

Page 16: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

The Implementation of the Tri-Borough Adult Reoffending ServiceRef: 03911/13/C/AThe following decisions are required to enable the successful implementation of the service model for tackling adult refoffending as per the Community Budget proposal to central government:

1 To implement a new service model for a 2-year pilot period to reduce adult reoffending of those prisoners sentenced to less than 12 months in custody.

2 To agree to release the funds from the Mayor's Office for Policing and Crime and from Public Health grant to support the 2 year pilot programme

3 To decommission our current approach to the delivery of the Drug Intervention Programme across the three boroughs

4 To approve that Westminster City Council acts as the lead commissioner for the implementation of the Adult Reoffending Service.

5 To approve appropriate governance arrangements and future decision making.

Jnt Dec with Cab Member for ASC, PH & EH.

G Driscoll & S Priestley

Not before09 Jan 13

Cabinet Member for Civil SocietyCllr Rock Feilding-Mellen

Mayor's Office for Policing and CrimeMetropolitan Police ServiceLondon Probation Trust

No♦ Cabinet and Corporate Services Scrutiny CommitteeHealth, Environmental Health and Adult Social Care Scrutiny Committee

02-Jan-13 Page 13 of 30

Page 17: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Kensal House Annex, Ladbroke Grove, W10Ref: 03900/13/H/ATo approve the grant of a new lease.

There will be a Part B (Confidential) Appendix.

Matthew Mitchell

Not before09 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

N/A. No♦ Housing and Property Scrutiny Committee

Tri-Borough Development Partner FrameworkRef: 03916/13/H/AAgreement for the Royal Borough to access the housing developer framework that Westminser City Council has procured through an OJEU process for the potential delivery of new homes.

Jane Trethewey

Not before09 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

N/A. Yes♦ Housing and Property Scrutiny Committee

Localised Social Fund ReportRef: 03897/13/K/AThis report recommends that approval is given to the Tri-borough administration of a new discretionary emergency payment scheme devolved from the Department for Work and Pensions to Local Authorities from April 2013.

Paul Ellary

Not before10 Jan 13

Full CabinetThe Full Cabinet

N/A No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 14 of 30

Page 18: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Council Tax Base 2013-14Ref: 03862/13/K/AThis report seeks a Cabinet recommendation to Council to confirm the use of the existing Local Government Act 2003 Council Tax discount powers and the latest relevant Local Government Finance Act powers (assuming the draft bill becomes law) and, subject to this, confirm the Council Tax base for the financial year 2013-14. This decision will be taken by Cabinet on 10 January 2013 then Council on 23 January 2013

Officer contact: Nicholas Holgate

Officer contact: Nicholas Holgate

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation Yes♦ Cabinet and Corporate Services Scrutiny Committee

Working from Anywhere Technical ImplementationRef: 03878/12/K/AThis Working from Anywhere ICT technical solution would allow access to staff's employing borough ICT service from any location across the three councils' estate. This was driven by tri-borough property rationalisation and the needs of the business, especially services such as ASC and Children's to work more efficiently.

This report will have a part B apppendix

Officer contact: David Gough-Palmer

Not before11 Jan 13

Full CabinetThe Full Cabinet

Consultation with Westminster City Council and the London Borough of Hammersmith and Fulham

Yes♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 15 of 30

Page 19: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Campden Hill, W8 - Planning OverageRef: 03901/13/K/ATo approve the overage due to the Council for improved planning consent obtained by Native Land/Grosvenor for the development of the land that formed part of the Holland Park School

This report will have a part B appendix

Officer contact: Martin Olomofe

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

East Row Children's Home W10 - Appointment of Design and Build ContractorRef: 03903/13/K/AThe report will seek permission to enter into stage 2 of a design and build contract, appointing the contractor for the construction of a new children's home.

This report will have a part B appendix

Officer contact: Richard Merle

Not before11 Jan 13

Full CabinetThe Full Cabinet

Public consultation held on 20th September 2012

No♦ Cabinet and Corporate Services Scrutiny Committee

Colville Primary School, Lonsdale Road, W11 - appointment of main contractorRef: 03904/13/K/ATo approve the appointment of the main contractor

This report will have a part B appendix

Officer contact: Derek Harrison

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 16 of 30

Page 20: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Acquisition of the retail unit at Silchester Garages Redevelopment SiteRef: 03905/13/K/ATo approve the acquisition of the retail unit at Silchester Garages Redevelopment Site

This report will have a part B appendix

Officer contact: Danielle Torpey

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

Cheyne Walk, SW10 - new lease of advertising hoardingRef: 03907/13/K/ATo approve the new lease of the advertising hoarding

This report will have a part B appendix

Officer contact: Matthew Mitchell

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

Oremi Centre, 5 Golborne Road W10 and 2nd floor and roof garden, 1-9 St Marks Road - New LeasesRef: 03908/13/K/ATo approve new leases

This report will have a part B appendix

Officer contact: Matthew Mitchell

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 17 of 30

Page 21: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Shalfleet Drive, W10 - acquisition of leaseholder interestsRef: 03909/13/K/AApproval to acquisition of leaseholder interests to enable phase two of the Silchester Garages site redevelopment scheme to provide affordable housing units. This is part of the Unilateral Undertaking in respect of the Holland Park School land development scheme.

This report will have a part B appendix

Officer contact: Martin Olomofe

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

Conference and Events ReviewRef: 03912/13/K/AThis report provides an overview on the Council's Conference and Events business and seeks approval to restructure the business unit

This report will have a part B appendix

Officer contact: Joanne Gordon

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 18 of 30

Page 22: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

National Non-Domestic Rates Forecast 2013-14Ref: 03915/13/K/AThis report seeks a Cabinet recommendation to Council to confirm the National Non Domestic Rates income forecast for the financial year 2013-14. The government's Business Rates Retention scheme should be in place from 1 April 2013. Under this scheme local authorities will retain a proportion of the business rates collected locally and will therefore be required to set their budgets taking account of a local forecast of any change in business rates income. This decision will be taken by Cabinet on 10 January 2013 then Council on 23 January 2013

Officer contact: Nicholas Holgate

Not before11 Jan 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

To access the Meals Service ContractRef: 03827/12/A/ATo enter into a Call Off Agreement to access the Meals Service Contract let under a Framework Agreement by Hammersmith & Fulham. RBK&C were named in the advert and are entitled to start to access the service at any date from 1st December 2012 to 30th November 2013 for a period which will expire before or on 30th November 2017.PART B APPENDIX

Contact officer: Tim Lothian, Hammersmith & Fulham

Not before17 Jan 13

Cabinet Member for Adult Social Care, Public Health and Environmental HealthCllr Fiona Buxton

Westminster Service User Group were consulted on the Service Specification.

No♦ Health, Environmental Health and Adult Social Care Scrutiny Committee

02-Jan-13 Page 19 of 30

Page 23: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Extend the Contract for the Provision of Decriminalised Traffic and Parking Enforcement ServicesRef: 03838/12/T/ARequest to extend the existing Contract with NSL Ltd. for a further three years at a value of £5.8 million with the purpose of providing the service for the provision of operating a decriminalised traffic and parking enforcement operation. The breakpoint of the contract expires 2 July 2013. The extension will allow the contract to expire on 1 July 2016.

Contact Officer: Jacqueline Joseph

Not before17 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

None No♦ Public Realm Scrutiny Committee

London Borough Grants Scheme 2013-14Ref: 03884/13/C/ATo agree the Royal Borough's contribution to the grants scheme managed by London Councils.

(Lucy Ashall)

Not before18 Jan 13

Cabinet Member for Civil SocietyCllr Rock Feilding-Mellen

None No♦ Cabinet and Corporate Services Scrutiny Committee

Continuation of Services from Families and Children Third Sector OrganisationsRef: 03845/12/S/ATo extend existing third sector contracts. The extension will allow time for a thorough commissioning process to be followed for each service area.

Contact: Paul Williamson

Not before24 Jan 13

Cabinet Member for Family and Children's Services and Education and LibrariesCllr Elizabeth Campbell

Kensington and Chelsea Social Council

No♦ Family and Children's Services Scrutiny Committee

02-Jan-13 Page 20 of 30

Page 24: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Tri-borough strategy for alternative provisionRef: 03875/12/S/ATo endorse the Tri-borough strategy for alternative provision.Contact: Ian Heggs

Not before24 Jan 13

Cabinet Member for Family and Children's Services and Education and LibrariesCllr Elizabeth Campbell

schools, headteachers, learners, experts and staff

No♦ Family and Children's Services Scrutiny Committee

Access to Framework Agreement for Independent Fostering AgenciesRef: 03880/12/S/BTo agree access to a framework agreement prepared by West London Alliance (on behalf of RBKC, LBHF, WCC and six other local authorities) to engage a number of independent fostering agencies to provide foster placements to looked after children at a better price than is available through spot purchasing, which is the current arrangement for procuring these placements.

Not before24 Jan 13

Cabinet Member for Family and Children's Services and Education and LibrariesCllr Elizabeth Campbell

None No♦ Family and Children's Services Scrutiny Committee

02-Jan-13 Page 21 of 30

Page 25: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Re-let of Graffiti and Fly Posting Removal ContractRef: 03888/12/P/AThe London Borough of Hillingdon has set up a contract with a service provider for them to provide graffiti removal services which other participating authorities can call upon on an ad hoc basis. The London Borough of Hillingdon has invited the Royal Borough of Kensington and Chelsea to access the services provided under their contract. The Royal Borough's own contract came to an end on 31st May 2012, and since then an interim agreement has been made to renew the contract on a monthly basis. The contract now needs to be re-let for an extended period. The key decision will recommend access and use of the London Borough of Hillingdon contract.

Contact Officer: Perez Calvo

Not before24 Jan 13

Cabinet Member for Planning PolicyCllr Tim Ahern

None No♦ Public Realm Scrutiny Committee

02-Jan-13 Page 22 of 30

Page 26: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Framework Contract Award For Polythene Waste and Refuse Sacks and BagsRef: 03837/12/T/ATo seek approval to award a Framework Contract for Polythene Waste and Refuse Sacks and Bags.

There will be a private Part B appendix to this report. Not for publication by virtue of information relating to the financial or business affairs of any particular person (including the authority holding that information).

Contact Officer: Kathy May

Not before24 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

None Yes♦ Public Realm Scrutiny Committee

Annual review of charges for Transportation and Highway servicesRef: 03879/12/T/ASeeks approval to increase the charges for certain miscellaneous Transportation and Highways services with effect from 1 April 2013.

Name of Contact Officer: Ian Davies

Not before24 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

None No♦ Public Realm Scrutiny Committee

Kensington Park/Elgin Crescent Review of Trial MeasuresRef: 03883/12/T/AThe report reviews the trial and recommends that the experimental changes at the junction should be made permanent and the traffic signals removed.

Contact Officer: Bob Romei

Not before24 Jan 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

None No♦ Public Realm Scrutiny Committee

02-Jan-13 Page 23 of 30

Page 27: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

January 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Elm Park Gardens-Unilateral UndertakingRef: 03921/13/H/AThe Council is seeking planning consent for the use of empty basement spaces for residential accommodation, and must enter into a unilateral undertaking to satisfy the s106 requirements associated with the consent it seeks.

Jane Trethewey

Not before28 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

None No♦ Housing and Property Scrutiny Committee

Denyer St Dept SW3-Appt of Proj Mgr, Quantity Surveyor and Employer's Agent Consultancy Serv.Ref: 03885/12/H/AApproval of appointment of project manager, quantity surveyor and employer's consultancy service.

[Paul Snoddy]

Not before31 Jan 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

None No♦ Housing and Property Scrutiny Committee

02-Jan-13 Page 24 of 30

Page 28: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

February 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Revenue Budget and Council Tax 2013-14Ref: 03887/13/K/AThis paper sets out proposals for the Council's Revenue Budget and Council Tax to be recommended to Council on 6 March 2013. It also outlines the medium term financial plan for the Council for the period from 2013-14 to 2015-16.

Final approval will be given at the Council meeting on 6 March 2013.

Officer contact: Nicholas Holgate

Not before21 Feb 13

Full CabinetThe Full Cabinet

Consulted on as part of overall Business and Financial Planning consultation (as set out in the Cabinet Business Plan).

No♦♦♦ Cabinet and Corporate Services Scrutiny Committee

Capital Programme 2013-14 - 2015-16Ref: 03893/13/K/AThis paper sets out the Capital Programme for the next three years with proposals for funding the programme. The decision will be taken by Cabinet on 21 February 2013 and then full Council on 6 March 2013

Officer contact: Nicholas Holgate

Not before22 Feb 13

Full CabinetThe Full Cabinet

Consulted on as part of overall Business and Financial Planning consultation.

Yes♦♦♦ Cabinet and Corporate Services Scrutiny Committee

2012-13 Budget Monitoring Quarter 3Ref: 03894/13/K/ATo agree budget virements and/or transfers to/from reserves as outlined in the report.

Officer contact: Nicholas Holgate

Not before22 Feb 13

Full CabinetThe Full Cabinet

No external consultation No♦♦♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 25 of 30

Page 29: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

February 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Proposals to Modify Accommodation and Reconfigure Services Delivered from Ellesmere HouseRef: 03913/13/K/ATo approve the modification of the ground floor of Ellesmere House and create extra nursing beds in this facility.

Officer contact: Stella Baillie

Not before22 Feb 13

Full CabinetThe Full Cabinet

The Health, Environmental Health and Adult Social Care Scrutiny Committee will be consulted at its meeting on 24th January 2013.

No♦♦♦ Health, Environmental Health and Adult Social Care Scrutiny Committee

Opera Holland Park Transfer ProcessRef: 03588/11/T/AAn independent Opera Holland Park

Not before06 Feb 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

Friends of Opera Holland Park

Consultant David Elford

No♦ Public Realm Scrutiny Committee

Eco House, Holland Park, W8 - Outline BudgetRef: 03852/12/K/AApproval to outline budget

Officer contact: Carl Ainley

This report will have a part B appendix.Exempt from publication for the following reason - Information relating to the financial or business affairs of any particular person (including the authority holding that information)

Not before22 Feb 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 26 of 30

Page 30: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

February 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Chelsea Academy, Lots Road, SW10 - ExtensionRef: 03864/12/K/ATo agree terms for the development and leaseback of accommodation for the Chelsea Academy 6th form extension

This report will have a part B appendix

Officer contact: Danielle Torpey

Not before22 Feb 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

Basements, Elm Park Gardens, SW10 - Leasehold DisposalRef: 03902/13/K/ATo approve the leasehold disposal

This report will have a part B appendix

Officer contact: Simon Rose

Not before22 Feb 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

20 Kingsbridge Road, W10 - transfer of site from PCT to RBKCRef: 03906/13/K/ATo approve the transfer of 20 Kingsbridge Road, W10 from the PCT to RBKC

This report will have a part B appendix

Oficer contact: Joseph Baugh

Not before22 Feb 13

Full CabinetThe Full Cabinet

No external consultation No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 27 of 30

Page 31: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

March 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Remote Housing and Council Tax Benefit Processing TenderRef: 03889/13/F/BA report to the Leader's Group in November 2012 agreed a new local scheme will be administered by RBKC Housing Benefit Section on behalf of Tri-Borough authorities. It was proposed that the vacancies that arise will be filled with an off-site Housing Benefit processing contractor and as the tender value is over £100,000 member approval is required.

There will be Part B Confidential Appendix.

Paul Ellary

Not before01 Mar 13

Cabinet Member for Finance and ITCllr Warwick Lightfoot

Leader's Group No ‡♦ Cabinet and Corporate Services Scrutiny Committee

Phase 3 London Cycle Hire Scheme ProjectRef: 03922/13/T/AImplementation of Phase 3 of London Cycle Hire Scheme Project, Cycle Hire Expansion and Intensification.

Contact Officer: Sidonie Forrest-Brown

Not before19 Mar 13

Deputy Leader and Cabinet Member for Environment, Transport and LeisureCllr Nicholas Paget-Brown

TfL and Ward Councillors No♦ Public Realm Scrutiny Committee

02-Jan-13 Page 28 of 30

Page 32: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

April 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Tri borough Local HealthWatchRef: 03861/13/C/AFor the Royal Borough of Kensington and Chelsea, London Borough of Hammersmith and Fulham and Westminster City Council to deliver a Local HealthWatch in each local authority

Stephen Morgan

Not before01 Apr 13

Cabinet Member for Civil SocietyCllr Rock Feilding-Mellen

Consultation with Cllr F Buxton and Cllr E Campbell since the Local HealthWatch will have an impact on their respective policy areas. A tri-Borough Key Decision Report will be used.

No♦♦♦ Cabinet and Corporate Services Scrutiny CommitteeHealth, Environmental Health and Adult Social Care Scrutiny Committee

Corporate Services and Charges for 2013/14Ref: 03918/13/H/ATo set fees and charges for the Conference and Events (Halls Lettings) Service.

Lyn Myers/ Hitendra Godhana

Not before01 Apr 13

Cabinet Member for Housing and PropertyCllr Tim Coleridge

None No♦ Housing and Property Scrutiny Committee

Corporate Services Fees and Charges for 2013/14Ref: 03919/13/P/ATo set fees and charges for the Registrars' Service.Lyn Myers/ Hitendra Godhania

Not before01 Apr 13

Cabinet Member for Planning PolicyCllr Tim Ahern

None No♦ Cabinet and Corporate Services Scrutiny Committee

02-Jan-13 Page 29 of 30

Page 33: THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA ... plan January 2013...Decision-maker reference details shown below as follows: Cabinet Member for Adult Social Care, Public Health and

April 2013

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Roll over of adult social care grants 2013-14Ref: 03851/13/A/AThis key decision report will set out the recommendation to Roll Over AdultSocial Care grants for the financial year 2013 -14, the reasons for doing soand the proposals for longer term arrangements for these grants.

Contact officer:

Pete McDonnell Strategic Commissioning

Not before17 Apr 13

Cabinet Member for Adult Social Care, Public Health and Environmental HealthCllr Fiona Buxton

1) Local Third Sector Providers2) The Kensington and Chelsea Social Council

No♦ Health, Environmental Health and Adult Social Care Scrutiny Committee

+ 4 Months

ReferralCommittees

Key Decision to be considered Decision Maker Reportavailable

Main Consultees Date to be implemented

To contact all decision makers call the Town Hall Cabinet Office on 020 73613950 or e-mail [email protected]‡ contains exempt information. Summary available on request.

Rating

Opera Holland Park - An Independent OperaRef: 03768/12/K/ATo separate Opera Holland Park from the Council, and launch it as an independent company.

This report will have a part B appendix

Officer contact: Tot Brill

Not before21 Jun 13

Full CabinetThe Full Cabinet

No external consultation No♦♦ Cabinet and Corporate Services Scrutiny Committee