___________________________________________________________________________ 2013/SOM3/SCSC/WKSP2/015 Session 6 The Role of Building Energy Modeling in Design Practice in Indonesia Submitted by: Indonesia Joint APEC-ASEAN Workshop - How Building Information Modeling Standards Can Improve Building Performance Medan, Indonesia 24-25 June 2013

The Role of Building Energy Modeling in Design Practice in ...mddb.apec.org/Documents/2013/SCSC/WKSP5/13_scsc_wksp5_015.pdf · The Role of Building Energy Modeling in Design ... 06/07/2013

Embed Size (px)

Citation preview

___________________________________________________________________________

2013/SOM3/SCSC/WKSP2/015 Session 6

The Role of Building Energy Modeling in Design Practice in Indonesia

Submitted by: Indonesia

Joint APEC-ASEAN Workshop - How Building Information Modeling Standards

Can Improve Building Performance Medan, Indonesia

24-25 June 2013

06/07/2013

1

BIM WORKSHOP06/07/2013

The Role of Building Energy Modeling in Design Practice in Indonesia

Dr.techn. Rahmi Andarini6 July 2013

1

BIM WORKSHOP06/07/2013

Fact Base•Energy crisis•Government has to subsidize the domestic use of energy•Less subsidies for other sectors

(MEMR 2009)

2

06/07/2013

2

BIM WORKSHOP06/07/2013 3

Jakarta (Megacity)Area    : 750 km²Population : 8.5 millions Density      : 12,738 /km²

Surabaya (Metropolitan)Area      : 290 km²Population    : 3.23 millions Density         : 10,721 /km²

Fact BaseCities Growing Rapidly

BIM WORKSHOP06/07/2013

The trend of amount of sold electricity by State Electricity Company DKI Jakarta (Source : PT PLN Persero Jakarta, 2012)

4

Fact BaseEnergy Consumption’s Growing 

06/07/2013

3

BIM WORKSHOP06/07/2013

����

�����

����

����� �

Indonesian ethnic house

5

BIM WORKSHOP06/07/2013 6

Indonesia’s current situation

06/07/2013

4

BIM WORKSHOP06/07/2013

Weather Data i.e. Jakarta vs Graz

7

Influence of weather

Jakarta, 7.4° South Latitude Graz, 47 ° North Latitude

BIM WORKSHOP06/07/2013 8

DISTRIBUTION OF ENERGY CONSUMPTION TYPE

AC (%)

ELEV/ESC. (%)

LIGHTING (%)

OTHERS (%)

1. Office a. Government 46,80 1,80 21,10 30,30 b. Private 45,74 3,20 21,00 30,05 2. Shopping Center 51,55 4,78 18,57 25,10 3. Office & Shopping Center

47,56 3,82 14,82 33,80

4. Hospital a. Public 60,25 4,43 10,82 24,50 b. Private 62,04 4,27 11,77 21,92 5. Hotel a. Five Stars 60,18 6,44 14,54 18,84 b. Four Stars 60,15 7,68 9,57 22,40 c. Three Stars 65,40 16,10 10,40 8,10 6. Mall 51,90 0,92 11,95 35,20 7. Apartment 53,45 6,75 12,25 27,55 Source : KONEBA, PT. 2006, Survey results in 60 buildings in Jakarta, Indonesia.

Cooling dominates the energy consumption!!!

Energy Consumption for Commercial Building (PT Koneba, 2006)

06/07/2013

5

BIM WORKSHOP06/07/2013 9

• Energy efficient buildings are ofcrucial importance in a context wherecities are booming

• Method on energy efficient building design should be made available

• The existing standards and guidelinesshould be more integrated and comprehensive

• Raising awareness campaign and behaviour changes towards energy effieciency 

Therefore...

BIM WORKSHOP06/07/2013 10

The opportunity to change the design is unlimited during the planning stage, and requires no cost 

Source : Müller, C., 1999

Impact of Energy Efficient Design

06/07/2013

6

BIM WORKSHOP06/07/2013 11

Building GeometryWeather Data

INPUTS

Construction MaterialInternal Gains

SIMULATION

Schedules People, Equipments, Lightings

InfiltrationHVAC

RESULT

SENSITIVITY ANALYSISRECOMMENDATIONS

FOR ENERGY EFFICIENT BUILDING

Building Thermal Simulation & Analysis

BIM WORKSHOP06/07/2013 12

Case IRenovation Project DGNREEC ‐MEMR 

06/07/2013

7

BIM WORKSHOP06/07/2013 13

16 January , 09.00 16 January , 15.00

Case IRenovation Project DGNREEC ‐MEMR 

BIM WORKSHOP06/07/2013 14

16 July , 09.00 16 July , 15.00

Case IRenovation Project DGNREEC ‐MEMR 

06/07/2013

8

BIM WORKSHOP06/07/2013 15

Case IRenovation Project DGNREEC ‐MEMR 

BIM WORKSHOP06/07/2013 16

Case IRenovation Project DGNREEC ‐MEMR 

06/07/2013

9

BIM WORKSHOP06/07/2013 17

Case IRenovation Project DGNREEC ‐MEMR 

BIM WORKSHOP06/07/2013

No  Scenario Recomendation 

How Consideration 

1. Primary Recommendation 1Improving Lighting Devices  o Task Lighting

o Rearrange Lighting Zone  o Replacing TLT8 with TLT5 o Housekeeping control on lighting 

 

Potential Saving

Investment Cost 

Level of difficulty for Installation  

     

     

     2. Primary Recommendation 2Recommendation 1 and Improving glazing material performance + Chiller Efficiency  

o Recommendation 1o Replacing glaze material with SHGC = 0.371; LT = 

0.309; U value = 5.797 W/m2 K o Chiller Effiency by: 

Conduct online measurement to test overall chillers condition 

Check performance of AHUs  Replace the old control valve of AHU  House Keeping and Maintenance 

Potential Saving

Investment Cost 

Level of difficulty for Installation 

  

     

     

     

 

18

Case IRenovation Project DGNREEC ‐MEMR 

06/07/2013

10

BIM WORKSHOP06/07/2013

No  Scenario Recomendation 

How Consideration 

3. Secondary RecommendationFloor and Ceiling Material 

 o Using Carpet Floor and Acoustic Ceiling 

 Noise Reduction 

Investment Cost 

Level of difficulty for Installation 

  

     

     

     

4. Additional Recommendation Improving Operational Procedure 

o Installing power meter for MVAC, Lighting, and Plug load separately, so that the energy consumption of each load can be monitored. 

o Installing BAS in order to monitor & control the energy consumption  

o Occupant education to increase the awareness of energy efficiency, such as broadly campaign that the comfort indoor air temperature is 25OC + 1OC, efficient use of lighting device, and so on 

Potential Saving 

Investment Cost 

Level of difficulty for Installation 

  

     

     

     

 

19

Case IRenovation Project DGNREEC ‐MEMR 

BIM WORKSHOP06/07/2013 20

Case IIDesign Project Graha Kirana Megah

06/07/2013

11

BIM WORKSHOP06/07/2013 21

Case IIDesign Project Graha Kirana Megah

Building GeometryZoning

BIM WORKSHOP06/07/2013 22

Case IIDesign Project Graha Kirana Megah

Solar Heat Gain

06/07/2013

12

BIM WORKSHOP06/07/2013 23

Case IIDesign Project Graha Kirana Megah

Solar Heat Gain

BIM WORKSHOP06/07/2013 24

Case IIDesign Project Graha Kirana Megah

Daylighting

Alternative I Alternative II Alternative IV

06/07/2013

13

BIM WORKSHOP06/07/2013 25

Alternative V Alternative VI

Case IIDesign Project Graha Kirana Megah

Daylighting

BIM WORKSHOP06/07/2013 26

Case IIDesign Project Graha Kirana Megah

Cooling

06/07/2013

14

BIM WORKSHOP06/07/2013 27

Conclusions

• Building Thermal Simulation is an effective design tool towards Energy efficient buildings

• Building thermal simulation should be included in the standard/guideline of energy efficient buildings.

BIM WORKSHOP06/07/2013 28