1

 · the river level to feed the hydroelectric power plant (3 Francis Turbine, total 132 MW), located 330m below the water reservoir. During her internship, the trainees greatly benefitted

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview