14
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

Embed Size (px)

Citation preview

Page 1: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

The PDM-blockThe PDM-block

M. Casolino on behalf of JEM-EUSO collaborationEUSO-BALLOON Phase A review

2nd February 2012, CNES, Toulouse

Page 2: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

PDM Block and the instrumentPDM Block and the instrument

22

Page 3: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• The PDM, which stands for Photo Detector Module, consists in 36 MAPMTs (grouped in 9 Elementary cells and arranged in matrix of 6x6) equipped with UV filters and their associated electronic chain. The PDM has a well defined mechanical structure that welcome all these elements

What is the PDM unit ?What is the PDM unit ?

33

Page 4: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• Functional RequirementsIt is the core element to detect the UV light coming from the optics.

• Size167 mm x 167 mm x 200 mm (TBC) corresponding to the mechanical structure, the MAPMT and electronic (EC_dynode, Ec_anode, EC_HV, EC_ASIC, PDM board, HV box (LVPS + switches))

• Mass The total weight is given by the mechanical structure (0,730 kg)+ electronic (~ 1,7 kg) + MAPMT (1,125 Kg) and HV box (300 g TBC) + PDM Board (145 g) + LVPS (150 g). All those numbers are TBC.

• Power budgetAbout 300 mW for one EC without MAPMT. Therefore 2.7 W for the 9 EC units. HV box is about 800 mW total. The power consumption of the PDM board (1.8 W) and the switches should be added. All those numbers are (TBC).

Technical specificationsTechnical specifications

44

Page 5: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

Mechanical StructureMechanical Structure

Page 6: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

Mechanics PrototypeMechanics Prototype

Prototypes of the PDM structure already manufactured by the INFN- National Laboratories in Frascati, Italy.

Page 7: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• The PhotoMultiplier (MAPMT) and the Filters• The ASIC (ASIC)• The Elementary Cell (EC)• The High Voltage Power

Supply (HVPS) and Switches (SW)• The PDM Board (PDMB)

PDM unit descriptionPDM unit description

77

Page 8: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• 9 elements each with 4MAPMTs

• for a total of 36 MAPMTS

EC boards (P. Barrillon)EC boards (P. Barrillon)

Page 9: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• 6 elements each with 6ASICs on each• Total of 36 ASICs • 6 connectors to PDM-FPGA board

EC ASIC board (P. Barrillon)EC ASIC board (P. Barrillon)

ASICASICASIC

68 pins

ASIC

68 pins

68 pins

ASIC

68 pins

68 pins

ASIC

68 pins

At least120 mm needed.

~40 mm

~ 60 mm

~ 20 mm

~ 150 mm

120 pins

Page 10: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

• 1 board in the PDM• Interfaces to 6ASIC boards• Interfaces to CCB board• Interface to LV power supply

PDM FPGA boardPDM FPGA board

Page 11: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

Functional Requirements,• first-level trigger algorithm,

and the interface with the EC board and CCB board.

• Housekeeping and other operation-related functions are also controlled by the FPGA chips.

• Clocks at 40MHz and 400kHz are received from the CCB and distributed to EC boards.

• From the EC boards, the data transmission is running at the rate of 400kHz. To the CCB, the data transmission rate is at a lower level, 7Hz (TBC).

The PDM Board (PDMB)The PDM Board (PDMB)

Page 12: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

LVPS and switches, HV box (P. Gorodetzky)LVPS and switches, HV box (P. Gorodetzky)

Page 13: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

Risk analysisRisk analysis

1313

• EC boards not available in due time• Mechanical integration problems• Delay in PDM assembly/integration• Electronics integration problems• Common noise• Grounding loops• Failure of 1 component (EC, HV, PDM, ASIC after

integration…)• Maquette and electrical protype needed• Spares need to be produced. • Help will come from TA-EUSO experiment which

will produce a prototype

Page 14: The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse

GANT chart and development planGANT chart and development plan

Special Thanks to P. Barrillon for the layout.