The Molo Graphite Project Madagascar
1
November 2013
December 2013
Project
Ocean Ports
TSX:EGZ | OTCQX:ENZR | FWB:YE5
We are evolving our company from mine exploration to mine development.
Rio Tinto $1 Billion Mineral Sands Project
Sherritt, Sumitomo, KORES $6.5Billion Ambatovy Nickel & Cobalt Project
Africa
Shipping Port in Taolagnaro
Sakoa Coal Project $400M (e)
Green Giant Graphite Project
• Located in the southern arid region of Madagascar
• $Billion+ mining projects established in-country
• Mining industry viewed as very positive by government
Japan
Green Giant Graphite Project, Fotadrevo, Madagascar
Shipping Port in Tulear
3
WTR Mineral Sands $200M (e)
Sherritt/Glencore Limestone
EU
China
India
South Korea
Japan
Molo Deposit Madagascar
Molo is located within the hub of top purchasing and processing markets for flake graphite.
4
• Never exceeded 12,000 TPA production
• Remaining mines are family-owned, small and rudimentary
• Located in environmentally sensitive areas with no possibility of expansion
Typical Madagascar Flake Graphite Setting
5
Madagascar has been renowned as a producer of high-quality, large flake graphite for over a century.
• Flat, grassland with sparse vegetation
• Very low population density
Molo Flake Graphite Setting
6
Arid setting and low population density have prompted top government officials to state the project is ‘perfectly situated’.
Sedimentary Metamorphic
Intermediate Pressure Granulite
High Pressure Granulite
Energizer’s Property is situated in a Very Rare and Unique Geological Setting
Transpressive lithospheric shear zone
• Within the highest grade, medium pressure metamorphic facies
• Energizer has secured ~80% of this zone
• 100% owned
7
• 84.04 Mt indicated resources @ 6.36% C, above a 2% C cut-off
• 40.34 Mt inferred resources @ 6.29% C, above a 2% C cut-off
• Easily expandable to meet additional market demand as required
Japan
8
One of the largest flake graphite deposits in the world. (NI 43-101 compliant)
NI 43-101 compliant resource
Surface Mining Open Pit Mining • Immediately at surface
• No overburden
• Minimal waste-to-ore ratio
• Continuous mineralization throughout
• Open along strike and at depth
9
Recovery: 89% Average Head Grade: 8.5 % Annual Production Graphite: 84,000T/year Open Pit Mining Strip Ratio 1.65 Operating Costs: US$418.45/T
NPV 10% discount: US$421M IRR: 48% Payback: 3 years
10
Preliminary Economic Assessment Study Results
Robust Mine Economics
Molo Graphite Deposit – Very Large and Expandable
11
• 120 km (75 mile) long property
• Total graphite strike length > 320 km (199 miles)
• Additional tonnage available immediately around Molo
• Molo is one of many graphite zones (17) on Green Giant property
20-50 MT
80-150 MT
5-15 MT
30-50 MT
20-40 km 12-15 km 5-10 km
40-60 km
40-60 km 40-60 km
5-10 MT
12
Multiple Graphite Types Identified on Property
Vein Hydrothermal Breccia
High Grade (to 71.94% in
outcrop) Acicular Flake
100% Owned Property
13
Largest market
Why are we targeting flake graphite?
Refractory Battery Consumer Electronics
Require Flake Graphite
Largest potential market
Fastest growing market
14
• 98% purity through flotation
• 47% of flakes are Large and Jumbo (>80 mesh)
• 99.9% purity confirmation by GDMS analysis
Technical Milestones Achieved for Target Markets
Current testing underway to ascertain costing to achieve >99.9% purity
15
Composite Bulk Sample for Pilot Plant
16
Composite Bulk Sample
17
Molo Metallurgical Results
•+100 33.3% @ 94.9%C •+200 36.1% @ 93.3%C • -200 30.6% @ 82.1%C Mintek
•+48 22% @ 97.4%C •+65 18% @ 96.7%C •+80 8% @ 95.7%C •+100 11% @ 96.0%C •+200 22.6% @ 95.2%C • -200 18.5% @ 95.9%C
SGS
89% Recovery 1:1.65 Strip Ratio
95% Recovery 1:0.07 Strip Ratio
PEA
Pilot Plant
Process allows Energizer to adjust product specs according to market needs
18
Process Flow Accommodates Different Product Streams
Ore Flash Flotation Grind Flotation
Grind
+80 mesh
+150 mesh
-150 mesh
Grind
Grind
Grind
Cleaner
Flotation
Flotation
Flotation
Africa’s leading mine construction and operations company already in place to develop the Molo mine.
A top director of DRA is on Energizer’s Board.
19
Minopex, a wholly owned subsidiary of DRA, can operate the Molo mine.
The Panalpina Group, the world’s largest mining logistics company, and has confirmed the in-place infrastructure at Molo is serviceable to operate a graphite mine today.
The Right Expertise in Place
Labradorite quarry Sakoa Coal Project
Limestone (Sherritt & Glencore)
Mineral Sands (WTR)
Molo
20
Existing Road to coast ~ 160 km
Trucking Transhipment
Container Shipping
In-Place and Serviceable Infrastructure The Molo project will benefit from, but is not at all dependant upon, the upgrading of infrastructure planned for other projects.
PORT of TULEAR PORT of SOALARA
20-tonne dimensional stone blocks are trucked out daily to the port of Tulear.
21
Existing Road Network Supports a Graphite Mine
We are hitting all milestones for mine development.
Graphite Discovery
Exploration
•41 DDH (8,459 m) •18 trenches (2,100 m)
2016 Q1-2 2015 Q3-4 2015 Q1-2 2014 Q3-4 2014 Q1-2 2013 Q3-4 2012 Q3-4 2012 Q1-2 2011 Q3-4 2013 Q1-2
Accelerated Timeline - Exploration through to Production
Resource Delineation
•Airborne and ground geophysics •20 DDH (2,842 m)
Preliminary Economic Analysis
MINE DEVELOPMENT TIMELINE
Rapid Development of Project In the space of just five years, Energizer anticipates the project will have evolved from discovery through to production.
NI 43-101 Resource
Pilot Plant Testing
Environmental Baseline Study Environmental Impact Assessment
Mining Permit Application
Bankable Feasibility Study
LGIM Application
Mine Construction
Mine Commissioning
Full-scale Production
2007
2008
2009
2010
2011
2012
2013
2014
Madagascar Government Energizer Resources has been operating in Madagascar since the fall of 2007.
Marc Ravoalamana Andry Rajoelina Dr. J-L Robinson or Hery Rakotoarimanana
Started exploration Identified one of largest
vanadium deposits in the World
NI 43-101 Indicated V2O5 resource of 49.5MT @ 0.693%
Discovered graphite
NI 43-101 Indicated graphite resource of 84.04MT @ 6.36% and Inferred resource of 40.34MT @ 6.29%
Published extremely positive PEA
BFS
Production
Major countries are currently invested in Madagascar (U.S., France and China) and regard it as a strategic location for mineral wealth opportunity.
25
The United States Embassy in the capital city of Antananarivo.
The Right Expertise in Place
Graphite Discovery, Delineation and Project Development
Mine Design and Construction
Mine Operation
Product Delivery
Financial Partners
We have the ideal team to realize the
potential of the World Class
Molo Deposit Off-Take Partner In Progress
27
Mine Development Expertise
Senior Vice-President Mine Development
• Will oversee all matters related to the development of the Molo Graphite Project as it moves toward mine construction and production
• Mining Engineer
• Served as Mining Director for DRA Mineral Projects
• Served as COO of Red Island Minerals – Madagascar coal venture
• Experience in the management of African-based underground and surface mining operations
Robin Borley
28
Investment Thesis Strong Board
• V. Peter Harder – political strength; former Deputy Minister of Foreign Affairs
• Richard Schler – technical and management strength; engineer, former steel company executive
• John Sanderson – legal strength; senior arbitration lawyer
• Craig Scherba – geotechnical strength; geologist
• Quentin Yarie – geotechnical strength; geophysicist
• Johann de Bruin – technical strength; Director of DRA, engineer, mine construction experience
• Kirk McKinnon – management strength; former executive with Nestle
• Albert A. Thiess Jr. – financial strength; former Senior Partner with Price-Waterhouse-Coopers
• Robin Borley – technical strength; engineer, mine construction & management experience
29
Very large and expandable NI 43-101 flake deposit
Robust and Conservative PEA Study
In-place and serviceable infrastructure
Proximal to key demand markets
Scalable mine with surface mining; no environmental issues
Turn-key African-centric partner in-place to build and run mine
Pilot plant operation/bulk sample testing
✓ ✓ ✓ ✓ ✓ ✓
ADVANCING TO A MINE
✓
Energizer Resources is rapidly advancing a world-class graphite project.
Nuclear Energy
Li-ion Batteries for EVs
Energy Storage Fuel Cells
Electronics
Battery-based Transportation
Refractories
30
We Are Positioned To Seize The Present Opportunity, and Can Meet Graphite Demand As The Market Expands
Molo
Contact Information
Brent A. Nykoliation Senior Vice President, Corporate Development
Richard Schler, Chairman and CEO Craig Scherba, P.Geo., President and COO
141 Adelaide Street West, Suite 520 Toronto, Ontario, Canada M5H 3L5
telephone: 416.364.4911 facsimile: 416.364.2753
www.energizerresources.com