67
The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues Review Presented By: Michael Mayhill

The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

Embed Size (px)

Citation preview

Page 1: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation.

1

Technical Issues Review

Presented By:

Michael Mayhill

Page 2: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

2

Technical Issues Review

Composite BladesAluminum BladesHubsSealsSpinnerDe-iceMiscellaneousStatus Updates

Page 3: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

3

Your Input Appreciated

Some of our best fixes have been suggested by the field

You see these products in normal and extreme conditions every day –– What do you see that is working?– What do you see that is not working?– Do you have suggestions to make something

better?

Page 4: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

4

Composite BladesASC II

As of September 24th there were 4087 of the composite N7605( ) blades manufactured

These blades are becoming more and more popular with your customers

We are working to develop new applications

More are manufactured every day

Page 5: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

5

Composite BladesASC II

HC-SL-61-294:

Field Inspection and Minor Repair Criteria for N7605( ) blades [May 07/09]

Previously in Manual 135F only

Page 6: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

6

Composite BladesASC II

HC-SL-61-294:

Defines permitted field repairs for A&P mechanics

Damage beyond minor repair limitations must go to a certified propeller service facility

Page 7: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

7

Composite BladesInspection

HC-ASB-61-306 rev. 2:

N7605B blade ‘crack’ indication in boot area

– Evaluation found ‘soft spot’ at the ‘crack’ location

– Resin did not properly cure during early production process

Page 8: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

8

Composite BladesInspection

HC-ASB-61-306 rev. 2:

Inspections of N7605( )

– Effectivity is s/n specific to early production

– 387 blades affected

Page 9: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

9

Composite BladesInspection

HC-ASB-61-306 rev. 2:

Visual Inspection:– Recurring visual

inspection every 100 hrs/annual

• Reporting required• A&P can accomplish

– Warranty coverage for visual

Page 10: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

10

Composite BladesInspection

HC-ASB-61-306 rev. 2: Inspection of N7605( )

– Terminating Action UT Inspection at or before overhaul• Reporting required• Accomplished by Level II or III • 52 inspections completed, 6 blades replaced

Page 11: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

11

Composite BladesInspection

Page 12: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

12

Composite BladesInspection

Page 13: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

13

Composite BladesInspection

HC-ASB-61-306 rev. 2: Inspection of N7605( )

– UT equipment available for loan– Warranty coverage for UT at overhaul

Page 14: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

14

Composite BladesStaking Pins

Staking pins found sheared during standard engineering evaluation of high-time N7605( )blade

– No performance issues noted

– Design improvement with larger staking pins

Page 15: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

15

Composite BladesStaking Pins

HC-SB-61-319: Staking Pins [pending]– Affects N7605( ) and

N7893( ) blades by s/n• 3658 blades

– Terminating Action at overhaul• Index to new location• Insert new, larger pins

– Does not affect life of product

Page 16: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

16

Composite BladesStaking Pins

Was B-5996-628 Ø=0.125” Now B-5996-640 Ø=0.1875”(Production)

Page 17: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

17

Aluminum BladesProduction Rolling Issue

HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10]

Internal production process issue

– M, P, and R shank blades from Jul 09 – Jan 10

– Cost analysis led to engineering review• Reduced minimums approved• Manual update pending

Page 18: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

18

Aluminum BladesProduction Rolling Issue

HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10]

– M, P, and R shank blades by s/n• K85813 – K97065

– Optical Comparator Inspection

– Factory only rework

Page 19: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

19

Aluminum BladesProduction Rolling Issue

HC-SB-61-318 rev. 1: Blade Inspection [Jun 15/10]

– Reworked and non-reworked may be mixed in a propeller assembly if balance can be achieved

– No loss of clamping force due to clamp design

Page 20: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

20

Aluminum BladesNaCl Contamination

HC-ASB-61-322: Blade Replacement [pending]

– Fissure indication in the blade bore discovered at overhaul inspection

– Originated from Sodium Chloride contamination within the ingot

– Potentially all blades forged from that ingot could be contaminated

Page 21: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

21

Aluminum BladesNaCl Contamination

HC-ASB-61-322: Blade Replacement [pending]

– Affects Y-shank aluminum blades by serial number• 452 blades affected • 82 left Hartzell as blade only shipment

We are Considering:– Replacement within 250 hours/ 24 calendar months,

whichever occurs first• Any inventory/stock replacement within 24 calendar months

Page 22: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

22

Aluminum BladesNaCl Contamination

HC-ASB-61-322: Blade Replacement [pending]

– Affected blades MUST be retired and destroyed

– Airworthiness Directive is possible

– Warranty:• Replacement Blades free of charge until Nov 30, 2016• Some additional coverage for props maintained IAW SL61Y

Page 23: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

23

HubsLubrication Fittings

HC-SL-61-187 rev. 3: 45˚ Lubrication Fitting [Nov 13/09]

– Originally issued Oct 15/98

– Revision 3 removed torque • “Tighten until snug”

Any issues with the zerk fittings?

Page 24: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

24

HubsModification

HC-SI-61-206: Hub Modification – Bore Bushing

– Dimensional specifications for machining of bore and bushing on lightweight turbine propellers

– Available on request

– Revision needed for additional part numbers

Pending Changes related to Sample Program review

Page 25: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

25

Hubs1900D Inspection

HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09]

– Two 1900D hubs found fractured near dowel holes and oversize inserts on mounting flange

– Found at overhaul inspection

Page 26: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

26

Hubs1900D Inspection

HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09]

– ~800 hubs affected– Initial visual inspection

based on TSO– As required following visual:

• ECI• Stamp hub “K”• REPORTING

REQUIRED

Page 27: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

27

Hubs1900D Inspection

HC-ASB-61-316 rev. 1: Hub Inspection [Jun 26/09]

– 273 inspected • No indications

– Recurring ECI every 1000 hrs • REPORTING REQUIRED

– ECI required at each overhaul• REPORTING REQUIRED

Page 28: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

28

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]– Compact -1 propeller on a

Beechcraft Bonanza stopped actuating in flight

– Investigation found failed bore bushing with oil behind the piston

– Hydraulic lock

Page 29: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

29

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]– Failure to seal due to:

• No bushing– Scored bore / damaged o-ring

• Bushing installed with adhesive – Failed adhesive– Bushing Slippage

Page 30: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

30

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]

– Propeller operates, doesn’t actuate

• Defaults to low pitch, high RPM

• Operates as fixed pitch propeller

Page 31: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

31

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]

– Bonanza pilot set up for POH ‘Best Glide’

• Not compatible with low pitch, high RPM setting for Bonanza

– FAA SAIB-CE-10-21 issued to notify pilots

Page 32: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

32

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]

– Compliance required for any Bonanza or Debonair w/ ( )HC-(C,G,L)(2,3,4)Y(F,K,R)-1( )

• Propellers NOT maintained IAW SL61Y: 200 hrs, 12 calendar months, or next major disassembly, whichever occurs first

• Propellers maintained IAW SL61Y:next major disassembly or SL61Y overhaul limit, whichever occurs first

Page 33: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

33

HubsBonanza/Debonair Bushing

HC-SB-61-315: Hub Bore Bushing [pending]

– Serial number prefix identifies affected hubs

– Perform applicable pitch change rod bore repair procedure IAW Manual 202A

Page 34: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

34

HubsProduction Bushing (-1)

HC-SL-61-305 [pending]

– Production change for all standard -1 hubs

• Does not match 202A repair

• Replace bushing at overhaul

• No machining required

Page 35: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

35

HubsProduction Bushing (-1)

HC-SL-61-305 [pending]

– Production change for all standard -1 hubs

• Already implemented in 113B for all Bonanza specific item #

• SL305 addresses all remaining standard -1 hubs

Page 36: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

36

HubsTB-10 Inspection

HC-SB-61-323: Hub Inspection [pending]– Affects propellers installed on Socata TB-10

– ECI of “A” suffix hubs, similar to SB269• Initial within 50 hours• Recurring every 100 hours or annual

– Terminating actions:• Hub Replacement with “B” suffix hub• Oil fill IAW SL273 [pending]

Page 37: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

37

Hubs Oil-Fill

HC-SL-61-273: Hub Modification [pending]

– ~4500 hrs in field– Only when directed

by Hartzell Service Bulletin

• Machine hub bore & breather holes

• Install bushing & retainer ring

Page 38: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

38

Hubs Oil-Fill

HC-SL-61-273: Hub Modification [pending]

– Only when directed by Hartzell Service Bulletin

• New sealant at parting line• Plugs instead of zerks• Red-dyed oil-filled for crack

detection

Page 39: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

39

SealsGrease Leaks

Silicone O-rings– Grease leaks have

been a concern in aluminum hub propellers

– Suggestion from the field for use of new material

– Engineering analysis for compatibility completed

Page 40: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

40

SealsGrease Leaks

Silicone O-rings– Field testing in alum

models ongoing– Over 30,000 SER

hours with NO leaks– Already implemented

in production for many models

Successful seal is also dependent upon a good installation of the appropriate wear strip

Page 41: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

41

SealsGrease Leaks

HC-SL-61-293 rev. 1: Y Shank Aluminum Blades [Mar 12/10]– Introduces C-3317-340-8– Approved alternate to

quad seal– Requires use of 0.010”

Teflon®

– Cost analysis in process for production implementation

Page 42: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

42

SealsGrease Leaks

HC-SL-61-301: Supersedes all C-3317-340

[Mar 12/10]– Introduces C-3317-340-8– Requires use of 0.010”

Teflon® on alum blades– Use existing C-3317-340– Composite blades use

different wear strip• No change required

– Production implemented

Page 43: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

43

SealsGrease Leaks

HC-SL-61-303: Supersedure in 1900D Installations [Apr 9/10]

– Introduces C-3317-340-8

– May use existing energizer ring + blade seal in combination

Page 44: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

44

SealsGrease Leaks

HC-SL-61-303: Supersedure in 1900D Installations [Apr 9/10]

– Energizer ring + blade seal can not be mixed with C-3317-340-8 in same propeller assembly

– Production and overhaul kit implementation is complete

Page 45: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

45

SealsGrease Leaks

HC-SB-61-321: Replacement in PC-21 Installations [Jun 15/10]

– Introduces C-3317-341-8 and 103379-1 wear strip

– Required at next o/h

– Optional at disassembly

– Requires use of thicker 103379-1 wear strip

Page 46: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

46

SealsGrease Leaks

HC-SB-61-321: Replacement in PC-21 Installations [Jun 15/10]

– Energizer ring + blade seal combination can not be mixed with C-3317-341-8 in same propeller assembly

– Reporting required

– Production and o/h kit implementation complete

Page 47: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

47

SealsGrease Leaks

HD-SL-61-042: Supersedure for Do-328

Installations [pending]

– Introduces C-3317-341-8 and 103379-1 wear strip

– Requires use of thicker 103379-1 wear strip

Page 48: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

48

SealsGrease Leaks

HD-SL-61-042: Supersedure for Do-328

Installations [pending]

– Energizer ring + blade seal combination can not be mixed with C-3317-341-8 in same propeller assembly

Page 49: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

49

Spinner

Known cracking issues

Working to design a permanent fix by application

Page 50: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

50

Spinner835-54(P) Replacement

HC-SB-61-311:

Inspection of 835-54(P) Spinner Assembly & Introduction of New Spinner Assemblies– Progression of document

• Original Issue:

1.D-5769-1(P) dome, filler plate removal required

Page 51: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

51

Spinner835-54(P) Replacement

HC-SB-61-311:

Inspection of 835-54(P) Spinner Assembly & Introduction of New Spinner Assemblies– Progression of document

• Original Issue:

2. 102965(P) dome released as supercedure to unsupported D-5769-1(P)

– 102965(P) includes bonded support

Page 52: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

52

Spinner835-54(P) Replacement

HC-SB-61-311, Rev 1:

Inspection of 835-54(P) Spinner Ass’y & Introduction of New Spinner Assemblies

• Revision 1

1.D-5769-1(P) dome uses field-installable forward bulkhead & spacers

Page 53: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

53

Spinner835-54(P) Replacement

HC-SB-61-311, Rev 1:

Inspection of 835-54(P) Spinner Ass’y & Introduction of New Spinner Assemblies

No-Charge Warranty Components

Page 54: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

54

Spinner835-54(P) Replacement

HC-SB-61-311, Rev 3:

New Composite Spinner Ass’y Introduction

– Revision 2 (pending)

– Terminating Action within 13 calendar months/ 50 hours, whichever first

Page 55: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

55

Spinner835-54(P) Replacement

HC-SB-61-311, Rev 3:

New Spinner Ass’y Introduction

1.103585(F1) assembly with composite dome (Mooney)

2. 835-58(P) assembly with blunt, aluminum dome (Comanche)

No Charge Warranty Coverage

Page 56: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

56

De-Ice

Hartzell de-ice components

– Working to convert legacy components to Hartzell components

– Making design improvements along the way• Your suggestions are welcome• If you have found a difficult installation and/or have

design/installation suggestions please let us know

Page 57: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

57

De-IcePC-12 Routing

HC-SL-30-295 rev. 2: Wire Harness and Boot for PC-12 [Apr 9/10]– Conversion to Hartzell

components– Design improvements– New routing required– Expect similar

updates for similar installations

Page 58: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

58

MiscellaneousTSN

Questions on Time Since New of a propeller – What parts to track time for– What happens when components are changed out

HC-SL-61-61Y rev. 3: Overhaul & Life Limits [Nov 13/09]– Definition of Time Since New (TSN)– Primary components = hub, blades, & life-limited parts – Propeller assembly TSN = highest TSN primary

component installed

Page 59: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

59

MiscellaneousCam Follower Retention

HC-SB-61-320 [June 2010]:

Pitch Change Knob Bracket

– Affects HC-E5A-2 on Pilatus PC-21

– Introduces new unit with improved cam follower retention design

Page 60: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

60

MiscellaneousPreload Plate Wear

HC-SL-61-282 rev. 1, [Nov 09]:Preload Plate Wear Limits

– E shank blade butt seal released in 2005 to prevent hub cavity grease migration

• Later reports identified wear on the preload plate caused by the new seal

Page 61: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

61

MiscellaneousPreload Plate Wear

HC-SL-61-282 rev. 1, [Nov 09]: Preload Plate Wear Limits

– Affects E shank lightweight turbines and Y shank compacts with composite blades (excludes N shank)

– Preload plate inspection criteria at overhaul

What are you seeing in the field?

Page 62: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

62

MiscellaneousFeathering Spring

HC-SL-61-291 [obs] → HC-SB-61-324 [pending]:

Feathering Compression Spring

Reports of feathering issues in the field

– Unable to reach full feather at shutdown

– Disassembly found fractured feathering spring

Page 63: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

63

MiscellaneousFeathering Spring

HC-SL-61-291 [obs] → HC-SB-61-324 [pending]:

Feathering Compression Spring

– Affects HC-B(4,5)(M,T)(A,N,P)-(1,2,3,5)

– Introduces 102877 spring as supercedure to A-3496

• New 102877 has flat outer diameter and improved fatigue life

Page 64: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

64

MiscellaneousFeathering Spring

HC-SL-61-291 [obs] → HC-SB-61-324 [pending]:

Feathering Compression Spring

– (new in SB324) At next overhaul, requires replacement of the A-3496 with new 102877

Page 65: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

65

Status UpdatesSB269 Program

HC-SB-61-269 rev. 4: Hub Inspection [Nov 13/09]– FAA approved AMOC to AD 2009-22-08

• AD 2009-22-08 superseded AD 2006-18-15

– AD requires initial inspection within 50 flight hours • Contact local FSDO to discuss

– Retained 100 flight hour recurring inspection• Removed ‘or annual inspection’

– Pricing program (within TBO) expires April 30, 2011

Page 66: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues

66

Technical Issues Review

Documents go through writing, review, editing, and approval – but still not perfect– If you want clarification– If you find an error– If you have a suggestion

PLEASE CONTACT PRODUCT SUPPORT

Page 67: The information in this presentation is not intended to supersede, replace, or be used in lieu of approved published documentation. 1 Technical Issues