13
GLOBAL CCS INSTITUTE THE GLOBAL STATUS OF CCS PROJECTS Barry Jones General Manager, Policy and Membership IEA/CERT Workshop Carbon “Capture and Storage: Regaining Momentum” Sydney, Australia, 20-21 February, 2012 WWW.GLOBALCCSINSTITUTE.COM

THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

THE GLOBAL STATUS OF CCS PROJECTS

Barry Jones – General Manager, Policy and Membership

IEA/CERT Workshop Carbon “Capture and Storage: Regaining Momentum”

Sydney, Australia, 20-21 February, 2012 WWW.GLOBALCCSINSTITUTE.COM

Page 2: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

1

Page 3: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

2

MEASURED PROGRESS OF LARGE-SCALE

INTEGRATED PROJECTS SINCE 2009

0 5 10 15 20 25 30

Identify

Evaluate

Define

Execute

Operate

Number of Projects

2011 (December Update) 2010 2009

Page 4: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

GLOBAL SPREAD OF PROJECTS

3

Page 5: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

PROJECTS IN OPERATION OR CONSTRUCTION

PROJECT NAME LOCATION CAPTURE TYPE

VOLUME CO2

(Mtpa)

STORAGE

TYPE

START

DATE

In operation

Val Verde Natural Gas Plants United States Pre-combustion (gas processing) 1.3 EOR 1972

Enid Fertilizer Plant United States Pre-combustion (fertiliser) 0.7 EOR 1982

Shute Creek Gas Processing Facility United States Pre-combustion (gas processing) 7 EOR 1986

Sleipner CO2 Injection Norway Pre-combustion (gas processing) 1 (+ 0.2 in

construction)

Deep saline

formation

1996

Great Plains Synfuels Plant & Weyburn-Midale US/ Canada Pre-combustion (synfuels) 3 EOR 2000

In Salah CO2 Storage Algeria Pre-combustion (gas processing) 1 Deep saline

formation

2004

Snøhvit CO2 Injection Norway Pre-combustion (gas processing) 0.7 Deep saline

formation

2008

Century Plant United States Pre-combustion (gas processing) 5 (+ 3.5 in

construction)

EOR 2010

In construction

Lost Cabin Gas Plant United States Pre-combustion (gas processing) 1 EOR 2012

Air Products Steam Methane Reformer EOR Project United States Pre-combustion (hydrogen

production)

1 EOR 2012

Illinois Industrial Carbon Capture and Sequestration (ICCS) United States Industrial (ethanol production) 1 Deep saline

formation

2013

Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014

Agrium CO2 Capture with ACTL Canada Pre-combustion (fertiliser) 0.6 EOR 2014

Kemper County IGCC Project United States Pre-combustion (power) 3.5 EOR 2015

Gorgon Carbon Dioxide Injection Project Australia Pre-combustion (gas processing) 3.4 - 4 Deep saline

formation

2015

Page 6: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

PROJECTS ARE IN A WIDE RANGE OF

COUNTRIES

5

0 5 10 15 20 25 30

Africa

East Asia

Middle East

China

Australia and New Zealand

Canada

Europe area

United States

Number of Projects

2011 (December Update) 2010 2009

Page 7: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

6

CO2 IS BEING CAPTURED AND STORED

0 10 20 30 40 50 60 70 80

Africa

East Asia

Middle East

China

Canada

Australia and New Zealand

Europe area

United States

Confirmed and Potential Volume of CO2 (Mtpa)

Operate Execute Planned

Mtpa

Page 8: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

CONCENTRATION ON POWER GENERATION,

BUT OTHER INDUSTRIES IMPORTANT TOO

7

0 5 10 15 20 25 30 35 40

Chemical Production

Oil Refining

Iron and Steel Production

Hydrogen Production

Coal-to-liquids (CTL)

Fertiliser Production

Synthetic Natural Gas

Natural Gas Processing

Power Generation

Number of Projects

Page 9: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

PROJECTS ARE SPREAD ACROSS

TECHNOLOGIES

8

Page 10: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

REGIONAL BIAS TOWARDS STORAGE TYPE

9

0 10 20 30 40 50 60 70 80

Africa

East Asia

Middle East

China

Canada

Australia and New Zealand

Europe area

United States

Potential Volume of CO2 (Mtpa)

Enhanced Oil Recovery Deep Saline Formations

Depleted Oil and Gas Reservoirs Various / Not Specified

Mtpa

Page 11: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

PROJECT DEPLOYMENT TIMEFRAMES

10

0

20

40

60

80

100

120

140

160

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Planned

Execute

Operate

Confirmed and Potential Volume of CO2 (Mtpa)

Mtpa

Page 12: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

KEY MESSAGES

CCS projects are operating today, in a number of industries

and a number of countries

– often when carbon capture is already part of the

industrial process and where already well explored

storage locations are available.

Two power station CCS projects are now under

construction, along with others in other industries.

A number of other projects have indicated they could be in

a position to decide on a final investment decision within 12

months.

Planning and execution takes time, and all elements of

CCS projects must be carefully integrated.

11

Page 13: THE GLOBAL STATUS OF CCS PROJECTS · formation 2013 Boundary Dam with CCS Demonstration Canada Post-combustion (power) 1 EOR 2014 Agrium CO 2 Capture with ACTL Canada Pre-combustion

GLOBAL CCS INSTITUTE

www.globalccsinstitute.com 12