GLOBAL CCS INSTITUTE Status of Demo activities around the World John Scowcroft, General Manager Europe CCS: a key technology for a low-carbon European economy WWW.GLOBALCCSINSTITUTE.COM Romania, 06 September 2012

The Status of CCS, Global-CCS-Institute

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

Status of Demo activities around the World John Scowcroft, General Manager – Europe

CCS: a key technology for a low-carbon European economy

WWW.GLOBALCCSINSTITUTE.COM

Romania, 06 September 2012

Page 2: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

Introduction Global CCS Institute

1

Page 3: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

INSTITUTE FOCUS

The Global CCS Institute connects parties around the world to solve problems, address

issues and learn from each other to accelerate the deployment of CCS projects through:

ASSISTING PROJECTS

bridging knowledge gaps between demonstration efforts; and

developing project-specific solutions particularly amongst early movers.

SHARING KNOWLEDGE

collecting information to create a central repository for CCS information; and

creating and sharing information to fill knowledge gaps and build capacity.

FACT-BASED ADVOCACY

to inform and influence domestic and international low carbon policies;

to advance understanding of appropriate risk regimes, funding and financing

solutions; and

raising awareness of the benefits of CCS and its role within a portfolio of low

carbon technologies. 2

Page 4: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

Comprehensive

analysis Global Status

of CCS reports

3

Institute website:

Live updates on the

status of CCS

Page 5: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

Global Status of CCS

4

Page 6: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

STATUS OF CCS

5

Page 7: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

LSIPS BY REGION AND YEAR

6

Page 8: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

LARGE SCALE

INTEGRATED

PROJECTS (LSIPS)

IN

OPERATE AND

EXECUTE PHASE

7

NAME COUNTRY CAPTURE TYPE

VOLUME CO2

(MTPA)

STORAGE

TYPE

DATE OF

OPERATION

Operate stage

Val Verde Gas Plants United States Pre-combustion (gas

processing)

1.3 Mtpa EOR 1972

Shute Creek Gas Processing

Facility

United States Pre-combustion (gas

processing)

7Mtpa EOR 1986

Sleipner CO2 Injection Norway Pre-combustion (gas

processing)

1Mtpa (+0.2

Mtpa in

construction)

Deep saline

formation

1996

Great Plains Synfuel Plant

and Weyburn-Midale Project

United States /

Canada

Industrial separation

(synfuels)

3Mtpa EOR 2000

Enid Fertilizer CO2 -EOR

Project

United States Industrial separation

(fertiliser)

0.68Mtpa EOR 2003

In Salah CO2 Injection Algeria Pre-combustion (gas

processing)

1Mtpa Deep saline

formation

2004

Snøhvit CO2 Injection Norway Pre-combustion (gas

processing)

0.7Mtpa Deep saline

formation

2007

Century Plant United States Pre-combustion (gas

processing)

5Mtpa (+

3.5Mtpa in

construction)

EOR 2010

Execute stage

Air Products Steam Methane

Reformer EOR Project

United States Pre-combustion

(hydrogen production)

1Mtpa EOR 2012

Lost Cabin Gas Plant United States Pre-combustion (gas

processing)

1Mtpa EOR 2012

Illinois Industrial CCS Project United States Industrial separation

(ethanol)

0.4Mtpa (and

0.6Mtpa in

planning)

Deep saline

formation

2013

ACTL with Agrium CO2

Stream

Canada Industrial separation

(fertiliser)

0.59 Mtpa EOR 2014

Boundary Dam Integrated

CCS Demonstration Project

Canada Post-combustion

(power generation)

1Mtpa EOR 2014

Kemper County IGCC Project United States Pre-combustion (power

generation)

3.5Mtpa EOR 2014

Gorgon Carbon Dioxide

Injection Project

Australia Pre-combustion (gas

processing)

3.5Mtpa Deep saline

formation

2015

Page 9: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

POWER PROJECTS UNDER CONSTRUCTION

Boundary Dam

Retrofit post-combustion capture

EOR

Kemper County

IGCC with capture (pre-combustion)

EOR

8

Page 10: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

STATUS OF CURRENT AND PLANNED

STORAGE PROJECTS

9

Page 11: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

FUNDING STILL TO BE ALLOCATED

10

Page 12: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

LEVELISED COST OF ELECTRICITY OF LOW-

CARBON TECHNOLOGIES

11

Page 13: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

PROJECT PREFERENCE OF ENABLING

POLICY INSTRUMENTS

12

Page 14: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

GLOBAL SITUATION

80% of the total CO2 emitted over the period to

2035 is already ‘locked-in’ by existing capital

stock, leaving little room for adjustment.

If internationally coordinated action is not

implemented by 2017, any new investment must

be zero-carbon.

Delaying action is false economy. For every $1

of investment avoided before 2020, an

additional $4.3 would need to be spent after

2020 to compensate for the increased

emissions 13

Page 15: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

14

CCS power generation

12% CCS industry and transformation 12%

Source: IEA

BY 2050 WITHIN EUROPE, CCS PROVIDES

~24 PER CENT OF THE SOLUTION, AND NOT

JUST IN THE POWER SECTOR

Page 16: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

CCS is a critical tool for combating climate change, and

the costs will be higher if it is not used.

Political support and appropriate incentives are vital for

project progression.

A number of power projects are on the verge of FID but

making the business case is difficult.

Two power projects under construction - with government

funding.

Greater collaboration and transparency between

government and industry is needed.

15

KEY MESSAGES

Page 17: The Status of CCS, Global-CCS-Institute

GLOBAL CCS INSTITUTE

www.globalccsinstitute.com