THE DST THIRD QUARTER PERFORMANCE REPORT PRESENTATION (1 OCTOBER 2012 TO 31 DECEMBER 2012) DR. PHIL MJWARA 06 MARCH 2013

THE DST THIRD QUARTER PERFORMANCE REPORT PRESENTATION (1 OCTOBER 2012 TO 31 DECEMBER 2012)

  • Upload
    loc

  • View
    39

  • Download
    1

Embed Size (px)

DESCRIPTION

THE DST THIRD QUARTER PERFORMANCE REPORT PRESENTATION (1 OCTOBER 2012 TO 31 DECEMBER 2012). DR. PHIL MJWARA 06 MARCH 2013. OUTLINE OF THE PRESENTATION. DST Overview. DST Achievements for the Third Quarter. DST Achievements per Programme. DST Financial Performance. Conclusion. - PowerPoint PPT Presentation

Citation preview

Page 1: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

THE DST THIRD QUARTER PERFORMANCE REPORT PRESENTATION

(1 OCTOBER 2012 TO 31 DECEMBER 2012)

DR. PHIL MJWARA06 MARCH 2013

Page 2: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

DST Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 3: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 4: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

THE MANDATE OF THE DEPARTMENT (1)

The Department of Science and Technology (DST) derives its mandate from the 1996 White Paper on Science and Technology, which introduced the concept of a National System of Innovation.

The NSI remains an ideal for which South Africa continues to strive. It is an enabling framework for science, technology and innovation (STI).

NSI can be understood as a set of functioning institutions, organisations and policies that interact constructively in the pursuit of a common set of social and economic goals and objectives, seeking to promote change through the introduction of innovations.

4

DST Overview

Page 5: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

THE MANDATE OF THE DEPARTMENT (2)

The DST, as the custodial coordinator for the development of the NSI, influences this system through key strategies such as the National Research and Development Strategy (NRDS) and the Ten-Year Innovation Plan (TYIP).

The latter, particularly, seeks to contribute to the transformation of the South African economy from a resource-based into a knowledge-based economy, in which the production and dissemination of knowledge will lead to economic benefits and enrich all fields of human endeavor.

In this regard, the measure of success will be the level to which science, technology and innovation (STI) play a driving role in enhancing productivity, economic growth and socio-economic development.

5

DST Overview

Page 6: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

.

6

MissionTo develop, coordinate and manage a

National System of Innovation (NSI) that will bring about maximum human capital,

sustainable economic growth and improved quality of life for all

VisionTo create a prosperous society that

derives enduring and equitable benefits from science and technology

DST Overview.

Page 7: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

KEY OBJECTIVES OF THE DEPARTMENT

To enhance South Africa’s knowledge-generation capacity.

To develop the innovation capacity of the NSI.

To develop appropriate science, technology and innovation human capital to meet the needs of society.

To build world-class STI infrastructure.

To position South Africa as a strategic international RDI partner and destination.

7

DST Overview

Page 8: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

GOVERNMENT OUTCOMES

The Department also contributes to and reports on the following government outcomes:

Outcome 2: A long and healthy life for all South Africans.

Outcome 4: Decent employment through inclusive economic growth.

Outcome 5: A skilled and capable workforce to support an inclusive growth path.

Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.

Outcome 10: Environmental assets and natural resources that are well protected and continually enhanced.

8

DST Overview

Page 9: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST PROGRAMMES.

DST Overview

Research,Development &

Innovation

International Cooperation & Resources

Socio-EconomicPartnerships

Corporate Services

& Governance

White Paper on

S&T, National Research &

Development Strategy, Ten-Year

Innovation Plan

Human Capital &

Knowledge Systems

Page 10: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

PURPOSE OF THE PROGRAMMES (1) Programme 1: Administration To conduct the overall management and administration of the department.

Programme 2: Research, Development and Innovation To facilitate knowledge generation and exploitation through R&D in key

priority areas, namely, space science, bio-economy, and energy.

Programme 3: International Cooperation and Resources This Programme aims to strategically develop, promote and manage

international relationships, opportunities and S&T agreements that strengthen the NSI and enable an exchange of knowledge, capacity and resources between South Africa and its regional and international partners.

10

DST Overview

Page 11: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

PURPOSE OF THE PROGRAMMES (2) Programme 4: Human Capital and Knowledge Systems Provide leadership in the creation of an innovative and

competitive society with highly skilled human capital, and competitive knowledge and research infrastructure.

Programme 5: Socio-Economic Partnerships This Programme enhances the growth and development

priorities of government through targeted S&T-based innovation interventions and the development of strategic partnerships with other government departments, industry, research institutions and communities.

11

DST Overview

Page 12: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 13: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

13

Achieved28

42%

On Course15

23%

Moderate Risk19

29%

Certainty3

5%

Not Reported1

1%

DST Achievements for the Third Quarter

Figure 1: Overall DST Performance for Q3 2012/13

Page 14: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

OVERALL PERFORMANCE FOR THE THIRD QUARTER

14

DST Achievements for the Third Quarter

Page 15: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 16: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (1)

Through DST funding, the University of Cape Town announced the development of a candidate Malaria drug that shows potential activity against multiple points in the malaria parasite’s cycle

Through DST funding, the National Health Laboratory Services announced the discovery of potent antibodies which are able to kill 88% of HIV found throughout the world. This ground-breaking discovery provides important clues that could be useful in making AIDS vaccine.

16

DST Achievements Per Programme

Page 17: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (2)

NIPMO is being established as an institution at an increasing arms-length from the DST.

In December 2012, the DST, through NIPMO, launched its first series of guidelines mandated by the Intellectual Property Rights from Publicly Financed Research and Development Act (IPR-PFRD Act). The guideline is entitled: “Interpretation of the scope of the IPR-PFRD Act: setting the scene”.

The Technology Top 100 (TT100) awards event took place and was hosted by DST in its capacity as a strategic partner to the Da Vinci Institute.

17

DST Achievements Per Programme

Page 18: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (3)

In the reporting period, the DST, through its participation in Bridging Action for GMES and Africa (BRAGMA), organised the 1st Global Monitoring for the Environment and Security (GMES) & Africa workshop in Mombasa, Kenya in October 2012 where African experts gathered to discuss and contribute towards the Marine and Coastal Management chapter of the much anticipated GMES & Africa Action Plan.

BRAGMA also organised a side event during the African Association of Remote Sensing of the Environment (AARSE) that was held in EI Jadida, Morocco.

The Space Science and Technology unit has made significant progress with respect to the implementation of the Cabinet resolution recommending the absorption of SunSpace capability into SANSA.

18

DST Achievements Per Programme

Page 19: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (4)

Annual Target Quarter 3 Progress Status Reason for variance

1 MeerKATantennadesigned andaligned to SKA design

The contract for the design, manufacture, installation and commissioning of the 64 MeerKAT antennas was awarded to a South African Company.The design of the MeerKAT is going according to plan

On course

8 new technology products, processes or services developed for commercialisation by 31 March 2013

Through TIA, a total of 20 products, processes and services have been developed; with 3 of these being commercialised

Achieved The target for TIA was set higher than that of the DST

6 research chairs and 6 research initiatives in bio-science and energy related fields financially supported

8 research chairs in energy, biotechnology and health and 8 research initiatives in bio-technology and health financially supported

Achieved

19

DST Achievements Per Programme

Page 20: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (5)

Annual Target Quarter 3 Progress Status Reason for variance

5 technology-based enterprises supported financially by 31 March 2013

A total of 3 technology-based enterprises were established through TIA funding support

On Course

274 undergraduates, post graduates and technicians funded by 31 March 2013

A total 333 students were funded as at 31 December 2012

Achieved After winning the SKA bid, a decision was taken to fund more students in SKA projects

40 South African candidates trained in IP and technology transfer specialised skills by March 2013

53 candidates were trained in technology transfer skills

24 candidates trained in Intellectual Property (IP) through World Intellectual Property Organisation (WIPO)

Achieved20

DST Achievements Per Programme

Page 21: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (6)

Annual Target

Quarter 3 Progress Status Reason for variance

1 prototype developed and a patent registered locally by 31 March 2013

Patent:Trial runs were performed on a membrane electrode assembly (MEA) production line,an assembled stack of proton exchange membranes (PEMs), catalyst and flat plate electrode used in a fuel cell. Among other advantages these are meant to provide high power density and have greater tolerance to poisoning.

Prototype:2kW HT PEMFC Stack developed. A proton exchange membrane (PEM) is a semi permeable membrane generally made from ionomers and designed to conduct protons while being impermeable to gases such as oxygen or hydrogen.

On Course

21

DST Achievements Per Programme

Page 22: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RESEARCH, DEVELOPMENT AND INNOVATION (RDI) – (7)

Annual Target Quarter 3 Progress Status Reason for variance

6 Publications resulting from R&D funded initiatives by 31 March 2013

11 Journal Articles published in peer reviewed journals

Achieved

5000 requests for satellite data honoured by March 2013

162 544 Earth Observation data scenes were distributed

Achieved

22

DST Achievements Per Programme

Page 23: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (1)

In collaboration with European Development Countries Clinical Trials Partnerships and European Commission (EDCTP), DST organized a conference to consult with African international stakeholders to discuss the second round of EDCTP.

A project on building human capacity around Legume Science aimed at addressing food security and poverty in Africa was launched by the DST in collaboration with the Bill & Melinda Gates Foundation and the Tshwane University of Technology.

South Africa hosted the first of many SADC Policy Training Workshop in October 2012. These workshops are aimed at building science and technology policy capacity in the SADC region.

23

DST Achievements Per Programme

Page 24: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (2)

The DST also hosted the second Brazil, Russia, India, China and South Africa (BRICS) Senior officials meetings in November 2012 which prioritized thematic areas of cooperation, with each country mandated to drafting a Memorandum of Understanding which serves as a framework for S&T cooperation.

Joint Committee meetings were convened with Australia and Japan with the key focus on new opportunities to strengthen human capital development in areas such as astronomy, space science and technology.

24

DST Achievements Per Programme

Page 25: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – (3)

Annual Target Quarter 3 Progress

Status Reason for variance

R240 000 000.00 foreign STI funds leveraged by31 March 2013

A total STI funds of R30 406 616.25 were leveraged as in 31 December 2012.

Moderate Risk

Confirmations from most Development Partners on in- kind contributions are still outstanding. This target will be achieved by end of March. More than R163 million was already confirmed by end of January, and this will be reported in the fourth quarter

R46 500 000.00 South African and foreign funds spent onS&T-based socio-economic development in Africa by 31 March 2013

R32 496 699.41 foreign funds were spent on S&T- based socio- economic development in Africa.

On Course

25

DST Achievements Per Programme

Page 26: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

INTERNATIONAL COOPERATION AND RESOURCES (ICR) – ( 4)

Annual Target Quarter 3 Progress

Status Reason for variance

450 South African studentsparticipating in internationalcooperation STI research projects by 31 March 2013

A total of 197 South African students participated in international cooperative STI research projects.

Moderate Risk

Some calls were not placed as anticipated due to non commitment from countries like Brazil and Norway. Also, Japan could only contribute R4 million due to financial constraints

800 foreignparticipants inglobal knowledgeand STInetworks by31 March 2013

A total of 366 foreign participants in global knowledge and STI networks

Moderate Risk

Some calls were not placed as anticipated due to non commitment from countries like Brazil and Norway

26

DST Achievements Per Programme

Page 27: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (1)

The Accreditation and Certification of norms and standards for traditional medicine were finalised.

An Indigenous Knowledge National Recordal System’s Communication Plan was approved by EXCO.

27

DST Achievements Per Programme

Page 28: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (2)

Annual Target Quarter 3 Progress

Status Reason for variance

6100 students financially supported by 31 March 2013

7058 students financially supported by 31 December 2012

Achieved

550 postgraduate students supported as interns in a SETI work environment by 31 March 2013

520 postgraduate students were supported as interns in a SETI work environment by 31 December 2012

Moderate Risk

The budget allocated to this indicator could only cover 520 students due to the nature of allocation of funds to students. Stipend amounts allocated were dependent on the level of degree.

27 IKS community of practice skilled workers developed by 31 March 2013

28 IKS community practice skilled workers developed by 31 December 2012

Achieved

28

DST Achievements Per Programme

Page 29: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (3)

Annual Target Quarter 3 Progress Status Reason for variance

2600 researchers financially supported through NRF-managed programmes by 31 March 2013

2792 researchers supported

Achieved

1 photonics technician teaching and training platform established by 31 March 2013

The teaching and training platform has been established. The programme has been registered with SAQA and the programme commenced in January 2013

Achieved

7 nanotechnology flagship projects supported by 31 March 2013

10 projects currently funded

Achieved29

DST Achievements Per Programme

Page 30: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (4)

Annual Target Quarter 3 Progress

Status Reason for variance

50 research equipment grants awarded by 31 March 2013

A call for NEP/NNEP grant proposal was issued in December 2012 due to the decision taken by Management to delay the call for priority reasons

On Course

250 researchers accessing infrastructure

0 Certainty While the award for the research grants will be made before end of the financial year, the transfer of funds will not be possible, due to delays of call for proposals for research equipment grants due to decision made by Management for priority reasons

30

DST Achievements Per Programme

Page 31: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

31

Institution

InstrumentInvestme

ntResearch Focus

Socio-economic Impact

Nelson Mandela Metropolitan University

High Resolution Electron Microscope and Feeder Instrumentation

 

R 107 000 000

 

Clean coal technology, nuclear and hydrogen energy, synthetic diamonds and other hard products.

Energy and materials research

Rhodes

University

 

X-Ray Photoelectron Spectrometer and Atomic Force Microscope

 

R 7 584 000Cancer research, medical chemistry, nanotechnology

Development of new cancer diagnosis and treatment methodology called “photo-dynamic therapy” which is intended as an alternative to chemotherapy.

Tshwane University of Technology

Ultra-High Resolution Field Emission Scanning Electron Microscope (UHR FE-SEM) and a Multipurpose Tribocorrosion Tester

R 6 800 000Processing and characterisation of advanced nanomaterials

 

Advanced materials required for local industries and human capacity development.

Page 32: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

NELSON MANDELA METROPOLITAN UNIVERSITY

High Resolution Electron Microscope and Feeder Instrumentation

Page 33: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

RHODES UNIVERSITY

X-Ray Photoelectron Spectrometer and Atomic Force Microscope

Page 34: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

TSHWANE UNIVERSITY OF TECHNOLOGY

Ultra – High Resolution Field Emission Scanning Electron Microscope (UHR FE-SEM) and a Multipurpose Tribocorrosion Tester

Page 35: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (5)

Annual Target Quarter 3 Progress Status Reason for variance

42 academic and research sites connected to SANReN by 31 March 2013

29 academic and research sites have been connected

On Course

A functioning NRS established in EC and FS provinces by 31 March 2013

IKS Documentation Centre (IKSDC) in North West and Free State equipped with NRS IT infrastructure

Achieved

Production processes for 2 candidate products piloted by 31 March 2013

This activity has been postponed pending the approval of TIA proposal to be resubmitted in the Fourth Quarter

Moderate Risk

The first proposal submitted by TIA was not accepted by the Department and had to be resubmitted 35

DST Achievements Per Programme

Page 36: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (6)

Annual Target Quarter 3 Progress

Status Reason for variance

15 leads identified for product development by March 2013

A total of 17 leads identified for product development

Achieved

3 patents locally registered

2 provisional skin toning and anti-blemish patents were locally filed

Moderate Risk

The filing of the anti-balding and anti-wrinkle provisional patents was delayed due to the need to outsource an independent reviewer of the study results

20 patents filed140 products; prototypes and artefacts by 31 March 2013

Reported annually None

36

DST Achievements Per Programme

Page 37: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

HUMAN CAPITAL AND KNOWLEDGE SYSTEMS (HCKS) – (7)

Annual Target Quarter 3 Progress Status Reason for variance

4000 peer reviewed; 70 books and 240 chapters

Reported annually

10 peer reviewed publications resulting from research and innovation by Nanotechnology Innovation Centres (NICs)

40 journal articles have been published

Achieved

385 000 people participating in science awareness and engagements programmes by 31 March 2013

421 005 people participated in DST-led science awareness and engagement programmes

Achieved

37

DST Achievements Per Programme

Page 38: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO-ECONOMIC PARTNERSHIP (SEP) – (1)

A total of 54 entrepreneurs were developed during this reporting period.

The first cohort of 26 entrepreneurs trained through Sasol the ChemCity have reached sustainability and were handed over to Sasol ChemCity Aftercare team.

A new 22 entrepreneurs from M’wamitwa village in Limpopo started training in August. Already, the cohort has had a total profit of more that R50 000 jointly with an average of over R2 000 per entrepreneur.

An additional 6 entrepreneurs are being trained by the Nkowankowa Distribution Centre through the mentoring programme of the Sasol ChemCity.

38

DST Achievements Per Programme

Page 39: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (2)

R&D tax incentives new amendments became effective from 1 October 2012.

As at December 2012, the DST received 222 applications from companies to be considered for the R&D tax incentive scheme. The evaluation of these applications is soon to follow.

In terms of promoting the new amended R&D tax incentives; to date: 7 meetings with private companies, 3 meetings with consulting firms and meetings with Pharmaceutical Industry Association of South Africa

(PIASA) and South African Clinical Research Association (SACRA ) industry association have been held.

39

DST Achievements Per Programme

Page 40: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (3)

The report on the Evaluation of S&T capabilities for the weather services has been completed and will be approved before the end of the financial year.

R&D survey 2010/11 has been received and the Clearance Committee has recommended that the report be approved for publication.

7 policy interventions were successfully completed and these include: Exploring the opportunities of an African-Based System of

Innovation. Preserving and providing access to South African Social Science

and Humanities Research Data. Linking the South African System of Innovation with those in the

rest of Africa, etc.

40

DST Achievements Per Programme

Page 41: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (4)

Annual Target Quarter 3 Progress Status Reason for variance

400 livelihood opportunities created, sustained or improved by 31 March 2013

400 livelihood opportunities are being sustained

On Course

50 companies on a register of companies provided with Technology Assistance Package (TAP) by 31 March 2013

36 companies are in the register

Moderate risk

The were delays during TAP approvals processes. 14 companies will be approved before the end of March 2013

1928 small and medium enterprises receiving technology support

1619 enterprises are receiving technology support

On Course

41

DST Achievements Per Programme

Page 42: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (5)

Annual Target Quarter 3 Progress Status Reason for variance

373 Masters and PhD students funded in technology demonstrator and technology transfer packages

519 Masters and PhDs research graduates funded or co-funded in designated niche areas by 31 December 2012

Achieved

2 additions to the IP portfolio (patents, patent applications, prototypes, technology demonstrators and technology transfer packages)

Investigation for optimal side for Lunar Laser ranger is on track

The second IP will only be reported in the fourth quarter

Moderate Risk

Unforseen delays in the implementation of research activity that would yield another IP

13 patents, prototypes, technology demonstrators or technology transfer packages added to the IP portfolio by 31 March 2013

This target is on track with the exception of a ‘Detailed design of titanium metal powder plant’

Moderate Risk

This was delayed to allow the completion of the chemical store for safety reasons

42

DST Achievements Per Programme

Page 43: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

SOCIO- ECONOMIC PARTNERSHIP (SEP) – (6)

Annual Target Quarter 3 Progress

Status Reason for variance

50 scientific and technical papers accepted for publication by 31 March 2013

47 scientific and technical papers accepted for publication

On Course

7 peer reviewed scientific papers published by June 2012

13 peer reviewed scientific papers published by December 2012

43

DST Achievements Per Programme

Page 44: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

DST Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 45: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

BUDGET SPLIT – BY PROGRAMMES

DST Financial Performance Report

Page 46: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

BUDGET SPLIT – BY ECONOMIC CLASSIFICATION

DST Financial Performance Report

Page 47: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

FINANCIAL PERFORMANCE - SUMMARY

DST Financial Performance Report

Page 48: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

FINANCIAL PERFORMANCE PER PROGRAMME – 31 DECEMBER 2012

DST Financial Performance Report

Page 49: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

EXPENDITURE BY PROGRAMME ( JANUARY 2013)

49

Programme/R'thousands

Revised planned expenditure as at end of Jan 2013

Actual expenditure as at end of Jan

2013

Deviation from revised planned

expenditure

Amount

Planned expenditure as % of

total adjusted budget

Amount

Actual expenditure as % of

total adjusted budget

Amount

Deviation as % of revised planned spending

Administration 163 743 71.4% 184 127 80.3% (20 384) -12.4%

Research Development and Innovation

1 105 547

96.7% 1 067 732 93.4% 37815 3%

International Cooperation & Resources

106467 76.4% 116489 83.6% (10 022) -9.4%

Human Capital & Knowledge Systems

2 014 944

97.6% 1 980 940 95.9% 34 004 1.7%

Socio-Economic Partnerships

1 298 422

91.2% 1 249 108 87.8% 49 314 3.8%

Total 4 689 123

93.8% 4 598 396 92% 90 727 1.9%

DST Financial Performance Report

Page 50: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

EXPENDITURE TRENDS AS AT END OF JANUARY 2013

50

DST Financial Performance Report

Page 51: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

DST Overview

Conclusion

DST Financial Performance

DST Achievements for the Third Quarter

DST Achievements per Programme

OUTLINE OF THE PRESENTATION

Page 52: THE DST THIRD QUARTER  PERFORMANCE REPORT PRESENTATION  (1 OCTOBER 2012 TO 31 DECEMBER 2012)

52

Summary

MTSF, NRDS and TYIP inform our work.

42% of our annual targets have already been achieved.

Human capital development, knowledge generation and exploitation, infrastructure and Africa collaboration will remain key focus areas.

DST is committed in achieving at least 80% of its targets this financial year.

Conclusion