48
The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

Embed Size (px)

Citation preview

Page 1: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

1

The Art of Managing Timed Money

Perkins Local FundsCACTA Mid-Winter Conference

February, 2012

Page 2: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

2

The Early Bird Gets the Worm!• The Perkins grant is complex.

• Attention required each month.

STATE FUNCTIONS

LOCAL FUNCTIONS

Go Back and Forth

Page 3: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

3

CONTINUOUS MONITORING IS CRITICAL

•Sign Purchase Requisitions•If amount =or > than $5,000 for one unit, is Local Plan approved with this item categorized as Equipment!• Are all out-of-state travel details in?

Page 4: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

4

NO CHARGES TO PERKINS ACCOUNT WITHOUT LOCAL PERKINS

ADMINISTRATOR’S SIGNATURE•Is it in the Local Plan?

•If amount = or > than $5,000 for one unit, is the spending category “Equipment” and is the Local Plan approved?

Page 5: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

5

NO CHARGES TO PERKINS WITHOUT PERKINS ADMINISTRATOR’ SIGNATURE

•Is the Purchase Requisition date later than the Plan Submittal date or July 1 – whichever is later?• Will the items arrive by June 30?•Is there a waiver if late?

Page 6: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

6

NO CHARGES TO PERKINS WITHOUT PERKINS ADMINISTRATOR’ SIGNATURE

•Does Purchasing have a copy of the Local Plan?• Does the Grant Accountant have a copy of the Local Plan?

Page 7: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

7

START NOW – EARLY FEBRUARY!• Set Date for a one-day 2013 Planning

Meeting.• Attendance required if you want money!

STATE FUNCTION: Post Intent To Participate

LOCAL FUNCTION: Complete Intent to Participate

Go Back and Forth

Page 8: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

8

START NOW – AFTER CACTA!• Review Funded Projects Action Steps for

obligations.• Send warning to non-obligated – Spend now

or lose the funds!

STATE FUNCTION: Review Plan Revision

LOCAL FUNCTION: Submit Revised Local Plan per above.

Go Back and Forth

Page 9: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

9

ALL LOCAL PLAN SUBMITTALS

State:Questions/Comments

Local:Answers/Responses

LOCAL PLAN IS APPROVED

Page 10: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

10

START NOW – AFTER CACTA!• Review Funded Projects Action Steps for

obligations.• Send warning to non-obligated – Spend now

or lose the funds!

STATE FUNCTION: Review Plan Revision

LOCAL FUNCTION: Submit Revised Local Plan per above.

Go Back and Forth

Page 11: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

11

MARCH – EVERYONE WANTS TO KNOW YOUR 2013 BUDGET!

• Advise not available until June.

• Advise Perkins only supplemental.

STATE FUNCTION: She has no idea!

LOCAL FUNCTION: Call Lorrie and ask when will we know next year’s allocation amounts.

Go Back and Forth

Page 12: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

12

MARCH – PREP FOR PLANNING!

•What are new College initiatives?

• What action steps were not funded last year?

• What are the old and new Perkins Performance Metrics Indicating?

• Arrange the location, refreshments, and send reminders – ATTENDANCE REQUIRED

Page 13: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

13

LOCAL FUNCTION: Plan and Conduct a Perkins Strategic Planning Meeting• Based on CTE vision aligned to . . .• Based on SWOT analysis• Based on Congressional intent• Develop more Action Steps than you have

money.• Prioritize Action Steps• See Administrators’ Handbook for strategic

meeting guides

MARCH – PREP FOR PLANNING!

Page 14: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

14

APRIL 1– PREPARE FOR MAY 1 DEADLINE!

• Review Funded Projects Action Steps for obligations.

• Send warning to non-obligated – Spend now or lose the funds!

STATE FUNCTION: Review Plan Revision

LOCAL FUNCTION: Submit Revised Local Plan per above.

Go Back and Forth

Page 15: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

15

• Review account transaction details for expenses paid between

January 1 and March 31.

APRIL 4– PREPARE THIRD QUARTER VOUCHER (VOUCHER 3)

STATE FUNCTION: Review Voucher 3

LOCAL FUNCTION: Submit Voucher 3, print & sign, mail with support documents.

Go Back and Forth

Page 16: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

16

APRIL 27– SUBMIT FINAL PLAN REVISIONS

• Except May or June Out-of-State Travel action steps unless know details now

• Send warning to non-obligated – Spend now or the Institution will lose the funds!

STATE FUNCTION: Review Plan Revision

LOCAL FUNCTION: Submit Revised Local Plan per above.

Go Back and Forth

• Are any P.O.’s on back order?

Page 17: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

17

MAY – TIME IS UP!• Call state to open plan for Out-of-State

Travel action steps

• Call vendors with back orders – remind them of the waiver – or right to cancel

STATE FUNCTION: Review Plan Revision

LOCAL FUNCTION: Submit final out-of-state travel details.

Go Back and Forth

Page 18: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

18

JUNE – STOP PURCHASING!• Do NOT allow any pre-obligation of the next

year’s funds!!!

• Cancel all orders that cannot guarantee a June 30 receipt of goods date.

Funded personnel extra duty time or professional services contracts work must be completed by June 30.

Page 19: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

19

JUNE – PREPARE NEXT YEAR’SLOCAL PLAN!

• Look at your prioritized action steps from March strategic planning meeting.

• Look at Perkins Performance Metrics Report.

STATE FUNCTION: Review Local Plan

LOCAL FUNCTION: Submit new Local Plan.

Go Back and Forth

Page 20: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

20

JUNE – PREPARE NEXT YEAR’SLOCAL PLAN!

• Print Local Plan Signature Sheet; Obtain required signatures, Fax signed sheet to CCCS.

STATE FUNCTION: Review Local Plan

LOCAL FUNCTION: Submit new Local Plan Signature Sheet.

Go Back and Forth

• Is Your Local Plan Sanctioned?

• REMEMBER – PERKINS FUNDS CANNOT BE APPLIED TO MIDDLE SCHOOL CTE PROGRAMS!

Page 21: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

21

SANCTIONED LOCAL PLANSBEGINS WITH FY2012-2013

• Failed to meet 90% of State Target of same performance metric three consecutive years

• Ten percent of total award, per each deficient metric, must be applied to improve any metric with 3 consecutive years of deficiency.

• State team will be visiting.

Page 22: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

22

JUNE – TRAVEL GETS TRICKY!• Registration for an event is obligated when paid. If paid prior to July 1 – must have an action step in current plan to cover registration.

• Travel is obligated when taken. If travel is after July 1, must have an action step in new plan and new plan must be submitted prior to departure date!

Page 23: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

23

JUNE – TRAVEL GETS TRICKY!• If purchasing airline tickets in June for July travel, must charge cost to general fund account.

• After the travel is taken in July, and if the Local Plan was submitted prior to departure, and if the out-of-state travel details were in the Local Plan, can journal entry the airline tickets cost to the new Local Plan Perkins Account.

Page 24: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

24

JUNE – TRAVEL GETS TRICKY!• Between June and September more than 80 Local Plans are submitted, reviewed, resubmitted, reviewed again, etc.

• If funding out-of-state travel in new Local Plan, that is expected to occur in either the summer or the fall, it is urgent that the details of that out-of-state travel are included when the plan is first submitted.

Page 25: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

25

JULY- FIRST INSTALLMENT

•An official document•Posted to Local Plan•Must be copied and saved•Indicates 1st Quarter Spending Limit

Page 26: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

26

AUGUST – RESPOND AND PROCEED

• DON’T FORGET TO RESPOND TO REQUESTS FOR INFORMATION.

• Call, if need help with questions or comments made about your Local Plan

STATE FUNCTION: Review Local Plan

LOCAL FUNCTION: Submit new Local Plan.

Go Back and Forth

Page 27: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

27

AUGUST – RESPOND AND PROCEED• Most Perkins purchases can be obligated as

soon as the Local Plan is submitted or July 1, whichever is later.

• Begin to order items that are needed for CTE classrooms.

• Watch the exceptions to this early ordering:

Page 28: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

28

AUGUST – EXCEPTIONS TO EARLY ORDERING

• Cannot obligate any “Equipment” purchases until Local Plan is approved.

• Cannot obligate out-of-state travel until details are included in the Local Plan

• Cannot over-obligate – must remain within First Installment limit.

Page 29: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

29

SEPTEMBER – HE WHO WAITS IS LOST• Last day to submit a Local Plan is September

30• However, if you wait that long to submit, you

are essentially already 3 months behind!• The early bird gets the worm, has less stress,

can provide materials and items into classrooms sooner, and are more likely to meet the December 31 deadline!

Page 30: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

30

SEPTEMBER 30 – PREPARE VOUCHER 1

• Voucher 1 must be submitted by everyone.

• Voucher 1 cannot be accessed until three previous steps are completed!

• The following slides represent the processes that must be completed to meet the December

31st deadline for receipt of Voucher 1

September 30 is also the deadline for Local Plan Submittal but since you are watching this Powerpoint, we know you will have submitted your Perkins Local Plan much earlier!

Page 31: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

31

THE NEW LOCAL PLAN

STATE FUNCTION: Review Local Plan

LOCAL FUNCTION: Submit new Local Plan.

Go Back and Forth

Steps to be Completed in order to Meet December 31 Deadline!

Page 32: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

32

THE LOCAL PLAN APPROVED

STATE FUNCTION: Review Local Plan

LOCAL FUNCTION: Respond to requests for more information.

Go Back and Forth

Steps to be Completed in order to Meet December 31 Deadline!

Page 33: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

33

THE AWARD PACKET POSTEDSTATE FUNCTION: If Plan Approved andIf After October 1 (or so): Post New Local Plan Award Packet.

LOCAL FUNCTION: Print appropriate Award Packet Documents.

Steps to be Completed in order to Meet December 31 Deadline!

Page 34: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

34

THE AWARD PACKET POSTEDLOCAL FUNCTIONS: •Get Grant Recipient Agreement Letter Signed.•If received a Non-Traditional Careers grant, get Amendment to Agreement signed (postsecondary.)•If not a CCCS College, obtain a copy of most recently completed A-133 Single Audit Report*•Get signature on Civil Rights Assurance form.•Mail originals of all required Award Packet documents to state (CCCS.)

* See Perkins CTE Technical Guide for Award Packets on Administrators’ Handbook webpage.

Steps to be Completed in order to Meet December 31 Deadline!

Page 35: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

35

THE AWARD PACKET POSTEDLOCAL FUNCTIONS FOR CONSORTIA: •Get Grant Recipient Agreement Letter Signed.•Obtain a copy of most recently completed A-133 Single Audit Report•Get signature on Civil Rights Assurance form.•Mail originals of all required Award Packet documents to state (CCCS.)• Get copies of most recently completed A-133 Single Audit Report (within last 2 years) from each member district that had one OR• Get signed copies of A-133 waiver form from member districts that are not required to have the A-133 Single Audit Report. • Get signed copies of Civil Rights Assurance form from each member district.

Steps to be Completed in order to Meet December 31 Deadline!

Page 36: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

36

THE AWARD PACKET RECEIVED AND UNDER REVIEW

STATE FUNCTION: Trigger e-mail to Local Recipient indicating the Award Packet documents have been received.

LOCAL FUNCTION: Mail required Award Packet Documents to CCCS.

Steps to be Completed in order to Meet December 31 Deadline!

Page 37: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

37

THE AWARD PACKET RECEIVED AND UNDER REVIEW

STATE FUNCTION: Check all documents received: accurate, correct and complete?If gaps, e-mail Perkins contact for missing items.

LOCAL FUNCTION: Respond to e-mails requesting needed items to complete the Award Packet.

Go Back and Forth

Steps to be Completed in order to Meet December 31 Deadline!

Page 38: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

38

THE AWARD PACKET APPROVED AND VOUCHER 1 POSTED

STATE FUNCTION: Approves Award Packet; Voucher 1 automatically posts to CTE Online Account

LOCAL FUNCTION: Prepare Voucher 1, submit, print, sign and mail to state (CCCS) with support documents so that received at CCCS by DECEMBER 31.

Steps to be Completed in order to Meet December 31 Deadline!

Page 39: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

39

Do you see?Do you see now, why it is so important for you

to start the Perkins Local Plan submittal process early?

Do you see now why it is so important for you to respond to e-mails that ask for more information asap?

Page 40: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

40

JANUARY – FINISH VOUCHER 1

STATE FUNCTION: Reviews Voucher 1; contacts local staff if questions or if need more information.

LOCAL FUNCTION: Respond to e-mails about Voucher 1.

Go Back and Forth

NOTE: This can be completed earlier if all other previous steps are completed earlier!!

Page 41: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

41

JANUARY – PREPARE VOUCHER 2

STATE FUNCTION: Voucher 1 approved, Voucher 2 automatically posted.

LOCAL FUNCTION: Prepare Voucher 2 for expenses paid in 2nd quarter, Oct. 1 through Dec. 31.

Go Back and Forth

Page 42: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

42

JANUARY – PREPARE INITIAL LOCAL IMPROVEMENT PLAN*

STATE FUNCTION: Post Initial Local Improvement Plans into Local Plans of recipients who did not meet 90% of state target in most recent data.

LOCAL FUNCTION: Complete and submit Initial Local Improvement Plan.*Only required for recipients that did not meet Perkins Performance targets with most recent data.

Go Back and Forth

Page 43: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

43

JANUARY OR FEBRUARY – SUBMIT INTENT TO PARTICIPATE FORM

STATE FUNCTION: Intent to Participate form posted for the following fiscal year.

LOCAL FUNCTION: Assure Plan of Study on file is still current and submit Intent to Participate by deadline.

Page 44: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

44

START NOW – EARLY FEBRUARY!• Set Date for a one-day 2014 Planning

Meeting.

• Attendance required if you want money!

THE CIRCLE IS COMPLETE – THE PROCESS BEGINS AGAIN

Page 45: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

45

AND THERE’S MORE

• Currently approved CTE Programs

• Current and appropriately credentialed teachers or faculty

• Allowable costs• Unallowable costs• Disposal of Perkins

funded items

Page 46: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

46

AND THERE’S MORE

• Correct data reporting• Well-written action steps

that address project objectives

• Meeting the intent and requirements of Congress

• Assuring use of funds for CTE

• Supplementing, not supplanting

Page 47: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

47

AND THERE’S MORE

• The Perkins grant is complex.

• Attention required each month.

• Staying on schedule with Timed

Money is key!

Page 48: The Art of Managing Timed Money Perkins Local Funds CACTA Mid-Winter Conference February, 2012 1

48

FOR QUESTIONS OR HELP:

Lorrie Toni, Perkins [email protected]

CCCS9101 E. Lowry Blvd.Denver, CO 80230