TERCERO PHASE IINEW CONSTRUCTION, LEED GOLD
David Mogavero
Patrice Coffman
Project Profile
Tercero Student Housing, Phase II 155,000 square feet $35 million 592 beds Sep. 2010 completion Architect: Mogavero
Notestine Associates Contractor: Brown
Construction
Energy
exceeded Title 24 by 32% savings of 572,145
kWh + 3,576 therms = $52,744
high-performance windows
solar thermal
Water
project reduction of water use by 41% 30% from fixtures 11% from process
water
Indoor Environment
increased ventilation by 30% rapidly renewable material recycled content material low or no VOC lighting controls
Innovation
Green Cleaning Policy & Program education program (CIR 9/24/2001) “green” furniture building metering
Occupant Satisfaction
93.3% of occupants are satisfied reliance on natural light
CUARTO DINING COMMONSCOMMERCIAL INTERIORS, LEED GOLD
David Mogavero
Patrice Coffman
Project Profile
Cuarto Dining Commons 18,430 square feet $7.9 million Sep. 2010 completion design/build Design Architect:
Stafford King Wiese Architect of Record:
Mogavero Notestine Associates
Contractor: Valley Construction
Existing Interior
cafeteria style low ceilings dark small rooms multiple renovations
Design – First Floor
Design – Second Floor
Energy
25% more efficient than Title 24-2001 40% reduction in lighting density solar thermal Melink system
Interior
Interior
Outcome
a destination showcase dining facility support UC sustainable food goals education program (CIR 9/24/2001)
David [email protected]
Patrice [email protected]
images from Frank Domin, Christopher Fallon, Julianne Nola, UC Davis, and Mogavero Notestine Associates