STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION
SUITE 700 • JAMES K. POLK BUILDING NASHVILLE, TENNESSEE 37219
DALE R. KELLEY COMMISSIONER
April 1, 1986
The Honorable Doug Henry Chairman Senate Finance Ways and Means Ccmnittee Rcx:m 11, Legislative Plaza Nashville, Tennessee 37219
The Honorable Riley Darnell Chairman Senate TranspJrtation Ccmnittee Rcx:m 2, Legislative Plaza Nashville, Tennessee 37219
Dear Mr. Chairman:
The Honorable John Bragg Chairman House Ways & Means Ccmnittee Roan 33, Legislative Plaza Nashville, Tennessee 37219
The Honorable Charles Robinson Chairman House Trans:pJrtation Ccmnittee Rcx:m 24, Legislative Plaza Nashville, Tennessee 37219
In order to address trans:pJrtation needs identified from both traffic and econcrnic stand:pJints, Governor Alexander recarmended, in February of this year, a three-cent increase in the gas and rrotor fuel tax. This tax would fund a program containing six interstate-type parkways and fi~een priority
/ projects, and would allow us to accelerate our existing primary highway program.
During Legislative hearings and reviews by local offficials and the general public, the Department received recarmendations that additional highway segments be included in the plan. Accordingly, we have revised the highway plan to include those projects which have sufficient justification, and are suhnitting a copy for your consideration. In the future, this plan will be updated periodically and used as the basis for preparation of the project listing which supports our annual budget request.
,_
We appreciate very much your efforts to provide additional revenue to finance the much-needed improvement plan.
Sincerely,
fe~;l'<_j:(//1:-1 Dale R. Kelley c;I Carmissioner
_,,.,..--·· -
t 1 , ,
URGENT HIGHWAY NEEDS
1. BICENTENNIAL PARKWAYS
2. 15 PRIORITY ROAD PROJECTS
3. ACCELERATED PRIMARY HIGHWAY PLAN
prepared by
TENNESSEE DEPARTMENT OF TRANSPORTATION
February 1986 Revised March 1986
,, ' . . J ,. Page 1 of Z
BICENIENNIAL PARKWAYS . . Length airl CoSt Estimates ·
MIIES CCST (MILLICNS)
Interstate 155 Extension 47.5 $198.5
Interstate 840 · 11.0 351.0
Interstate 140 19.5 151.7
Interstate 181 Extension 15.Q 95.5
Naiconnah Parkway 5.5 40.0
u.s. 27 14.0 30.0
TOl'AL 178.5 $866.7
/
BI<ENI'ENNIAL PARKWAYS SPECIFIC DESCRIPrICNS
. PAGE 2 CF 2
CClJNl'Y- . - - . . ·· ·· ·· RClJI'E · · · ·· ··· · · · ·· · · . - - - . IESCRIPrI CN . . . .. . . . . .. - - . . . . . ... . . I.EroI'!i
Dyer-Gibson- I-155 Interstate 155 Extension 47.5 Madison Ext. (COnstruct new 4-Lane Divided Higmrey)
Dickscn- I-840 Middle Tennessee Parkway, fran I-40 West 77.0 Wil,liamscn- of Nashville, Exterrling South of Nashville Rutherford- to I-40 Ea.st of Nn.shv:i.lle (Construct 4-Wilson Lane Divided Highway
Knox- I-140 Extension of Pellissipp.i Parkway, fran I-40 19.5 BlOllllt in West Knox County to US-321 in East Blount
Coonty (Construct 4 Lane Divided Highway)
Unicoi I-181 Extensicn of I-181, fran Ei:win to the North 15.0 Ext. Carolina State Line {Construct 4 Lane Divided
Highway)
Shelby us-12 Nanconnah Parkway, Fran I-240 to Winchester 5.5 Road (Construct 4 Lane Divided Highway)
Hamilton- ~-27 Fran COrridor "J" in Soddy-Daisy · to Dayton 14.0 Rhea ByPass (Construct 4 Lane Divided Highway)
..
/
15 PRI CRITY RON:S Le!'J3th arx1 Cost Estimates
.., _.
Bristol Bypass ·
U.S. llE, Limestone to Jonesl:oro
u.s. 27, N&1 River to Cneida
U .s. 25E, f.k)rris1:01n to Bean Station
U .s. 64, Ocoee Gorge
Hixson Pike
State Ra: ·' ~ 111; Sparta to Cookeville
Mc::Minnville Bypass
Bell Road/ Old Hickory Boulevard Bren~ to Hickory HallGT
U .s. 70, Waverly Bypass
He:OO.ersonville Bypass Comlector to I-65
State Route 22, Hlllltingdon to McKenzie
U .s. 45, Selmer to Bethel Springs
Austin Peay Highway, I-240 to Raleigh-Millington Road
U.S. 64, I-40 to Eads
TOI'AL
MITES
5.0
10.0
s.s
5.1
9.4
1.8
9.3
5.1
10.6
5.7
3.6
8.4
5.2
7.5
96.6
CCST (MILLI CNS)
$ 25.0
25.0
25.0
15.o
35.0
s.o
20.0
18.0
45.0
20.0
30.0
21.0
21.0
a.o
15.7
$328.7
caJNrY·
Sullivan
Washington
Scott
Grainger
Polk .
Hamilton
wniteFu cnam
warren
Davidson
Hurrphreys
SumnerDavidson
Carroll
McNairy
Shelby
Shelby
RClJI'E
15 PRI CIUTY RCN) PROJECTS SPECIFIC IESCRIPI'ICNS
.. . . - . . .. IESCRIPI'I CN .
US-llE Bristol ByPass (Construct NeN 4-Lane Highway)
US-llE Limestone to Jonesboro (Reconstruct to 4 Lane)
t.5-27 Fran NE:W River to Qleida (Reconstruct 2 Lane)
US-25E Appalachia Corr "B 11, MorristONn to
Bean Station (Construct 4 Lane)
US-64 Appalachia Corr ''K" Ocoee Gorge (Construct 2 Lane With Truck Clim:>ing Lanes)
SR-319 Hixon Pike, Austin Highway to N. of Middle Valley Road (Reconstruct to 4 Lane)
SR-111 - Corr "J", Sparta to Cookeville (Reconstruct to 4 Lane)
SR-55 McMinnville ByPass, fran US-70 to SR-55 Near Smartt (Construct 4 Lane)
SR-254 Old Hickory Blvd/Bell Road, fran I-65 at Brentwood to I-24 at Hickory Hollor'1 (Reconstruct to 5 Lanes)
US-70 Waverly ByPass (CCXlStruct to 4 Lanes)
SR-386 Henderscnville ByPass Conn~tor to I-65 (COnstruct 4 Lanes)
SR-22 McKenzie to Huntingdon (Construct to 4-Lanes)
US-45 Selmer to Bethel Sprin:Js (Construct 4 Lanes)
SR-14 Austin Peay Highway, fran I-40 to RaleighMillington (Reconstruct to 7 Lanes)
US-64 I-40 to Fayette County Line Near E.AL.6 ( Recx:::nstruct to 4 Lanes)
PAGE 2 CF 2
s.o
10.0
a.a
5.1
9.4
1.8
9.3
5.1
10.6
5.7
3.6
a.4
5.2
1.1
7.5
URGENT HIGHWAY NEEDS
PRIMARY HIGHWAY SYSTEM IMPROVEMENT PLAN
This listing contains projects totaling an estimated $2.l billion based on 1986 costs.
The Department considers these projects ' to be of most urgent need for improvement based on factor~ considered at this time. However, it is necessary that changing conditions be monitored continuously and the listing updated periodically.
Both the Administration and the General Assembly should have an opportunity to review programs annually by continuing the current practice of programming by phase of development and submitting a project listing
/ for review during the budget process.
prepared by
TENNESSEE DEPARTMENT OF TRANSPORTATIO
February 1986
Revised March 1986
CCUNI'Y
Andt:rson
And t:rson
Andt:rson
Anderson
Bt<if ord
Bt<iford
BE:df ord
Blollilt
Blount
Blount
Bradley
Carmon
CannonRutherford
ROJI'E
SR-61
SR-61
SR-62
SR-62
SR-398
SR-10 (IB-231)
SR-10 (IB-231)
SR-35 (l.E-411)
SR-33 (US-411)
SR-33 (IB-411)
SR-60
SR-1 (U5-70S)
SR-1 (US-70S)
ACCEIERATED PRIMARY HIGHWAY PLAN
DESCRI Pl' I CN
I-75 to SR-71 (lli-441) - Reconstruct to 4-Lane
Clinton SW City Limits to SR-9 Rt:construct to 4-Lane
West Olter Dr. to SR-95 in Cak Ridge -Rtconstruct to 4-Lane
Tuskegee Drive to Bethel Valley Rd. in Oik Ridge - Reconstruct to 4-Lane
Wartrace to Co ff eE:: County Line Ne.:w 2-Lane Construction
Shelbyville to SR-82 Reconstruct to 4-Lane
SR-82 to Rutherford County LinE:: Reconstruction to 4-Lane
Washington St. to Burchfield St. in Maryville - Reconstruct to 4-Lane with turn Lane
Loudon County Line to 5 .o Mi. S. of l.E-129 @ Maryville - Reconstruct to 4-Lane
5 .o Mi. N. of Loudon County Line to US-129 @ Maryville - Reconstruct to 4-Lane
Adkinson Dr. to Existing SR-60 - Construct Nett 4-Lane
SR-64 to Wocx:iliury - Construct NE.W 4-Lane
Peaks Hill to SR-64 - Construct new 4-Lane
Page 1
LENGTH
1.5
2.5
LO
2.3
5.1
5.5
4.5
0.9
5.0
5.0
1.5
4.1
3.4
Ca.JNI'Y
Carroll
carroll
Carroll
CarrollHenderson
Carter
CarterS ull i van
carter
Cheatham
Chester
Chester
Claiborne
Clay
ROJI'E
SR-364
SR-22
SR-22
SR-22
SR-37 (IB-19E)
SR-37 {US-19E}
SR-37 (US-19E}
SR-12
SR-5 (US-45}
SR-100
SR-33
Corr"J"
Page 2 ACXEI.ERATED PRIMARY HIGHWAY PLAN
IESCRI PI' I CN I.ENGI'H
Huntingdon Bypass, SR-lE (IB-70} 2.1 to SR-22 S. - Construct na.1 4-Lane
Huntingdon Bypass to S. of Westport Rd. - 3 .o Reconstruct to 4-Lane
S. of Westport Rd to South City Liroi ts 6 .o of Clarksburg - Reconstruct to 4-Lane
South City Limits of Clarksburg to I-40 - 5 .o Reconstruct to 4-Lane
Broad St. to Tin Can Hollo.v Rd. N. 1.8 of ElizabE:thtco - Construct new 4-Lane on Southern End, Pave additional 2-lanes on Northern End
Tin Can Hollo.v Rd. to 1.0 Mi. N. of Sullivan County Line - Construct new 4-Lane
SR-67 (US-321} in Hanpton to 4-Lane S. of Elizabethton - Construct na.1 4-Lane
Ashland City Bypass: SR-49 to SR-12 -Construct New 2-Lq.ne
McNairy County Li.Ile to the Henderson ByPass - Reconstruct to 4-Lane
W. of SR-5 (US-45} to Henderson East City Limits - Reconstruct to 4-Lane with turn Lane
Sandlick to Minton Hollo.v Rd. W. of New Tazewell - Reconstruct to 2-Lane
Cbty River @ Celina to Existing SR-53 -Construct New 2-Lane
3.7
2.0
0.8
3.3
2.5
3.2
CCl.JNI'Y
Clay
Cocke
Cocke
Cocke
Cocke
Cocke
Coffee
Davidson
Davidson
ROJI'E
Corr"J"
SR-32
SR-32
SR-32
SR-35 (l.E-321)
SR-35 (IB-321)
SR-398
SR-392
SR-28 (l.E-127)
SR-155
SR-155
Page 3 ACCEIERA'l'ED PRIMARY HIGHWAY PLAN
IESCRIPI'ICN LENGTH
Existing SR-53 to Kentucky State Line - 4.3 Construct Ne.v 2-Lane
SR-73 (Wilton Springs Rd) N. of Cosby 1.9 to near Bogard Rd. - Reconstruct to 2-Lane
Near P.ogard Rd. to Near Mt. Zion 1.8 Church Road - Reconstruct to 2-Lane
Nta.r Mt. Zion Church Rd. to I-40 1.8 @ NewfX)rt - Reconstruct to 4-Lane
W. of Gocd Hope Rd to 2.3 Mi. E. of 5 .2 Parrottsville - Reconstruct to 2-Lane
2 .3 Mi. E. of Parrottsville to Greene 3 .6 County Line - Reconstruct to 2-Lane
Bedford Ccunty Line to I-24 Near 4.7 Busy Corner - New 2-Lane Construction
Stanley St. to SR-1 (US-70) in Crossville - 0.9 Con5truct NE::!W 4-Lane
N. of SR-68 to Hayes St. in Crossville - 3.1 Reconstruct to 4-Lane
Brilty Parkway; 800' N. of Cockrill Bend Br. 1 • 7 to SR-12 (Ashlarrl City Highway) - Construct Ne.. 4-Lane
Brile:y Parkwdy; Centennial Blvd. to SR-12 2.9 (Ashlarrl City Hwy) - Pave New 4-Lane Construction
/
CCl.JNI'Y
DavidsonRobertson
Davidsen
DavidsonWilson
Davidson
Davidson
Davidson
Decatur
Dt.catur
Decatur
Dickson
Dick~on
Dyt:r
RClJI'E
SR-11 (US-41)
SR-24 (IB-70)
SR-24 (US-70)
SR-106 (IB-431)
SR-155
SR-155
SR-69
SR-69
SR-69
SR-46
SR-46
SR-20
ACCEIERro'ED PRIMARY HIGHWAY PLAN
DESCRI PI' I CN
Old Springfield Highway to SR-257 in Ridgetop - Reconstruct to 4-Lane
Fairfield Ave. to Seal::x:xird Systan R/R in Nashville - Reconstruct to 4-Lane with Turn Lane
Page 4
LENGTH
2.3
0.6
AndrtW Jackson Park\'1ay to 2 .5 Mi. W. of 2 .5 Mt. Juliet Road - Reconstruct to 4-Lane
Williamson County Line to Harding Place 3.8 Reconstruct to 4-Lane
Briley Parkway: SR-12 to SR-65 (IB-431) 4.2 Construct NEW 4-Lane Freeway
Briley Parkway: Brick Church Pike to I-65 - 1 .4 Construct NEW 4-Lane Freeway
SR-202 (Brooksi~/Tharpscn Rd) to SR-69 2.8 S. of Decaturville - Reconstruct to 2-Lane
SR-114 to SR-202 - Reccnstruct to 2-Lane
SR-69 to SR-114 - Reconstruct to 2-Lane
South of Grab Cretk Rd. to SR-235 in Dickson - Reconstruct to 4-Lane
I-40 to South of Grab Creek Rd. S. of Dickscn - Reconstruct to 4-Lane
Dyersburg ByPass, SR-20 (US-412) to SR-104 Pave NEW 2-Lane Construction
4.3
1.5
2.5
4.5
CCUNrY
Dytr
FayettE:
Fayette
Fayette
Fentress
Fentress
Franklin
Gibson
.RCUI'E
SR-399
SR-15 (US-64)
SR-15 (US-64)
SR-15 (l.E-64)
SR-15 (US-64)
SR-15 (l.E-64)
SR-28 (IB-127)
SR-28 (lE-127)
SR-15 (IB-64)
& SR-16
(US-41A)
SR-5 (l.E-45W)
ACCELERATED PRIMARY HIGHWAY PLAN
LESCRIPI'I CN
US-51 South of Favlkes to US-412 S .E. of Dyersburg - Construction New 2-Lane on 4-Lane Right-of-Way
Shelby County Line to oakland West City Limit - Reconstruct to 4-Lane
cakland West City Linii t to Cakland East City Limit - Reconstruct to 4-Lane with Turn LanE:
O:lklano East City Liroi ts to Sanerville -Reconstruct to 4-Lane
Sanerville East City Liroi ts to Country Club Road East of Sanerville - Reconstruct to 4-Lane with Turn Lane
Country Club Road East of Sanerville to the Hardanan County Line - Reconstruct to 2-Lane on 4-Lane Right-of-Way
Jamesto.o.n ByPass, SR-28 s. to SR-52 -Construct Ne.w 2-Lane cri 4-Lane Right-of-Way
Jamesta...n ByPass, SR-52 to SR-28 N. -Construct New 2-Lane cri 4-Lane Right-of-Way
Wincht0:sttr ByPass, State Route 15 West of Winchester to SR-16 North of Winchester -Construct NE.w 4-Lane
N. of Humboldt to S • of Trenton -RE:!COnstruct to 4-Lane
Page 5
IBNGrH
3.5
6.5
1.1
7 .9
0.9
8.5
2.7
3.8
3.3
5.6
. ,.
CCl.J'NI'Y
Giboon
Gibson
Gibson
Gibson
Gibson
Gibson
Gibson
Giles
Giles
Giles
Giles
Ra.JI'E
SR-43 (US-45E)
SR-43 (US-45E)
SR-43 (U3-45E)
SR-43 (US-45E)
SR-43 (U5-43E)
SR-43 (US-45E)
Page 6 ACCELERATED PRIMARY HIGHWAY PLAN
DESCRIPI'I CN LEtJGI'H
4.5 Mi. N. of Fairview to N. of Nedina - 4.0 Reconstruct to 4-Lane
NE.ar Mila n North City Lirni ts to South of 5 .9 ICG Railroad - Reconstruct to 4-Lane
Bridge and Approaches at ICG Railroad 0 .8 South of Bradford - Reconstruct to 4-Lane
North of ICG Railroad to Near Bradford 2.6 South City Limits - Reconstruct to 4-Lane
Near Bradford South City Limits to near 2.7 Bradford North City Limits - Reconstruct to 4-Lane with Turn Lane
Near Bradford North City Limits to 1.6 Weakley County Line - Reconstruct to 4-Lane
(See Madison Courity)
SR-15 (US-64)
SR-15 (U5-64)
SR-15 (US-64)
SR-15 (U3-64)
Pulaski ByPass, West of Pulaski to SR-7 -Construct New 2-Lane on 4-Lane Right-of-Way
Pulaski ByPass, SR-7 to East of Pulaski -Construct Ne.v 2-Lane en 4-Lane Right-of-Way
Pulaski ByPass to I -65 - Reconstruct to 2-Lane en 4-Lane Right-of-Way
I-65 to Lincoln County Line - Reconstruct to 2-Lane
2.3
2.0
6.3
2.5
' '
Ccut .. TY
Grainger
GraingerKnox
GraingtrHawkins
Gri:;cne
GreE:::ne
Hamblen
Hamilton
Hamilton
Hamilton
Hamilton
RQJI'E
SR-1 (l.E-llW)
SR-1 (l.E-llW)
SR-1 (U>-llW)
SR-35 (US-321)
SR-35 (l.E-321)
SR-70
SR-160
Corr"J"
Corr"J"
Corr"J"
Corr"J"
Page 7 ACCEIERATED PRIMARY HIGHWAY PLAN
DESCRI Pr I CN LENGrH
SR-32 Left to SR-32 Right at BE:an Station 3 .O - Reconstruct to 4-Lane
Circle Road in Knox County to E. of SR-61 2 .5 at Blaine - Reconstruct to 4-Lane
Corr "S" @ Bt!Cill Station to Futuristic Rd.- 2.1 Construct New 4-Lane
N. of Nolichucky River to the Proposed 5 .2 ByPass Southwest of GreenE:ville - Construct N811 2-Lane
Gret'neville ByPass, SR-34 (US-llE) to 3 .4 SR-35 (IB-321) - Construct New 2-Lane on 4-Lane Right-of-Way
Greeneville ByPass, SR-35 (US-321) to SR-70 2.0 Construct New 2-Lane en 4-Lane Right-of-Way
Morristo,.m ByPass, Alpha Valley Rd. to 6.2 SR-32 (lE-25E) - Construct New 2-Lane on 4-Lane Right-of-Way
Back Valley Rd. to Jones Gap Rd. - 3.7 Construct New 2-Lane en 4-Lane Right-of-Way
SR-29 (US-27) @Soddy Daisy to 400' W 1.3 of Back Valley Rd. - Construct New 2-Lane on 4-Lane Right-of-Way
Jones Gap Rd. to Seq_uatchie County Line - 3.0 Construct New 2-Lane on 4-Lane Right-of-Way
2098' s. of Morrison Springs Rd. to S. 4.4 of Levi Canetery Road - Pave Nev.r 4-Lane Construction
' '
CCl.JNI'Y
Hamilton
Hamilton
Hamilton
Hamilton
Hamilton
Hamilton
Hamil ten
Hancock
Hanccx:k
Hardcrran
Hardanan
Hardin
RCUI'E
Corr"J"
SR-153
SR-58
SR-8 (U3-127)
SR-153
SR-17
SR-17
SR-31
SR-31
SR-15 (IB-64)
SR-15 (U3-64)
SR-15 (U3-64)
Page 8 ACCEIBRATED PRIMARY HIGHWAY PLAN
DESCRIPI'ICN IENGTH
s. of Levi Cenetery Rd. tow. of SR-153 1.6 Pave Ne.w 4-Lane Construction
N. of Hixson Pike to s. of SR-29 (US-27) - 2.6 Reconstruct to 4-Lane
Sunrist Drivt to Birchv.ocd Drive - 1.0 Reconstruct to 4-Lane
SR-29 (US-27) to SR-27 (Suck Creek Rd.) - 1.4 Reconstruct to 6-Lane
I-75 to SR-58 - Reconstruct to 6-Lane 4.9
Georgia State Line to Alton Park Blvd. 1. 7 @ 40th St. in Chattanooga - Construct Ne.w 4-Lane with Turn Lane
Alton Park Blvd. @ 40th St. to Shipp O .9 Street in Chattanooga - Reconstruct to 4-Lane with Turn Lane
1. 7 Mi. N. of Green Lawson Schcol to N. 1.3 of Duck Creek S. of Sneedville -Reconstruct to 2-Lane
North of Duck Creek South of Sneedville to Sneedville
Jones Street to Bolivar East City Limits -Reconstruct to 4-Lane
SR-100 East of 'Whiteville to Bolivar -Reconstruct to 2-Lane en 4-Lane Right-of-Way
E. of Crump to W. of Tennessee River - Reconstruct to 4-Lane
1.8
1.1
7.2
1.9
CaJNI'Y
HardinMc:N airy
Hardin
Hardin
HardinDeca tur
Hawkins
Hawkins
Hawkins
Henderson
Henderson
Henderson
Ht:nderson
Henry
ROJIB
SR-15 (IB-64)
SR-69
SR-69
SR-69
SR-70
SR-1
SR-66
SR-20
SR-22
SR-22
SR-22
SR-76 (IB-79)
ACXEIERATED PRIMARY HIGHWAY PLAN
DESCRIPI'I CN
Adamsville: to E. of Crurp - Reconstruct to 4-Lane
US-64 Near Savannah to SR-128 Near Buckto.Nn - New 2-Lane ·Construction
SR-128 NE:cff BucktONn to Near BrCMn Cornt::!I" - New 2-Lane Construction
Ne:ar Bro.m Corner to SR-69 New 2-Lane Construction
0. 3 Mi. E • of Old SR-66 to 0. 3 Mi. W. of Net:drrore - Pave New 2-Lane Construction
Page 9
I.ENGI'H
5.1
3.4
5.3
3.8
2.8
Rogersville Bypass - Reconstruct to 2.7 4-Lane
SR-113 to West Main Stre:et in Rogersville - 3 .9 Reconstruct to 4-Lane
Curb & Gutter Section to E. of 0. 7 Blankenship Rd. in Lexington -R~struct to 5-Lane
SR-22A to CUrb & Gutter Section in 1 .5 Lexingt.cn - Reconstruct to 5-Lane
Lexington to North of Robertson Rd. 5 .o Reconstruct to 4-Lane
North of Robertson Rd. to I-40 5 .o Reconstruct to 4-Lane
W. of z...4.iller School to CBk Grove Rd. E. of Paris - Reconstruct to 4-Lane
3.0
' '
Ca.JNI'Y
He::nry
Henry
Hickrran
Hickrran
Houston
Hurphreys
Jefft:rson
JeffersonCocke
Johnson
Johnson
Knox
Ra.JIB
SR-76 (IB-79)
SR-76 (US-79)
SR-50
SR-7
SR-149
SR-1 (US-70)
SR-92
SR-35 (US-321)
SR-34 (US-421)
SR-34
SR-1 (L6-11W)
ACCELERA'IED PRIMARY HIGHWZW PLAN
r::ESCRI Pr I CN
Q:lk Grove Rd. tow. of Tennessee River @ Paris Landifl3 - Reconstruct to 4-Lane
County Har~ Rd. to SR--69A in Paris -Construct New 2-..Lane (US-79 ByPass)
Existing SR-50 nE:ar Tract: Cr. Rd. to Charles Thanpson Br. W. of Centerville - ReC'Onstruct to 2-Lane
Gin Branch Road to SR-4Ci and 100 NE of CenttrVille - Construct New 2-Lane
SR-49 in Erin to the Cumberland City By-Pass - Construct New 2-Lane
4-Lane Sect. w. of Waverly to 2000 ' W. of Bro.vnto.vn Rd. -Reconstruct to 4-Lane
Dumplin Valley Rd. to Hinchey Hollo.v Rd. S • of Jeff er son City - Reconstruct to 2-Lane
1.8 Mi. E. of SR-92 @ Chestnut Hill to I-40 w. of Newport - Reconstruct to 2-Lane
E. of 5-Lane Section to 2 .5 Miles W. of SR--67 - Reconstruct to 2-Lane
2 .5 Miles W. of SR-67 to North Carolina -Reconstruct to 2-Lane
Roberts Rd. to Mine Rd. - Reconstruct to 4-Lane
Page 10
LENGTH
3.4
2.0
2.2
4.2
4.2
2.7
4.4
3.5
3.4
2.0
! • ' ..
CClJNl"'Y
Knox
Knox
Knox
Knox
Knox
Knox
Lau:lerdale
Lawr1:nce
Lawrence
Lawrtnce
RClJIE
SR-1 (US-llW)
SR-71
SR-71
SR-62
SR-71
SR-62
SR-19
SR-15 (LG-64)
SR-15 (US-64)
SR-15 (US-64)
Page 11 ACCEIBRATED PRIMARY HIGHWAY PLAN
IBSCRIPTI CN LENGrH
Mine Rd. to Circle Rd. - Reconstruct to 2.1 4-Lane
South Knoxville Blvd., Mcx::x:1y Avenue to 1.3 S. Approach cf Tenness€€ River Bridge -Construct t;ev 4-Lane
South Knoxville Blvd., Chapnan Hwy (US-441) 2 .3 to Moody Ave. - Construct Ncw 4-Lane
Sanderson Rd. to E. of Texas Ave. in 0.6 Knoxville - Reconstruct to 6-Lanes with Turn Lane
South Knoxville Blvd., ':f'ennEsste River Bridge to SR-158 -Construct New 4-Lane
Knoxville Urban Boondary to I-75 -Reconstruct to 4-Lane
Ripley Bypass, SR-3 (LG-51) to SR-19 -Pave Ne.v 2-Lane Construction
Prcposed Lawrenceburg ByPass to Lawrenceburg Airport - Reconstruct to 4-Lane with Turn Lane
Lawrenceburg ByPass; SR-15 (T.E-64) West of Lawrenceburg to SR-15 (US-64) East of Lawrenceburg - Construct New 2-LanE on 4-Lane Right-of-Way
1.2 Mile:s West of Lawrenceburg Bypass to the Lawrenceburg Bypass ReconstrUct to 4-Lane with Turn Lane
0.3
3.7
2.9
3.0
3.4
1.2
CCl.J~H'Y
Lincoln
Lincoln
Lincoln
Loudon
Loudon
McNinn
McMinn
McMinn
McMinn
McMinn
McNairy
RClJI'E
SR-15 (US-64)
SR-15 (IB-64)
SR-15 (IB-64)
SR-72
SR-3 ?. (IB-411)
SR-30 (lE-411)
SR-30 SR-33
(US-411)
SR-33 (US-411)
SR-33 (US-411)
SR-310
SR-5 (US-45)
ACCEIERATED PRIMARY HIGHWAY PLAN
DESCRIPI'I CN
SR-15 (US 64) West of Fayetteville to SR-10 (US-231) South of Fayetteville -Expand fran 2 Lanes to 4 Lanes
SR-244 to F'ayett12ville Bypass -Reconstruct to 2-Lane
Giles County Line to SR-244 - Reconstruct to 2-Lane
Robinson Mill to SR-2 - Construct New 2-Lane en 4-Lane Right-of-Way
Monroe County Line to Blount County Line -Reconstruct to 4-Lane
Polk County Line to E ta.Yah S • City Limits - Reconstruct to 4-Lane
Eta.rah S. City Limits to E to.vah N. City Limits - Reconstruct to 4-Lane with Turn Lane
E to.v'ah N. City Limits to N e.ar Englavocd S. City Limits -Reconstruct to 4-Lane
Near Englet.-ood S. City Limits to Monroe County Line - Reconstruct to 4-Lane
Mecca P i.k.e, P 1E£sant Grove Road to Existing Mecca Pike E • of E tcwah -Construct New 2-Lane
Selmer Bypass - Scuth Western LEg -Pave New 4-Lane Construction
Page 12
IENGI'H
2.2
9.6
6.0
2.0
3.7
3.3
2.6
4.1
4.1
2.8
3.8
.. ' .
CCLNI'Y
McNairy
Md~c::iry
t-:o.con
lv'.ddiscnG ibson
MaC.iscnG l.bson
r-.adison
lv'.ii:iricn
t-iarion
RCUI'E
SR-5 (US-45)
SR-5 (US-45)
SR-5 (US-45)
SR-10
SR-5 (US-45W)
S~-43
(US-45E)
SR-20 (US-412)
SR-27 (US-72)
SR-28
SR-28
ACCELERATED PRnrARY HIGHWAY PLAN
DESCRI PI' I CN
1.2 .t-Ji. N. of Mississippi State Line to SR-57 @ Eastvit.W - Rcconstruct to 4-Lanei:.
SR-57 @ Eastvii::w to SR-15 (lli-64) ByPc::ss South of S~lmt:r - Rt:ecnstruct to 4-LclfltS
fa.:th~l Sprinss Eypc::ss to tht Cht-stt:r County Lint - R~ccn~tl:uct to 4-Lant-s
S. cf Irvin Avt;. tc N. of Vinson Rd. in Lafayette - Widt::n to Provide a Ct:11ttr Turn Lane
SR-43 (t:S-45I:) @ E'airvhw tc Hurrroldt -Reconstruct to 4-Lanes
SR-5 (l.E-45\"l) @ E'airvitw to 4 .5 t·:i. N. -Rt::construct to 4-Lune~
US-45 Bypass to I-40 - Rtecnstruct to 4-Lanes with Turn Lane
Alabarra. Statt- Line to 8th StreE:t in South Pittsburg
SR-2 (US-41) @ Jasper to Jones Crossing Rd. - Construct Nt.W 2-Lanc
Jones Crossing Rd. to SR-28 Near Whitwell - Consti:·uct Nt::.w 2-Lant-
Pc.gt: 13
4.7
6.0
'"' 0 G •~
0.8
4.1
4.5
l.G
1.6
4.3
5.2
· . ..
CWNrY
Marshall
Maury
Maury
Maury
?-'.aury
Maury
Ma.ury
t-lauryHickman
Maury
RClJIB
SR-106 (US-431)
SR-6 (US-43)
SR-6 (lE-43)
SR-6 (U>-43)
SR-6 (US-43}
SR-6 (lE-43)
SR-6 (IB-31)
SR-6 (IB-31)
SR-7
SR-7
SR-7
ACCELERATED PRIMARY HIGHWAY PLAN
DESCRIPI'I CN
SR-50 to SR-11 (US-31A) in Lewisburg - Expand Existirg 2-Lane ByPass to 4 Lanes
Airport Connector Rd. to Zion Rd. S • of Columbia - Construct 2 Lanes on 4-Lane Right-of-Way
Zion Rd. to SR-99 W. of Columbia -Construct 2 Lanes en 4-Lane Right-of-Way
SR-99 to SR-50 W. of Columbia -Construct 2 Lanes on 4-Lane Right-of-Way
SR-50 to SR-7 NW of Columbia - Construct New 4-Lane
SR-7 to SR-6 (lB-31) & SR-99 N. of Colurnbia - Construct New 4-Lane
Spring Hill Bypass - Construct New 4-Lane
SatUill Ccrrplex lnterchange - Construct New Interchange at South Ero of Saturn Ccnplex on U.S. 31
New Fly Village to Proposoo Natchez Trace Parkway - Construct Ntw 2-Lane
Proposed. Natchez Trace Parkway to Gin Branch Rd. - Construct New 2-Lane
Columbia to 6.5 Mil~s Northwest Construct New 2-Lane
Page 14
LENGTH
1.1
2.5
3.0
1.3
3 .7
1.4
2.1
2.0
6.4
6.5
. ·. ·.-
ccrn-ITY
Maury
Monroe
lv'onroe
t-bnroe
.t-bnroe
?-'bnroe
t-"on.roe
t'ontganery
t-bntganery
t-bntgant:ry
RaJl'E
SR-7
SR-68
SR-68
SR-33 (lS-411)
SR-33 (US-411)
SR-33 (lS-411)
SR-33 (US-411)
SR-2 (lS-11)
SR-12 (t:s-41A)
SR-12 (US-41A)
SR-76 (lS-79)
ACCEIERATED PRIMARY HIGHWAY PLAN
DESCRIPI'ICN
6.5 Miles Northwest of Columbia to New Fly Village - Construct New 2-Lane
S • of Madisonville to Ragan Valley Rd. - Construct New 2-Lane
Ragan Valley Rd. to 1.5 Mi. S. of Tellico Plains - Construct New 2-Lane
McMinn County Line to Madisonville Reconstruct to 4-Lane
Madisonville to Mason Rd. Re-construct to 4-Lane
Mason Rd. to Vonore Reconstruct to 4-Lane
Vcriore to Loudon County Line - Re<XJnstruct to 4-Lant:s
SR-68 to Central Ave. in Sweetwater -Reconstruct to 4 Lanes with Turn Lane
SR-76 to Ringgold Rd. - Reconstruct to 6 Lanes
Ringgold Rd. to KY State Line -Reconstruct to 6 Lanes
Clarksville West City Limits to SR-12 (lS-41A) - Reconstruct to 4 Lanes with Turn Lane
Page 15
LE~JGTH
6.5
6.2
7.7
5.0
4.5
s.o
1.4
1.7
3.4
3.4
2.3
/
CCUNI'Y
Montgonery
Montgonery
Montgonery
CbionWeakl ey
CbionWeakl ey
Cb ion
Cb ion
Oler ton
Oler ton
Oler ton
R<lJI'E
SR-374
SR-374
SR-374
SR-22
SR-43 (US-45E)
SR-43 (US-45E)
SR-215
SR-42
SR-42
SR-42
ACCELERATED PRIMARY HIGHWAY PLAN
DESCRIPI'ICN
North Parkway; SR-12 (US-41A) to Peachers Mill Rd. - Construct NeN 2-Lane on 4-Lane Right-of-Way
North Parkway; Peachers Mill Road to SR-48 - Construct NeN 2-Lane on 4-Lane Right-of-Way
North Parkway; SR-76 (US-79) West of Clarksville to SR-12 (US-41A) North of Clarksville - Construct NeN 2-Lane on 4-Lane Right-of-Way
E. of Lee Rd. to E. of ICG R/R -Pave NeN 4-Lane Construction
Martin ByPass to Near South Fulton South City Limits - Reconstruct to 4-Lane
Near South Fulton SCL to SR-215-Reconstruct to 4-Lane
South Fulton B~ass - Reconstruct to 4-Lane
Page 16
I.ENJI'H
1.2
4.3
2.7
1.9
1.8
Rickman Rd. (SR-293) to Existing SR-42 6 .8 @ Livingston - Pave NeN 2-Lane Construction
Putnam County Line to Ricknan Rd. (SR-293) 2.9 Construct NeN 2-Lane on 4-Lane RCW
Near Livingston Bypass to 1.5 Miles North 1.5 Reconstruct to 4-Lane
Page 17 ACCELERATED PRIMARY HIGHWAY PLAN
CaJNl'Y RClJI'E DESCRIPI'ICN IEN:Il'H
Pickett SR-42 Byrdsta,.m Bypass to KY State Line - 3.4 Pave N6'1 2-Lane Construction
Polk SR-33 SR-40 to 1.0 Mile N. of Benton 7.0 (US-411) Reconstruct to 4-Lane
Polk SR-33 1 • 0 Mile N. of Benton to McMinn 7.0 SR-30 County Line - Reconstruct to 4-Lane
(US-411)
Polk SR-68 Copperhill By-Pass - Construct N6'1 2-Lane 1.2 on 4-Lane Right-of-Way
Putnam SR-42 Algcx:xi ByPass to OV'erton County 2.5 Line - Construct New 2-Lane on 4 Lane Rm
Rhea SR-29 4-Lane N. of Dayton to Near 5.3 (U5-27) Evensville
Rhea SR-29 Near Evensville to Pennine 5.3 (US-27) Reconstruct to 4-Lane
Rhea SR-29 Pennine to Spring City N. City 5.3 (US-27) Limits - Reconstruct to 4-Lane
Rhea SR-29 Spring City N. ;city Limits to 5.0 (US-27) Ma.cedina Rd. - Reconstruct to 4-Lane
Rhea- SR-29 Ma.cedina Rd. to 2.5 Miles N. 5.0 Roane (US-27) of Roane County Line
Reconstruct to 4-Lane
Rhea SR-68 N. of Rhea Avenue to SR-29 (US-27) 1.3 in Spring City - Construct N6'1 2-Lane
CCl.JNI'Y
Roane
Rcane
Roane
Robertson
Robertson
Robertson
Rutherford
Ruthtrford
Rutherford
Rutherford
Ra.JIB
SR-29 SR-1
(US-27}
SR-58
SR-58
SR-65 (lS-431}
SR-11 (US-41}
SR-11 (IB-41}
SR-10 (lS-231)
SR-10 (IB-231}
SR-10 (IB-231)
SR-10 (IB-231)
Page 18 ACCEIERATED PRIMARY HIGHWAY PLAN
DESCRIPrI CN LENGTH
2 .5 Miles N. of Rhea County 5 .o Line to 4-Lane Section in Rockwood Reconstruct to 4-Lane
I-40 to C0k Ridge City Limits - 3. 7 Reconstruct to 4-Lane
Cak RidgE:: City Limits to SR-95 - 3 .3 Reconstruct to 4-Lane
SR-257 (Betts Rd.) to 0.4 Mi. 2.0 N. of Carr Cr. S. of Spri09field -Construct UtW 2-Lane
SR-257 @ Ridgetop to Gree:nbrit:r 4 .4 North City Limits - Reconstruct to 4-Lane
Greenbrier N. City Lirni ts to 4-Lane 3 .6 St!etion in Spri09field - Reconstruct to 4-Lane
5-Lane Section to Ccnpton Rd. - Reconstruct 3 .1 -to 4-Lane with TlJI11 Lane
Carpton Rd. to Walter Hill - Reconstruct 3 .2 to 4-Lane with Turn Lane
Bedford County Line to Christmas 5.0 Creek - Reconstruct to 4-Lane
Christ:m3.s Creek to I-24 - Reconstruct to 5. 7 4-Lane with Turn Lane
'. .
CClJNI'Y
Rutherford
Rutherford
Scott
Sequatchie
. Sequatchie
StqUatchie
Sevie r
Sevier
Sevier
Sevier
SevierJeffcrson
RCUI'E
SR-1 (lE-7CS)
ACCEI.ERATED PRIMARY HIGh'WAY P!AfJ
I:ESCRIPI'I CN
4-Lane Section in Murfreesboro to E. of Baxter Rd. - Construct New' 4-Lane
SR-1 E. of Baxter Rd. to Peaks Hill - Construct (lE-70S) New 4-Lane
SR-63 SR-29 (US-27) to Ccrner Dr. in Huntsville - Reeonstruct to 4-Lane
Corr "J" East Valley Rd. to SR-28 (US-27) @ Dunlap - Construct Ne,...r 2-Lane on 4-Lane Right-of-Way
Corr "J" Ls-;is Chapel Rd. to East Valley Rd. -Construct New 2-Lane on 4-Lane Right-of-Way
Corr "J" Hamil ton County Line to Lewis
SR-66
SR-66
SR-35 (IB-411)
SR-73
SR-35 (IB-321)
Chapel Rd. - Construct New 2-Lane on 4-Lane Right-of-~y
SR-139 to I-40 - E ~d fran 2-Lane to 4-Lane
s. of French Broad River to I-40 -Pave New 2-Lanes
E. of SR-66 to Sevierville East City Limits - Reconstruct to 4-Lane with Turn Lane
w. of Pigeon Forge to SR-71 in Pigeon Forge - Reconstruct to 4-Lane with Turn Lane
Sims Rd. to 1.8 Mi. E. of SR-92 @ Chestnut Hill - Reconstruct to 2-Lane
Page 19
LE'NGI'H
5.7
5.0
2.5
2.9
4.2
3.8
2.0
4.1
2.8
1.6
5.3
CaJNI'Y
Shelby
Shelby
Shelby
Shelby
Shelby
Shelby
Shelby
Smith
Smith
Smith
Ra.JI'E
SR-86 (US-72)
SR-3 (US-51)
SR-1 (US-70)
SR-385
SR-385
SR-385
SR-385
SR-25
SR-25
SP.-80
Page 20 ACCELERATED PRIMARY HIGHWAY PLAN
IESCRIPI'I CN LENGTH
SR-57 to Collierville South City Limits - 1.9 Reconstruct to 4-Lane
SR-300 to 1.9 Miles North - Reconstruct 1.9 to 4-Lane with Turn Lane
E • of Macon Dr. to E lrrort Rd. - Re.construct 3 • 2 to 6-Lanes with Turn Lane
Millington-Arlington Pkwy., Singletcn 3 .2 Pkwy. to Austin Peay Hwy. - Construct NE.W 4-Lane
1".iillington-Arlington Pkwy.: Aus tin Peay 2 .6 Hwy. to Pleasant Ridge Rd. - Construct New 4-Lane
Millingto~Arlington Pkwy., Plf:ilsant 4.4 Ridge Rd. to Osbornta.vn Rd. - Construct NE.W 4-Lane
Millington-Arlington Pkwy., Csborntown 3.4 Rd. to I-40 - Construct New 4-Lane
Carthage ByPass, s. of SR-24 0.9 (U5-70N) to N. of Upper Ferry Rd. (includes Upper Ferry Rd. ) - Construct New 4-Lane
carthage ByPass, N. of Upper Ferry 3 .o Rd. to SR-25 N. of Carthage - Construct New 2-Lane on 4-Lane Right-of-Way
~.onoville to SR-85 - ReconstrUct to New 1.1 2-Lanes
' .
CCLl..'I Y
StEWc:irt
Sullivan
Sullivu11
!:;ullivun
Sullivan
Sullivan
Stm:nt:r
Sumnt=rMa(.un
Sumner
Sur.ntr
SlllT'.r1tr
RCUI'E
SR-149
SR-37 (US-19E)
SR-37
SR-93
SF~-126
SR-1 (US-llW)
SR-52
SR-52
SR-109
SR-386
SR-109
Page 21 ACCELERATED PRihARY HIGLMAY PLAN
CESCRI Pl' I Q J
Cumberland City ByPass, N. of Housten County Line to Guices Creek -Pave ni:.w 2-Lane Construction
.N. of Carter County Line to SR-34 (US-19\i) @ Bluff City - Construct Ntw 4-Lants
US-llJ: at Bluff City to I-81 Construct htw 4-Lane
SE-347 to S. of I-181 Rt:.construct to 4-Lane
IntErst:ction of Wilcox, Sullivo.n & Lincoln StreEts in Kingsport -I ntErsecticn Ir.;provantnts
Stone Drive, SR-36 (Old US 23) to SR-93 -Reconstruct to 6-Lanes with Turn Lane
HoracE Bro.m Rc1. to SR-6 (US 31E) in \\Testl1on=lc.r.d - Construct t' e.v 2-Lane
SR-6 (US-31E) in Westrrorelc.no to SP-141 -Construct Ntw 2-Lane
1 .4 Mi. S • of Bug Hollo.·• Rd. to Hollis Chapel Rd. N. of Gallatin -Construct New 2-LanE:
SR-6 (US-31E) to Avondale in HendE:rscnvillt: Pave Ntw 4-Lane Construction
Gallatin ByPass, Southtrn Lt:g SR-109 to SR-6 - Construct NEW 4-Lane
2.4
3 .0
2.6
0.4
3.4
4.3
3.2
7.0
2.2
• ,
CaJNl'Y
Sumner
Tipton
Van Buren
Warren
Warren
·warren
Washington
Wa.shington
RCUI'E
SR-109
SR-109
SR-384
SR-1 (US-705)
SR-1 (US-70S)
SR-1 (US-705)
SR-56
SR-55
SR-34 (U3-llE)
SR-34 (U3-11E)
Page 22 ACCELERATED PRIMARY HIGHWAY PLAN
DESCRIPI'I G-J
Gallatin ByPass, Western Leg SR-6 to SR-25 - Construct New 4-:-Lane
Gallatin ByPass, Northern Leg SR-25 to SR-109 - Construct New 4-Lane
East Stn:t:t; l-:Uin Street to State Rcute 54 - Reconstruct 2-Lane
Rocky River to Caney Fork River -Construct Ne.v 4-Lane
SR-30 to Campaign - Pave New 4-Lane Construction
Campaign to Rocky River - Construct New 4-Lane
SR-1 (US-7CS) to 1.0 Mile North -Reconstruct to 4-Lane with Turn Lane
Morrison ByPass to Prop. Mc:MinnvilltByPass - Reccnstruct to 4-Lane
f'/.arkt:!t St. to Sunset Dr. in Johnson City -Construct NE:W 4-Lane
Sunset Dr. to I-181 in Johnson City -Construct New 4-Lane
LEtmH
1.3
2.6
1.0
3.0
7.2
1.4
1.0
6.0
1.1
2.3
r · •
CcuNrY
WashingtonCarter
Washington
\·iashing ton
WayncPerry
Wayne
WeaJdey
Weakley
Weakley
WE:akley
Weakley
Weakley
Ra.JI'E
SR-67
SR-34 (LS-19W)
SR-381
SR-13
SR-15 (LS-64)
SR-22
SR-22
SR-43 (LS-45E)
SR-43 (IB-45E)
SR-43 (lS-45E)
SR-43 (IB-45E)
Page 23 ACCELERATED PRIMARY HIGHWAY PLAN
IESCRIPI'ICN
I-181 in Johnson City to Existing SR-67 @ Happy Valley Interchange - Pave New 4-Lane Construction
I-181 in Johnson City to Existing SR-34 at Green Valley - Construct NEW 4-Lane
State of Franklin Rd., Ntar Tyner St. to Sherrcrl St. in Johnson City - Reconstruct to 4-Lane
Near Smith Branch Rd. to N. of Flat Woods - Construct New 2-Lane
Dry HollCJN Road to Courthouse Square in Waynesboro - Widai to Provide a Center Turn Lane
W. of SR-43 @ Martin to E • of Lee Rd. -Construct New 4-Lane
SR-22 near Ralston to SR-43 (US-45E) @ Martin - Pave Ne.+1 4-Lane Construction
Gibson County Line to Near Greenfield South City Limits - Reconstruct to 4-Lane
Near Greenfield South City Limits to Near Greenfield North City Limits Reconstruct to 4-Lane with Turn Lane
Near Greenfield North City Limits to South of Sharon - Reconstruct to 4-Lane
south of Sharon to North of Sharon - Reconstruct to 4-Lane with Turn Lane
IENGTH
4.0
2.3
0.6
7.0
1.2
3.7
6.0
2.0
3.1
2.4
1.9
.. -• ! • ~
CCUNI'Y
Weakley
Weakley
vvhite
White
Williamson
Williamson
Williamson
Williamson
Williamson
Williamson
RCUIB
SR-43 (US-45E)
SR-43 (lE-45E)
SR-1 (US-7C6)
SR-1 (lE-70S)
SR-6 (lE-31)
SR-106 (tE-431}
SR-106 (lE-431)
SR-106 (lE-431)
-SR-106 {IB-4-31-)
SR-6 (tE-31}
AC.'CEIERA'IBD PRIMARY HIGHWAY PLAN
DESCRIPI'ICN
North of Sharon to r.".iartin ByPass -Reconstruct to 4-Lane
Martin ByPass - Reconstruct to 4-Lane
Cam~y Fork River to S. of Doyle -Construct New 4-Lane
S. of Doyle to Corr "J" near Sparta -Construct Ne.w 4-Lane
Franklin ByPass, Eastern Leg SR-96 to SR-6 (lE-31} - Construct New 2-Lane on 4-Lane Right-of-Way
Franklin ByPass, ·Northern Leg SR-6 (lE-31) to SR-106 (lE-431) Construct N811 2-Lane on 4-Lane Right-of-Way
Propost<l Franklin ByPass to SR-46 - Reconstruct to 4-Lane
SR-46 to Davidson County Line Reconstruct to 4-Lane
7th Avenue in Franklin to Pro_FOsE:rl Franklin ByPass - Reconstruct to 4-Lane with Turn Lane
Concord Rd. to S • of Murray Lane -Reconstruct to 4-Lane with Turn Lane
Page 24
IENGI'H
4. 7
7.0
3.7
3.7
2.1
4.3
3.2
2.1
1.1
• { f ~
C<XJNTY RCUTE
Anderson SR-61
cannon SR-1
Cheatham SR-12
Davidson SR-12
Davidson SR-12
Davidson SR-251
Houston- SR-46 Dickson
.Maw:y-Lewis-Perry-Iecatur-Henderson
Shelby SR-14 (US-61)
Snith SR-25
ACCELERATED PRIMARY HIGHWAY PLAN (Added by I.egislati ve Arrendrrents)
DESCRIPTICN
Page 25
SR-95 to Clinton Southwest City Limits
SR-64 to Vb:>dbury (Bridges)
Davidson County Line to Ashland City
Clarksville Highway to Sulphur Creek
Sulphur Creek to Cheatham County Line
Old Hickory Blvd., SR..,.1 (US-708) to SR-24 (US-70N)
SR-149 to Dickson (Preplanning)
Columbia to I.aw Road
South 'Ihi.rd St. , Shelby Drive to Mitchell Road
Cumberland River Bridge at Carthage (Design)
LENGIH
3.8
5.3
3.9
4.0
3.0
3.0