TEIAS
TURKISH ELECTRICITY TRANSMISSION CORPORATION
GENERAL MANAGEMENT
380 kV KÜÇÜKBAKKALKÖY GIS SUBSTATION - MALTEPE GIS SUBSTATION (GAS INSULATED SYSTEM SUBSTATION)
UNDERGROUND CABLE
ENVIRONMENTAL MANAGEMENT PLAN (İSTANBUL PROVINCE, ATAŞEHİR and MALTEPE COUNTIES)
ANKARA – FEBRUARY 2011
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
380 kV KÜÇÜKBAKKALKÖY GIS SUBSTATION-MALTEPE GIS
SUBSTATION UNDERGROUND CABLE
ENVIRONMENTAL MANAGEMENT PLAN
Project Owner Turkish Electricity Transmission Co. General Management
Address Inonu Boulevard No:27 Bahcelievler 06490, Ankara
Telephone +90 (312) 203 86 12
Fax no +90 (312) 203 87 17
Project name 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS Substation Underground Cable
Location of Project Site Istanbul Province, Ataşehir and Maltepe Counties
2
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
TABLE OF CONTENT
Table of Content ................................................................................................................. 3 List of Tables ...................................................................................................................... 4 List of Figures..................................................................................................................... 5 Appendix List ..................................................................................................................... 6
CHAPTERS
1. PROJECT DESCRIPTION
1.1. General Description ..................................................................................................... 8 1.2. Project Purpose and Scope........................................................................................... 8 1.3. Project Site................................................................................................................... 10 2. MITIGATION PLAN................................................................................................... 14 3. MONITORING PLAN ................................................................................................. 18 4. INSTITUTIONAL ARRANGEMENTS..................................................................... 28 4.1. Liabilities and Procedures related to Mitigation Measures and Monitoring ............... 29 4.2. Environmental Information Flow (Reporting and the Frequency of the Report Submission) ........................................................................................................................ 29 4.3. 380 kV Küçükbakkalköy GIS Substation-Maltepe GIS Substation Underground Cable Project Environmental Information Follow.............................................................. 30 5. CONSULTATION WITH PROJECT AFFECTED GROUPS AND NON-GOVERMNENTAL ORGANIZATIONS (NGO’s) ...................................................... 32
APPENDIX
PROJECT TEAM PREPARING THE REPORT
3
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
TABLE LIST
Table 2.1.Mitigation Plan.........................................................................................................15
Table3.1.Monitoring Plan ........................................................................................................20
Table4.1.OrganizationTable.....................................................................................................31
4
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
FIGURE LIST
Figure 1.1. Underground Cable Installation Section ......................................................... 9 Figure 1.2. Process Flow Chart.......................................................................................... 10 Figure 1.3. Timing Chart ................................................................................................... 10 Figure 4.1. Environmental Information Flow.................................................................... 30
5
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX LIST
APPENDIX A Satellite Image of the Cable Route
APPENDIX B Map of Cable Route
APPENDIX C Photographs of the Project Site
APPENDIX D Public Consultation Documents
APPENDIX E Correspondences with Institutions/Associations
APPENDIX F “EIA Not Necessary” Certificate
6
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
CHAPTER - I
PROJECT DESCRIPTION
7
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
1. PROJECT DESCRIPTION
1.1. Project Description
This project covers the construction and operation of 380 kV Küçükbakkalköy Gas
Insulated System (GIS) Substation-Maltepe GIS Substation having a length of around
12 km within the boundary of Ataşehir and Maltepe Counties in Istanbul.
1.2. Project Purpose and Scope
The proposed cable project will be implemented to meet the energy demand of the
region between Küçükbakkalköy and Kartal districts and the Marmaray Project being
continuously under construction. Moreover, it is aimed with the proposed project to
reduce the likelihood of blackouts and brownouts in the area supplying energy to the
area uninterruptedly and maintaining the energy continuity. Therefore, the bottleneck in
energy in the region which is expected in the future shall be prevented. With the
implementation of the project it is anticipated that the economy of both the region and
the country will be influenced for the good.
Project planned to be completed in 17 months by working 8 hours per day. As the works
of underground cable installation on the course shall be limited in the locations with
heavy traffic; works shall be performed in off-peak hours within shifts.
Installation section of underground cable is shown in Figure 1.1, and Process Flow and
Time Chart are presented in Figure 1.2 and Figure 1.3, respectively.
8
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Figure 1.1. Underground Cable Installation Section
9
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Field Studies
Excavation Works
Laying the cable along the route
Closing the holes with filling mate
rials
Operational Acceptance
(Energizing the cable )
Figure 1.2. Process Flow Chart
Figure 1.3. Timing Chart
1.3. Project Site
The route of 380 kV Küçükbakkalköy GIS-Maltepe GIS Substation Substation
Underground Cable Project starts from the presently existing 380 kV Küçükbakkalköy
GIS Substation and ends at 380 kV Maltepe GIS Substation which will be installed on
the plot no. 1684, 5725 m2 parcel no. 28 of Istanbul Province, Maltepe County, Cevizli
District.
10
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
The proposed cable route will mainly follow D100 North and South Side Ways being
parallel to E5 Highway under the authority of Istanbul Greater Municipality. Therefore,
there will not be procedures to be subject to expropriation.
The line will be connected to 380 kV Maltepe GIS Substation from 380 kV
Küçükbakkalköy GIS Substation following the route between the two substations in this
way;
The cable from 380 kV Küçükbakkalköy GIS Substation will follow Topçu İbrahim
Street after crossing E-80 Connection Road and continue with Ataşehir Hal Way. From
the Hal Way, the cable will pass over E5 D100 North Side Way and be laid along
Hastane Street (Yeditepe University Hospital and Fatih Sultan Mehmet Education and
Investigation Hospital exist on the Hastane Street). After Hastane Street, the cable will
pass along İçerenköy Mahir Street and then be connected to Değirmen Yolu Road.
Bostancı Oto Sanayi, Bostancı Doğa Collage, İstanbul Tax Administration and
Kozyatağı Tax Administration are on Değirmen Yolu Road along the cable route. After
passing Değirmen Yolu Road, the cable will directly connect to the Cemetery Street
(Küçükyalı Cemetery). The cable route will follow D100 North Side Way and then
İnönü Road, respectively after passing by Küçükyalı Cemetery. Istanbul Trade
University locates on Inönü Road. The cable will follow on Sanayi Road and reach to
Maltepe Cross. Suzan-Ahmet Yalkın Primary School exists along the cable route. Since
there is a creek-passing under Maltepe Cross, it is planned that the cable will be passed
through Maltepe Cross through horizontal drilling method. After passing Maltepe
Cross, the cable will follow along D100 North Side Way until Gülsuyu Sport Facilities.
On the cable right-of-way between Maltepe Cross passing and Gülsuyu Sport Facilities,
there exist Handan-Hayrettin Yelkikanat Anatolian Technical School, Nezahat Aslan
Eksioğlu Primary School, Maltepe Rest Home, and Türkan Saylan Cultural Center. The
cable will cross over E5 Highway from the point of Gülsuyu Overpass and the route
will follow along D100 South Side Way until Cömert Street and follow on Cömert
Street and Füsun Street, respectively. Orhan Gazi Park, Şaman Industrial Estate and
Silvan Iron Foundry locate on Cömert and Füsun Street along the cable route. The cable
will finally connect to 380 kV Maltepe GIS Substation crossing Tugayyolu Road
vertically after Füsun Street.
11
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
The Project area of 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS Substation
Underground Cable Project is planned to be implemented within the boundaries of
Ataşehir and Maltepe Counties, and İçerenköy, Aydınevler, Girne, Zümrütevler ve
Gülsuyu Distircts will be within the extent of cable right of way.
The satellite image and map of the proposed cable route is illustrated in Appendix.A
and Appendix.B, respectively. Moreover, the photographs of the described 380 kV
Küçükbakkalköy GIS Substation - Maltepe GIS Substation Underground Cable route
are given in Appendix-C.
1.3.1. Places with High Landscape Value, Recreation and Protection Areas
By considering the sensitive districts list in EIA Regulation Appendix-V, the proposed
project location within its total 500 meters course which is 250 meters from left and 250
meters from right do not include any wetland, coast, mountainous and forestland,
agricultural field, natural park, special protection area, historical, cultural,
archaeological and with similar importance and aquifer, potential erosion and
afforestation area subject to protection in accordance with the law regarding
Groundwater numbered 167. Additionally, there is no high value rural landscape in or
close environment of the project area.
12
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
CHAPTER - II
MITIGATION PLAN
13
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
14
2. MITIGATION PLAN
This section describes the “Mitigation Plan” prepared to ensure the compliance with the
national environmental regulations and the World Bank Operational Policy (OP/BP/GP
4.01) principles and procedures for the activities to be carried out during the
construction, operation and decommissioning phases of the 380 kV Küçükbakkalköy
GIS Substation - Maltepe GIS Substation Underground Cable.
Mitigation Plan prepared within this scope is presented in Table 2.1.
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Tablo 2.1. Mitigation Plan
Phase Subject Mitigation Measures*** Cost
Responsible Institution**
Start Date Finish Date
Cultural and Historical Assets
In case of coinciding with any cultural asset, the construction will be stopped immediately and the Cultural and Natural Assets Protection Committee will be informed.
Until the response is taken, any action will not be done at the site.
After taking the positive response (no cultural assets), the construction will continue.
No additional
cost Contractor
Start of Construction Works
Completion of construction works
CONSTRUCTION Dust – Particulate
Matter (Due to the
movement of construction machines,
excavation works etc.)
The regulated limit value of Dust/Particulate matter emission being 3 mg/Nm3 (Industrial Air Pollution Control Regulation) is not to be exceeded.
Watering will be done in dry seasons Loading and unloading will be carried out with care
and without scattering. In order not to lead to scattering, loading/unloading works will be performed in an area allocated for loading/unloading and water sprays will be used in loading/unloading area. Moreover, the workers are warned being careful about loading/unloading activities. Windy weathers will not be selected for loading/unloading if it is applicable.
The trucks will be covered and speed limitation will be applied. Speed limit on trucks is 30 km/hr (at project site) and 50 km/hr (outer of the project site – within the city)
Only vehicles with emission stickers will be used
Included in
the construction
contract
Contractor Start of the
excavation work Completion of the excavation works
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject Mitigation Measures*** Cost
Start Date Finish Date Responsible Institution**
Noise
All construction works will be done between 7am and 7pm. If it is required to work after 7 pm, local authorities and public will be informed about these working hours.
People, living at the population centers around, will be informed about the working durations
The continuous work-site noise (day times) will be ensured to be under 70 dBA (according to the Turkish Regulation on Assessment and Management of Environmental Noise. To satisfy this;
The construction machines (vehicles) inspection, maintenance and oiling will be done in time and periodically, and the items resulting in noise will be placed. In the case of working all the construction machines at the same time, the noise level produced from these machines is 100 dB in average (at the origin). However, the cable route background noise level is expected to be lower than the noise level due to the construction activities of the cable because the cable follows the route as parallel to D-100 Highway (North and South Side Ways) having high level of traffic.
No additional
cost
Contractor
Start of Construction Works
Completion of construction works CONSTRUCTION
Wastewater
Wastewater due to work-site will be given to the
sewerage system of Istanbul Province by the connection to the sewerage system of Istanbul (by using existing toilets where possible or not possible by portable toilets in the temporary construction site)
Included in the
construction contract
Contractor
Start of Construction Works
Completion of construction works
14
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject Mitigation Measures*** Cost
Start Date Finish Date Responsible Institution**
Excavation, solid and hazardous wastes due to construction
Excavation wastes will be deposited at the nearest deposition area in the Anatolian side of Istanbul having the license taken by Istanbul Greater Municipality.
Solid wastes (construction materials such as metal, wood) and packaging wastes (plastic, paper, glass etc.) will be systematically and separately collected and it will be ensured to be taken by Ataşehir and/or Maltepe Municipality or a licensed recycle firm.
Organic domestic wastes due to worker/personnel will be collected separately and it will be ensured to be taken by relevant Municipality (Ataşehir or Maltepe) and disposed to the Kömürcüoda Solid Waste Landfill locating in Karakiraz Village.
Not high Contractor Start of Construction
Works Completion of construction works
Wastes due to vehicle parking
Maintenance of the vehicles will not be done at the project site unless there is an emergency situation
Waste oil due to construction machines and vehicles will be collected in rustless barrels and will be sent to a licensed firm by the contractor.
The barrels will be placed onto an impermeable ground to protect them from rain and sun and all necessary precautions against fire will be taken. The area where the barrels are placed will be surrounded with the warning sign. Fire fighting set (bucket, axe, shovel, pickaxe and anchor) will be at that area.
Batteries, tires and similar items due to construction machines and vehicles will be sent to a licensed firm for final disposal
Not High Contractor Start of Construction
Works Completion of construction works
CONSTRUCTION Health and Safety
All necessary protective equipments (hard hat, safety belt, protective clothes, gloves, glasses etc.) will be provided to the workers
The personal will be trained in “occupational health and safety” issues. Information about the safety rules that must be obeyed within the work-site area during construction works, risks and related regulations will be provided to all workers before the construction starts.
Within project budget
Contractor Start of Construction
Works Completion of construction works
15
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject Mitigation Measures*** Cost
Start Date Finish Date Responsible Institution**
Public and Traffic Safety
Proper notification signs will be placed to maintain the security of the public and local people and entrance of people to construction site will be prevented by placing plastic strips, barriers, phosphoric warning lights.
Safe traffic flow required measures shall be taken with the relevant institutions (security departments, police headquarters, etc)
Included in the
construction contract
Contractor Completion of
construction works Taking the substation into operation
Site Restoration
Construction site shall be brought to its initial situation before excavation process (by maintaining the coordination with Ataşehir and Maltepe Municipalities)
No hazardous, solid, liquid, construction wastes will be left along the cable route/project site
Included in the
construction contract
Contractor
Completion of construction works
Taking the substation into operation
OPERATION Electro-Magnetic
Field (EMF)
Electric and magnetic fields are expected to comply with the international limit values (5 kV/m for electric field/for public, 1000 mG for magnetic field; 10 kV for electric field/for labors, 5000 mG for magnetic field) mentioned in International Commission on Non-Ionizing Radiation Protection (ICNIRP) because of the materials used for the production of the cable and the structure of the channel which the cable is laid (Figure.1.1).
Within the operation budget
TEIAS Taking the
substation into operation
Completion of the economic life of the substation
16
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
17
Phase Subject Mitigation Measures*** Cost
Responsible Institution**
Start Date Finish Date
Public and Workers Health
and Safety
The personal who will be responsible for the maintainance, control, repairs and operation of the cable will be selected from the people having trained in first aid, electric safety and fire.
The warning signs will be placed along the cable route for public.
Not high (as a part of operation budget)
TEİAS
Taking the substation into
operation
After the completion of the economic life of the substation
OPERATION
Solid-Liquid and Hazardous
Wastes
Solid wastes generated during the maintainance of the cable shall be ensured to be collected by the Ataşehir or Maltepe Municipality.
Hazardous wastes are produced during the maintenance of the cable (the materials (cable wastes) due to the connection points, due to changing the cable ends etc.) and when there is a failure (perforation, deformation etc.). These wastes shall be collected seperatedly and taken by the lisenced firm to be disposed.
Not High TEIAS Taking the
substation into operation
After the completion of the economic life of the substation
** Valid in the case of handing over of the proposed works to subcontractors. Otherwise, responsibilities defined for contractor will belong to TEIAS *** While taking the proposed measures, compliance with all related regulations (Air Quality Evaluation and Control Regulation, Water Pollution Control Regulation, Regulation on Assessment and Management of Environmental Noise, Solid Waste Control Regulation, Regulation on Soil Pollution Control and Contaminated Sited by Point Sources, Excavation, Construction and Demolition Wastes Control Regulation, Hazardous Waste Control Regulation, Package and Packaging Waste Control Regulation, Grounding in Power Installations Regulation, Labor Health and Safety Regulation, Health and Safety Conditions on Usage of Work Equipments Regulation) will be complied
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
CHAPTER - III
MONITORING PLANS
18
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
19
3. MONITORING PLANS
This section describes the “Monitoring Plan” prepared for checking the compliance of
the activities to be carried out during the planning/design, construction, operational and
decommissioning phases of 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS
Substation Underground Cable with the national environmental regulations and the
World Bank Operational Policy (OP/BP/GP 4.01) principles and procedures. Reports in
3 months period concerning the construction activities carried out in accordance with
Mitigation and Monitoring Plans will be prepared and submitted to TEIAS.
Monitoring Plan prepared within this scope is presented in Table 3.1.
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Table 3.1
Phase
Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that controls – frequency
of the control
Start Date Finish Date
Cultural and
Historical Assets
Cultural assets at the
site
Along the cable route
Visual
In case of coinciding a
cultural asset
continuously by an
archeologist
Compliance with Cultural and
Natural Assets Protection Law
Not high if no cultural assets are damaged
Provincial Culture and
Museum Directorate
Start of the constructio
n works
Completion of
construction works
Construction
Dust – Particulate
Matter
Dust Formation due to the Movement
and Exhaust of the
Construction Machinery (mg/Nm3)
Complaints from public
Along the cable route
Visual
inspection
Interviews with the
local people near the site
During the excavation
period / intense
construction works,
weekly/ in the case of complaint
Industrial Air Pollution Control
Regulation
No additional
cost (within the project
budget)
TEİAS
4. TEIAS District Office
Start of constructio
n works
Completion of
construction works
20
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Table 3.1
Phase
Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that controls – frequency
of the control
Start Date Finish Date
Construction
Noise
Complaints from public
Noise Level
(dBA)
Along the cable route
Interviews to
be conducted in
near residential
areas
Noise level measurement with noise
meter (sound level meter)
Observation (weekly)
In the case of complaint from public
Regulation on Assessment and Management of Environmental
Noise
Not High
TEİAS
4. TEIAS District Office
Start of the constructio
n works
Completion of
construction works
21
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Table 3.1
Phase
Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that controls – frequency
of the control
Start Date Finish Date
ConstructionWastewate
r
Connection to the sewerage
system
Contamination along the
cable route
Connection to the
sewerage system
The cable route
Visual (Wastewater generated by the workers
shall be given to the sewerage
system of the city. The
connection to the sewer
system and whether any wastewater
is discharged to soil, water
or to any receiving
body expect the permitted one shall be
observed and
controlled)
Weekly (irregular controls)
In accordance with the Water
Pollution Control Regulation, and
Regulation on Soil Pollution Control
and Contaminated Sites by Point-
Source
No additional cost (within the project
budget)
TEİAS
4. TEIAS
District Office
Start of the constructio
n works
Municipality
Completion of
construction works
22
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that
controls – frequency
of the control
Start Date Finish Date
Construction
Excavation, Solid and
Hazardous Wastes
Storage and disposal
conditions
Along the cable route
(construction site)
Visual
Weekly (irregular controls)
Compliance with Solid Waste
Control Regulation and Regulation on
Soil Pollution Control and
Contaminated Sites by Point-
Source, Hazardous
Wastes Control Regulation, Excavation
Wastes, Construction and Debris Wastes
Control Regulation and Waste Oil
Control Regulation
Within the Project Budget
TEİAŞ
4. TEIAS District Office
Contractor
Municipality
Start of the constructio
n works
Completion of
construction works
23
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that
controls – frequency
of the control
Start Date Finish Date
Wastes due to Vehicle Parking
Waste oils, automobile
batteries, used tires and junk
electronic materials
At the vehicle
parking area
Visual Inspection and control of vehicle
maintenance documents
During the failure and
regular maintenance
Achievement of
the disposal of the wastes
compliance with Waste Oil Control Regulation, Waste
Battery and Accumulators
Control Regulation, End-of-tires Control
Regulation
No additional cost
Contractor Start of the constructio
n works
Completion of
construction works
Health and Safety
Documents related to
workers health and safety
training
Equipments used by the
worker during working for construction (hard hat,
gloves, safety belt etc.)
Construction sites (cable construction
line)
Visual
Beginning of
the each work stage
Daily
In accordance with Labor Health and Safety Regulation
No additional cost (within the project
budget)
TEİAS
4. TEIAS
District Office
Start of the constructio
n works
Completion of
construction works
24
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that
controls – frequency
of the control
Start Date Finish Date
Public and Traffic Safety
Plastic strips, barriers,
phosphoric warning lights
Traffic load
Along the cable route
Visual During the
construction period
Compliance with Environmental
Law and Regulations
Maintenance for
public safety
No additional cost
TEIAS
4. TEIAS District Office
Municipality
(Ataşehir and Maltepe)
Start of the constructio
n works
Completion of
construction works
Construction
Site Restoration
Wastes (solid, liquid,
hazardous, construction
etc.)
Soil / service roads
Along the cable route
Visual
During closing the
construction site
Compliance with Environmental
Law and Regulations
No additional cost (within the project
budget)
TEIAS
4. TEIAS District Office
Completion of
construction works
Taking the cable into operation
Operation Electromagn
etic Field Strengths
Complaints from public
Documents
related to the equipment
procurement
Along the cable route
Interviews with the
people at the near
residential areas
In the case of complaints
Control of satisfying the national and international
referance values
Not High
TEAİS
4. TEIAS District Office
Taking the cable into operation
Completion of the
economic life of the cable
25
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Phase Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that
controls – frequency
of the control
Start Date Finish Date
Operation
Public and Worker
Health and Safety
Technical training in terms of
operation and maintenance
Protective
equipments and clothes
(whether usage or not)
Warning
beams/signs
Along the cable
route/cable connection
points
Visual
Before the operation
Maintenance
works (proper periods)
Once, before
taking the cable into operation
Compliance with related Labor
Health and Safety Regulations
No additional cost (within
the operation budget)
TEİAS
4. TEIAS District Office
Taking the cable into operation
Completion of the
economic life of the cable
26
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
27
Phase Subject
What are the parameters, which would
be monitored?
Where would the
parameters be
monitored?
How would the
parameters be
monitored/types of the monitoring equipment
When would the
parameters be
monitored - frequency
of the measureme
nts / continuous measureme
nt?
Why would the parameters be
monitored? Cost
The Institute that
controls – frequency
of the control
Start Date Finish Date
Operation
Solid-Liquid and
Hazardous Wastes
Defective equipment
wastes
Cable used wastes
Along the cable route
Visual
During the operation
period
In the case of defection,
failure
Compliance with Solid Waste
Control Regulation and, Regulation on Soil Pollution
Control and Contaminated Sites by Point-
Source, Hazardous Waste Control Regulation
Not high
TEIAS
4. TEIAS District Office
Municipality
Taking the cable into operation
Completion of the
economic life of the cable
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
CHAPTER - IV
INSTITUTIONAL ARRANGEMENTS
28
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
4. INSTITUTIONAL ARRANGEMENTS In this chapter, information about the responsibilities and procedures related to
mitigation measures and monitoring, environmental information flow chart, decision
making hierarchy on environmental management will be given and how the data
gathered from the monitoring is analyzed and used in an efficient way to maintain a
sustainable environmental performance will be mentioned.
4.1 Liabilities and Procedures related to the mitigation measures and monitoring
“Mitigation Plan” which covers the mitigation measures to be taken to minimize the
negative possible environmental effects due to the planning/design, construction and
operation activities is presented in chapter-II. “Monitoring Plan” which aims to control
the implementation clauses of the procedures and measures mentioned in the
“mitigation plan” is provided in chapter-III. “Mitigation and monitoring plans” are the
basic elements forming the “Environmental Management Plan” prepared within the
content of “Political, Forensic and Administrative Framework” section in environmental
impact assessment reports.
4.2 Environmental Information Flow (Reporting and the Frequency of the Report
Submission)
In order to devise and implement a successful environmental management plan, the
elements which are supposed to be obeyed should be determined carefully. Within this
scope, it is abided by the subjects mentioned in the international regulations and
communiqués. Environmental issues in Turkey Clauses predicates on the clauses of
“Environmental Assessment Regulation” published in official gazette on 17 July 2008
with no.26939. According to this regulation, in accordance with Article 32, List.2,
energy transmission plants (transmission lines, substation, switchyard) having 154 kV
or above voltage and length of 5 km or longer are supposed to be obtained “EIA Not
Necessary Certificate”. Therefore, “EIA Not Necessary Certificate” (Appendix.F) was
obtained on the date of 17.01.2011 from Turkish MoEF for the 380 kV
Küçükbakkalköy GIS Substation - Maltepe GIS Substation Underground Cable Project,
due to the fact that the length of 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS
Substation Underground Cable is around 12 km. Furthermore, the substations to which
the underground cable will be connected fulfilled the EIA requirements from the
reasons of Turkish Legislation. “EIA Not Necessary Certificates” were obtained for 380
kV Küçükbakkalköy GIS Substation (with the connection of 380 kV (Ümraniye-
29
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Tepeören)Brş.-Küçükbakkalköy GIS Substation Energy Transmission Line) and 380 kV
Maltepe GIS Substation (with the connection of 380 kV Maltepe GIS Substation-Kartal
GIS Substation) on 13.03.2007 and 04.05.2010, respectively.
4.3 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS Substation
Underground Cable Project Environmental Information Flow
Environmental information flow chart (Figure 4.1) for the proposed 380 kV
Küçükbakkalköy GIS Substation - Maltepe GIS Substation Underground Cable project
based on the mentioned regulation above and the table describing the organization are
presented below (Table 4.1).
“EIA Not Necessary” Certificate and required permits are obtained
Environment Management Plan (EMP) is prepared in answer to the request from World Bank
The prepared EMP is submitted by TEIAS to the World Bank
EMP Monitoring Report, which is prepared/had made by the Contractor based on the EMP and Monitoring Program, is submitted to TEIAS
The EMP Monitoring Reports approved by TEIAS is submitted to the World Bank (*)
The submitted report is controlled and approved by the World Bank (**)
Figure 4.1 Environmental Information Flow
(*): TEIAS (as the project owner) with the help of TEIAS’s district offices shall audit the environmental
performance of the contractor and controls whether the contractor obeys to the issues determined in the
EMP. Within this scope, the contractor is liable to meet the environmental requirements and to submit the
reports (in quarterly basis) covering the construction activities and their corresponding mitigation
measures to TEIAS.
(**): In the case of necessity, the project site is audited checking in place and approved by the World
Bank representatives.
30
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Table 4.1 Organization Table
Action Institutional Responsibility Monitoring Data Collection Construction
Monitoring will be performed by the contractor or consultancy firm hired by the contractor. The report (monitoring) prepared by collecting monitoring data will be submitted to the TEIAS in a quarterly basis.
Data Analysis Construction
TEIAS related district office (TEIAS 4. District Office) will control the accuracy of the data in the reports (by examining the data validity in place). Then, the district office will send the report to the TEIAS General Management (Ankara) for control. After the control of the report by TEIAS (Environment, Estate and Expropriation Department), the report is sent to the World Bank for approval.
Management Action Construction
Turkish Ministry of Environment and Forestry has the authority to shutdown, change the operations etc. if any illegal or unregulated situation is observed.
31
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
CHAPTER - V
PUBLIC CONSULTATION WITH PROJECT AFFECTED GROUPS and
NON-GOVERNMENTAL ORGANIZATIONS (NGO)
32
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
5. GROUPS WHICH WILL BE AFFECTED BY THE PROJECT AND DISCUSSIONS WITH VOLUNTARY AGENCIES (NGO)
İçerenköy, Aydınevler, Girne, Zümrütevler and Gülsuyu districts have been
determined as the inspection area of 380 kV Küçükbakkalköy GIS Substation -Maltepe
GIS Substation Underground Cable Project and the people who live in these selected
districts were identified as the project likely affected group.
For the aforesaid project; a meeting of Public Participation has been held in the
meeting hall of Nezahat Aslan Ekşioğlu Primary School in Maltepe County, Girne
District, on January 07 2011, 2 p.m. Announcement of the aforesaid meeting has been
published in national POSTA and local DOKUZ SÜTUN newspapers on the date of
02.12.2010. All local people who reside in sites that are involved in the project’s
inspection area and the headmen of the districts have been invited to the subject
meeting.
Meeting Place and Date:
The meeting was held on the date of 07 January 2011 at 2 p.m. in the meeting
room of Nezahat Aslan Ekşioğlu Primary School within the boundary of Girne District,
Maltepe County in Istanbul.
Evaluation of the Meeting:
The photographs relating to the meeting, the participation list and the information
brochures (project site description and information on electromagnetic fields)
distributed to the participants are presented in the Appendix.D.
Dates of Interviews/Pre-Preparations
The headmen of İçerenköy, Aydınevler, Girne, Zümrütevler and Gülsuyu Districts
were interviewed with on the dates of 21 October 2010 and 06 January 2011. After the
mentioned meetings, the public participation meeting was held in the meeting room of
Nezahat Aslan Ekşioğlu Primary School in Girne District, Maltepe County, Istanbul
Province on 07 January 2011 at 2 p.m.
33
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
‐ Places which discussions were implemented:
Discussions/interviews were implemented with the headmen of İçerenköy,
Aydınevler, Girne, Zümrütevler and Gülsuyu Districts via both telephone and visit in
place. The photographs associated to the mentioned interviews are presented in
Appendix.D.
‐ Who were invited to discussion(s):
The public to be possibly affected from the project and who were living within the
borders of the proposed cable investigation area has been invited to the subject meeting.
All relevant people were invited to the meeting by means of correspondences with
headman of related districts and local and national newspaper announcements (Posta
Newspaper Turkey Edition and Dokuz Sütun Local Newspaper of Istanbul Province on
December 02 2010, Appendix.D).
‐ Who were participated in discussions:
The list of all participants to the mentioned meeting is provided in Appendix.D.
‐ Program and Calendar of the Meeting:
Information on project and about likely environmental effects and measured taken
during construction stage of the project were provided to the participant and then,
comments and questions raised by the participants being related to the proposed project
were accepted and answered.
‐ Minutes of Meeting:
Question: When will the construction works of 380 kV Küçükbakkalköy GIS
Substation- Maltepe GIS Substation Underground Cable Project start?
Answer (TEIAS): It is planned to start the construction of the proposed project
within the year of 2011. The exact date has not been defined yet.
Question (Headman of Girne District): What is the route of the cable within Girne
District?
Answer (TEIAS): The cable route will follow D 100 North Side Way and will not
pass the cross streets within the boundary of the district.
Question: Which hours will the construction works of the proposed project occur?
Answer (TEIAS): The construction works will be done between 7 a.m and 7 p.m.
34
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Question: Is it too early to start the construction works at 7 a.m?
Answer (TEIAS): The preparation for the construction works (preparing the project
site) starts at 7 a.m. Construction activities causing environmental noise will not start at
7 a.m.
35
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-A
Satellite Image of the Cable Route
36
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-B
Map of Cable Route
37
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-C
Photos of the Project Site
38
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.1 (380 kV Küçükbakkalköy GIS Substation)
Photo.2 (Cable Right-of-way/Topçu İbrahim Street Entrance)
39
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.3 (Cable Right-of-way/Hastane Street)
40
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.4 (Cable Right-of-way/Fatih Sultan Mehmet Education and Investigation
Hospital)
41
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.5 (Cable Right-of-way / D-100 North Parallel Road)
42
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.6 (Cable Right-of-way /Entrance Değirmen Yolu Road)
43
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.7 (Cable Right-of-way/D100 North Side Way)
44
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.8 (Cable Right-of-way/Cemetery Street-Küçükyalı Cemetery)
45
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.9 (Cable Right-of-way)
46
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.10 (Cable Right-of-way/ Istanbul Trade University on Inönü Road)
47
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.11 (Cable Right-of-way/ Inönü Road)
48
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.12 (Cable Right-of-way)
49
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.13 (Cable Right-of-way/Sanayi Road)
50
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.14 (Cable Right-of-way/Creek Passage-Maltepe Cross)
51
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.15 (Cable Right-of-way)
52
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.16 (Cable Right-of-way)
53
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.17 (Cable Right-of-way /Road parallel to E5)
54
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.18 (Cable Right-of-way/D100 North Side Way)
Photo.19 (Cable Right-of-way/Gülsuyu Overpass)
55
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.20 (Cable Right-of-way/D100 South Side Way-Cömert Street
Entrance)
56
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.21 (Cable Right-of-way/Cömert Street)
57
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.22 (Cable Right-of-way/Cömert Street)
58
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.23 (Cable Right-of-way/Füsun Street)
59
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.24 (Cable Right-of-way/Füsun Street Entrance-Intersection of Füsun Street with
Tugay Yolu Road)
Photo.25 (Cable Right-of-way/Proposed Project Area for 380 kV Maltepe Substation)
60
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-D
Public Consultation Documents
61
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
GAZETTE ANNOUNCEMENTS
Gazette Announcement (1) – Local Newspaper
62
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Gazette Announcement (2) – National Newspaper
63
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
INTERVIEWS WITH THE HEADMEN
Photo.26 Interview with the Headman of Gülsuyu District (21.10.2010)
Photo.26 Interview with the Headman of Zümrütevler District (21.10.2010)
64
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
MEETING ANNOUNCEMENTS ON ANNOUNCEMENT CLIPBOARD OF HEADMAN
Photo.28 Announcement Clipboard of Girne District Headman
Photo.29 Announcement Clipboard of Zümrütevler District Headman
65
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
INFORMATIVE BROCHURES DISTRIBUTED TO THE PARTICIPANT IN THE CONSULTATION MEETING
Brochure (1-a) Information on Project
66
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Brochure (1-b) Information on Project
67
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Brochure (2-a) Information on Electromagnetic Fields
68
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Brochure (2-b) Information on Electromagnetic Fields
69
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
LIST of PARTICIPANTS TO THE MEETING
70
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
71
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
PUBLIC CONSULTATION MEETING PHOTOS 07 January 2011 / 2 p.m.
Nezahat Aslan Ekşioğlu Primary School Meeting Room / ISTANBUL
Photo.30 Nezahat Aslan Ekşioğlu Primary School
Photo.31
72
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
Photo.32
Photo.33
73
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-E
Correspondences with Associations/Institutions
74
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
APPENDIX-F
“EIA Not Necessary” Certificate
75
TEIAS 380 kV KÜÇÜKBAKKALKÖY GIS-MALTEPE GIS UNDERGROUND CABLE ENVIRONMENTAL MANAGEMENT PLAN
76
Project Owner: TEIAS (Turkish Electricity Transmission Corporation)
Project Location: Istanbul Province, Ataşehir and Maltepe Counties
Project Team Preparing 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS Substation
Underground Cable Project Environmental Management Plan
Project Name: 380 kV Küçükbakkalköy GIS Substation - Maltepe GIS Substation
Underground Cable
Name&Surname Occupation Signature
Gül MISIRLI Architect
Dilek KESKİN
Geological Engineer
(Environmental Sciences
Master Degree)
Mustafa GÖKHARMAN Electrical Engineer
Burcu BARUT Agricultural Engineer, M.S.
Gözde TEZCE Environmental Engineer, M.S.
Murat GÜRSOY Chemical Engineer