SummarySummary

Dandenong Section- kms & PlansDandenong Section- kms & Plans ComplexityComplexity DeliveryDelivery ApproachApproach TeamTeam Technical InnovationTechnical Innovation

CaddPro- refine and develop, customise for projectCaddPro- refine and develop, customise for project MStn V8- Levels 1-63 replaced and by levels introduced, nested filesMStn V8- Levels 1-63 replaced and by levels introduced, nested files Integrated 3D Seamless Environment- InRoads, MicroStation, Integrated 3D Seamless Environment- InRoads, MicroStation,

Autoturn & Storm and SanitaryAutoturn & Storm and Sanitary Bridges in 3DBridges in 3D InRoads “smarts”InRoads “smarts”

Feature Editing of .dtmsFeature Editing of .dtms Intelligent feature Modelling- non triangulable dataIntelligent feature Modelling- non triangulable data Horizontal & Vertical ControlsHorizontal & Vertical Controls Horizontal Component PlacementHorizontal Component Placement Extensive use of Decision TablesExtensive use of Decision Tables Profile and Cross Section UpdaterProfile and Cross Section Updater CaddPro ResheetCaddPro Resheet

Page 3: Technical Innovation On Eastlink

DANDENONG TEAM MAKEUP- 15 TOTAL MAX

MANAGEMENT

COORDINATORS

DESIGNERS

DRAFTING

DRAINAGE DESIGN & DRAFTING

Page 4: Technical Innovation On Eastlink

DANDENONG SECTION

• ROAD

– Main Carriageway 6kms 3-4 lanes, Median, Design Speed 100kmh

– Ramps 10kms

– Monash Widening 5kms

– Local Roads 3kms

– Total 24kms

– Police Road Interchange- Grade Separated half diamond (Main Under)

– Monash Interchange- Freeway to Freeway, 3 Levels, 1st in Victoria (Main Under)

– Halton Road Overbridge (Main Under)

– Oakwood Avenue Overbridge (Main Under)

– Princes Hwy Interchange- Grade separated diamond (Main Over) with Heatherton Road Bridge Over Main- 3 levels

– Railway Parade Crossing (Main Over)

– Mile Creek Crossing (Main Over)

– Jacksons Road Interchange- Exit and Loop Ramp Entry

Page 5: Technical Innovation On Eastlink

DANDENONG SECTION

• STRUCTURES– Road Bridges 22– SUP Bridges 4– SUP Box culvert Underpasses 2– Main Type Precast Concrete 1200 – 1800 Super T’s– Loop Bridge on Monash- 2m Steel Box,250m long, 170m Rad with Sight

Line Widening– Princes Highway- 2.2m Steel Box– Heatherton- 2m Steel Box,220m long over the Main over the Princes Hwy- 3

levels

Page 6: Technical Innovation On Eastlink

DANDENONG SECTION

• SHARED USE PATH– Total 5kms DDA compliant and to AustRoads– Challenge – restrictive grades and ROW constraints– Shared Off Road Path 2kms (SORP)

• RE EARTH WALLS– No of 20, 2.7kms, 1 Ha approx– Located in

• Earth Fills for ROW Clearance• Bridge Abutments in Fill

• SOIL NAIL WALLS– No of– Total Length– Approximate Area

• WATER QUALITY TREATMENT– BioSwales– Swales– Wetlands

• Oakwood Park• Monash Interchange

Page 7: Technical Innovation On Eastlink

TECHNICAL INNOVATION- Eastlink DANDENONG TEAM

• CaddPro- (Drafting Productivity)• MStn V8 (Standardise CAD Platform)• Integrated Seamless Environment• 3D Environment• Bridges in 3D• InRoads Smarts• Storm and Sanitary• MX “I feel like they are going to take my nail gun away

and replace it with a hammer ”

Page 8: Technical Innovation On Eastlink

CaddPro Drafting Productivity Gains

• Drafting

– Manages• Scales for Text, dimensions, title sheets• Cell libraries for disciplines- eg structural Steel Profiles• Patterning• Creation of CAD documents• Title Sheet Placement and provides tagged data linkage to Excel• Plotting

– Automates• PDF Issue and .csv file creation• Pram Crossing Drafting & Type• Batter Tic Placement• Curve Setting Out Data Extraction• 3D Bridge Modelling• Resheeting of Roads

Page 9: Technical Innovation On Eastlink

Adoption of Standard CAD Platform

• Agreed at Outset to adopt MStnV8

• Why?– Standard exchange of files with VicRoads– Provides a standardised and controlled environment– Delivers a user friendly 3D environment– Provides Superior Referencing and Mapping Power– Draws from major pool of local drafting resources– Technical exchange & share of best practice information– Increased Customisation provides improved drafting power & efficiencies– Mixed platforms historically proved not to work well

• Conversions are imperfect• Breaks down the sharing of live data• Controlled data• Consumes valuable time due to handling

– Client directed– It does have the ability to read/ write to ACAD if required but not vice versa– Proven track record

Page 10: Technical Innovation On Eastlink

InRoads Smarts & Strengths

MStn Civil

InRoads Storm & Sanitary

MStn 3D

Page 11: Technical Innovation On Eastlink

InRoads Smarts

• Provides a seamless 3D CAD design environment

• Advanced Feature Modelling

• Controlled Use of Feature Names

• Horizontal and Vertical Controls for Main for interior Backbone

• Decision Tables for Exterior Backbone– By feature xyz– By Feature xy– By grade– By Vertical Alignment– By Horizontal Alignment

• Feature Editing

• Graphical Based Modelling

• Cross Section and Profile Updating

Page 12: Technical Innovation On Eastlink

What did not work well

• Project Basis- No Total Document Management System• Uncoordinated planning packages- Separating The Bridge team

from the Road Design Team• Non integrated environments- Giving work out to be undertaken in

other packages and then bringing it back• Giving out bridges to be done in 2D and ACAD• Lack of ownership and degradation of the survey• Overuse of Nested Reference Files• Conversions of Files

Page 13: Technical Innovation On Eastlink

What worked Well• Setting up of Project Drafting Standards• Customization and Configuration of MStn• Seamless Design Environment- MStn, InRoads and Storm & Sanitary• 3D Modelling Environment- Road, Walls, Services, Bridges• Training of ACAD users to MStn• Issue of 3D Electronic Data for Construction• Careful selection of qualified staff from outset of the project

Page 14: Technical Innovation On Eastlink

Bridges in 3D

• Exchange of 3D MStn Files• Road Surface Defined• 3D Beams assisted by CaddPro• Abutment Sills Wingwalls in 3D• 3D Data Checked back in InRoads

DTMS• Piles & Abutment Outlines Produced

as non-triangulable features in InRoads

• Clearance Diagrams Produced• Isopach Checks Confirmation