9
mobile: 661.343.9531 email: [email protected] Perriann Hodges Portfolio Open here

Teaser Portfolio

Embed Size (px)

DESCRIPTION

A short architecture portfolio illustrating a couple projects.

Citation preview

Page 1: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann HodgesPortfolio

Openhere

Page 2: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann HodgesMontgomery High School Gym Best Value Project Competition with Davy Architecture

Page 3: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann Hodges

20124 WeeksRevit, Photoshop, Illustrator, 45,000 Sq FtDavy ArchitectureLusardi ConstructionKTU+A Landscape

YearTime

ProgramSize

Collaboration

Assisted in the production of competition-quality renderings, graphics and layouts for a final presentation to the school district. Tasks include but not limited to interior perspectives, exterior perspectives, site plan, floor plans, building sections, board layouts, presentation format, generation of a revit walkthrough, and 3D modeling in revit.

Montgomery High School Gym Best Value Project Competition with Davy Architecture

Page 4: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann HodgesThe NewDorms of Architecture & Design School Project Proposal

Page 5: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann Hodges

AssignmentYearTime

ProgramSize

Collaboration

The NewDorms of Architecture & Design is situated right in the mecca of the NewS-chool campus. The high rise facilitates dorm rooms for graduate and undergraduate students. 8 four story atrium gardens allowing students to grow food just steps from their home. Other facilities through out the high rise include a gallery space, workshop, cafe, restaurant, and art store.

The NewDorms of Architecture & Design School Project Proposal

Studio Assignment201010 WeeksRevit, Photoshop200,000 Sq FtGroup Project

Page 6: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann HodgesSoccer Facility Competition

Page 7: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann Hodges

AssignmentYearTime

ProgramSize

Collaboration

A sign of hope and a sense of community will develop in Buenos Aires around the soccer facility. Due to extenuating circumstances, the facility does not have electri-cal or water hook ups and must be self sustaining. Also, the budget is limited to a total of 45,000 USD. Construction of phase one is to be finished in 3 months, and phase two in another 6 months.

Soccer Facility Competition

Buenos Aires Competition20114 WeeksRevit, Photoshop2,000 Sq FtGroup Project

Page 8: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann HodgesCultural Center School Project Proposal

Page 9: Teaser Portfolio

mobile: 661.343.9531email: [email protected]

Perriann Hodges

AssignmentYearTime

ProgramSize

Collaboration

Cultural Center for the LGBT Community with a small health clinic, restaurant, art gallery, library, and educational center.

Cultural Center School Project Proposal

Studio Assignment20107 WeeksRevit, Photoshop250,000 Sq FtIndividual Project