Tamiami Trail: A Comparison of Ecological Benefit Methods Used by Different Federal Agencies Presented by: Bradley A. Foster Jacksonville District US Army Corps of Engineers August 5, 2011 Tamiami Trail Miami Biscayne Bay BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Tamiami Trail: A Comparison

of Ecological Benefit Methods

Used by Different Federal

Agencies

Presented by: Bradley A. FosterJacksonville District US Army Corps of EngineersAugust 5, 2011

Tamiami Trail Miami

Biscayne Bay

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 2: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Location• The Tamiami Trail

project is part of

Modified Water

Deliveries to

Everglades National

Park - a precursor

and foundation

project for the

Project

Area

project for the

Comprehensive

Everglades

Restoration Plan

(CERP)

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 3: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Ecological Problem• Barriers and compartments

• Water depth, hydroperiod,

and velocity

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 4: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Part of the Problem is Tamiami Trail

FIGURE 1-6: CROSS-SECTION OF TAMIAMI TRAIL

(current conditions)

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 5: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Part of the Solution is to Modify Tamiami Trail

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 6: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Tamiami Trail Key Dates1928: Construction completed from Tampa to Miami

1940s: Bridges constructed

1950s: Bridges replaced by culverts

1950s -1960s : Central and Southern Florida project

constructed (levees, gates, pump stations, etc.)

1989: ENP Protection and Expansion Act

• Purchase ~192,000 acres

• Restore hydrology to the extent practicable

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 7: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Previous Studies

2003

20052 mile 1 mile

3000 feet

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

2007

2010

1 mile

1 mile2.6 mile

.66 mile1.77 mile

.38 mile

Page 8: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

2008 LRR (U.S. Army Corps of Engineers)

2010 EIS (National Park Service)

• Compare methods to estimate ecosystem benefits

used in the two most recent Tamiami Trail studies

• These benefits methods are integrated into the

decision-making process for these studiesdecision-making process for these studies

• Thus, will consider both benefits and

decision-making

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 9: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

National Park Service Process (CBA)

There are five basic steps in the Choosing By Advantages (CBA)

decision-making process:

1. Summarize the ATTRIBUTES of each alternative

2. Decide the ADVANTAGES of each alternative

3. Decide the IMPORTANCE of each advantage3. Decide the IMPORTANCE of each advantage

4. Weigh COSTS with TOTAL IMPORTANCE of the advantages

5. SUMMARIZE the decision

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 10: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Cost

Ecological

Other

PM

CE/ICA

HU & BenefitsB

C

U.S. Army Corps of Engineers Process

System of

accounts

B

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 11: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Cost

Ecological

Other

Importance

Importance

scores

I

C

National Park Service Process

Attributes

Importance

versus costAdvantages Importance

(paramount)

(relative)

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

Page 12: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Ecological Performance MeasuresRestore water deliveries to ENP

• Average annual flow volumes

• Potential connectivity of Water Conservation

Area (WCA3)-B Marsh and NESS as percent of

total project length

• One in ten year maximum discharge

Restore Ridge and Slough Processes

• Number of sloughs crossed by bridges

• Difference between average velocity in marsh

and average velocity at road

• Flows into NESS provided via bridge

Restore Vegetative Communities

• Number of days water depth at NESRS1 and

• Potential connectivity of Water Conservation

Area 3B (WCA-3B) Marsh and NESRS as percent

of total project length

• Number of sloughs crossed by each alternative

• Difference between Average Velocity in Marsh

and average velocity at road

• Flows into NESS provided via bridge

U.S

. AR

MY

CO

RP

S O

F E

NG

INE

ER

S

NA

TIO

NA

L PA

RK

SE

RV

ICE

20

10

EIS

• Number of days water depth at NESRS1 and

NESRS2 > 2 ft. during wet season peak

• Number of days water depth at NESRS1 and

NESRS2 > 3 ft. during wet season peak

• Average water depth during wet season peak

• Reduction in wildlife mortality

• Reduction in wildlife mortality

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

U.S

. AR

MY

CO

RP

S O

F E

NG

INE

ER

S 2

00

8 LR

RN

AT

ION

AL

PA

RK

SE

RV

ICE

Page 13: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Selected Differences• Corps process evolved from

economic decision methods (e.g. flood control studies) where effects are monetized

� Net benefit = benefit – cost

• For ecosystem restoration, effects and benefits are quantified but not monetized

� Benefits are developed using the difference from the without

• National Park Service uses Choosing By Advantages (CBA)

• CBA can use quantifiable and qualitative attributes

� Advantages are developed using the differences from the least preferred attribute

• Importance values are assigned to the advantages

U.S

. AR

MY

CO

RP

S O

F E

NG

INE

ER

SN

AT

ION

AL

PA

RK

SE

RV

ICE

the difference from the without project (no action) condition

� Benefits are in habitat units

� Use Incremental cost analysis

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

U.S

. AR

MY

CO

RP

S O

F E

NG

INE

ER

SN

AT

ION

AL

PA

RK

SE

RV

ICE

Page 14: Tamiami Trail: A Comparison of Ecological Benefit Methods ......Choosing By Advantages (CBA) • CBA can use quantifiable and qualitative attributes Advantages are developed using

Take HomeCorps Process versus NPS Process

• Problems and objectives were the same

• Underlying science and assumptions were similar

• Analytical methods to calculate ecosystem benefits

and to select an alternative differ

• At team level, initial discomfort regarding “other agency”

process and impression of apparent subjectivity

• Both methods have been used elsewhere and the • Both methods have been used elsewhere and the

procedures are reliable

• Identification of selected alternative appears to be driven more

by the predicted effects (from science, modeling, etc.) and less

by the method of processing of these predictions

BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District