46
50 th Annual General Meeting 7 May 2015

Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

1 3 June 2014

50th Annual General

Meeting

7 May 2015

Page 2: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Contents

1 2014 Financial Highlights 2 Contribution of Plantation Division 3 Contribution of Healthcare Division 4 Conclusion

Page 3: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

• 2014 was challenging but still a rewarding year. • Our (CPO) production declined by 6%. • MPOB’s CPO’s Price was flat. • Profit from Healthcare Division declined by 15%. • Despite that, TDM still made very good progress.

3

Challenging but rewarding year

Page 4: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

2014 Financial Highlights

Page 5: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Financial Highlights (2014)

RM386.1 million

3.82 sen RM0.90

RM68.4 million

Revenue Profit

Before Tax

Net Assets Per Share

Earnings Per Share

5

2014 - Key Financial Highlights

Page 6: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Group Revenue (RM’ mil)

125

197

228 205

159 145

171

238 230

200 194

267

381

336

394

516

455

371

386

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

2x

Annual average = RM184 mil

Annual average = RM339 mil

6

Page 7: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Group Profits (RM’ mil)

11 6 28

(21)

(49) (8)

6 29 26 23 27

60

141

77

130

222

149

67 68

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

|

300x

Annual average = RM0.3 mil

Annual average = RM90 mil

7

Page 8: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Net Assets per Share

0.22

0.49 0.53

0.46

0.25 0.21

0.41 0.42 0.44 0.46 0.46 0.48 0.56 0.59

0.64

0.99 1.02

0.85 0.90

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

| 2x

Annual average = RM0.37

Annual average = RM0.67

8 Note: Figures are adjusted for share split

Bonus Issue

Page 9: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Earnings per Share (EPS)

0.03 0.01 0.05

(0.01) (0.12) (0.02)

0.08

1.39 1.40 1.54 1.44

3.59

9.07

5.01

8.13

13.53

8.33

3.18 3.82

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

|

30x

Annual average = 0.18 sen

Annual average = 5.37 sen

9 Note: Figures are adjusted for share split

Split + Bonus Issue

Page 10: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Contribution by Plantation Div.

Page 11: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Better CPO

Pricing

11

Page 12: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

TDM’s better CPO price contributes to better profit

YEAR

MPOB

TDM

2014

RM2,383

RM2,432

2013

RM2,371

RM2,360

12

2%

0%

-1%

3%

Page 13: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Other Progress by Plantation Div.

Page 14: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

14

+1,484 +5,660

* Included new planted areas from Kalimantan, Indonesia

Total Planted Area (Ha)

32,710 33,222 33,374

39,034 40,518

44,005 45,389

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

2008 2009 2010 2011 2012 2013 2014

+152 +512

+3,487 +1,384

Growth in the Plantation Size

Page 15: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Terengganu mill rejuvenation program 2nd Bio-Composting plant KPOM

First plant (in STOM) operational since 2011

2nd is in construction (target operational in Q3 2015)

STOM produces 15,000t organic compost, while KPOM will produce 24,000t per annum.

15

Page 16: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Terengganu mill rejuvenation program Continuous sterilizer in KPOM and STOM

Will reduce cost of processing FFB by about 25%

16

Page 17: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Terengganu mill rejuvenation program Bio-Gas Plant in KPOM and STOM

17 Note: This is not an actual picture at our mills

Page 18: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Rejuvenation of Terengganu Estates (New Replanting Technique @ 4% p.a.)

A 2012 A 2013 A 2014 F 2015 F 2016 Replanting (Ha) 1,474 1,671 1,103 1,537 1,624

- 200 400 600 800

1,000 1,200 1,400 1,600 1,800

Replanting (Ha)

Replacing low yield, old trees with new high-yielding seedlings and high planting density and better irrigation system - to improve oil palm productivity

18

Page 19: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Many small innovations:

Gerobok

19

Page 20: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Many small innovations:

NETTING BAG FOR LOOSE FRUIT COLLECTION

RAKE AS LOOSE FRUIT COLLECTION TOOL

20

Page 21: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Many small innovations:

CONCRETE FFB PLATFORM

ASSISTED FFB COLLECTION USING BUFFALOES

21

Page 22: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Progress on Kalimantan Estates

Our estate in Kalimantan

22

Page 23: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Planted Area (Inti)

453 1,808

6,575

8,081

11,546

13,281

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

2009 2010 2011 2012 2013 2014

Planted (Ha)

23

Page 24: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Pre-Nursery in Kalimantan

24

Page 25: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Main Nursery

25

Page 26: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Kalimantan Estate – Immature area

26

Page 27: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Kalimantan Estate – Immature area

27

Page 28: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Matured Palm

28

Page 29: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Matured Palm (2014 - 3,359 mt FFB)

29

Page 30: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Healthy Production

30

Page 31: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Mill Complex under construction

31

Page 32: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Kabupaten Melawi, Kalimantan Barat

Main Building – the mills

32

Page 33: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Contribution by Healthcare Div.

Page 34: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Healthcare Revenue (RM’mil)

0.4 4.2 8.7

15.1 13.7 19.9 21.9 21.6 24.2

31.3

42.4

58.0 65.4

78.0

90.3

106.7 115.1

130.3

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

|

Annual average = RM12.0 mil

Annual average = RM69.4 mil

34

6x

Page 35: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Profits declined by 15% because of expansion

(1.1)

(3.2)

(5.1)

(6.9)

(4.1)

(1.5)

(4.9) (4.2)

(0.9) (0.9)

3.1

6.1

8.3

10.7 10.6 10.0

13.1

11.1

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

|

Annual average = (RM3.8 mil)

Annual average = RM4.1 mil Profit RM’mil

35

2x

Page 36: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Double capacity by 2017 Hospital Current

(Bed No.) Target

(Bed No.)

Kuantan Medical Centre 84 150

Kuala Terengganu Specialist 33 130

Taman Desa Medical Centre 45 90

Kelana Jaya Medical Centre 42 80

Total 204 450 x2

2015 2016 2017 2017

Commencement of new KMC Commencement of new KTS

New Hospital

36 Expansion for TDMCH

Page 37: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

37

Page 38: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

New KMC in 2015 In operation 2015

38

Page 39: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

New KTS, Target Operation in Q1 2016

39

Page 40: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

• Rehabilitation of our business requires very high CAPEX.

• In 2014, this rehabilitation costs us RM30 mil (in term of start-up losses).

• However, this investment is necessary to provide sustainable growth in the future.

• Hence, we adopt the approach of balancing dividends – investment for growth – and cash reserve.

40

Investment for future

Page 41: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

37%

63%

2014 Actual

Group OPEX & CAPEX

41

61%

39%

2015 Budget

Opex Capex

Actual annual spending = RM495 mil Annual Budget = RM890 mil

Page 42: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

35%

48%

17%

2014 Actual

Group CAPEX

42

16%

39%

45%

2015 Budget

Kalimantan Malaysia

RM182 mil RM546 mil Healthcare

Page 43: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Dividends Distribution (2014)

Page 44: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

1. 30% of PATAMI

2. As the business is growing, so should be the dividend

44

Dividend Policy

Page 45: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Recommend 1.5 sen dividend per share (40% of PATAMI)

TDM paid RM219 mil in dividends (2007-2014)

4.3

12.1

23.1 26.4

38.3

45.4

54.3

14.8

22.2

0

10

20

30

40

50

60

2007 2008 2009 2010 2011 2012 2013 2014 2015

Dividend (RM'mil)

Maiden Dividend

45

Reinvest for future growth

Page 46: Taklimat Projek Perladangan TDM di Kalimantan, Indonesia … › Upload › Docs › TDM › Slide Presentation... · 2015-05-07 · • 2014 was challenging but still a rewarding

Thank you

46