1 EQUIPMENT: NORTH FACE SPRAY CIRCULATION PUMP ( 42-016 ) .............................................................................................................................................................3 EQUIPMENT: SOUTH FACE SPRAY CIRCULATION PUMP ( 42-017 )..............................................................................................................................................................4 EQUIPMENT: ONCE THROUGH WATER RETURN PUMP ( 112 )......................................................................................................................................................................5 EQUIPMENT: CHUTE COOLING WATER PUMP ( ) .........................................................................................................................................................................................6 EQUIPMENT: DRYER SPILLAGE CONVEYOR ( 005 ).......................................................................................................................................................................................7 EQUIPMENT: JEFFERY FEEDER & PRODUCT BIN ( 012 & 143 ) ......................................................................................................................................................................8 EQUIPMENT: AMMONIA COOLER (400) ..........................................................................................................................................................................................................9 EQUIPMENT: BFL AMMONIA VAPORIZER (403) ........................................................................................................................................................................................... 11 EQUIPMENT: AIR CHILLER (404) .................................................................................................................................................................................................................... 12 EQUIPMENT: BAGHOUSE FAN ( 1311 ) .......................................................................................................................................................................................................... 13 EQUIPMENT: BAGHOUSE SCREW CONVEYOR ( 2111 ) ................................................................................................................................................................................ 14 EQUIPMENT: DRYER/COOLER EQUIPMENT SCRUBBER (117) ................................................................................................................................................................... 15 EQUIPMENT: DRYER & COOLER CYCLONES ( 380 & 381 )........................................................................................................................................................................... 16 EQUIPMENT: DAP WATER COLLECTION TANK ( 154 ) ................................................................................................................................................................................ 17 EQUIPMENT: COOLER BAGHOUSE ( 306 ) ..................................................................................................................................................................................................... 18 EQUIPMENT: 54% ACID STORAGE TANK (502)............................................................................................................................................................................................. 19 EQUIPMENT: 54% ACID STORAGE TANK SPLITTER BOX (650) .................................................................................................................................................................. 21 EQUIPMENT: AIR PRE-HEATER ( 403 ) ........................................................................................................................................................................................................... 22 EQUIPMENT: DEFOAMER TANK ( 511 ).......................................................................................................................................................................................................... 23 EQUIPMENT: AMMONIA COOLER (400) ........................................................................................................................................................................................................ 24 EQUIPMENT: BFL AMMONIA VAPORIZER (403) ........................................................................................................................................................................................... 26 EQUIPMENT: AIR CHILLER (1311) .................................................................................................................................................................................................................. 27 EQUIPMENT: NO.1 54% FEED PUMP (102A).................................................................................................................................................................................................... 29 EQUIPMENT: NO.2 54% FEED PUMP (102B) .................................................................................................................................................................................................... 31 EQUIPMENT: BFL CONDENSATE PUMP ........................................................................................................................................................................................................ 33 EQUIPMENT: TAIL GAS SCRUBBER CIRCULATION PUMP (116/117) .......................................................................................................................................................... 34 EQUIPMENT: "A" R/G PRE-SCRUBBER PUMP (119) ....................................................................................................................................................................................... 36 EQUIPMENT: "B" R/G PRE-SCRUBBER PUMP (120) ....................................................................................................................................................................................... 38 EQUIPMENT: "A" ACID SCRUBBER PUMP (120A) ......................................................................................................................................................................................... 40 EQUIPMENT: "B" ACID SCRUBBER PUMP (120B) .......................................................................................................................................................................................... 41 EQUIPMENT: DEFOAMER PUMP (233A)......................................................................................................................................................................................................... 43 EQUIPMENT: "A" SLURRY PUMP (122A) ........................................................................................................................................................................................................ 44 EQUIPMENT: "B" REACTOR SLURRY PUMP (122B) ...................................................................................................................................................................................... 45 EQUIPMENT: "A" EFFLUENT RETURN PUMP (134A) .................................................................................................................................................................................... 46 EQUIPMENT: "B" EFFLUENT RETURN PUMP (134B) ..................................................................................................................................................................................... 47 EQUIPMENT: CYCLONIC SCRUBBER PUMP(120) ......................................................................................................................................................................................... 49 EQUIPMENT: ONCE THRU WATER PUMP (154) ............................................................................................................................................................................................. 50 EQUIPMENT: HYDRAULIC SYSTEM PUMPS (640E-W) ................................................................................................................................................................................. 51 EQUIPMENT: INTREMEDIATE CONVEYOR (016) ......................................................................................................................................................................................... 53 EQUIPMENT: "A" & "B" DEDUSTING SCREEN............................................................................................................................................................................................... 55 EQUIPMENT: RECYCLE ELEVATOR (102) ..................................................................................................................................................................................................... 56 EQUIPMENT: GRANULATOR (103) ................................................................................................................................................................................................................. 58 EQUIPMENT: LUMPBREAKER (105) ............................................................................................................................................................................................................... 60 EQUIPMENT: SCREENS FEED ELEVATOR (106) ........................................................................................................................................................................................... 61 TABLE OF CONTENTS

TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

Embed Size (px)

Citation preview

Page 1: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

1

EQUIPMENT: NORTH FACE SPRAY CIRCULATION PUMP ( 42-016 ) .............................................................................................................................................................3EQUIPMENT: SOUTH FACE SPRAY CIRCULATION PUMP ( 42-017 )..............................................................................................................................................................4EQUIPMENT: ONCE THROUGH WATER RETURN PUMP ( 112 )......................................................................................................................................................................5EQUIPMENT: CHUTE COOLING WATER PUMP ( ) .........................................................................................................................................................................................6EQUIPMENT: DRYER SPILLAGE CONVEYOR ( 005 ).......................................................................................................................................................................................7EQUIPMENT: JEFFERY FEEDER & PRODUCT BIN ( 012 & 143 )......................................................................................................................................................................8EQUIPMENT: AMMONIA COOLER (400) ..........................................................................................................................................................................................................9EQUIPMENT: BFL AMMONIA VAPORIZER (403)...........................................................................................................................................................................................11EQUIPMENT: AIR CHILLER (404) ....................................................................................................................................................................................................................12EQUIPMENT: BAGHOUSE FAN ( 1311 ) ..........................................................................................................................................................................................................13EQUIPMENT: BAGHOUSE SCREW CONVEYOR ( 2111 )................................................................................................................................................................................14EQUIPMENT: DRYER/COOLER EQUIPMENT SCRUBBER (117) ...................................................................................................................................................................15EQUIPMENT: DRYER & COOLER CYCLONES ( 380 & 381 )...........................................................................................................................................................................16EQUIPMENT: DAP WATER COLLECTION TANK ( 154 ) ................................................................................................................................................................................17EQUIPMENT: COOLER BAGHOUSE ( 306 ) .....................................................................................................................................................................................................18EQUIPMENT: 54% ACID STORAGE TANK (502).............................................................................................................................................................................................19EQUIPMENT: 54% ACID STORAGE TANK SPLITTER BOX (650) ..................................................................................................................................................................21EQUIPMENT: AIR PRE-HEATER ( 403 ) ...........................................................................................................................................................................................................22EQUIPMENT: DEFOAMER TANK ( 511 )..........................................................................................................................................................................................................23EQUIPMENT: AMMONIA COOLER (400) ........................................................................................................................................................................................................24EQUIPMENT: BFL AMMONIA VAPORIZER (403)...........................................................................................................................................................................................26EQUIPMENT: AIR CHILLER (1311) ..................................................................................................................................................................................................................27EQUIPMENT: NO.1 54% FEED PUMP (102A)....................................................................................................................................................................................................29EQUIPMENT: NO.2 54% FEED PUMP (102B)....................................................................................................................................................................................................31EQUIPMENT: BFL CONDENSATE PUMP ........................................................................................................................................................................................................33EQUIPMENT: TAIL GAS SCRUBBER CIRCULATION PUMP (116/117) ..........................................................................................................................................................34EQUIPMENT: "A" R/G PRE-SCRUBBER PUMP (119) .......................................................................................................................................................................................36EQUIPMENT: "B" R/G PRE-SCRUBBER PUMP (120) .......................................................................................................................................................................................38EQUIPMENT: "A" ACID SCRUBBER PUMP (120A) .........................................................................................................................................................................................40EQUIPMENT: "B" ACID SCRUBBER PUMP (120B) ..........................................................................................................................................................................................41EQUIPMENT: DEFOAMER PUMP (233A).........................................................................................................................................................................................................43EQUIPMENT: "A" SLURRY PUMP (122A) ........................................................................................................................................................................................................44EQUIPMENT: "B" REACTOR SLURRY PUMP (122B) ......................................................................................................................................................................................45EQUIPMENT: "A" EFFLUENT RETURN PUMP (134A) ....................................................................................................................................................................................46EQUIPMENT: "B" EFFLUENT RETURN PUMP (134B).....................................................................................................................................................................................47EQUIPMENT: CYCLONIC SCRUBBER PUMP(120) .........................................................................................................................................................................................49EQUIPMENT: ONCE THRU WATER PUMP (154).............................................................................................................................................................................................50EQUIPMENT: HYDRAULIC SYSTEM PUMPS (640E-W) .................................................................................................................................................................................51EQUIPMENT: INTREMEDIATE CONVEYOR (016) .........................................................................................................................................................................................53EQUIPMENT: "A" & "B" DEDUSTING SCREEN...............................................................................................................................................................................................55EQUIPMENT: RECYCLE ELEVATOR (102) .....................................................................................................................................................................................................56EQUIPMENT: GRANULATOR (103) .................................................................................................................................................................................................................58EQUIPMENT: LUMPBREAKER (105) ...............................................................................................................................................................................................................60EQUIPMENT: SCREENS FEED ELEVATOR (106) ...........................................................................................................................................................................................61

TABLE OF CONTENTS

Page 2: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

2

EQUIPMENT: PROCESS SCREENS (107A-D)...................................................................................................................................................................................................63EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE (108A-D) ................................................................................................................................................................64EQUIPMENT: DRAG FLIGHT CONVEYOR (110).............................................................................................................................................................................................65EQUIPMENT: PRODUCT COOLER (111)..........................................................................................................................................................................................................67EQUIPMENT: PRODUCT ELEVATOR (113).....................................................................................................................................................................................................68EQUIPMENT: PRODUCT CONVEYOR (141)....................................................................................................................................................................................................69EQUIPMENT: FINES CONVEYOR (146)...........................................................................................................................................................................................................70EQUIPMENT: NORTH DAP DISTRIBUTION CONVEYOR (415) .....................................................................................................................................................................71EQUIPMENT: DAP DISTRIBUTION CONVEYOR AND TRIPPER (417/417A) ................................................................................................................................................72EQUIPMENT: PRE-SCREEN RECYCLE CONVEYOR......................................................................................................................................................................................74EQUIPMENT: ROTARY DRYER (104) ..............................................................................................................................................................................................................75EQUIPMENT: COMBUSTION CHAMBER (104-1)............................................................................................................................................................................................76EQUIPMENT: I.D.FAN (116)..............................................................................................................................................................................................................................78EQUIPMENT: DRYER/COOLER EQUIPMENT SCRUBBER (117) ...................................................................................................................................................................79EQUIPMENT: T.G.SCRUBBER (148).................................................................................................................................................................................................................81EQUIPMENT: BURNER BLOWER (153) ...........................................................................................................................................................................................................83EQUIPMENT: CYCLONIC SCRUBBER (310)....................................................................................................................................................................................................84EQUIPMENT: R/G PRE-SCRUBBER .................................................................................................................................................................................................................86EQUIPMENT: BAGHOUSE AIR COMPRESSOR (1313-1-2)..............................................................................................................................................................................88EQUIPMENT: 54% ACID STORAGE TANK AGITATOR (034).........................................................................................................................................................................89EQUIPMENT: REACTOR (501) .........................................................................................................................................................................................................................90EQUIPMENT: 54% ACID STORAGE TANK (502).............................................................................................................................................................................................93EQUIPMENT: 54% ACID STORAGE TANK SPLITTER BOX (650) ..................................................................................................................................................................95

Page 3: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

3

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: NORTH FACE SPRAY CIRCULATION PUMP ( 42-016 )EQUIPMENT NUMBER: 42-016DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the North face spray circulation pump( 42-016) by pressing the stop button on the panel board.

2. Open and lock the disconnect for North face spray circulation pump( 42-016) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 12" Suction valve and the 8" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Eye/skin irritation

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 4: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

4

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: SOUTH FACE SPRAY CIRCULATION PUMP ( 42-017 )EQUIPMENT NUMBER: 42-017DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the South face spray circulation pump( 42-017) by pressing the stop button on the panel board.

2. Open and lock the disconnect for South face spray circulation pump( 42-017) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 12" Suction valve and the 8" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Eye/skin irritation

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 5: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

5

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1EQUIPMENT: ONCE THROUGH WATER RETURN PUMP ( 112 )EQUIPMENT NUMBER: 112DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Once through water return pump( 112) by pressing the stop button on the panel board.

2. Open and lock the disconnect for Once through water return pump( 112) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 2" Suction valve and the 2" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Fresh water.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 6: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

6

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1EQUIPMENT: CHUTE COOLING WATER PUMP ( )EQUIPMENT NUMBER: DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Chute Cooling Water pump( ) by pressing the stop button on the panl board.

2. Open and lock the disconnect on the Chute Cooling Water pump( ) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 2" Suction valve and the 2" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Fresh water.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 7: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

7

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: DRYER SPILLAGE CONVEYOR ( 005 )EQUIPMENT NUMBER: 005 DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board.

2. Open and lock the disconnects for the Dryer Spillage Conveyor (005) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 8: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

8

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: JEFFERY FEEDER & PRODUCT BIN ( 012 & 143 )EQUIPMENT NUMBER: 012 & 043DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Jeffery feeder by pushing the stop button on the panelboard.

2. Open and lock the disconnects for the Jeffery feeder in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. If entry into the product bin is required the Screens Feed Elevator and the primary screens must also be locked out.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/480 volts

4.. None

5.. None

1. Accidental start-up.

2. Cubical explosion.

3. Cubical explosion

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 9: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

9

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: AMMONIA COOLER (400)EQUIPMENT NUMBER: 0042-41-400DWG. NO.: 42-F-0030/42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

** Prior to begining repairs Steam Purge the entire system. **

1. Close and chain lock the 3" Ammonia Supply line valve located behind the Granulator, with a Production Lock. Open and tag 1" vent valve. Install a Stainless Steel Blind.

2. Close and chain lock Ammonia Chiller 3" exit valve and the 4" exit valve with a Production Lock. Open and tag 3/4" vent valve.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Ammonia/250 PSIG.

2. Ammonia/250 PSIG.

3. None

4. None

1. Health/Fire/Explosion.

2. Health/Fire/Explosion.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 10: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

10

Page 11: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

11

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: BFL AMMONIA VAPORIZER (403)EQUIPMENT NUMBER: 042-41-403DWG. NO.: 42-F-0031/42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Close and chain lock the Main Ammonia Supply line Valve (on the Granulator Floor). Steam Purge the entire system to the Reactor.

2. Close and chain lock 4" Ammonia Supply Line valve. Open and tag the 2" Vent valve.

3. Close and chain lock 6" L.P. Steam valve with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the valves designated.

5. After work completion, inspect equipment and reverse the procedure to put the equipment back in service.

1. Ammonia liquid and vapors/250 PSIG. L.P. Steam 45 PSIG.

2. Ammonia liquid and vapors/250 PSIG.

3. L.P. Steam 45 PSIG. Ammonia vapors.

4. None

5. None

1. Health/Fire/Explosion. Thermal burns.

2. Health/Fire/Explosion.

3. Thermal burns/Health.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 12: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

12

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: AIR CHILLER (404)EQUIPMENT NUMBER: 0042-41-1311DWG. NO.: 42-F-0050/42-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Cooler Vent Fan (116) by pushing the stop button on the panel board.

2. Close and chain lock the 3" Ammonia Supply valve located on the North side of DAP 1, with a Production Lock. Steam Purge the entire system. Open and tag Vent valve.

3. Close and tag 3" inlet valve at the Air Chiller, and 8" outlet valve Open and tag 2" bleed valve and 3/4" bleed valve.

4. Employees working on this equipment will place their personal lock(s) on the valves and disconnect designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Ammonia/150 PSIG. M. P. Steam

3. Ammonia/150 PSIG.

6. None

7. None

1. Accidental start-up.

2. Health/Thermal burns. Personal injury.

3. Health/Personal injury.

6. No hazard.

7. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 13: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

13

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: BAGHOUSE FAN ( 1311 )EQUIPMENT NUMBER: 1311DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Baghouse Fan motor (1311) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Baghouse Fan motor (1311) in the Motor Control Center (MCC) with a production lock.

3. Wait for the I.D.Fan Motor to completely stop rotating (turning).

4. Employees working on this fan will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Fan rolling backward.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 14: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

14

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: BAGHOUSE SCREW CONVEYOR ( 2111 )EQUIPMENT NUMBER: 2111 DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Baghouse Screw Conveyor (2111) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Baghouse Screw Conveyor (2111) in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 15: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

15

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRYER/COOLER EQUIPMENT SCRUBBER (117)EQUIPMENT NUMBER: 117 DWG. NO.: 42-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Acid Scrubber Pumps (120A/120B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Acid Scrubber Pumps (120A/120B) in the Motor Control Center (MCC).

3. Close and chain lock the 3" Pond Water valve, the 8" Venturi Spray valve, and the 1 1/2" H2S04 valve. Close and chain lock the 1 1/2" Steam valves and the 1" Defoamer valve. Close and chain lock the 4" 30% PPA valve and the 4" AP line valve with Production Locks. Open and tag the 6" C/E Scrubber Drain valve.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic. 55 PSIG Steam. Phosphoric Acid (54%/30%) 180o + F. Sulfuric Acid (93%).

1. Accidental start-up.

2. Cubical explosion.

3. Eye/Skin irritation. Chemical/Thermal burns. Personal injury.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 16: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

16

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRYER/EQUIPMENT SCRUBBEREQUIPMENT NUMBER: 117 DWG. NO.: 42-F-0037

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

4. None

5. None

4. No hazard.

5. No hazard.

Page 17: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

16

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: DRYER & COOLER CYCLONES ( 380 & 381 )EQUIPMENT NUMBER: 380 & 381DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. If entry into the Dryer and Cooler cyclones is required the Tailgas Scrubber must be shutdown and locked out.

2. Shut down the Tailgas Scrubber fan (116)from the panelboard and lock it out in the MCC.

1. Excess draft or air flow in the ducts.

2. Electrical / 480 volts.

1. Physical injury

2. Cubical explosion

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 18: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

17

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1EQUIPMENT: DAP WATER COLLECTION TANK ( 154 )EQUIPMENT NUMBER: 154 DWG. NO.: 170B-123

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Empty or control Tank inventory as needed for repairs.

2. Close and chain lock the 3" O.T.W. Supply line valve. Close and tag the 2" Pump Suction valve, open and tag the Tank 1" Drain valve.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect the equipment and reverse procedures to put the equipment back in service.

1. None

2. O.T.W. under pressure.

3. None

4. None

1. No hazard.

2. Personal injury.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 19: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

18

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: COOLER BAGHOUSE ( 306 )EQUIPMENT NUMBER: 306DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. If entry into the Baghouse dust bin is required the baghouse screw (1311) and the baghouse compressor ( 1313) must be shutdown and locked out in the MCC.

2. Employees working on this equipment will place their personal lock(s) on the equipment designated.

3. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical / 480 volts

2. No Hazard

3. No hazard

1. Cubical explosion

2. No Hazard

3. No hazard

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 20: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

19

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANK (502)EQUIPMENT NUMBER: 42-502 DWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the 54% Acid Storage Tank Agitator (034) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the 54% Acid Storage Tank Agitator (034) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 4" Merchant Acid valve, the 4" 54% Acid valve, the 4" Sludge line Valve, and the 4" A.P. line Valve with a Production Lock.

4. Blind or chain and lock the 4" Merchant Acid line, the 4" 54% line, the 4" Sludge line, and the All-Purpose (A-P) line at Clarification (Double Block and Bleed.

1. Electrical/120 volts.

2. Electrical/120 volts.

3. Phosphoric acid 180o F.

4. Phosphoric acid 180o F.

1. Unexpected power surge/release of stored energy. Accidental start-up.

2. Cubical explosion.

3. Chemical/thermal burns.

4. Chemical/thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEF GOLWITZER

DATE: 09/26/96

Page 21: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

20

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANKEQUIPMENT NUMBER: 42-502DWG. NO.: 42-F-0005

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the disconnect.

6. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None

6. None

5. No hazard.

6. No hazard.

Page 22: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

21

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANK SPLITTER BOX (650)EQUIPMENT NUMBER: 42-650DWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Chain and Lock the 4" Merchant Acid, the 4" 54% Acid, the 4" Sludge, the 4" All Purpose (A-P) line Feed lines at the 54% Acid Storage Tank Splitter Box. The above Supply line valves will be chained and locked at their source (DAP and Clarification).

2. Employees working on this equipment will place their personal lock(s) on the valves designated.

3. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Phosphoric acid 180o F.

2. None

3. None

1. Chemical/thermal burns.

2. No hazard.

3. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 23: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

22

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: AIR PRE-HEATER ( 403 )EQUIPMENT NUMBER: 403DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. If entry is required into the pre-heater the burner blower (153 )and the main 150 lb. steam supply valve to the pre-heater must be locked out.

2. Open and lock the disconnect for the burner blower (153 ) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the main 150 lb. steam valve to the pre-heater.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. 150 lb steam and excess draft or air pressure.

2. Electrical / 480 volts

3. 150 lb. steam.

4. No Hazard

5. No Hazard

1. Physical injury from steam and air flow

2. Cubical explosion

3. Thermal burns

4. No hazard

5. No hazard

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 24: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

23

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP-1 EQUIPMENT: DEFOAMER TANK ( 511 )EQUIPMENT NUMBER: 511 DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Empty Reagent Tank (511) or control inventory as required for repairs.

2. Close a chain lock the Utility Water supply line vlve, and the 3" Reagent Supply line valve with a Production Lock. Open and tag the 2" Tank Drain valve. Close and tag the Discharge valves on the three (2) Defoamer Transfer Pumps.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect the equipment and reverse procedures to put the equipment back in service.

1. Defoamer Reagent.

2. Steam, 150 PSIG/Defoamer Reagent/Water.

3. None

4. None

1. Eye irritation/Slippery liquid.

2. Eye irritation/Thermal burns/Slippery conditions.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE YES

CHAIRMAN:

JEFF A. GOLWITZER

DATE:

OCTOBER 1996

Page 25: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

24

SPECIFIC LOCKOUT PROCEDURE PAGE 24PLANT: DAP 1 EQUIPMENT: AMMONIA COOLER (400)EQUIPMENT NUMBER: 0042-41-400DWG. NO.: 42-F-0030/42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

** Prior to begining repairs Steam Purge the entire system. **

1. Close and chain lock the 3" Ammonia Supply line valve located behind the Granulator, with a Production Lock. Open and tag 1" vent valve. Install a Stainless Steel Blind.

2. Close and chain lock Ammonia Chiller 3" exit valve and the 4" exit valve with a Production Lock. Open and tag 3/4" vent valve.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Ammonia/250 PSIG.

2. Ammonia/250 PSIG.

3. None

4. None

1. Health/Fire/Explosion.

2. Health/Fire/Explosion.

3. No hazard.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 26: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

25

07/31/95 * 09/26/96 * 09/26/96

Page 27: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

26

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: BFL AMMONIA VAPORIZER (403)EQUIPMENT NUMBER: 042-41-403DWG. NO.: 42-F-0031/42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Close and chain lock the Main Ammonia Supply line Valve (on the Granulator Floor). Steam Purge the entire system to the Reactor.

2. Close and chain lock 4" Ammonia Supply Line valve. Open and tag the 2" Vent valve.

3. Close and chain lock 6" L.P. Steam valve with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the valves designated.

5. After work completion, inspect equipment and reverse the procedure to put the equipment back in service.

1. Ammonia liquid and vapors/250 PSIG. L.P. Steam 45 PSIG.

2. Ammonia liquid and vapors/250 PSIG.

3. L.P. Steam 45 PSIG. Ammonia vapors.

4. None

5. None

1. Health/Fire/Explosion. Thermal burns.

2. Health/Fire/Explosion.

3. Thermal burns/Health.

4. No hazard.

5. No hazard.

07/28/95 * 02/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 28: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

27

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: AIR CHILLER (1311)EQUIPMENT NUMBER: 0042-41-1311DWG. NO.: 42-F-0050/42-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Cooler Vent Fan (116) by pushing the stop button on the panel board.

2. Close and chain lock the 3" Ammonia Supply valve located on the North side of DAP 1, with a Production Lock. Steam Purge the entire system. Open and tag Vent valve.

3. Close and tag 3" inlet valve at the Air Chiller, and 8" outlet valve Open and tag 2" bleed valve and 3/4" bleed valve.

4. Employees working on this equipment will place their personal lock(s) on the valves and disconnect designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Ammonia/150 PSIG. M. P. Steam

3. Ammonia/150 PSIG.

6. None

7. None

1. Accidental start-up.

2. Health/Thermal burns. Personal injury.

3. Health/Personal injury.

6. No hazard.

7. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 29: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

28

07/31/95 * 02/26/96 * 08/19/96 * 09/26/96

Page 30: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

29

SPECIFIC LOCKOUT PROCEDURE PAGE 29PLANT: DAP 1 EQUIPMENT: No.1 54% FEED PUMP (102A)EQUIPMENT NUMBER: 42-102ADWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the No.1 54% Feed Pump (102A) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the No.1 54% Feed Pump (102A) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 6" Suction valve and the 4" Discharge valve with a Production Lock. Open and tag the 3/4" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid 180o F.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Chemical/thermal burns.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 31: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

30

06/21/95 * 09/26/96 * 09/26/96

Page 32: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

31

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: No.2 54% FEED PUMP (102B)EQUIPMENT NUMBER: 42-102BDWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the No.2 54% Feed Pump (102B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the No.2 54% Feed Pump (102B) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 6" Suction valve and the 4" Discharge valve with a Production Lock. Open and tag the 3/4" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid 180o F.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Chemical/thermal burns.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 33: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

32

06/21/95 * 09/26/96 * 09/26/96

Page 34: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

33

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: BFL CONDENSATE PUMP EQUIPMENT NUMBER: DWG. NO.: 42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the BFL Condenstae Transfer Pump by pushing the stop button on the panel board.

2. Open and lock the disconnect for the BFL Condensate Transfer Pump in the Motor Control Center (MCC) with a production lock.

3. Close and chain lock the 2" Suction valve and the 2" discharge valve with a Production Lock. Open and tag the 1" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Ammoniated liquid.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury/Ammonia inhalation

4. No hazard.

5. No hazard.

07/24/95 * 10/11/96 * 10/17/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 10/17/96

Page 35: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

34

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: TAIL GAS SCRUBBER CIRCULATION PUMP (116/117)EQUIPMENT NUMBER: 116/117 DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Tail Gas Scrubber circulation pump (116/117) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Tail Gas Scrubber circulation Pump (116/117) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 10" Suction valve(s) and the 8" Discharge valve(s) for North and/or South Pump as required, with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Eye/skin irritation.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 36: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

35

07/20/95 * 09/26/96 * 09/26/96

Page 37: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

36

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "A" R/G PRE-SCRUBBER PUMP (119)EQUIPMENT NUMBER: 119DWG. NO.: 42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "A" R/G Pre-scrubber Pump (119) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "A" Pre-scrubber Pump (119) in the Motor Control Center (MCC) with a production lock.

3. Secure the Hydraulic Fluid Supply to the 10" Suction valve and the 10" Discharge valve by the following means: Disable/Disconnect/Drain and/or Lock with a Production Lock. Open and tag the 2" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180° F.

4. None

1. Accidental start-up.

2. Cubical explosion.

3. Thermal and chemical burns.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 38: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

37

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "A" R/G PRE-SCRUBBER PUMPEQUIPMENT NUMBER: 119DWG. NO.: 42-F-0031

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None 5. No hazard.

06/09/95 * 02/26/96 * 08/19/96 * 09/26/96

Page 39: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

38

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "B" R/G PRE-SCRUBBER PUMP (120)EQUIPMENT NUMBER: 120DWG. NO.: 42-F-0031

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "B" R/G Pre-scrubber Pump (120) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "B" R/G Pre-scrubber Pump (120) in the Motor Control Center (MCC) with a Production Lock.

3. Secure the Hydraulic Fluid Supply to the 10" Suction valve and the 10" Discharge valve by the following means: Disable/Disconnect/Drain and/or Lock with a Production Lock. Open and tag the 2" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180° F.

4. None

1. Accidental start-up.

2. Cubical explosion.

3. Thermal and chemical burns.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 40: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

39

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "B" R/G PRE-SCRUBBER PUMPEQUIPMENT NUMBER: 120DWG. NO.: 42-F-0031

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None 5. No hazard.

06/09/95 * 02/26/96 * 08/19/96 * 09/26/96

Page 41: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

40

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: "A" ACID SCRUBBER PUMP (120A)EQUIPMENT NUMBER: 120A DWG. NO.: 42-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "A" Acid Scrubber Pump (120A) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "A" Acid Scrubber Pump in the Motor Control Center (MCC) with a production lock.

3. Valve out Hydraulic Service for the 10" Suction valve and 10" Discharge. Open and tag the 1" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse the procedures to put the equipment back into service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180° F.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Thermal and chemical burns.

4. No hazard.

5. No hazard.

07/20/95 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 42: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

41

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "B" ACID SCRUBBER PUMP (120B)EQUIPMENT NUMBER: 120B DWG. NO.: 42-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "B" Acid Scrubber Pump (120B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "B" Acid Scrubber Pump (120B) in the Motor Control Center (MCC) with a production lock.

3. Valve out Hydraulic Service to the 10" Suction valve and the 10" Discharge valve with a Production Lock. Open and tag the 1" drain valve.

4. Employees working on this equipment will place their personal(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid/180° F.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Thermal and chemical burns.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 43: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

42

07/20/95 * 08/19/96 * 09/26/96

Page 44: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

43

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DEFOAMER PUMP (233A)EQUIPMENT NUMBER: 0042-27-233ADWG. NO.: 44-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Defoamer Metering Pump (233A) by pushing the stop button in the field.

2. Disconnect the Defoamer Metering Pump (233A) by tagging receptacle located in the DAP 1 Control Room.

3. Close and chain lock the Suction valve with a Production Lock. Close and tag 1" Discharge valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse the procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/120 volts.

3. Defoamer (oil) under pressure.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

5. No hazard.

07/20/95 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 45: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

44

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: "A" SLURRY PUMP (122A)EQUIPMENT NUMBER: 122ADWG. NO.: 42-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1.Stop "A" Slurry Pump (122A) by pushing the stop button on the panel board.

2.Open and lock the disconnect for "A" Slurry Pump (122A) in the Motor Control Center (MCC) with a Production Lock.

3.Close and chain lock the 6" suction valve and the 4" discharge valve with a Production Lock. Open and tag the 1" drain valve. Close and tag the 3" Pond Water valve.

4.Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5.After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1.Electrical/120 volts.

2.Electrical/480 volts.

3.Ammoniated slurry/235o F. Pond water/mildly acidic.

4.None

5.None

1.

2.

3.

4.

5.

06/08/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 46: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

45

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: "B" REACTOR SLURRY PUMP (122B)EQUIPMENT NUMBER: 122BDWG. NO.: 44-F-0030

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the "B" Reactor Slurry pump (122B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Reactor Slurry pump (122B) in the Motor Control Center (MCC) with a production lock.

3. Close and chain lock the 6" Suction valve and4" Discharge valve with a Production Lock. Open and tag the 1" Drain valve. Close and tag the 3" Pond Water valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Ammoniated slurry/235° F. Pond water/mildly acidic.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Chemical/thermal burns.

4. None

5. No hazard.

06/08/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 47: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

46

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "A" EFFLUENT RETURN PUMP (134A)EQUIPMENT NUMBER: 134A DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "A" Effluent Return Pump (134A) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "A" Effluent Return Pump (134A) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 12" Suction valve and the 8" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Eye/skin irritation

4. No hazard.

5. No hazard.

06/12/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 48: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

47

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "B" EFFLUENT RETURN PUMP (134B)EQUIPMENT NUMBER: 134B DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop "B" Effluent Return Pump (134B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for "B" Effluent Return Pump (134B) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 12" Suction valve and the 8" Discharge valve with a Production Lock. Open and tag the drain valve.

4. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

6. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic.

4. None

5. None

1. Unexpected power surge/release of stored energy. Accidental start-up.

2. Cubical explosion.

3. Eye/skin irritation.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 49: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

48

06/12/95 * 02/26/96 * 08/19/96 * 09/26/96

Page 50: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

49

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: CYCLONIC SCRUBBER PUMP(120)EQUIPMENT NUMBER: 0042-50-120DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Cyclonic Scrubber Pump (120) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Cyclonic Scrubber Pump (120) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 6" Suction valve and the 4" Discharge valve with a Production Lock. Open and tag the 3" Drain valve.

4. Employees working on this equipment will place their personal lock(s) in the disconnect and valves designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Process Water.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

5. No hazard.

07/26/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 51: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

50

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: ONCE THRU WATER PUMP (154)EQUIPMENT NUMBER: 154 DWG. NO.: 170B-123

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the DAP Water Collection Tank Pump (154) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the DAP Water Collection Tank Pump (154) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 2" Pump Suction valve, the 2" Pump Discharge valve, and the 2" Crossover valve from the Chute Cooling Pump with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect the equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Once thru water.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

5. No hazard

12/06/95 * 09/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/97

Page 52: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

51

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: HYDRAULIC SYSTEM PUMPS (640E-W)EQUIPMENT NUMBER: 42-640E-WDWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Hydraulic System Pumps (640E-W) by pushing the stop button on the panel board.

2. Open and lock the disconnects for the Hydraulic System Pumps (640E-W) in the Motor Control Center (MCC) with a Production Lock.

3. Close and tag the Discharge valve on the Accumulator and bleed the Hydraulic System down by opening and closing the cylinder on the equipment to be repaired.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Hydraulic Fluid 750 PSIG.

4. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury/Health.

4. None

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 53: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

52

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: HYDRAULIC SYSTEM PUMPSEQUIPMENT NUMBER: 42-640E-WDWG. NO.:

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None 5. No hazard.

07/26/95 * 09/26/96 * 09/26/96

Page 54: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

53

SPECIFIC LOCKOUT PROCEDURE PAGE 53PLANT: DAP 1 EQUIPMENT: INTREMEDIATE CONVEYOR (016)EQUIPMENT NUMBER: 42-016 DWG. NO.: 50-F-0002

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop or divert the Material flow away form the Intermediate Conveyor (016).

2. Stop the Intermediate Conveyor (016) by pushing the stop button on the panel board.

3. Open and lock the disconnect for the Intermediate Conveyor (016) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Granulated material flow.

2. Electrical/120 volts.

3. Electrical/480 volts.

4. None

5. None

1. Personal injury.

2. Accidental start-up.

3. Cubical explosion.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 55: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

54

06/14/96 * 09/26/96 * 09/26/96

Page 56: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

55

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: "A" & "B" DEDUSTING SCREEN EQUIPMENT NUMBER: DWG. NO.: 42-0039

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the "A" or "B" Dedusting Screen by pushing the stop button on the Field switch.

2. Open and lock the disconnect for the "A" or "B" Dedusting Screen in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3.

4. No hazard.

07/26/95 * 01/29/96 * 08/19/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLSITZER

DATE: 09/26/96

Page 57: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

56

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: RECYCLE ELEVATOR (102)EQUIPMENT NUMBER: 102 DWG. NO.: 42-F-0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Recycle Elevator (102) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Recycle Elevator (102) in the Motor Control Center (MCC) with a Production Lock.

If entry is required Steps 3 and 4 apply.

3. Stop the Dragflight (110) by pushing the stop button on the panel board.

4. Open and lock the disconnect for the Dragflight (110) the Motor Control Center (MCC) with a Production Lock.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/120 volts.

4. Electrical/480 volts.

1. Accidental start-up.

2. Cubical explosion.

3. Accidental start-up.

4. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 58: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

57

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: RECYCLE ELEVATOR (102)EQUIPMENT NUMBER: 102DWG. NO.: 42-F-0035

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the equipment designated.

6. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None

6. None

5. No hazard.

6. No hazard.

07/20/95 * 09/26/96 * 09/26/96

Page 59: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

58

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: GRANULATOR (103)EQUIPMENT NUMBER: 0042-55-103DWG. NO.: 42-F-0034/30/31/35

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the granulator (103) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Granulator (103) in the Motor Control Center (MCC) with a Production Lock.

If entry is necessary, steps 3 through 7 apply.

3. Stop the Recycle Elevator (102) and "A" and "B" Slurry Pumps (122A-B) by pushing the stop button on the panel board.

4. Open and lock the disconnects for the Recycle Elevator (102) and "A" & "B" Slurry Pumps (122A-B) in the Motor Control Center (MCC) with a Production Lock.

5. Close and chain lock (DOUBLE BLOCK & BLEED) the NH3 Supply Line valves to the Sparger with a Production lock. Steam Purge the NH3 Sparger to the Granulator (103).

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/120 volts.

4. Electrical/480 volts.

5. Ammonia liquid and vapors. Medium Pressure Steam 150 PSIG.

1. Accidental start-up.

2. Cubical explosion.

3. Accidental start-up.

4. Cubical explosion.

5. Health-Thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 60: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

59

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: GRANULATOR (103)EQUIPMENT NUMBER: 0042-55-103 DWG. NO.: 42-F-0034/30/31/35

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

6. Shut compressor breaker off & lock. Close discharge valve to air bladder & open bleed. Check gauges for zero pressure.

7. Close and tag 3" valve and open and tag 3/4" vent valve. Close and chain lock 1" Medium Pressure Steam valve with a Production Lock.

8. Close and chain lock 6" valves on line from BFL Vaporizer and the 2" valve from Ammonia Cooler with a Production Lock. Open and tag 1" Vent valve.

9. Employees working on this equipment will place their personal lock(s) on the disconnect and valves designated.

10. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

6. None

7. Ammonia liquid and vapors./Steam 150 PSIG

8. Ammonia liquid and vapors./250 PSIG

9. None

10. None

6. No hazard

7. Health/Fire/explosion.

7. Health/Fire/explosion.

8. No hazard.

9. No hazard.

Rev. 11/2004

NOTE: Tailgas scrubber fan should be running if acid scrubbers have acid or scrub water in them.

Page 61: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

60

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: LUMPBREAKER (105)EQUIPMENT NUMBER: 105 DWG. NO.: 42-F-0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Rotary Dryer (104) and the Lump Breaker (105) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Lumpbreaker (105) in the Motor Control Center (MCC) with a Production Lock.

** If Lumpbreaker entry is required, the Rotary Dryer Must Be locked out in the MCC. **

3. Employees working on this equipment will place their personal lock(s) on the disconnect designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

06/22/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 62: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

61

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: SCREENS FEED ELEVATOR (106)EQUIPMENT NUMBER: 106DWG. NO.: 42-F-0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Screens Feed Elevator (106) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Screens Feed Elevator (106) in the Motor Control Center (MCC) with a Production Lock.

** If entry to the elevator boot is required, Steps 3 and 4 apply. **

3. Stop the Rotary Dryer (104) and the Lumpbreaker (105) by pushing the stop buttons on the panel board.

4. Open and lock the disconnects for the Rotary Dryer (104) and Lump Breaker (105) in the Motor Control Center (MCC) with a Production Lock.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/120 volts.

4. Electrical/480 volts.

1. Accidental start-up.

2. Cubical explosion.

3. Accidental start-up.

4. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 63: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

62

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: SCREENS FEED ELEVATOREQUIPMENT NUMBER: (106)DWG. NO.: 42-F-0032

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the equipment designated.

6. After work completion, inspect equipment and reverse procedures to put the equipment back into service.

5. None

6. None

5. No hazard.

6. No hazard.

07/20/95 * 09/26/96 * 09/26/96

Page 64: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

63

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: PROCESS SCREENS (107A-D) EQUIPMENT NUMBER: 107A-DDWG. NO.: 42-F-0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Divert Material Flow as required. close valve on Hydraulics Cylinder.

2. Stop the Process Screens (107A-D) as required, by pushing the stop button on the panel board or the Field Switch as required.

3. Open and lock the disconnect for the Process Screens (107A-D) as required in the Motor Control Center (MCC) with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the disconnect designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Granulated Material Flow.

2. Electrical/120 volts.

3. Electrical/480 volts.

4. None

5. None

1. Personal injury.

2. Accidental start-up.

3. Cubical explosion.

4. No hazard.

5. No hazard.

06/22/95 * 02/26/97 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 65: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

64

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: CAGE MILLS INNER AND OUTER CAGE (108A-D)EQUIPMENT NUMBER: 4305-06-108A-D DWG. NO.: 42-F-0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Inner and Outer Cage Mill(s) (108 A-D) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Inner and Outer Cage Mill(s) (108A-D) as needed in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) lock on the disconnect designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Unexpected power surge/release of energy. Accidental start-up.

2. Same as above.

3. No hazard.

4. No hazard.

06/22/95 * 02/26/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 66: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

65

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRAG FLIGHT CONVEYOR (110)EQUIPMENT NUMBER: 4305-06-110DWG. NO.: 42-F-0035

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Drag Flight Conveyor (110) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Drag Flight Conveyor (110) in the Motor Control Center (MCC) with a Production Lock.

** If entry is required steps 3 and 4 will apply. **

3. Stop the Cage Mills (108 A-D), the Pre-screen Recycle Belt, and the Screens Feed Elevator (106) by pushing the stop button(s) on the panel board.

4. Open and lock the disconnect for the Cage Mills (108 A-D), the Pre-screen Recycle Belt, and the Screens Feed Elevator (106) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/120 volts.

4. Electrical/480 volts.

1. Accidental Start-up.

2. Cubical explosion.

3. Accidental Start-up.

4. Cubical explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 67: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

66

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRAG FLIGHT CONVEYOREQUIPMENT NUMBER: 4305-06-110DWG. NO.: 42-F-0035

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the equipment designated.

6. After work completion,inspect equipment and reverse procedures to put the equipment back in service.

5. None

6. None

5. No hazard.

6. No hazard

06/26/95 * 02/26/96 * 09/26/96

Page 68: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

67

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: PRODUCT COOLER (111)EQUIPMENT NUMBER: 111DWG. NO.: 42-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Product Cooler (111) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Product Cooler (111) in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

07/18/95 * 01/29/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 69: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

68

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: PRODUCT ELEVATOR (113)EQUIPMENT NUMBER: 113DWG. NO.: 42-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Product Cooler (111) and the Product Elevator (113) by pushing the stop button on the panel board.

2. Open and lock the disconnects for the Product Cooler (111) and the Product Elevator (113) in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the disconnect.

4. After work completion, inspect equipment and reverse procedure to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard

07/26/95 * 01/29/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 70: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

69

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: PRODUCT CONVEYOR (141)EQUIPMENT NUMBER: 141DWG. NO.: 42-F-0036

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Product Conveyor (141) by pushing the stop button on the panel board.

2. Open and lock the disconnects for the Product Conveyor (141) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

07/26/95 * 01/29/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 71: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

70

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: FINES CONVEYOR (146)EQUIPMENT NUMBER: 146 DWG. NO.: 170D-140

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Fines Conveyor (146) by pushing the stop button on the panel board in the DAP 1 Control Room.

2. Open and lock the disconnect for the Fines Conveyor (146) in the DAP 1 Motor Control Center (MCC) with a Production Lock. Activate RED FLASHING LIGHT.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Active equipment traffic area.

4. None

1. Unexpected power surge/release of stored energy. Accidental start-up.

2. Cubical explosion.

3. Payloaders.

4. No hazard.

12/05/95 * 01/29/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 72: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

71

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: NORTH DAP DISTRIBUTION CONVEYOR (415)EQUIPMENT NUMBER: 415DWG. NO.: 170D-40

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the North DAP Distribution Conveyor (415) by pushing the stop button(s) on the Field switch.

2. Open and lock the North DAP Distribution Conveyor (415) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

12/04/95 * 01/29/96 * 08/19/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 73: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

72

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DAP DISTRIBUTION CONVEYOR AND TRIPPER (417/417A)EQUIPMENT NUMBER: 42-417/417A DWG. NO.: 50-F-0002

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop or divert Material flow away form the DAP Distribution Conveyor and Tripper (417/417A).

2. Stop the DAP Distribution Conveyor and Tripper (417/417A) by pushing the stop button on the panel board.

3. Open and lock the disconnect for the DAP Distribution Conveyor and Tripper (417/417A) in the DAP 1 Motor Control Center (MCC) with a Production Lock.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Granulated material flow.

2. Electrical/120 volts.

3. Electrical/480 volts.

4. None

5. None

1. Personal injury.

2. Accidental start-up.

3. Cubical explosion.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 74: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

73

06/14/96 * 09/26/96 * 09/26/96

Page 75: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

74

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: PRE-SCREEN RECYCLE CONVEYOR EQUIPMENT NUMBER: DWG. NO.: 170D-140

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Pre-screen Recycle Conveyor by pushing the stop button on the panel board in the DAP 1 Control Room.

2. Open and lock the disconnect for the Pre-Screen Recycle Conveyor in the DAP 1 Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

12/05/95 * 09/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 76: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

75

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: ROTARY DRYER (104)EQUIPMENT NUMBER: 104DWG. NO.: 42-F-0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Dryer (104) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Dryer (104) in the Motor Control Center (MCC) with a Production Lock.

** If entry is necessary, Step 3 will apply.

3. Stop the Granulator (103) and the Lumpbreaker (105) by pushing the stop buttons on the panel board. Depending on the work to be performed it may be necessary to stop the Dryer ID Fan (116) and the Burner Blower (153).

4. Employees required to work on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Electrical/120 volts.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Accidental start-up.

4. No hazard.

5. No hazard.

07/20/95 * 09/26/96 * 10/17/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 10/17/96

Page 77: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

76

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: COMBUSTION CHAMBER (104-1)EQUIPMENT NUMBER: 104-1DWG. NO.: 42-F-0032

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Dryer (104) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Dryer (104) in the Motor Control Center (MCC) with a Production Lock.

** If entry is necessary, Steps 3 through 5 apply. **

3. Close, chain lock, and/or open and bleed down Fuel Source valves as required: The 2" Natural Gas valve (or verify that the line is blanked) and the 1" Fuel Oil valve, (or verify that the line is blanked), with a Production Lock.

4. Close and chain lock the 1" valve on the 150 PSIG Atomizing Steam line to the Combustion Chamber with a Production Lock.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Natural Gas/No.6 Fuel Oil/140o + F. Insufficient oxygen supply.

4. Steam/150 PSIG. Plant air 30 PSIG.

1. Accidental start-up.

2. Cubical explosion.

3. Thermal Burns/Fire or explosion. Health.

4. Thermal burns/Personal injury.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 78: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

77

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: COMBUSTION CHAMBEREQUIPMENT NUMBER: 104-1 DWG. NO.: 42-F-0032

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the equipment designated.

6. After work completion,inspect equipment and reverse procedures to put the equipment back in service.

5. None

6. None

5. No hazard.

6. No hazard

07/20/95 * 09/26/96 *

Page 79: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

78

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: I.D.FAN (116)EQUIPMENT NUMBER: 116DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the I.D.Fan Motor (116) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the I.D. Fan Motor (116) in the Motor Control Center (MCC) with a production lock.

3. Wait for the I.D.Fan Motor to completely stop rotating (turning).

4. Employees working on this fan will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Fan rolling backward.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

5. No hazard.

07/20/95 * 08/19/96 * 09/26/96 * 10/17/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 10/17/96

Page 80: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

79

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRYER/COOLER EQUIPMENT SCRUBBER (117)EQUIPMENT NUMBER: 117 DWG. NO.: 42-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Acid Scrubber Pumps (120A/120B) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Acid Scrubber Pumps (120A/120B) in the Motor Control Center (MCC).

3. Close and chain lock the 3" Pond Water valve, the 8" Venturi Spray valve, and the 1 1/2" H2S04 valve. Close and chain lock the 1 1/2" Steam valves and the 1" Defoamer valve. Close and chain lock the 4" 30% PPA valve and the 4" AP line valve with Production Locks. Open and tag the 6" C/E Scrubber Drain valve.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond water/mildly acidic. 55 PSIG Steam. Phosphoric Acid (54%/30%) 180o + F. Sulfuric Acid (93%).

1. Accidental start-up.

2. Cubical explosion.

3. Eye/Skin irritation. Chemical/Thermal burns. Personal injury.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 81: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

80

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: DRYER/EQUIPMENT SCRUBBEREQUIPMENT NUMBER: 117 DWG. NO.: 42-F-0037

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

4. None

5. None

4. No hazard.

5. No hazard.

07/17/95 * 01/29/96 * 09/26/96

Page 82: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

81

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: T.G.SCRUBBER (148)EQUIPMENT NUMBER: 0042-50-148DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop I.D.FAN (116), and the North and South Tailgas Scrubber Recirculation Pumps (116N & 117S), by pushing the stop buttons on the panel board.

2. Open and lock the disconnects for the I.D.Fan (116) and the North and South Recirculation Pumps (116N & 117S) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock 10" Pond Water valve and 6" valve with a Production Lock. Open and tag 3" drain valve and 1/2" drain valve.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse the procedures to put the equipment back into service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pond Water/mildly acidic

4. None

5. None

1. Unexpected power surge/release of stored energy. Accidental start-up.

2. Cubical explosion

3. Eye/skin irritation.

4. No hazard.

5. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 83: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

82

06/26/95 08/19/96 * 09/26/96

Page 84: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

83

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: BURNER BLOWER (153)EQUIPMENT NUMBER: 153 DWG. NO.: 42-F-0025

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Burner Blower (153) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Burner Blower (153) in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None.

4. None.

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

07/17/95 * 01/29/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 06/26/96

Page 85: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

84

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: CYCLONIC SCRUBBER (310)EQUIPMENT NUMBER: 0042-50-310DWG. NO.: 42-F-0038

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

** If Cyclonic Scrubber entry is required, the Plant must be down. **

1. Stop the Cyclonic Recycle Pump (120) and the I.D.Fan (116) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the Cyclonic Recycle Pump (120) and the I.D.Fan (116) in the Motor Control Center (MCC) with a production lock.

3. Close and chain lock the 2" Once Thru Water Valve with a Production Lock.

4. Employees required to work on this equipment will place their personal lock(s) on the equipment designated.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Pressurized once thru water.

4. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 86: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

85

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: CYCLONIC SCRUBBEREQUIPMENT NUMBER: 4250-310DWG. NO.: 42-F-0038

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None 5. No hazard.

06/12/95 * 08/19/96 * 09/26/96

Page 87: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

86

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: R/G PRE-SCRUBBER EQUIPMENT NUMBER: 0042-50-383DWG. NO.: 42-F-0031/42-F-0037

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop R/G Pre-scrubber pumps (119A & 120B) by pushing the stop button on the panel board.

2. Open and lock the disconnects for the R/G Pre-scrubber pumps (119A & 120B) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 12" Suction valves and the 10" discharge valves with a Production Lock. Open and tag the 2" drain valves.

4. Close and chain lock the 1" H2SO4 valve, the 1" Medium Pressure Steam valve, and 3" 22% valve. Open and tag the R/G Pre-scrubber 2" Drain valve.

5. Close and tag 2" Process Water line valve.

6. Employees working on this equipment will place their personal lock(s) on the equipment designated.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Phosphoric acid 180o F./Pond water mildly acidic.

4. Phosphoric acid 180o F./Pond water mildly acidic/Medium Pressure Steam/ Ammoniated Fumes.

5. Water under pressure.

6. None

1. Accidental start-up.

2. Cubical explosion.

3. Chemical burns. Eye/skin irritation.

4. Chemical/thermal burns. Eye/skin irritation. Health

5. Personal injury.

6. No hazard.

REVIEWED BY:

AREA SAFETY COMMITTEE

CHAIRMAN:

DATE:

Page 88: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

87

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: R/G PRE-SCRUBBER EQUIPMENT NUMBER: 0042-50-383 DWG. NO.: 42-F-0031/42-F-0037

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

7. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

7. None 7. No hazard.

J:\WPC\DAP1\383 07/25/95

Page 89: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

88

SPECIFIC LOCKOUT PROCEDUREPLANT: DAP 1 EQUIPMENT: BAGHOUSE AIR COMPRESSOR (1313-1-2)EQUIPMENT NUMBER: 4248-1313-1-2DWG. NO.:

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the Baghouse Air Compressor(s) by (1313-1-2) pushing the stop button in the field.

2. Open and lock the disconnect for the Baghouse Air Compressor(s) (1313-1-2) in the Motor Control Center (MCC) with a Production Lock.

3. Bleed down Baghouse Air Compressor(s) (1313-1-2) and Receiver.

4. Employees working on this equipment will place their personal lock(s) on the equipment designated.

5. After work completion, inspect equipment and reverse procedures to put equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Compressed air.

4. None

5. None

1. Accidental start-up.

2. Cubical explosion.

3. Personal injury.

4. No hazard.

5. No hazard.

06/20/95 * 09/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 90: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

89

SPECIFIC LOCKOUT PROCEDURE PAGE 89PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANK AGITATOR (034)EQUIPMENT NUMBER: 42-034DWG. NO.: 42-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the 54% Storage Tank Agitator (034) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the 54% Acid Storage Agitator (034) in the Motor Control Center (MCC) with a Production Lock.

3. Employees working on this equipment will place their personal lock(s) on the equipment designated.

4. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. None

4. None

1. Accidental start-up.

2. Cubical explosion.

3. No hazard.

4. No hazard.

07/20/95 * 09/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 91: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

90

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: REACTOR (501)EQUIPMENT NUMBER: 0042-02-501DWG. NO.: 42-F-0030/31/37

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the 54% Acid feed pumps (102 A & B), the R/G Pre-scrubber Pumps (119A & 120B), and the Acid Scrubber Pumps (Venturi) (120A & 120B) by pushing the stop button on the panel board.

2. Open and lock the disconnect(s) for the 54% Acid feed pumps (102 A & B), the R/G Pre-scrubber Pumps (119A & 120B) and the Acid Scrubber Pumps (Venturi) (120A & 120B) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 4" valve located behind the Granulator, with a Production Lock. Steam purge the Ammonia Supply Line and Ammonia Vaporizer. Close and chain lock 3" valve at Ammonia Vaporizer discharge. Close and chain lock 8" valves from BFL Vaporizer with a Production Lock. Open and tag 3/4" vent valve.

1. Electrical/120 volts.

2. Electrical/480 volts.

3. Ammonia liquid/vapors/250 PSIG.

1. Accidental start-up.

2. Cubical explosion.

3. Health/Fire/Explosion.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 92: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

91

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: REACTOREQUIPMENT NUMBER: 0042-02-501DWG. NO.: 42-F-0030/31/37

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

4. Close and chain lock 4" valve at R/G Pre-scrubber Pumps (119A & 120B), and 8" valve from Acid Scrubber Pumps (Venturi) (120A & 120B) with a Production Lock.

5. Disconnect 2" AAN Supply line at AAN truck. Close and chain lock 2" valve at Reactor with a Production Lock. Open and tag 1" drain line. Close and chain lock the 2" H2S04 valve with a Production lock.

6. Close and chain lock 4" 30% Regular Jumper line valve and 4" AP line valves. Close and chain lock 4" valve on Jumper line from AP line to Regular 54% Acid line. Close and chain lock 4" valve, also located on the regular 54% line. All valves are to be locked with a Production Lock.

4. Phosphoric Acid/180o F.

5. Ammonium Nitrate.

6. Phosphoric Acid/180o F./Pond water mildly acidic.

7. Phosphoric Acid/180o F.

4. Chemical/thermal burns.

5. Chemical burns.

6. Chemical burns.

7. Chemical/thermal burns/Eye/skin irritation.

Page 93: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

92

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: REACTOREQUIPMENT NUMBER: 0042-02-501 DWG. NO.: 42-F-0030/31/37

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

7. Close and chain lock 1" Med. Press. Steam valves with a Production Lock.

8. Open and tag the 6" Reactor Drain valve.

9. Employees working on this equipment will place their personal lock(s) on the equipment designated.

10. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

7. Phosphoric Acid/180o F.

8. Phosphoric Acid/180o F.

9. None

10. None

7. Chemical/thermal burns.

8. Chemical/Thermal burns.

9. No hazard.

10. No hazard.

06/15/95 * 09/26/96 * 09/26/96

Page 94: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

93

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANK (502)EQUIPMENT NUMBER: 42-502 DWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Stop the 54% Acid Storage Tank Agitator (034) by pushing the stop button on the panel board.

2. Open and lock the disconnect for the 54% Acid Storage Tank Agitator (034) in the Motor Control Center (MCC) with a Production Lock.

3. Close and chain lock the 4" Merchant Acid valve, the 4" 54% Acid valve, the 4" Sludge line Valve, and the 4" A.P. line Valve with a Production Lock.

4. Blind or chain and lock the 4" Merchant Acid line, the 4" 54% line, the 4" Sludge line, and the All-Purpose (A-P) line at Clarification (Double Block and Bleed.

1. Electrical/120 volts.

2. Electrical/120 volts.

3. Phosphoric acid 180o F.

4. Phosphoric acid 180o F.

1. Unexpected power surge/release of stored energy. Accidental start-up.

2. Cubical explosion.

3. Chemical/thermal burns.

4. Chemical/thermal burns.

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEF GOLWITZER

DATE: 09/26/96

Page 95: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

94

SPECIFIC LOCKOUT PROCEDURE

PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANKEQUIPMENT NUMBER: 42-502DWG. NO.: 42-F-0005

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

5. Employees working on this equipment will place their personal lock(s) on the disconnect.

6. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

5. None

6. None

5. No hazard.

6. No hazard.

06/21/95 * 02/26/96 * 09/26/96

Page 96: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

95

SPECIFIC LOCKOUT PROCEDURE PLANT: DAP 1 EQUIPMENT: 54% ACID STORAGE TANK SPLITTER BOX (650)EQUIPMENT NUMBER: 42-650DWG. NO.: 42-F-0005

PURPOSE: TO SECURE EQUIPMENT FOR MAINTENANCE OR CLEANING.AFFECTED EMPLOYEES: PLANT OPERATORS, OPERATOR TRAINEES AND MAINTENANCE MECHANICS.

WORK STEP TYPE/MAGNITUDE OF ENERGY HAZARDS

1. Chain and Lock the 4" Merchant Acid, the 4" 54% Acid, the 4" Sludge, the 4" All Purpose (A-P) line Feed lines at the 54% Acid Storage Tank Splitter Box. The above Supply line valves will be chained and locked at their source (DAP and Clarification).

2. Employees working on this equipment will place their personal lock(s) on the valves designated.

3. After work completion, inspect equipment and reverse procedures to put the equipment back in service.

1. Phosphoric acid 180o F.

2. None

3. None

1. Chemical/thermal burns.

2. No hazard.

3. No hazard.

06/21/95 * 02/26/96 * 09/26/96

REVIEWED BY:

AREA SAFETY COMMITTEE: YES

CHAIRMAN: JEFF GOLWITZER

DATE: 09/26/96

Page 97: TABLE OF CONTENTS - The Mosaic Company the Dryer Spillage Conveyor (005) by pushing the stop button on the panel board. 2. Open and lock the disconnects for the Dryer

96