Table of Contents
1. Brief Introduction & General Information
2. Company Capabilities & Resources
3. Organization Chart
4. CV’s of Key Personnel
5. List of Projects
6. Site Pictures
7. Approvals from Authorities
8. Performance / Appreciation Certificates
9. Trade License and relevant documents
10. Quality Assurance Policy and Health & Safety Policy
INTRODUCTION
Econ Contracting LLC is a Dubai Established Local Electrical Infrastructure Contracting Company.
Econ Contracting LLC is pre-qualified and Approved by DEWA, RTA, Dubai Municipality, MPW, FEWA, Etisalat,
Dubai Properties Group/TECOM, Nakheel, Emaar etc.
Econ Contracting LLC is specialized in MV & LV Cable Distribution Networks and Jointing, Street Lighting and
Tunnel (underpass) Lighting Works, Landscape Lighting Works besides other general Infrastructure activities,
which can be readily reviewed at our website www.econdubai.com
Econ Contracting LLC is supported by a consolidated team of specialized dedicated engineers and a
committed management with a substantial experience in this country, in various aspects of engineering,
procurement and construction.
We have qualified and fully trained technicians with hands on experience in the local construction industry, MEP
services in particular.
Our engineers are licensed and approved in Dubai Municipality and other govt. authorities like DEWA, SEWA
and MEW.
We believe in keeping our client’s interest on top priority and we extend our commitment in making our client’s
views into reality keeping in mind all the finest details involved in the process.
We emphasize our commitment to complete the project within the target dates, in full compliance with the contract
requirements. We are also committed to the safety and environmental regulations of UAE, and to implement
such policies in our projects.
With a stringent quality policy and consistent drive to provide an excellent service to all our clients, Econ
Contracting LLC is ready to take up more challenges and consolidate its position as one of the major
Infrastructure Services contractor in the region.
GENERAL INFORMATION
Company Name : Econ Contracting LLC
Company Address: P O Box 88712, MT Khoory Building,
Al Barsha1, Dubai, UAE
Contact Nos: Tel.: +971 4 3413914Fax: +971 4 3413915
Abu Dhabi Branch Office
Contact Nos: Tel.: +971 2 628-0199Fax: +971 2 628-0841
Email : [email protected]
Website: www.econdubai.com
- COMPANY CAPABILITIES
A. MEP services for infrastructure projects.
Design, Supply, installation testing and
commissioning of street lighting works, Tunnel and
Bridge lighting.
Design, supply, installation, testing and commissioning of entire lighting systems
including feeder pillars/panels.
Design, supply, installation, testing and commissioning of HV/LV cable
distribution networks and jointing.
Design, supply, installation, testing and commissioning of landscape decorative
lighting systems.
Econ Contracting LLC is capable of carrying out the projects in the following fields:
B. Turnkey MEP Projects
Design, supply, installation, testing and commissioning of the following
LV distribution networks.
11 KV / 0.4 K substation works.
Medium and HV switchgears.
Pumping stations (Sewerage, Drainage and portable water).
Water, Sewerage and Drainage networks.
MANPOWER
Administrative Staff 15
Field Workers 183
Supervisors/Engineers 42
TOTAL ECON EMPLOYEES 240
Items Quantity
Buses
o 15 seater Mini Bus 7 Nos.
o 84 seater Bus 1 No.
Pick Ups
o Double Cabin (1-Ton) 10 Nos.
o Double Cabin (3-Ton) 3 Nos.
o Long Body Pick Up (3-Ton) 2 Nos.
Light Vehicles
o Saloon Cars 6 Nos.
o 4 Wheel Drive 1 No.
PLANT & EQUIPMENT
Items Quantity
Hiab Cranes
o Crane Mounted Truck (3-Ton) 1 No.
o Crane Mounted Truck (10-Ton) 1 No.
Heavy Equipments
o JCB – CX 3 Loader 1 No.
o Bobcat 1 No.
Heavy Vehicles
o Water Tanker 1 No.
o Tipper Truck 1 No.
Miscellaneous Equipments
Item Quantity
o Cable Winch (3- Ton) 4 Nos.
o Cable Trailers 3 Nos.
o Plate Compactors 6 Nos.
o Cutting Machine 1 No.
o Surveying Equipments 2 Nos.
o Earth Resistance Testers 1 No.
o Meggar 2 Nos.
o Hydraulic Crimping Tool 3 Nos.
o Asphalt Cutter 1 No.
o Generators 2 Nos.
o Block Cutter 3 Nos.
o Cable Drum Jack 1 No.
o GI Pipe Bending Machine 1 No.
o Hydrolic Jack Pipe Bender 1 No.
o Cable Detector 4 Nos
ORGANIZATION CHARTManaging Director
Finance & Admin Manager
Civil Engineers
PurchaseDept
Electrical Engineers
Sr. Estimator / QS
AccountsDept
Admin &Personnel
Dept
PRO
Asst. Estimator/ Office Engineer
Asst. Estimator
Project ManagerStreet Lighting &Infrastructure
EngineersStreet Lighting &Infrastructure
Draftsmen
Foremen
Electricians
Labours
Projects ManagerCable Laying
HV & LV Networks
Site Secretaries
Civil Foremen
ChargeHands
Masons & Labours
Civil works
Team 1
ElectricalForemen
ChargeHands
Cable laying
Team 1
Cable laying
Team 2
Cable Jointers
JointingHelpers
Safety Supervisors
Surveyors
Chainman &Assistants
Safety labourers
Cable laying
Team 3
Project Managers
Admin Assistant
Secretary
Safety Officer
Draftsmen
Current Projects under Execution
SN PROJECT TITLE MAIN CONTRACTOR CLIENT NATURE OF WORKS VALUE (AED)
1 558 Key Villas / 260 Villas at Dubai Land Temporary Access RoadAscon Road Construction
Dubai Properties Road Lighting Works 708,593.73
2 CE/0256B/2011 Civil Works for Installation of 11/33 kv Cables Econ DEWA 11/33 kv Civil Works 4,270,815
3 Arabian Ranches DevelopmentArabian Coast
ContractingEMAAR Electrical & Street Lighting Works 788,000
4Jumeirah Golf Estates – Phase A, Infrastructure works & Portable Water Pumping Station
Ascon Road Construction
NAKHEEL Electrical Works 23,095,628
5International City, Phase 2 & 3, Infrastructure Works of Stage 1
Ascon Road Construction
NAKHEEL Electrical /Lighting Works 2,084,339
6 Energization of Street Lighting Poles at City of Arabia Econ Dubai Properties Street Lighting Works 198,645
7 R842/3 Improvements of Al Khail Roads - Jn. 10, 11 & 13 Ascon Road Construction
RTA Street Lighting Works 6,589,102
Major projects Completed in the Year 2004-2011
SN PROJECT TITLE MAIN CONTRACTOR CLIENT NATURE OF WORKS VALUE (AED)
1 DSS Festival Lighting Works Castros Middle East DEDSpecialized Festival Lighting Works
& Engineering Works500,000
2CE/0029A/10 – LV Cable Laying, Drilling Under the roads & Mini Distribution Pillars Installation
Econ DEWA LV Cabling Works 3,403,026
3 CE/0368A/2009 Installation of 11 KV Cables Econ DEWA 11KV cable Laying Works 8,246,727
4 DS150 Jabel Ali Sewage Treatment Plant Al Ahamadiah Aktor DMStreet Lighting Works & Engineering
Works5,311,923
5 Ocean Heights at Dubai Marina - Plot A27A Econ Damac 11KV cable Laying Works 600,000
6 The Villas @ Dubai Land (P-117) Econ Dubai Properties Street Lighting Cable Laying Works 3,324,215
7 CE/0231/2009/Installation of 11 KV Cables Econ DEWA 11 KV Cable Laying Works 2,652,685
8 R842/2 Improvements of Al Khail Roads-Jn 19&22 MNG Esmas RTA Street Lighting Works 3,350,000
9Dubai Studio City - Roads & Infrastructure Stage 2 & Pumping station works
Ascon Road Construction
Dubai PropertiesStreet Lighting & Pumping station
Works3,623,000
10 Dubai Studio City - Roads & Infrastructure - Sound Stage 1 ComplexAscon Road Construction
Dubai Properties Street Lighting Works 1,348,233
Major projects Completed in the Year 2004-2011
SN PROJECT TITLE MAIN CONTRACTOR CLIENT NATURE OF WORKS VALUE (AED)
11 Dubai Studio City - Roads & Infrastructure - Boundary Wall WorksAscon Road Construction
Dubai Properties Electrical Works 1,392,778
12 R942/5 Beautification of Jumeirah RoadIrrigation Trade
Middle EastRTA Electrical Works 1,540,720
13 CE/0166/2008 Installation of 11 KV Cables Econ DEWA 11 KV Cable Laying Works 2,652,685
14 558 Key Villas at Dubai Land (P-113) Econ Dubai Properties HV & LV cabling Works 13,750,000
15a) 260 Key Villas (P-103) at Dubai Land / P-103b) Business Park at Business Bay / P – 186 – Executive Towers
Infrastructure WorksEcon Dubai Properties HV & LV cabling Works 4,920,690
16 CE/0368A/2009 Installation of 11 KV Cables Econ DEWA 11 KV Cable Laying Works 8,246,727
17 R-709/2- Rehabilitation of Jabel Ali - Lihbab Road ,Phase - 2 Saif Bin Darwish RTAInfrastructure & Street Lighting
Works9,481,397
18 CE/421/07 Installation of 11 KV Cables Econ DEWA 11 KV Cable Laying Works 2,652,685
19 Labour Camp Accommodation at Al Quoze (P 004) Dubai Al Rajhi Contracting JIWIN Investments Electrical Works and Cabling Works 8,136,832
20 Ibis & Suit Hotels , Al Barsha, Dubai EconMajid Al Futtaim
Investments11 KV Cable Laying Works 959,614
Major projects Completed in the Year 2004-2011
SN PROJECT TITLE MAIN CONTRACTOR CLIENT NATURE OF WORKS VALUE (AED)
21 The Crescent plots at IMPZ Damac Damac Cable laying works 750,000
22 IMPZ/P-067B - 11KV Cable Network Tecom Investments Dubai Properties Cable laying works 1,200,000
23 Labour Camp At Umm Al Quwain Al Rajhi ConstrcutionAl Rajhi
ConstructionElectrical works 528,100
24 R6504 Camel Race at Lisailli Island Waves DEWA 11 KV Cable laying works 2,100,000
25 Arabian Ranches DevelopmentWade Adams
ContractingDEWA 11 KV Cable laying works 719,822
26 CE007/07 - 11 KV Cable laying ECON DEWA 11 KV Cable laying works 2,652,685
27 R709/1 - Rehabilitation of Jabel Ali Lihbab Road, Phase - 1 Bin Hafeez RTAInfrastructure and Street Lighting
Works705,000
28 R800/2 "Ras Al Khor Crossing Corridor" Phase 1 Dutco RTAMEP, Underpass, Street Lighting &
Bridge Lighting Works9,460,000
29 Jumierah Golf Estste Al Naboodah NakheelSite office Electrification & Street
Lighting Works1,550,000
30 The City Roads Khansaheb Civil Eng. TatweerInfrastructure & Street Lighting
Works3,244,851
Major projects Completed in the Year 2004-2011
SN PROJECT TITLE MAIN CONTRACTOR CLIENT NATURE OF WORKS VALUE (AED)
31a) JAP003 IBN Battuta Mallb) Contract JAP014-C-02 Jumeirah Lake Towers
Wade Adams Contracting
Nakheel Traffic Signal Works 596,448
32 Umm Al Quain Industrial Area Capital Coast TameerInfrastructure & Street Lighting
Works7,100,000
33 Sajaa - Khawaneej Capital CoastMinistry of Public
WorksInfrastructure & Street Lighting
Works4,900,000
34 Package No: 0511 - Mirdif Retail Development (29 Bldgs.)Khansaheb Civil
EngineeringAl Futtaim Real
EstateInfrastructure & Street Lighting Works & Traffic Signal System
2,219,369
35 Al Sufouh Roads BMTC DM Supply of Street Light fittings 2,100,000
36a) R924/2 - Beautification of Jumeirah Roadb) R924/1 - Beautification of Jumeirah Road
Emirates Roads Contracting
DM Street lighting & MEP works 505,000
37 Ring Road Development - Phase1 Infrastructure & Road Works Al Naboodah DMMEP, Substations & Street Lighting
Works1,789,000
38 Dubai Investment Park - Street Lighting WorksDubai Investment
ParkDubai Investment
ParkInfrastructure , Street Lighting &
Pumping Station Works1,743,340
39 R 703 - Footpaths in Al Wasl AreaAscon Road Construction
DMInfrastructure & Street Lighting
Works575,922
40 R 757/1A Palm Island (Jumeirah) Access Roads) Dutco DMInfrastructure & Street Lighting
Works460,957
Approvals from Authorities
1. RTA
2. DEWA
3. Dubai Properties Group/TECOM
4. FEWA
5. Ministry of public Works
6. Etisalat
7. Engineer’s Office
8. Nakheel
Health and Safety Policy
ECON Contracting LLC considers Health and safety to be the highest priority in day to day activities of the company. Providing
a standard of Training, Information, Instruction and Supervision in Health and Safety to enable its employees to carry out their
given duties safely is the main motive of ECON Contracting Company’s safety policy.
Safety including prevention of bodily injuries to one self as well as the others is the responsibility of each of our employees as
strictly instructed.
We confirm that we are in full compliance with Dubai Municipality and other governmental department’s regulations in regard to
the safety aspects.
Our safety policy is enforcing the following objectives to be strictly complied by all the employees.
1. Prevent any injury at work sites.
2. Always maintain a safe and healthy working atmosphere to avoid any injuries and always adopt safe working practice.
3. Increasing the awareness of the safety amongst the employees through the regular “ Tool Box Talks “.
4. Strictly ensure that the appointed sub contractors are fully aware of the safety policy and are in full compliance with the
company safety policy requirements.
5. Safety personnel are to monitor the safety performance of all the employees and sub contractors and to advice the
management accordingly to take the appropriate correction measures whenever necessary.
Management
Quality Assurance Policy
ECON Contracting LLC is committed to achieve the objective of getting the project completed on or ahead of programme within
the allocated budget and in accordance with the specification standards & to the satisfaction of the employer.
The above goal is achieved though the contribution of all the employees of company. ECON Contracting LLC is also committed to
improve the working environment & employees safety in adopting the following criteria:
1. Prevent any injury at work sites.
2. Always maintain a safe and healthy atmosphere to avoid any injuries and always adopt safe working practices.
3. Increasing the awareness of the safety among the employees through the regular “Tool Box Talks”.
4. Strictly ensure the appointed sub contractors are fully aware of the safety policy and are in full compliance with the
company safety policy requirements.
5. Safety personals are to monitor the safety performance of all the employees and sub contractors and to advice the
management accordingly to take the appropriate corrective measures whenever necessary.
6. Maintaining the quality of the work & the safety of the employees are the prime responsibilities of each individual
employee as per the company procedure.
The quality controller is to monitor the performance of the employees with regard to the quality and report to the management
periodically for further improvement.
-------------------------------------------
Management