17
DN DN UP DN DN UP 1 D613 1 D613 4 D616 4 D616 BACKWASH EQUALIZATION BASIN No. 1 BWT01 BACKWASH EQUALIZATION BASIN No. 2 BWT02 SEDIMENTATION SLUDGE EQUALIZATION TANK NO. 2 SED02 SEDIMENTATION SLUDGE EQUALIZATION TANK NO. 1 SED01 THICKENED SLUDGE TANK NO. 2 SLT02 THICKENED SLUDGE TANK NO. 1 SLT01 STAIRWELL#2 STAIRWELL#1 1 3 4 5  A B C 2 2 D614 2 D614 SEDIMENTATION SLUDGE THICKENER FEED PUMPS 3 D615 3 D615 BACKWASH THICKENER FEED PUMPS CENTRIFUGE FEED PUMPS NOTES 1. PIPE SUPPORTS ARE NOT S HOWN ON PROCESS DRAWINGS. PIPE SUPPORTS AND EXPANSION JOINTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH SPECIFICATION SECTION 11190. 2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPL ING ON EACH PIPE RUN. COUPLINGS TO BE LOCATED  ADJACENT TO PUMP S AND VALVE S AS REQU IRED TO FACILITATE DISSASSEMBLY. VICTAULIC COUPLING EXPANSION JOINT SPACING AS PER SPECIFICATION SECTION 11190. PROJECT CLIENT CONSULTANT KEY PLAN ISSUE/REVISION SHEET NUMBER SHEET TITLE PROJECTNUMBER ISSUED FOR TENDER    L   a   s    t    P    l   o    t    t   e    d   :    F    i    l   e   n   a   m   e   : Printed on ___% Post-Consumer RecycledConte ntPaper    P   r   o    j   e   c    t    M   a   n   a   g   e   m   e   n    t    I   n    i    t    i   a    l   s   :    D   e   s    i   g   n   e   r   :    C    h   e   c    k   e    d   :    A   p   p   r   o   v   e    d   :    I    S    O    A    1    5    9    4   m   m   x    8    4    1   m   m 2 3 4 5 1 2 3 4 5 D C B  A 1 ELGIN AREA WATER SUPPLY SYSTEM  AECOM 250 York Street, Suite 410 London, Ontario N6A 6K2 519. 676. 0510 t el 519 .673.5975 fax www.aecom.com 235 North Centre Road, Suite 200 London Ontario N5X 4E7 519. 930. 3505 t el 519 .474 .045 1 fax www.watersupply.london.ca 2013-10-09 0 PROCESS REGISTRATION    1    0    /    4    /    2    0    1    3    1    1   :    0    4   :    0    2    A    M    C   :    \    U   s   e   r   s    \    k   o    h    l   e   r   s    \    D   o   c   u   m   e   n    t   s    \    R   e   v    i    t    L   o   c   a    l    F    i    l   e   s    \    6    0    2    4    6    4    7    7   -    M    O    D   -    3    0   -    0    0    0    0   -    M   -    C    F _    k   o    h    l   e   r   s  .   r   v    t MANAGEMENT 43665 Dexter Line FACILITY RESIDUALS Central Elgin, Ontario N0L 2L0 ELGIN AREA WATER TREATMENT PLANT D601 60246477    C    h   e   c    k   e   r    D   e   s    i   g   n   e   r    A   p   p   r   o   v   e   r LOWER FLOOR - GENERAL LAYOUT D601 SCALE: 1 : 100 1 GENERAL A RRANGEMENT - LOWER LEVEL P LAN - EL. 204.55m LOWER LEVEL PART PLAN 1 SEE D604, D606 LOWER LEVEL PART PLAN 2 SEE D605, D607 N 0 mm 2500 5000 SCALE:1:100 LOWER LEVEL BACKWASH EQUALIZATION BASINS SEE D608 I/R DATE DESCRIPTION 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

T13 78Draw Process

Embed Size (px)

Citation preview

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 1/41

DN

DNUP

DN

DN

UP

1

D613

1

D613

4

D616

4

D616

BACKWASH EQUALIZATIONBASIN No. 1

BWT01

BACKWASH EQUALIZATIONBASIN No. 2

BWT02

SEDIMENTATIONSLUDGE

EQUALIZATIONTANK NO. 2

SED02

SEDIMENTATIONSLUDGE

EQUALIZATIONTANK NO. 1

SED01

THICKENEDSLUDGE

TANK NO. 2SLT02

THICKENEDSLUDGE

TANK NO. 1SLT01

STAIRWELL#2

STAIRWELL#1

1

3

4

5

 A B

C

2

2

D614

2

D614

SEDIMENTATION SLUDGETHICKENER FEED PUMPS

3

D615

3

D615

BACKWASH THICKENERFEED PUMPS

CENTRIFUGEFEED PUMPS

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   0   2   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D601

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

LOWER FLOOR - GENERALLAYOUT

D601 SCALE: 1 : 100

1 GENERAL ARRANGEMENT - LOWER LEVEL PLAN - EL. 204.55m

LOWER LEVEL PART PLAN 1

SEE D604, D606

LOWER LEVEL PART PLAN 2

SEE D605, D607

N

0

mm

2500 5000

SCALE:1:100

LOWER LEVEL BACKWASH EQUALIZATION BASINSSEE D608

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 2/41

UP

UP

UP

DN

DN

1

D613

1

D613

4

D616

4

D616

TRUCK BAYNO. 2

BACKWASH WASTETHICKENER NO.1

BACKWASH WASTETHICKENER NO.2 SEDIMENTATION SLUDGE

THICKENER NO.1SEDIMENTATION SLUDGE

THICKENER NO. 2

1

3

4

5

 A B C

TRUCK BAYNO. 1

2

D

2

D614

2

D614

4800

CLF01 CLF02 CLF03 CLF04

ELECTRICAL ROOM CONTROL ROOM

3

D615

3

D615

5

D621

5

D621

6

D622

6

D622

POLYMERROOM

BWT02_LE1

BWT01_LE1

BWT02_ZSL BWT01_ZSL 300-VT-SS1VENT C/W GOOSNECK &

INSECT SCREEN

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   0   8   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D602

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

MAIN FLOOR - GENERAL LAYOUT

D602 REF: D613 SCALE: 1 : 100

1 GENERAL ARRANGEMENT - MAIN FLOOR PLAN - EL. 213.25m

MAIN LEVEL PART PLAN 1

SEE D609

MAIN LEVEL PART PLAN 2

SEE D610

0

mm

2500 5000

SCALE:1:100

N

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 3/41

DN

DN

UP

UP

1

D613

1

D613

4

D616

4

D616

BACKWASH WASTETHICKENER NO.1

CLF01

BACKWASH WASTETHICKENER NO.2

CLF02

SEDIMENTATION SLUDGETHICKENER NO.1

CLF03

SEDIMENTATION SLUDGETHICKENER NO. 2

CLF04

1

3

4

5

 A B C

2

D

2

D614

2

D614

3

D615

3

D615

5

D621

5

D621

6

D622

6

D622

8000

6000 7900 106006000

   4   7   0   0

   3   0   0   0

   3   0   0   0

   3   0   0   0

   3   0   0   2

   1   6   9   8

240048003300

   C   E   N   T   R   I   F   U   G   E   C   O   N   T   R   O   L

   P   A   N   E   L   S

CENTRIFUGE No. 1CEN01

CENTRIFUGE No. 2CEN02

FUTURECENTRIFUGE No. 3CEN03

FUTURECENTRIFUGE No. 4CEN04

SCREW CONVEYORSCC01

SCREW CONVEYORSCC02

SCREW CONVEYORSCC03

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   1   1   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D603

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

UPPER FLOOR - GENERAL LAYOUT

D603 REF: D613 SCALE: 1 : 100

1 GENERAL ARRANGEMENT - UPPER FLOOR PLAN - EL. 219.25m

UPPER LEVEL PART PLAN 1SEE D611

UPPER LEVEL PART PLAN 2SEE D612

N

0

mm

2500 5000

SCALE:1:100

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 4/41

UP

3

4

5

 A B

SEDIMENTATIONSLUDGE

EQUALIZATIONTANK NO. 2

SED02

SEDIMENTATIONSLUDGE

EQUALIZATIONTANK NO. 1

SED01

THICKENEDSLUDGE

TANK NO. 2SLT02

STAIRWELL#1

SEDIMENTATION SLUDGETHICKENER FEED PUMPS

RSP01RSP02

BACKWASH WASTE THICKENERFEED PUMPS

100x32mm SSMIXING NOZZLES(TYPICALOF4)

100x32mm SSMIXINGNOZZLE(TYPICALOF4)

600x600SLUICEGATE

80x25mmSSMIXING NOZZLES(TYPICALOF4)

RSP03

SEDIMENTATION SLUDGEMIXING/RECIRCULATION PUMP

BACKWASH WASTEMIXINGPUMP

SED00-MX1

BWT00-MX1

300SEDSLUDGESUCTION BELL

300SEDSLUDGESUCTION BELL

400-CS-SS1C/L 205.05mBACKWASH WASTEPUMPS SUCTION

400mmSUCTIONBELL

200BLINDFLANGEFOR FUTURE PUMP

1

D617

1

D617

   1   0   5

   0

2250 1500 1500

   2   2   0   0

1000 1000

1500 1500

1500 1500

   R   S   P   0   3_

   P   S   H

   R   S   P   0   2_

   P   S   H

   R   S   P   0   1_

   P   S   H

SED00_PSH

SED00_TT1

BWT01_AE1BWT02_AE1

BWT00_PSHBWP01_PSH

BWT00_TT1

150mm MAGMETERFORINCOMING UTILITY WATER

BWP02_PSHBWP03_PSH

 PI PI PI

UWH01_FE1

BWP02

2

D617

2

D617

2

D618

2

D618

3

D618

3

D618

1

D618

1

D618

1350

300-CS-SS2

200x150 ECC RED. 300X200 ECC RED.

200BLINDFLANGETYP.

1150 1150

BWP03 BWP01

1500 1500

BLIND FLANGE    2   4   0   0

   1   1   5   0

1500

BACKWASH EQUALIZATIONBASIN NO. 2

BWT02

BACKWASH EQUALIZATIONBASIN NO. 1

BWT01

400- BWW- SS1C/L205.05m

200x150ECC RED.

C/L205.05m

100RISERFROMMIXING SYSTEMHEADER

BWT02_AT1

BWT02_LT1

BWT01_AT1

BWT01_LT1

LCP23

OUTLINEOF ACCESS HATCH ABOVE (TYP)

   L   C   P   2   6

   L   C   P   2   5

   L   C   P   2   4

LCP27

LCP22 LCP21 LCP20

   P   I

   P   I

   P   I

100RISERFROMMIXING SYSTEMHEADER

80 RISER FROMMIXING SYSTEMHEADER

150-UW-SS1INCOMING POTABLE WATER

PROCESS UTILITY AND POTABLE WATERFOR CONTINUATION SEE D650& MECHANICAL DRAWINGS

UWH01_FT1

-

D652

NOZZLE ORIENTATIONS TO BE SITE ADUSTED UNDER ENGINEERSINSTRUCTIONTYPICAL

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g

  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   1   5   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D604

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

LOWER FLOOR - PART PLAN 1EQUIP. & PIPING @ FLOOR LEVEL

D604 SCALE: 1 : 50

1 PART PLAN - LOWER LEVEL - EL. 204.55m

   F   O   R

   C   O   N   T   I   N   U   A   T   I   O   N

   S   E   E   D   6   0   5

FOR CONTINUATION SEE D608

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 5/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 6/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 7/41

DNUP

3

4

5

C

1

D617

1

D617

THICKENEDSLUDGE

TANK NO. 2SLT02

THICKENEDSLUDGE

TANK NO. 1SLT01

STAIRWELL#2

OUTLINE OF ACCESSHATCH ABOVE

500x500SLUICEGATE

THICKENED SLUDGETANK MIX PUMPSLT00_MX1

SFP03 SFP02 SFP01

2

D617

2

D617

4

D618

4

D618

300- BWW- SS1

250-CEN-SS1

150- SLU- SS2

150- SLU- SS2

200-CS-SS2

200- SLU- SS2 250- SLU- SS2

   1   5   0  -   S   L   U  -   S   S   1

150- SLU- SS2

C/L210.55m

C/L210.05m

C/L207.55m

C/L210.80m

C/L209.55m

C/L209.55m

150mm THICKENEDSLUDGE TANKOVERFLOW

200mm SEDIMENTATION SLUDGEUP TO CLARIFIER CLF03

C/L207.55m

150-SLU-SS

250mm CENTRATETO BACKWASH INLET CHAMBER

150mm THICKEND SLUDGE OVERFLOWTO BACKWASH INLET CHAMBER

   C   /   L   2   1   0 .   5   5  m

200mm SEDIMENTATION SLUDGEUP TO CLARIFIER CLF04

C/L208.05m

250250

   9   5   0

   4   5   0

   8   5   0

   1   2   0   0

   2   2   0   0   2

   7   0   0

   5   0   0 150- SLU- SS1

200- SLU- SS2

150- SLU- SS2

150- SLU- SS2

C/L207.55m

200x100 TEE

200x150RED

150x100 TEE

150x100RED

200x100RED

32x100MIXINGNOZZLESTYP.OF 4

75- SLU- SS1

100- SLU- SS2

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g

  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   2   2   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D607

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

LOWER FLOOR - PART PLAN 2aEQUIP. & PIPING ABOVE PUMPS0

mm

1250 2500

SCALE:1:50

D607 SCALE: 1 : 50

1 PART PLAN - LOWER LEVEL PIPING ABOVE EL. 205.55m

   F   O   R

   C   O   N   T   I   N   U   A   T   I   O   N

   S   E   E   D   6   0   6

FOR CONTINUATION SEE D608

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 8/41

DN

1

3

 A BC

2

BACKWASH EQUALIZATIONBASIN No. 2

BWT02

RSP01RSP02

900mm BWW DRAIN FROMFILTERS (SEE CIVIL FORCONTINUATION)

BACKWASHINLET CHAMBER

100x40mmMIXINGNOZZLE

100x40mmMIXINGNOZZLESTYPICALOF4

1000x1000SLUICE GATE

1000x1000SLUICE GATE

OVERFLOW CHANNEL

900mmOVERFLOW TOPLANTDRAIN(SEE CIVIL FOR CONTINUATION)

INV.206.20m

100x40mmMIXING NOZZLESTYPICALOF4

STS DOSING POINT

RSP03

300x200REDUC

300

   5   5   0

   2   6   0   0

BACKWASH EQUALIZATIONBASIN No. 1

BWT01

554

   1   5   0  -   B   W   W  -   S   S   2

200- BWW- SS2 C/L208.05m

   1   5   0  -   B   W   W  -   S   S   2

   3   5   0  -   C   T   S  -   S   S   1

   2   0   0  -   C   S  -   S   S   1

   C   /   L   2   1   1 .   0   5  m

   C   /   L   2   1   0 .   8   5  m

   C   /   L   2   0   8 .   0   5  m

   1   5   0  -   S   L   U  -   S   S   1

   2   5   0  -   C   E   N  -   S   S   1

   C   /   L   2   1   0 .   5   5  m

   C   /   L   2   1   0 .   8   0  m

   1   5   0  -   B   W   W  -   S   S   2

   C   /   L   2   0   8 .   0   5  m

200- BWW- SS2

   1   5   0  -   B   W   W  -   S   S   2

C/L208.05m

300

2500

3250 3250

2750

300

300

   5   5   0

300x200REDUC200x100 TEE200x150RED

150x100RED.

900-SS1-BWWOVERFLOWINV.208.980

STS DOSING POINT

STS DOSING POINTDOSING LOCATION TO BE 500mm IN FRONTOF NOZZLE DISCHARGE. DETAIL LOCATIONTO BE SET ON SITE.

200x150RED

150x100RED

300-VT-SS1VENP PIPE C/WGOOSENECK ANDINSECT SCREEN

300-VT-SS1VENP PIPE C/WGOOSENECK ANDINSECT SCREEN

STS DOSING POINT

10- STS- CPVC

10- STS- CPVC

10- STS- CPVC

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g

  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   2   5   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D608

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

PLAN - BACKWASH EQUALIZATIONBASINS

D608 SCALE: 1 : 75

1 PART PLAN - LOWER LEVEL - BACKWASH EQUALIZATION BASINS

0

mm

1250 2500

SCALE:1:50

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 9/41

UP DN

3

4

5

 A B

2

1

D619

1

D619

2

D619

2

D619

3

D619

3

D619

ELECTRICAL ROOM

607

STORAGE ROOM

606

CONTROL ROOM ANDLAB

608

DECHLORINATIONROOM

615

1

D623

1

D623

2

D623

2

D623

BACKWASH WASTETHICKENER #1

CLF01

BACKWASH WASTETHICKENER #2

CLF02

SEDIMENTATION SLUDGETHICKENER #1

CLF03

SODIUM THIOSULPHATEDOSING PUMP SKID

THICKENERS POLYMERMAKEUP & STORAGE SKIDPPP12

FUTUREPOLYMER BATCH

TANK

POLYMER FEE PUMP SKID

CENTRIFUGES

POLYMER FEED PUMP SKID

BACKWASH WASTE

THICKENERS

POLYMER FEED PUMP SKID

SEDIMENTATION SLUDGE

THICKENERS

POLYMERBATCH TANK #1

PDT22

POLYMERBATCH TANK #2

PDT23

LIQUIDPOLYMERTOTE

PDT21

LIQUIDPOLYMERTOTE

PDT11

DRYPOLYMER

BULK BAGSSTORAGE

 AREA

FUTURE

DEWATERING POLYMERMAKE-UP SYSTEMPPP22

SAMPLESINK

LIQUID POLYMERTRANSFER PUMPSPPP11, PPP21

PPP11_PSH PPP21_PSH

   P   O   P   1   5

   P   O   P   1   4

   P   O   P   1   6

   P   O   P   1   1

   P   O   P   1   2

   P   O   P   1   3

   P   O   P   2   1

   P   O   P   2   2

   P   O   P   2   3

GAS FIRED TANKLESS WATERHEATERS FOR POLYMER MAKEDOWNWATER TEMPERING

CLF01_FE1

CLF01_IC1

CLF01_AE1

CLF02_FE1

CLF02_IC1

CLF02_AE1

CLF03_FE1

CLF03_IC1

CLF03_AE1

CLF01_LSH CLF02_LSH CLF03_LSH

SAMPLESINK

SAMPLESINK

CLF01_FE2 CLF01_OC1

CLF02_FE2

CLF02_OC1

CLF03_FE2

CLF03_OC1 CLF04_OC1

CLF04_FE2

CLF01_AE2 CLF02_AE2

CLF03_AE2 CLF04_AE2

SED02_LE1

UTILITY WATERBOOSTER PUMPBSP01

TST01_WT1

PDT21_WT1PDT11_WT1

TSP02

TSP01

TSP03

CLF01_AE3

CLF02_AE3

CLF03_AE3

CLF04_AE3

THICKENER INSTRUMENTTRANSMITTER PANEL

THICKENER INSTRUMENTTRANSMITTER PANEL

THICKENER INSTRUMENTTRANSMITTER PANEL

SEDIMENTATION SLUDGETHICKENER #2

CLF04

FUTURE

POLYMER BATCHTANK

100mmMUDVALVESUMP DRAIN TO BWW TANK

100mmMUDVALVESUMP DRAIN TO BWW TANK

15-POL- PVC80

25-POL- PVC80

LEVELTRANSDUCER

   3   0   0  -   B   T   S  -   S   S   1

   C   /   L   2   1   7 .   2   5  m

SED01_LE1

LEVELTRANSDUCER

SLT02_LE1

LEVELTRANSDUCER SLT01_LE1

LEVELTRANSDUCER

100- BCS- SS2

300- BTS- SS1

300- CTS- SS1

200- CTS- SS1

   3   0   0  -   C   T   S  -   S   S   1

C/L218.25m

   C   /   L   2   1   7 .   2   5  m

C/L213.64m

C/L218.25m

INTERCONNECTION PIPE FORTESTING/COMMISSIONING(BACKWASH WASTE THICKENERSUPERNATENT TO BWW EQ. BASIN)

2LINES15-POL-PVC802LINES

20-POL- PVC8020-POL- PVC802LINES2LINES

500

500

POLYMER STORAGE AND MAKEUP ROOM

605

200- CCS- SS2

65-POL-PVC80

PWH01

PWH02

PWH03

SCP27

POP10_LSH

POP11_LSH

LCP33 LCP32 LCP34

POP20_LSH

SCP28

LCP41

LCP40

SCP23

CLF01_AT1

CLF01_FT2

CLF01_AT2

CLF01_FT1

CLF01_AT3

CLF02_AT1

CLF02_FT2

CLF02_AT2

CLF02_FT1

CLF02_AT3

CLF03_AT1

CLF03_FT2

CLF03_AT2

CLF03_FT1

CLF03_AT3

CLF04_AT1

CLF04_FT2

CLF04_AT2

CLF04_FT1

CLF04_AT3

THICKENER INSTRUMENT

TRANSMITTER PANEL

SCP24

SCP25 SCP26

200- CCS- SS1 C/L213.64m

SED01_LT1

SED02_LT1 SLT01_LT1

SLT02_LT1

NC

BWT02_LE1

BACKWASHEQUALIZATION BASINLEVEL TRANSDUCER

BWT01_LE1

IN-FLOOR VALVE BOXOPERATORFORSLUICE GATE

IN-FLOOR VALVE BOX &OPERATOR FOR SLUICE GATE

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   3   5   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D609

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

MAIN FLOOR - PART PLAN 1

D609 REF: D613 SCALE: 1 : 50

1 PART PLAN - MAIN FLOOR 0

mm

1250 2500

SCALE:1:50

   F   O   R

   C   O   N   T   I   N   U   A   T   I   O   N

   S   E   E   D   6   0   7

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 10/41

UP

UP

DN

33

44

55

C

22

D5

D621

5

D621

6

D622

6

D622

2

D620

2

D620

1

D620

1

D620

TRUCK BAY

NO. 1

TRUCK BAY

NO. 2

N

   L   O   A   D   O   U   T   C   O   N   V   E   Y   O   R

   S   C   C   0   4

   L   O   A   D   O   U   T   C   O   N   V   E   Y   O   R

   S   C   C   0   5

250-CEN-SS1

150- SLU- SS2

150- SLU- SS2

C/L218.35m

C/L218.35m

C/L217.85m

150mm SLUDGE FEEDUP TO CENTRIFUGE #1

150mm SLUDGE FEEDUP TO CENTRIFUGE #2

STAIR WELL No.2

603

TELESCOPIC CHUTEFROMCONVEYOR ABOVE

TELESCOPIC CHUTEFROMCONVEYOR ABOVE

   3   0   0   0

3200 4800 2300

FLOORHATCH

SAMPLESINK

SCC05 SCC04

HOIST WINCHCRN02

HOIST WINCHCRN01

SCC05_MS1 SCC04_MS1

CEN02_FE1

CEN01_FE1

4

D620

65-POL- PVC80

65-POL- PVC80

150- SLU- SS2

C/L218.50m

C/L218.35m

65mm POLYMER FEEDUP TO CENTRIFUGE #2

150mm POLYMER FEEDUP TO CENTRIFUGE #1

6mm UTILITY WATER FEEDUP TO CENTRIFUGE #1(SEEDWG D652)

65mm UTILITY WATER FEEDUP TO CENTRIFUGE #2(SEEDWG D652)

SCP29

HATCH OPENING ABOVE

2LINES

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   3   9   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D610

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

MAIN FLOOR - PART PLAN 2

D610 REF: D613 SCALE: 1 : 50

1 PART PLAN 2 - MAIN FLOOR 0

mm

1250 2500

SCALE:1:50

   F   O   R   C

   O   N   T   I   N   U   A   T   I   O   N

   S   E   E   D   6   0   6

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 11/41

DNUP

3

4

5

 A B

2

2

D614

2

D614

BACKWASH WASTETHICKENER NO.1

CLF01

BACKWASH WASTETHICKENER No.2

CLF02

SEDIMENTATION SLUDGETHICKENER No.1

CLF03

SEDIMENTATION SLUDGETHICKENER No. 2

CLF04

1

D619

1

D619

2

D619

2

D619

3

D619

3

D619

8000 6000 7900 6000

THICKENER ROOM

616

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   4   4   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D611

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

SECOND FLOOR - PART PLAN 1

D611 REF: D613 SCALE: 1 : 50

1 PART PLAN - UPPER LEVEL EL. 219.25 0

mm

1250 2500

SCALE:1:50

   F   O   R

   C   O   N   T   I   N   U   A   T   I   O   N

   S   E   E   D   6   0   9

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 12/41

DN

UP

33

44

55

C

22

D

   3   0   0   0

CENTRIFUGE NO. 1

CEN01

CENTRIFUGE NO. 2CEN02

   4   7   0   0

   3   0   0   0

   3   0   0   0

CENTRIFUGE NO. 3FUTURE

CENTRIFUGE NO. 4FUTURE

CROSS CONVEYORSCC03

SCREW CONVEYORSCC01

SCREW CONVEYORSCC02

5

D621

5

D621

6

D622

6

D622

4800

2

D620

2

D620

1

D620

1

D620

CENTRIFUGE CONTROLPANELS

CONVEYORSCONTROL PANEL

PROCESS INSTRUMENTATIONTRANSMITTERSWALL PANEL MOUNTED

CENTRIFUGE CONTROLPANELS (FUTURE)

CEN01_AE1

CEN02_AE1

   3   0   0   0

   2   5   0  -   C   E   N  -   S   S   1

   C   /   L   2   1   9 .   6   5  m

150-SLU-SS2SLUDGE FEED

65-POL-PVCPOLYMER FEED

65-POL-PCVPOLYMER FEED

150-SLU-SS2SLUDGE FEED

65-UW-PVCSERVICE WATER

65-UW-PVCSERVICE WATER

SCP22 SCP21

CEN01_AT1

CEN01_FT1

CEN02_AT1

CEN02_FT1

LCP35

LCP36

LCP37

LCP38

LCP39

REMOVALBE FLOOR PANELS(SEE STRUCTURAL)

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   4   8   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D612

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

SECOND FLOOR - PART PLAN 2

D612 REF: D613 SCALE: 1 : 50

1 PART PLAN - UPPER LEVEL EL. 219.25 0

mm

1250 2500

SCALE:1:50

CROSS CONVEYORSCC03

   F   O   R   C   O   N   T   I   N   U   A   T   I   O   N   S   E   E   D   6   0   8

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 13/41

MAIN FLOOR213.25m

MAIN FLOOR213.25m

UPPER FLOOR219.25m

UPPER FLOOR219.25m

ROOF225.20m

ROOF225.20m

PUMP ROOM FLOOR204.55m

PUMP ROOM FLOOR204.55m

T.W.L. SLUDGE TANK211.25m

 A B C D

BACKWASHWASTETHICKENERNo.1

CLF01

BACKWASHWASTETHICKENERNo.2

CLF02

SEDIMENTATION SLUDGEEQUALIZATION BASIN TANK

No.2SED02

SEDIMENTATION SLUDGETHICKENER No. 1

CLF03

SEDIMENTATION SLUDGETHICKENER No. 1

CLF04

THICKENER SAMPLINGSINK

TANK MIXINGSYSTEM PIPING

TANK MIXINGSYSTEM PIPING

TANK MIXINGSYSTEM PIPING

THICKENER SAMPLINGSINK

THICKENER SAMPLINGSINK

THICKENER SAMPLINGSINK

DECHLORINATIONROOM

615

THICKENER ROOM

616

CENTRIFUGE ROOM

617

SEDIMENTATION SLUDGEEQUALIZATION BASIN TANK

No.1SED01

250mm SED SLUDGE FEEDFROM SEDIMENTATION BASINS

TRUCK BAYNo.1

TRUCK BAYNo.2

THICKENED SLUDGEHOLDING TANK No. 2

SLT02

THICKENED SLUDGE HOLDINGTANK No. 1

SLT01

CLF04_FT2CLF03_FT2

300- BTS- SS1C/L217.25m

300- CTS- SS1C/L217.25m

MIXING NOZZLES TO BELOCATED500mm ABOVE TANK FLOOR

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   4  :   5   6   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D613

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

GENERAL SECTIONS0

mm

2500 5000

SCALE:1:100

D613 REF: D601 SCALE: 1 : 100

1 GENERAL SECTION

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 14/41

MAIN FLOOR213.25m

MAIN FLOOR213.25m

UPPER FLOOR219.25m

UPPER FLOOR219.25m

ROOF225.20m

ROOF225.20m

PUMP ROOM FLOOR204.55m

PUMP ROOM FLOOR204.55m

 ABCD

BACKWASHWASTETHICKENERNo. 2

CLF02

BACKWASHWASTETHICKENERNo.1

CLF01

C EN TR IF UG E F EE D P UM PS B AC KW AS H W AS TETHICKENER FEED PUMPS

SEDIMENTATION SLUDGETHICKENER FEED PUMPS

SEDIMENTATION SLUDGETHICKENER No. 1

CLF04

SEDIMENTATION SLUDGETHICKENER No. 1

CLF03

350 DISCHARGETO PLANT DRAIN

CENTRIFUGES

TRUCK BAYNo.1

TRUCK BAYNo.2

THICKENED SLUDGE TANKMIXINGPUMP

SEDIMENTATION SLUDGETANK MIXING PUMP

BACKWASH WASTE EQUALIZATIONTANK MIXING PUMP

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   5  :   1   0   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D614

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

GENERAL SECTIONS0

mm

2500 5000

SCALE:1:100

D614 REF: D601 SCALE: 1 : 100

2 GENERAL SECTION

I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 15/41

MAIN FLOOR213.25m

MAIN FLOOR213.25m

UPPER FLOOR219.25m

UPPER FLOOR219.25m

ROOF225.20m

ROOF225.20m

1

D613

1

D613

PUMP ROOM FLOOR204.55m

PUMP ROOM FLOOR204.55m

T.W.L.BWW209.98m

T.W.L. SLUDGE TANK211.25m

1345 2

2

D614

2

D614

SEDIMENTATION SLUDGEEQUALIZATION TANK

No.1

BACKWASH EQUALIZATOINBASIN No. 2

BWW OVERFLOW LIP210.08m

THICKENER ROOM

616

SAMPLE SINK

BACKWASH INLET CHAMBERSLUICE GATE OPERATOR

PUMP

GALLERY

BWWOVERFLOWTROUGH

SEDIMENTATION SLUDGETHICKENER No. 1

CLF04

CLEARANCE FORLAMELLA REMOVAL

TANK MIXING SYSTEMPIPING & NOZZLES

TANK MIXING SYSTEM PIPING AND NOZZLES

900 BACKWASH WASTE DRAINFROM FILTERS(SEE CIVIL DRAWINGS FOR CONTINUATON)

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   5  :   1   8   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F

_   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D615

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

GENERAL SECTIONS

D615 REF: D601 SCALE: 1 : 75

3 D- SECTION 3 I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

123

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 16/41

MAIN FLOOR213.25m

MAIN FLOOR213.25m

UPPER FLOOR219.25m

UPPER FLOOR219.25m

ROOF225.20m

ROOF225.20m

PUMP ROOM FLOOR204.55m

PUMP ROOM FLOOR204.55m

T.W.L.BWW209.98m

T.W.L. SLUDGE TANK211.25m

1

3 4 5

2

THICKENED SLUDGETANK No. 1

BACKWASH EQUALIZATIONBASIN No 1

THICKENER ROOM

616

PUMP GALLERYBWW OVERFLOW CHANNEL

900mmBWWOVERFLOWTO PLANT DRAIN

BWW INLET CHAMBERGATE OPERATOR

CLEARANCE FOR LAMELLA REMOVAL

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   5  :   2   7   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D616

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

GENERAL SECTIONS

D616 REF: D601 SCALE: 1 : 75

4 GENERAL SECTION I/R DATE DESCRIPTION

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 17/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 18/41

12345

60246477-Elgin RMF D600s 2013-10-04 Rev0 ForTENDER pdf

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 19/41

345

C/L213.64m

C/L217.25m

C/L218.25m

CLF01_FE2

CLF01_FE1

CLF01_AE1

19 SAMPLE PORT C/W VALVE

200- BWW- SS1

15-POL- PVC80

15-POL- PVC80

100- BCS- SS2

200x100RED

SAMPLE SINK

15 SS SAMPLE LINES

300- BTS- SS1

BACKWASHWASTETHICKENERNo.1

CLF01

HOSE STATION AND RACK

CLF01_OC1

CLF01_IC1

15-UW- PVC80

MAIN FLOOR213.25m

UPPER FLOOR219.25m

345

100- BCS- SS2

SAMPLE SINK

15 SS SAMPLE LINES

300- CTS- SS1

C/L217.25m

C/L218.25m

300x200RED

SLUDGE FROM BWWTHICKENER TO SLUDGEHOLDING TANK

SLUDGE FROM SED.SLUDGE THICKENER TOSLUDGE HOLDING TANK

CLF03_FE1

CLF03_AE1

SAMPLE PORT C/W VALVEC/L213.64m

20-POL- PVC80

20-CS- PVC80

250x200RED

200- CCS- SS2

CLEARANCE FORLAMELLA REMOVAL

SEDIMENTATION SLUDGETHICKENER No. 1

CLF03

CLF03_IC1

CLF03_FE2HOSE STATION AND RACK

200-CS- SS2

MAIN FLOOR213.25m

UPPER FLOOR219.25m

 A B1

D619

1

D619

2

D619

2

D619

BACKWASHWASTETHICKENERNo.1

CLF01

BACKWASHWASTETHICKENERNo.2

CLF02

SEDIMENTATION SLUDGETHICKENER No. 1

CLF03

SEDIMENTATION SLUDGETHICKENER No. 1

CLF04

300- BTS- SS1 300- CTS- SS1

   3   0   0  -   C   T   S  -   S   S   1

100- BCS- SS2

300- BTS- SS1 C/L218.25m

C/L217.25m

300x200RED

200- CTS- SS1

200x300RED

25 DRAIN PORT & VALVE

CLF03_AE2CLF01_AE2

C/L218.25m

200- CTS- SS1

300x200RED

N/C

BACKWASH WASTE CLARIFIERSUPERNATENT TO PLANT DRAIN

250- CS- SS C/L 211.65 m

DECHLORINATIONROOM

615

THICKENER ROOM

616

C/L213.64m

300TEE

300TEE

25 DRAIN PORT AND VALVE

SAMPLE SINK

15mm SS SAMPLELINES

200- CCS- SS2C/L213.64m

CLF04_FE2CLF03_FE2CLF02_FE2CLF01_FE1SAMPLE SINK SAMPLE SINK

SAMPLE SINK

CLF2_AE2CLF01_AE2

15mmUW TOSAMPLESTATION FLUSHING

15mmUW TOSAMPLESTATION FLUSHING

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIP E SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s

   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 fax

www.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   1   3   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D619

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

DETAIL SECTIONS - THICKENERS

D619 REF: D609 SCALE: 1 : 50

1 SECTION - BACKWASH WASTE THICKENERD619 REF: D609 SCALE: 1 : 50

2 SECTION - SEDIMENTATION SLUDGE THICKENERS

D619 REF: D609 SCALE: 1 : 50

3 SECTION - THICKENERS SOUTH ELEV.

I/R DATE DESCRIPTION

CLEARANCE FORLAMELLA REMOVAL

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

12345

60246477-Elgin RMF D600s 2013-10-04 Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 20/41

C D

CENTRIFUGE #2

CEN02SCREW CONVEYORSCC02

TRUCK BAYNo.1

TRUCK BAYNo.2

CENTRIFUGE ROOM

617

   3   5   0   0

   4   2   5   0

4

D620

150- SLU- SS2

OPENBOTTOMLOADOUTSCREW CONVEYORS(RAISED POSITION)

CONVEYOR IN LOWERED POSITION

CONVEYOR HOIST

250- CEN- SS1 C/L 219.65 m

65-POL-PVC80

CEN02_FE1

250-CEN-SS1C/L217.85m

65-POL- PVC80

65-POL- PVC80

   1   4   5   0

MAIN FLOOR213.25m

UPPER FLOOR219.25m

C D

CENTRIFUGE#1

CEN01

SCREW CONVEYORSCC02

CROSS CONVEYOR

SCC03

OPENBOTTOMLOADOUTSCREW CONVEYORSCC04

OPENBOTTOMLOADOUTSCREW CONVEYORSCC05

150- SLU- SS2

TRUCK BAYNo.2

TRUCK BAYNo.1

CENTRIFUGE ROOM

617

150mm SLUDGE FEED

TELESCOPIC CHUTE

   1   4   5   0

   I   N   R   A   I   S   E   D   P   O   S   I   T   I   O   N

   4   2   5   0

3

D620

65-POL-PVC80C/L218.35m

C/L218.50m

MAIN FLOOR213.25m

UPPER FLOOR219.25m

3

FUTURE CENTRIFUGESLUDGE FEED

150- SLU- SS2150- SLU- SS2

250-CEN-SS1

450

850

   1   5   0   0

   9   0   0

   1   4   0   0

CEN02_FE1

CEN01_FE1

65-POL-PVC80

POLYMER FEED TOCENTRIFUGES(2 LINES)

350

UPPER FLOOR219.25m

CENTRIFUGE No.1

250-CEN-SS1

CROSS CONVEYOR SCC03

150mm CENTRIFUGE SLUDGE FEED

65mm CENTIFUGE POLYMER FEED

65mm UTILITY WATER FEED

CENTRATE DISCHARGEFLEXIBLE CONNECTION

SOLIDS DISCHARGEFLEXIBLE CONNECTION

SOLIDS DISCHARGEDIVERTOR GATE

CONVEYORSCC02

CONVEYORSCC01

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s

   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

12345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   2   7   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D620

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

SECTIONS - CENTRIFUGES

D620 REF: D610 SCALE: 1 : 50

2 SECTION - CENTRIFUGE #2D620 REF: D610 SCALE: 1 : 50

1 SECTION - CENTRIFUGE #1

D620 REF: D610 SCALE: 1 : 50

4 SECTIOND620 REF: D620 SCALE: 1 : 25

3 CENTRIFUGE #1 DETAIL

D620

I/R DATE DESCRIPTION

g _ _ _ p

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 21/41

MAIN FLOOR213.25m

UPPER FLOOR219.25m

ROOF225.20m

345 2

300047006000

FUTURE CONVEYOR EXTENSION

CONVEYORSCC-02

OPENBOTTOMLOADOUTCONVEYORSCC-05

TELESCOPIC CHUTEMINIMUM 750mm TRAVEL

CROSS CONVEYORSCC-03

   C   O   N   V   E   Y   O   R   I   N   R   A   I   S   E   D   P   O   S   I   T   I   O   N

   4   2   5   0

   M   I   N .

   7   5   0

CONVEYORINLOWEREDPOSITIO

N

   3   5   0   0

11000

CENTRIFUGECEN01

CENTRIFUGECEN02

FUTURE CENTRIFUGECEN03

FUTURE CENTRIFUGECEN04

2

D620

2

D620

1

D620

1

D620

CONVEYOR HOIST WINCH

CONVEYOR TELESCOPICGUIDES

   1   1   2   5

   4   0   0   0

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s

   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   3   4   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D621

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

SECTIONS - CENTRIFUGES

D621 REF: D602 SCALE: 1 : 50

5 SECTION - CENTRIFUGES AND TRUCK LOADING I/R DATE DESCRIPTION

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 22/41

MAIN FLOOR213.25m

UPPER FLOOR219.25m

ROOF225.20m

345 2

CROSS CONVEYORSCC-03

17003000

TELESCOPIC CHUTE750mm TRAVEL

LOADOUTCO NVEYORSCC-04OPENBOTTOM

WINCH / HOISTINGMECHANISM

CONVEYORSCC-01

CENTRIFUGECEN01

CENTRIFUGECEN02

FUTURE CENTRIFUGECEN03

FUTURE CENTRIFUGECEN04

2

D620

2

D620

1

D620

1

D620

   7   5   0

CONVEYORINLOWEREDP

OSITIO

N

   3   5   0   0

   C   O   N   V   E   Y   O   R   I   N   R   A   I   S   E   D   P   O   S   I   T   I   O   N

   4   2   5   0

C/L219.65m

TELESCOPING GUIDES

250 CENTRATETO BWW BASIN

65mmUTILITYWATER

30003000

150mm SLUDGE FEED

65mm POLYMER FEED

   1   1   2   5

   5   0   0

OPENBOTTOMLOADOUTCONVEYOR11000

300

NOTES

1. PIPE SUPPORTS ARE NOT SHOWN ONPROCESS DRAWINGS. PIPE SUPPORTS ANDEXPANSION JOINTS SHALL BE DESIGNED ANDCONSTRUCTED IN ACCORDANCE WITHSPECIFICATION SECTION 11190.

2. PROVIDE MINIMUM ONE (1) VICTAULIC COUPLINGON EACH PIPE RUN. COUPLINGS TO BE LOCATED ADJACENT TO PUMPS AND VALVES AS REQUIREDTO FACILITATE DISSASSEMBLY. VICTAULICCOUPLING EXPANSION JOINT SPACING AS PERSPECIFICATION SECTION 11190.

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s

   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   4   1   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D622

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

SECTIONS - CENTRIFUGES

D622 REF: D602 SCALE: 1 : 50

6 SECTION I/R DATE DESCRIPTION

12345

60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 23/41

MAIN FLOOR213.25m

UPPER FLOOR219.25m

 A

GAS FIRED TANKLESS WATER HEATERS THICKENERS POLYMERMAKUP & STORAGE SKID

PPP12

POLYMER PUMP SKIDSEDIMENTATION SLUDGE

THICKENERS

POLYMER PUMP SKIDBACKWASH WASTE THICKENERS

POLYMER PUMP SKIDDEWATERING CENTRIFUGES

20-POL-PVC80

65-POL- PVC80

4LINES

2LINES

25-POL-PVC80

POLYMER LINE FROMMAKEUP SKID TO PUMPSKIDS

FUTURE

65-PVC80FROM BATCH TANKSTO CENTIFUGE PUMPSKID

100mmMUDVALVEINSTALLINSUMP PIT,DISCHAGETOBWW EQ TANK C/W DUCKBILL VALVE

POLYMERROOM

50-UW- PVC80

32-POL-PVC80FROMLIQUIDPOLYMERTOTE

50- UW- SS1TEMPERED WATER TO DEWATERINGPOLYMER MAKE-UP SYSTEM

40- UW- SS1TEMPERED WATER TO THICKENINGPOLYMER MAKE-UP SYSTEM

LCP32LCP33 LCP34SCP27

MAIN FLOOR213.25m

UPPER FLOOR219.25m

 A

20-POL- PVC80

POLYMER TO CENTRIFUGESNo.1&2

POLYMER TO SED. SLUDGECLARIFIERSNo.1 &2

POLYMER TO BWWCLARIFIERSNo.1 &215-POL- PVC80

POLYMER BATCHTANKS

DEWATERINGPOLYMERMAKE-UPSYSTEM

DRY POLYMERSTORAGE

LIQUID POLYMER TRANSFER PUMP

LIQUID POLYMER TOTES

POLYMER TOTE SCALES

LIQUIDPOLYMERTRANSFERLINETOTHICKENING POLYER PREPARATIONSYSTEM

LIQUID POLYER TRANSFER LINETO DEWATERING POLYMERPREPARATION SYSTEM

50-POL-PVC80

100mmMUDVALVEINSTALLINSUMP PIT,DISCHAGETOBWW EQ TANK C/W DUCKBILL VALVE

32-UW- PVC80

25-POL- PVC80

32-POL- PVC80

80- UW- SS1

50- UW- SS1TEMPERED WATER TOPOLYMER MAKE-UP SYSTEM

FROM BOOSTER PUMP SKIDTO TEMEPERING WATER HEATERS

PPP21

PDT21 PDT11 PPP11

PDT21_WT1 PDT11_WT1

65-POL- PVC80

50- UW- SS1

UTILITY WATER TO POLYMERPUMP SKIDS

SCP28

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   5   0   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D623

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

CHEMICAL ROOM

D623 REF: D609 SCALE: 1 : 50

1 SECTION - POLYMER ROOM

D623 REF: D609 SCALE: 1 : 50

2 SECTION - POLYMER ROOM

I/R DATE DESCRIPTION

NOTE:

1. THIS DRAWING INTENDED TO INDICATE GENERAL LAYOUT OFEQUIPMENT.

2. PIPING SHOWN IS FOR GENERAL INFORMATION. NOT ALL PIPE, VALVES AND CONNECTIONNS ARE SHOWN.

3. FOR COMPLETE PIPING REQUIREMENTS COORDINATE WITH P & I DDRAWINGS AND EQUIPMENT VENDOR DRAWINGS

m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 24/41

1

3

4

5

 A B C

2

D

COCO

FD2 ABOVE

FFD3 ABOVE

FD2 ABOVE

FFD3 ABOVE

FD2 ABOVE

FFD3 ABOVE

FD2 ABOVE

FFD3 ABOVE

FD3 ABOVE FD3

 ABOVE FD3 ABOVE

FFD4

FD3 ABOVE

FD3 FD3 FD3

FD3 ABOVE

75ø @1.00%100ø @1.00%

PROCESSDRAINSUMP PIT1200x1200x1200 DEEP. REFER TOSTRUCTURALDRAWINGSFOR PITCONSTRUCTION

NEWØ150INCOMINGWATERSERVICE

M

BACKWASHEQUALIZATIONBASIN1

BACKWASHEQUALIZATIONBASIN2

CLARIFIERSLUDGEEQUALIZATIONTANK No.2

CLARIFIERSLUDGEEQUALIZATIONTANK No.1

THICKENEDSLUDGETANKNo. 2

THICKENEDSLUDGETANKNo. 1

601

603

FD3FD3FD3

75ø @2.00%

DENOTESOPENING ABOVE

CO

CO

HR

32Ø UTILITY WATERBRANCHRISERUP

FINISHED FLOORELEVATION 204.55+-

100ø

INCOMING WATER SERVICE.COORDINATE WITH MECHANICAL

CO

CONNECTPROCESSDRAIN TO300 PROCESSLINETOBWWINLETCHAMBERC/WBACKFLOW PREVENTER

100ø

80-UW-SS1RISER UP

SEE DWG D652 FOR MAG METER AND BACKFLOW PREVENTERDETAIL

100-UW- SS1

50- PD- PVC

50mm RISER FROM SUMP PITDISCHARGE

100- PD- PVC

SLOPE 1.0%

100-UW-SS1RISER UP TO CENTRIFUGES AND CONVEYORS

100ø

80 UW FLUSHING WATERCONNECTIONS TO CENTRIFUGEFEED PUMPS

80- UW- SS1

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   6  :   5   7   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D650

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

LOWER FLOOR PLAN - UTILITYWATER AND DRAINAGE

D650 REF: D613 SCALE: 1 : 100

1 LOWER FLOOR-PLUMBING AND DRAINAGE

I/R DATE DESCRIPTION

m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 25/41

1

3

4

5

 A B C

2

D

FD3 FD3

FD3 FD3 FD3

FD2 FFD3 FD2 FFD3 FD2 FFD3 FD2

FFD3

DENOTESMEZZANINE ABOVE

UW

UW

HR

HR

HR 100ø @1.00%

607

606

608610

609

611

612

613

604

615

614

603

EXTENTOF DENOTESOPENINGABOVE

HR

100ø @1.00%

FD3 ABOVE

FD3 ABOVE

FD3 ABOVE

38mm PVC DRAINSAMPLESINKTOFUNNELDRAINTYPICAL4

UTILITY WATER BOOSTER PUMPPACKAGE FOR POLYMERPREPARATION SYSTEM

TANKLES INSTANTANEOUSWATER HEATERS FORPOLYMER PREPARATIONSYSTEM

UW

50- UW- SS1

32-UW- PVC80

50- UW- SS1

80- UW- SS1

32-UW- PVC80

15-UW- PVC80

15-UW- PVC80

15-UW- PVC80

15-UW- PVC80

32-UW- PVC80

HR

HOSE STATION AND RACK

3 2- U W - PV C8 0 3 2- U W - PV C8 0

HOSE STATION AND RACK

CONNECT 100 DRAINTOCENTRIFUGECENTRATEDRAIN LINE

CO

100-UW- SS1

100 UW RISER FROMLOWER LEVEL

HOSE STATION AND RACK

65 UW RISER UP TOCEN02

65 UW RISER UP TOCEN01

50- UW- SS1

65- UW- SS1

50RISERUPTOCONVEYOR FLUSHING

   C   O

50- UW- SS1

40- UW- SS1

TEMPERED WATER TOTHICKENING POLYMERMAKE-UP SKID

TEMPERED WATER TODEWATERING POLYMERMAKE-UP SKID

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   7  :   1   3   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D651

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

MAIN FLOOR PLAN - UTILITYWATER & DRAINAGE

D651 REF: D613 SCALE: 1 : 100

1 MAIN FLOOR-PLUMBING AND DRAINAGE

I/R DATE DESCRIPTION

m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 26/41

3

4

5

C

2

D

FD3

FD3

FD3

HR

617

603

PUMP ROOM FLOOR204.55m

150-UW- SS1

100-UW-SS1

75- UW- SS1

UWH01_FT1

INCOMINGUTILITY/POTABLEWATER

TO CENTRIFUGE AREA ANDLOWER LEVEL SERVICES

TOMAIN FLOOR

32 CONNECTION FORPOTABLE WATER SERVICE

150mmMAGFLOWMETER

150mm BACKFLOW PREVENTER

LEGEND - PIPING

R EF ER D ES CR IP TI ON

TEMPEREDWATERPIPINGT

CAPPEDPIPE

FLOORDRAINFD

FUNNELFLOOR DRAIN

HUBDRAINHD

ROOFDRAINRD

CLEANOUT(INFLOOR)CO

C O C LE AN O U T (I N L IN E OR S T AC K)

FLANGE

M WATER METER

PIPEDOWN

PIPE UP

ISOLATIONVALVE

THROTTILINGVALVE

STRAINER

CHECKVALVE

PIPETEE

TEE

ELBOW - 90°

ELBOW - 45°

WYE

REDUCER/INCREASER

UNION

PUMP

VERTICAL INLINE PUMP

FFD

OR

GRAY/ NON-POTABLEWATERGW

GENERAL NOTES:

1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDSANDBULLETINS, ETC., LATEST EDITIONS, AND TO THE LOCAL AUTHORITIES REQUIREMENTS.

2. IT IS THE CONTRACTOR’S RESPONSIBILITY TO VERIFY AND CHECK THE EXISTINGCONSTRUCTION PRIOR TO AND DURING CONSTRUCTION. ANY CHANGES AND/ORDISCREPANCIES SHALL BE REPORTED AND REVIEWED BY THE ENGINEER AND/OR

PROJECT MANAGER PRIOR TO PROCEEDING.

3. THE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE SPECIFICATIONS ANDTHEDOCUMENTS PERTAINING TO THE WORK OF OTHER TRADES.

4. OBTAIN EXACT DIMENSIONS FROM SITE MEASUREMENTS. DO NOT SCALE THESEDRAWINGS.

5. PENETRATIONS OF EITHER THE FIRE OR SMOKE BARRIERS SHALL BE SLEEVED ANDSEALED AGAINST THE PASSAGE OF FLAME AND/OR SMOKE WITH A SUITABLE NON-COMBUSTIBLE MATERIAL EQUAL TO THE CONSTRUCTION PENETRATED.

6. CHECK AND VERIFY THE LOCATIONS OF ALL PIPES, AND EQUIPMENT WITH THEWORKOFOTHER TRADES TO PREVENT INTERFERENCE.

7. PROVIDE ACCESS DOORS AS REQUIRED FOR ALL CONCEALED SERVICEABLECOMPONENTS, LOCATED ABOVE, BEHIND OR BELOW INACCESSIBLE CONSTRUCTION.

8. PROVIDE A CLEANOUT AT THE BOTTOM OF EVERY DRAIN AND STACK THATCONNECTSTO A HORIZONTAL PIPE.

PIPEROUTEANDCONNECTIONS:

9. ROUTE OF UTILITY WATER AND DRAIN PIPING AS SHOWN ON DRAWINGS IS APPROXIMATE ONLY. ACTUAL ROUTE TO BE DETERMINED ACCORDING TO FIELDCONDITIONS.

10. CONNECTIONS TO EQUIPMENT, SKIDS ETC. ARE SHOWN AS REFERENCE ONLY.REFERTO EQUIPMENT VENDOR DRAWINGS AND INSTALLATION MANUALS FOR ACTUALCONNECTION DETAILS.

11. NOT ALL PIPING, VALVES AND APPURTENANCES MAY BE SHOWN. COORD INATEWITHEQUIPMENT VENDOR DRAWINGS AND INSTALLATION MANUALS, AND P & I D DRAWINGS TOPROVIDE COMPLETE SYSTEMS

DRAINAGE FIXTURESLEGEND :

FD2 FLOOR DRAIN - 50mm

FD3 FLOOR DRAIN - 75mm

FFD3 FUNNEL FLOOR DRAIN - 75mm

FFD4 FUNNEL FLOOR DRAIN - 100mm

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   7  :   2   2   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D652

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

UPPER FLOOR PLAN - UTILITYWATER AND DRAINAGE

D652 REF: D613 SCALE: 1 : 100

1 UPPER FLOOR-PLUMBING AND DRAINAGE

I/R DATE DESCRIPTION

D652 REF: D604 SCALE: 1 : 50

- UTILITY WATER METER

  m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 27/41

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   7  :   3   9   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D691

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

3D VIEWS - THICKENER ROOM

D691 SCALE:

1 D-3D - THICKENING ROOM

I/R DATE DESCRIPTION

m  m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 28/41

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e

  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   8  :   0   8   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C

   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D692

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

3D VIEWS - CENTRIFUGE AREAD692 SCALE:

1 D-3D - CENTRIFUGE ROOM

I/R DATE DESCRIPTION

m  m

12345 60246477-Elgin RMF_D600s_2013-10-04_Rev0 For TENDER.pdf 

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 29/41

PROJECT

CLIENT

CONSULTANT

KEY PLAN

ISSUE/REVISION

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

ISSUED FOR TENDER

   L  a  s   t   P   l  o   t   t  e   d  :

   F   i   l  e  n  a  m  e  :

Printed on ___% Post-Consumer RecycledContentPaper 

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :   D  e

  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

   I   S   O   A   1   5   9   4  m  m  x   8   4   1  m

2345

D

C

B

 A

1

ELGIN AREA WATERSUPPLY SYSTEM

 AECOM250 York Street, Suite 410London, Ontario N6A 6K2519.676.0510 tel 519.673.5975 faxwww.aecom.com

235 North Centre Road, Suite 200 LondonOntario N5X 4E7519.930.3505 tel 519.474.0451 faxwww.watersupply.london.ca

2013-10-090

PROCESS

REGISTRATION

   1   0   /   4   /   2   0   1   3   1   1  :   0   8  :   1   7   A   M

   C  :   \   U  s  e  r  s   \   k  o   h   l  e  r  s   \   D  o  c  u  m  e  n   t  s   \   R  e  v   i   t   L  o  c  a   l   F   i   l  e  s   \   6   0   2   4   6   4   7   7  -   M   O   D  -   3   0  -   0   0   0   0  -   M  -   C   F_

   k  o   h   l  e  r  s .  r  v   t

MANAGEMENT

43665 Dexter Line

FACILITY

RESIDUALS

Central Elgin, Ontario N0L 2L0

ELGIN AREA WATER TREATMENT PLANT

D693

60246477

   C   h  e  c   k  e  r

   D  e  s   i  g  n  e  r

   A  p  p  r  o  v  e  r

3D VIEWS - PUMP GALLERYD693 SCALE:

1 D-3D - PUMP GALLERY

I/R DATE DESCRIPTION

  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 30/41

PLAN AT EL. 214.6

CLEARWELL

SEDIMENTATION TANK No. 1

SEDIMENTATION TANK No. 2

MAIN ACCESS GALLERY (BELOW)

FILTER 4

FILTER 3

FILTER 2

FILTER 1

CLEARWELL

MAIN ACCESS GALLERY (BELOW)

FILTER 4

FILTER 3

FILTER 2

FILTER 1

FLOCCULATIONTANK No. 1

FLOCCULATIONTANK No. 2

   9   4   1

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x   8   4   1

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D AT E DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

SEDIMENTATION TANK SCRAPERS

GENERAL ARRANGEMENTS

SHEET NUMBER

D701

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6

   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D   7   0   0   S  -   S   E   D   I   M   E   N   T   A   T   I   O   N   T   A   N   K .   D   W   G

PLAN ABOVE EL. 214.58SCALE 1:250

PLAN ABOVE EL. 210.31SCALE 1:250

1

D702

2

D703

TANK ACCESSHATCHES

N

N

SCRAPER MECHANISMMOTION DETECTORS

(TYPICAL - 6)

SCRAPER MECHANISM

MOTION DETECTORS

(TYPICAL - 6)

SEDIMENTATION TANK No 1

SEDIMENTATION TANK No 2

BACKWASH WASTE DIVERSION CHAMBER

900mm CPP BACKWASH WASTE TO

NEW RMF FACILITYBACKWASH WASTE DIVERSION CHAMBER

1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 31/41

CHEMICAL

FEED AREA

SEDIMENTATION SLUDGE

TRANSFER PUMP RSP11

SEDIMENTATION SLUDGE

TRANSFER PUMP RSP12

SEDIMENTATION SLUDGE

TRANSFER PUMP RSP21

SEDIMENTATION SLUDGE

TRANSFER PUMP RSP22

HYDRAULIC POWER UNITS

FOR SLUDGE SCRAPERS

CONTAINMENT CURB

 A B C D E F G

1

2

3

4

5

6

7

SLUDGE BLANKET SENSOR

SLUDGE BLANKET SENSOR

SLUDGE SCRAPER ACTUATORS

SEE VENDOR DRAWINGS FOR

DETAILS

SED11_LE1

SED21_LE1

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x   8   4   1

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D AT E DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

SEDIMENTATION TANK SCRAPERS

PLAN ABOVE EL. 214.58

SHEET NUMBER

D702

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D   7   0   0   S  -   S   E   D   I   M   E   N   T   A   T   I   O   N   T   A   N   K .   D   W   G

1 PLAN ABOVE EL. 214.58D701 SCALE: 1:100

B

D705

 A

D704

FLOCCULATION

TANK 1

FLOCCULATION

TANK 2

250 SEDIMENTATION SLUDGE

TRANSFER LINE TO NEWRMF BUILDING

250 SEDIMENTATION SLUDGE

TRANSFER LINE

EXISTING RWL PIPE

CHEMICAL

FEED AREA

STORAGE AREA

PAC SURRY

STORAGE

TANK

PAC SURRY

STORAGE

TANK

POLYMERPREP AREA

ELECTRICAL

ROOM

SEDIMENTATION

TANK No. 1

(BELOW)

SEDIMENTATIONTANK No. 2

(BELOW)

N

 AIR/VACUUM

VALVE

   2   5   0  -   C   S  -   S   S

250-CS-SS

HYDRAULIC CYLINDERS

FOR SCRAPER UNITS

TYPICAL

1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 32/41

 A B C D E F G

1

2

3

4

5

6

7

5124 4305 6439 6401 4648

   5   0   6   7

   4   9   1   5

   6   3   7   5

   6   3   7   5

   4   9   1   5

FLOCCULATIONTANK No. 1

FLOCCULATION

TANK No. 2

   9   4   1

FOR CONTINUATIONSEE CIVIL DRAWINGS

   5   0   6   7

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x   8   4   

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D AT E DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

I /R D AT E DE SC RI PTI ON

ISSUE/REVISION

 A 2012-06-08 FOR REVIEW

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

SEDIMENTATION TANK SCRAPERS

PLAN ABOVE 210.312

SHEET NUMBER

D703

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D   7   0   0   S  -   S   E   D   I   M   E   N   T   A   T   I   O   N   T   A   N   K .   D   W   G

2 PLAN ABOVE EL. 210.31D701 SCALE: 1:100

B

D704

NEW SLUDGE SCRAPER

BASIN 1 SECTION 1

NEW SLUDGE SCRAPERBASIN 1 SECTION 2

NEW SLUDGE SCRAPERBASIN 1 SECTION 3

NEW SLUDGE SCRAPER

BASIN 2 SECTION 1

NEW SLUDGE SCRAPER

BASIN 2 SECTION 2

NEW SLUDGE SCRAPERBASIN 2 SECTION 3

NEW SLUDGE CROSSCOLLECTOR

NEW SLUDGE CROSS

COLLECTOR

NEW SLUDGE CROSSCOLLECTOR

NEW SLUDGE CROSSCOLLECTOR

EXISTING MUD VALVES

TO BE REPLACED

EXISTING MUD VALVES

TO BE REPLACED

 A

D704

N

          

   

250mm SEDIMENTATION SLUDGE PIPING.

FIELD VERIFY ROUTE THROUGH LOWER LEVELTO AVOID EXISTING EQUIPMENT PIPING AND

INTERFERENCE S. VERIFY PROPOSEDOUTING WITH ENGINEER PRIOR TO

CONSTRUCTION

1829REF.

   4   8   2   6   T   Y   P .

   R   E   F

LOCATION OF SLUDGE BLANKET

SENSOR

LOCATION OF SLUDGE BLANKET

SENSOR

4   1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 33/41

PROVIDE NEW EXTENSION STEM,

GUIDES AND HARDWARE UP TO EXIST.

FLOOR BOXES

NEW 300mm (12") NON-RISING STEM

MUD VALVE

3mm RED RUBBER GASKET

EXIST. 300mm (12") PIPE & FLANGE

EXIST 300mm (12) DRAIN PIPE

(ENCASED IN CONC.)

208.534m

208.889m

DETAIL - MUD VALVE REPLACEMENTScale 1:20

DETAIL - MUD VALVE BLANKScale 1:20

EXIST. 300mm (12") PIPE & FLANGE

EXIST 300mm (12) DRAIN PIPE

(ENCASED IN CONC.)

208.534m

208.889m

300mm BLIND FLANGE & 3mm

RED RUBBER GASKET

HOPPER FILLED WITH CONCRETE

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x   8   4

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D AT E DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

SEDIMENTATION TANK SCRAPERS

SHEET NUMBER

D704

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D   7   0   0   S  -   S   E   D   I   M   E   N   T   A   T   I   O   N   T   A   N   K .   D   W   G

A SECTIOND702D703

Scale 1:100

1

D704

1 DETAILD704 Scale 1:50

HYDRAULIC POWER UNITSFOR SCRAPER MECHANISM

EXISTING 300 MUD VALVES

TO BE REPLACED

SLUDGE SCRAPER DRIVE MECHANISM

(REFER TO EQUIPMENT VENDORDRAWINGS)

250 SLUDGE TRANSFER LINE FROM

SEDIMENTATION BASIN No. 1C/L 217.84m

250 SLUDGE TRANSFER LINE FROMSEDIMENTATION BASIN No. 2

C/L 217.84m

SEDIMENTATIN SLUDGETRANSFER PUMP

NEW SLUDGE SCRAPER

(REFER TO EQUIPMENT VENDORDRAWINGS)

250 SLUDGE SUCTION LINE

150 CHECKVALVE

150 PLUG

VALVE

REMOVE EXISTING CONCRETEFOR SLUDGE PICKUP

TWL 213.94

LWL 213.36

EXIST. 300 DRAINC/L EL. 208.534

EL 210.01

EL. 208.89

EL. 214.58

EXISTINGFLOCCULATION

TANK

SEDIMENTATION TANK No. 2

SEDIMENTATION TANK No. 2

150mm CLEAR PVC SCH80PIPE SEGMENT FOR OBSERVATION50 SLUDGE RECIRULATI ON

LINE

SCRAPER MECHANISMMOTION DETECTOR

RISER PIPE C/W HINGEDLOCKING COVER FOR

SCRAPER MOTION DETECTORINSTRUMENT

450mm ABOVE GRADE

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 34/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 35/41

4   1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 36/41

NOTES

1. PROVIDE TEMPORARY SUPPORT AND THRUST RESTRAINT

TO VALVES AND PIPING IN CHAMBER DURINGCONSTRUCTION.

EXIST. PIPE SUPPORT TO BE MODIFIED

TO SUIT NEW PIPE SPOOL.

RAW WATER POTABLE WATER

 A

-

A SECTIONScale 1:30

EXIST 750mm CPP

RAW WATER FROMPUMPHOUSE

300mm POTABLE WATERLINE TO RMF BUILDING

SEE CIVIL DRAWINGS FORCONTINUATION

   9   1   4

   2   7   4   3

6401

   1   2   1   9

- PLAN - EXIST. CHAMBER #4

Scale 1:30

INTAKE VALVE CHAMBER No. 4 - SERVICE WATER TIE IN

   3   3

   5   3

EXIST. 750mm CPP TO

FLOCCCULATION TANKS

NEW FABRICATED S.S. TEE450mm x 300mm

SEE DETAIL 1

CORE DRILL THROUGHCHAMBER WALL

INSTALL 300mm PIPEWITH (2) LINK SEAL

MODULAR SEALS

TO BE FIELD

VERIFIED

VC

FABRICATED 450x300 S.S. TEE

LENGTH TO SUIT EXISTING

450 BLIND FLANGE

LENGTH TO SUIT

450mm (18")CLASS 250/300#

S.S. FLANGE

450mm (18")

CLASS 150#S.S. FLANGE

   5   0   0

300mm S.S. SCH 10sSTUB

1 FABRICATED TEE DETAIL- Scale 1:10

300

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x   8   4

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D ATE DE SCR IPT ION

ISSUE/REVISION

0 2013-10-07 ISSUE FOR TENDER

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   3   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

SERVICE WATER CONNECTION

DETAIL AT VALVE CHAMBER No.4

SHEET NUMBER

D707

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D   7   0   7  -   P   R   O   C   E   S   S   D   E   T   A   I   L   S .   D   W   G

PHOTO 1 - RAW WATER SIDE

PHOTO 2 - POTABLE WATER SIDE

450mm (18") PIPE SPACER

BLIND FLANGE

BLIND FLANGE

450mm (18") PIPE SPACER

BLIND FLANGE

BLIND FLANGE

450mm SPOOL SECTION TO BEREPLACED WITH FABRICATED TEE

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 37/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 38/41

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 39/41

x   8   4   1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 40/41

   1   0   0   0

12mm ANCHOR BOLTS

UNISTRUT

PIPE CLAMP

32mm BALL VALVE

UNISTRUT

PIPE CLAMP

32mm QUICK CONNECT

CAP

CHAIN

TYPICAL HOSE STATIONN.T.S.

PRESSURE GUAGE WITH ANNULAR RINGN.T.S.

   1   0   0

   1   5   0

NOTE:

1. THE CONTRACTOR SHALL ENSURE THAT

EACH SENSOR IS SUITABLE FOR ITS APPLICATION.

CONDUIT OUTLET

BOX C/W GASKETTED ALUMINUM COVER

FLAT FACE ANSI FLANGE

PRE-MANUFACTUREDCABLE TO SENSOR

LIQUID TIGHT FLEXIBLEMETAL CONDUIT TO

TRANSMITTER316 SS NUTS & BOLTS

NEOPRENE GASKET

300mm, 316 SS, SCH 40 PIPE

ENSURE THAT THE INSIDE ISSMOOTH WITHOUT BURRS,

WELDS OR PROTRUSIONS

FLOOR MOUNTED LEVEL TRANSDUCERN.T.S.

PRESSURE GUAGE (LIQUID FILLED)

FLANGED ANNULAR PRESSOR

SENSOR RING

PROCESS PIPE

 ANNULAR PRESSURE SENSOR RING

TO PROTECT AND ISOLATE

INSTRUMENTATION

 

SELF-CLEANING, FLEXING ACTION

NON-CLOG

MATERIALS OF CONSTRUCTION

CARBON STEEL BODY,

NON-WETTED

 ANSI B 16.5 CLASS 150 FLANGES

IN CARBON STEEL

TEFLON COATED BUNA-N

FILL FLUID ETHYLENE GLYCOL &

PRESSURE GUAGE (LIQUID FILLED)

FLANGED ANNULAR PRESSORSENSOR RING

PROCESS PIPE

PRESSURE SENSOR

Printed on ___% Post-Consumer Recycled Content Paper 

   I   S   O   A   1   5   9   4  m  m  x

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D ATE DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

   L  a  s   t  s  a  v  e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

DETAILS - 4

SHEET NUMBER

D904

   P  r  o   j  e  c   t   M  a  n  a  g  e  m  e  n   t   I  n   i   t   i  a   l  s  :

   D  e  s   i  g  n  e  r  :

   C   h  e  c   k  e   d  :

   A  p  p  r  o  v  e   d  :

_____

_____

_____

   F   i   l  e  n  a  m  e  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D  -   9   0   1_

   9   0   7 .   D   W   G

x   8   4   1  m  m

8/12/2019 T13 78Draw Process

http://slidepdf.com/reader/full/t13-78draw-process 41/41

   7   0   0

1000

   9   0   0

   4   0   0

   1   0   0

   6   0

   2   5

50mm DRAIN CONNECTION

L50x50x6 LEGS

4 THUS

100x100x6 BASE PLATE C/W

12mm ANCHOR BOLTSGROUT AS REQUIRED

15mm SAMPLE LINES

 AS REQUIRED

15mm SAMPLE PORTS IN

THICKENERS

15mm BALL VALVES

15mm FLUSHING WATER10mm FLUSHING LINE

12mm COPPER RING PIPE

UNDERSIDE OF PIPE

6mm THK COUNTER TOPSLOPE TO DRAIN

CHAMFER OR ROUND CORNERS

12mm FLUSHING LINE

SAMPLE STATION FOR THICKENERS/CLARIFIERS1 10

PLAN

SECTION

360 640

   3   5   0

NOTES:

1. FOR NUMBER OF SAMPLE PIPES, ORIENTATION ANDSIZE REFER TO GENERAL ARRANGEMENT AND

EQUIPMENT DRAWINGS

2. MATERAIL TO BE 316L SS UNLESS NOTED OTHERWISE

3. PROVIDE PIPING SUPPORTS AND CLAMPS ASREQUIRED.

   I   S   O   A   1   5   9   4  m  m  x

KEY PLAN

REGISTRATION

CONSULTANT

 AECOM

250 York Street, Suite 410

London, Ontario N6A 6K2

519.673.0510 tel 519.673.5975 fax

www.aecom.com

CLIENT

ELGIN AREA WATER

SUPPLY SYSTEM235 North Centre Road, Suite 200 London

Ontario N5X 4E7

519.930.3505 tel 519.474.00451 fax

www.watersupply.london.ca

PROJECT

RESIDUALS

MANAGEMENT

FACILITYELGIN AREA WATER TREATMENT PLANT

43665 Dexter Line

Central Elgin, Ontario N0L 2L0

PROJECT NUMBER

60246477

I /R D ATE DE SC RI PTI ON

ISSUE/REVISION

0 2013-10-09 ISSUE FOR TENDER

e   d  :   (   2   0   1   3  -   1   0  -   0   4   )

   L  a  s   t   P   l  o   t   t  e   d  :   2   0   1   3  -   1   0  -   0   4

SHEET TITLE

PROCESS

DETAILS - 5

SHEET NUMBERe  :   P  :   \   6   0   2   4   6   4   7   7   \   0   0   0  -   C   A   D   D   \   0   4   0   C   A   D   D  -   B   I   M   W   I   P   \   0   2  -   S   H   E   E   T   S   \   D  -   P   R   O   C   E   S   S

   \   6   0   2   4   6   4   7   7  -   S   H   T  -   3   0  -   0   0   0   0  -   D  -   9   0   1_

   9   0   7 .   D   W   G