t0090518-0104 FERC PDF (Unofficial) 05/15/2009 ORIGINAL FILED SECRETARy OF THE COHH/SSIO;~ ZO/]~~AY I S P I: I~q FEOERAL ENERGY REGULATORY COH,.~ES~:~ay 15,2009 VIA OVERNIGHT DELIVERY The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Revised ComDlianee Fill~: Standards for Bnsineu Practices and Communication Protocols for Public Utilities; Doeket No. ER09-626-~.. Dear Secretary Bose: Pursuant to Rule 207 of the Commission's Rules of Practice and Procedure and in compliance with Order No. 676-C issued in the Docket No. RM05-5-005, I and the Commission's Order issued on April 15, 2009 in this proceeding, 2 the PTO Administrative Committee ("PTO AC"), on behalf of the Participating Transmission Owners ("PTOs"), the Schedule 20A Service Providers ("SSPs"), New England Power Company ("NEP") d/b/a National Grid ("National Grid"), Fitchburg Des and Electric Light Company and Unitil Energy Systems, Inc. (collectively, the "Filing Parties"), 3 hereby jointly submit this filing to incorporate by reference into their respective sections of the ISO Tariffthe Wholesale Eleclyic Quadrant Standard 012, Version 001, of the North American Energy Standards Board ("NAESB") to comply with the Commission's April 15 Order.4 The Filing Parties are also submitting herewith substitute compliance tariff sheets incorporating by reference WEQ Standard 012. I Standards for Bmtness Practices and Communication Protocols for Public Utllltl~, Ordex No. 676-C, 124 FERC 1 61,070 C2008). 2 Participating ~ransmission Owners Administrative Committee, 127 FERC 1 61,053 (2009) (the "April 15 Order"). 3 The Filing Parties note that they possms certain rights under Section 205 ofthe Federal Power Act to modify certain terms, conditions and rates in the ISO New England Inc. Transmission, Mm'kets and Services Tstiff("ISO Tariff") in accordance with mmsmisslon operating agreements, prior Commission Orde~ and/or applicable case law. Capitalized terms used but not defined in this filing are intended to have the meanings given to such terms in Version 001 of the WEQ Standards adopted by NAESB, the Transmission Operating, or the ISO Tariff, including the ISO-NE's Open Access Transmission Tariff("lSO OATT"), which is Section 1I of the ISO Tariff, and Market Rule I, which is Section III of the ISO Tariff. The ISO Tariffis available at ne.com/retmlatory/tarifffindex.htral.

t0090518-0104 FERC PDF (Unofficial) 05/15/2009 ORIGINAL · 2018. 1. 19. · t0090518-0104 FERC PDF (Unofficial) 05/15/2009 ORIGINAL FILED SECRETARy OF THE COHH/SSIO;~ ZO/]~ ~AY IS

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • t0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ORIGINAL FILED

    SECRETARy OF THE COHH/SSIO;~

    ZO/]~ ~AY IS P I: I~q

    FEOERAL ENERGY REGULATORY COH,.~ES~:~ay 15, 2009

    VIA OVERNIGHT DELIVERY

    The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

    Re: Revised ComDlianee F i l l~ : Standards for Bnsineu Practices and Communication Protocols for Public Utilities; Doeket No. E R 0 9 - 6 2 6 - ~ . .

    Dear Secretary Bose:

    Pursuant to Rule 207 of the Commission's Rules of Practice and Procedure and in compliance with Order No. 676-C issued in the Docket No. RM05-5-005, I and the Commission's Order issued on April 15, 2009 in this proceeding, 2 the PTO Administrative Committee ("PTO AC"), on behalf of the Participating Transmission Owners ("PTOs"), the Schedule 20A Service Providers ("SSPs"), New England Power Company ("NEP") d/b/a National Grid ("National Grid"), Fitchburg Des and Electric Light Company and Unitil Energy Systems, Inc. (collectively, the "Filing Parties"), 3 hereby jointly submit this filing to incorporate by reference into their respective sections of the ISO Tariffthe Wholesale Eleclyic Quadrant Standard 012, Version 001, of the North American Energy Standards Board ("NAESB") to comply with the Commission's April 15 Order. 4 The Filing Parties are also submitting herewith substitute compliance tariff sheets incorporating by reference WEQ Standard 012.

    I Standards for Bmtness Practices and Communication Protocols for Public Utllltl~, Ordex No. 676-C, 124 FERC 1 61,070 C2008). 2 Participating ~ransmission Owners Administrative Committee, 127 FERC 1 61,053 (2009) (the "April 15 Order").

    3 The Filing Parties note that they possms certain rights under Section 205 ofthe Federal Power Act to modify certain terms, conditions and rates in the ISO New England Inc. Transmission, Mm'kets and Services Tstiff("ISO Tariff") in accordance with mmsmisslon operating agreements, prior Commission Orde~ and/or applicable c a s e law.

    Capitalized terms used but not defined in this filing are intended to have the meanings given to such terms in Version 001 of the WEQ Standards adopted by NAESB, the Transmission Operating, or the ISO Tariff, including the ISO-NE's Open Access Transmission Tariff("lSO OATT"), which is Section 1I of the ISO Tariff, and Market Rule I, which is Section III of the ISO Tariff. The ISO Tariffis available at ne.com/retmlatory/tarifffindex.htral.

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimberly D. Bose May 15, 2009 Page 2 of 7

    I. OVERVIEW OF FILING

    This Order 676-C Filing transmittal letter is organized as follows:

    • Section II provides a brief background of this Compliance Filing;

    Section III explains the rationale for incorporating by reference WEQ Standard 012 applicable to the transmission services provided by the Filing Parties;

    • Section IV discusses a related ministerial revision to the tariff sheets;

    Sections and V and VI provide a description of the Filing Parties' compliance tariff sheets;

    • Section VII provides the rcquesmd effective date;

    Section VIII describes the entities to whom service of this Compliance Filing is being sent; and

    • Section 1X contains the conclusion.

    II. BACKGROUND

    On January 30, 2009 ("January 30th Filing"), as amended on February 18, 2009, the Filing Parties and certain other New England transmission owners jointly submitted a compliance filing as required by Order No. 676-C. In the April 15 Order, the Commission granted in part, and denied in pert, the January 30th Filing. Specifically, the Commission directed the Filing Parties to file, within 30 days of the date of the April 15 Order, a further compliance filing to either incorporate the WEQ-012 Standard by reference into their respective sections of the ISO Tariff, or to provide timber support for a request for waiver. The Filing Parties hereby file with the Commission their compliance filing in accordance with the April 15 Order, and incorporate the WEQ-012 Standard by reference into their respective sections of the ISO Tariffas fimher explained herein.

    HI. OASIS-RELATED WEQ STANDARDS ADMINISTERED BY THE NEW ENGLAND RTO

    As the New England RTO, ISO-NE plays a primary role in operating and maintaining the OASIS per applicable WEQ Standards. Under the terms of operaling agreements with the PTOs and SSPs, ISO-NE is responsible for operating and maintaining the OASIS for the PTOs and the SSPs. The PTOs and SSPs are responsible for administering the related information for the transmission service they offer on their Transmission Provider Page as required by FERC and in accordance with the ISO-NE OATT.

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimberly D. Bose May 15, 2009 Page 3 of 7

    Under the TOA, ISO-NE has authority to operate and maintain the OASIS and to direct the PTOs to change their respective Transmission Provider Page to conform to applicable requirements. Pursuant to Section 3.03 (v) of the TOA:

    "The ISO shall operate and maintain the OASIS (or a successor system) as required by FERC, including posting of TTC/ATC for interties on the New England Transmission System; provided, however, that such system shall conform to the requirements for such systems as specified by FERC. The PTOs shall provide updates to PTO-specific Local Service pages on the OASIS site, subject to the ISO's review of such updates. The ISO shall have the authority to direct any changes to such PTO-specific Local Service pages that it deems approl~riate to conform to FERC requirements and the terms and conditions of the ISO OATT. ''°

    The HVDC TOA 6 and the HVDC TSAA, 7 impose similar obligations on ISO-NE to operate and maintain the OASIS for transmission services provided by the SSPs under Schedule 20A, including the posting of TTC on the Schedule 20A Service Provider pages. Thus, the PTOs and the SSPs are similarly situated with respect to their obligations to administer the OASIS.

    Under these agreements, the PTOs and the SSPs, however, share responsibilities over the proper administration of the OASIS. The PTOs and SSPs, for instance, are responsible for administering, including, but not limited to, posting and updating, their OASiS-related information on their transmission provider pages consistent with the Commission's rules and regulations. This may include responsibilities pursuant to WEQ Standard 012.

    Pursuant to the TOA, I-IVDC TSAA and HVDC TOA, ISO-NE administers and determines the architecture of OASiS-related communication systems. It is unknown at this time what aspects of WEQ Standard 012 will actually apply to the Filing Parties, and, therefore, the Filing Parties have made the incorporation by reference of that Standard subject to conditional language contained in the current tariff, which indicates that "to the extent that the requirements therein apply to" the PTOs or SSP's in their respective Schedules, WEQ Standard 012 is incorporated by reference into Schedules 20A and 21.8 Under this construct, the TOA, HVDC TOA and the HVDC TSAA will govern each party's respective obligations under this OASIS- related WEQ Standard.

    TOA, Section 3.03

    6 See:. Section 3.03 (c) of the HVDC TOA.

    Set. Sections 2.04, 2.05 and 3.03 ofthe ~ TSAA.

    ' This conditional language is contained in Schedule 21 on Fourth Revised Sheet No. 1400, and in Schedule 20A on Substitute Second Revised Sheet No. 928 of the ISO OATT, which will immediately precede the respective substitute tariffsheets for Schedules 21 and 20A submitted herewith.

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimberly D. Bose May 15, 2009 Page 4 of 7

    IV. MINISTERIAL REVISION TO TARIFF SHEETS

    The Filing Parties also take this opportunity to propose the removal of certain tariff language contained in the January 30 ~ Filing indicating that the Filing Parties had filed for a waiver of certain NAESB Version 001 Standards and that upon issuance of a final Commission order on the request for waiver, the Filing Parties would modify Schedules 20A and 21, and their respective Local Service Schedules, to reflect the Commission's determination. Because in the April 15 Order the Commission accepted all but one of the Filing Parties' requests for waiver, and since the instant Compliance Filing incorporates WEQ-012 into Schedules 20A and 21, there is no longer any outstanding request for waiver, h is, therefore, appropriate to remove the conditional language in Schedules 20A and 21 and the Local Service Schedules for Unitil Energy Systems, Inc., Fitchburg Gas and Electric Light Company and National Grid, to avoid any potential confusion by the Filing Parties' transmission customers. The Filing Parties respect_fully request that the Commission grant waiver of any of the Commission's procedural rules that might otherwise prevent this ministerial revision as part of this Compliance Filing.

    V. ORDER NO. 676-C COMPLIANCE TARIFF SHEETS - SCHEDULE 20A

    In Compliance with the April 15 Order, the SSPs hereby submit proposed amendments to the common provisions of Schedule 20A:

    Second Substitute First Revised Sheet No. 9284.

    V1. ORDER NO. 676-C COMPLIANCE TARIFF SHEETS - S C H E D U L E 21

    In Compliance with the April 15 Order, the PTO AC, on behalf of the PTOs, hereby submits proposed amendments to the common provisions of Schedule 21:

    Substitute First Revised Sheet No. 1400.01.

    National Grid submits proposed amendments to Schedule 21-NEP in compliance with the April 15 Order:

    Substitute Second Revised Sheet No. 3011.

    Unitil Energy Systems, Inc., submits proposed amendments to Schedule 21-UES in compliance with the April 15 Order:.

    Substitute Third Revised Sheet No. 4001 and Substitute Second Revised Sheet No. 4001A.

    Fitchburg Gas and Electric Light Company submits proposed amendments to Schedule 21-FG&E in compliance with the April 15 Order:

  • 20090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimberly D. Bose May 15, 2009 Page 5 of 7

    Substitute Third Revised Sheet No. 3801 and Substitute Second Revised Sheet No. 3801A.

    VII. REQUESTED EFFECTIVE DATE

    The Filing Parties respectfully request that the tariffchanges proposed in this Compliance Filing be made effective as of December I, 2008, to coincide with the effective date of the tariff compliance changes proposed in the Filing Parties' January 30 Filing and granted by the Commission in the April 15 Order. Further, an effective date of December 1, 2008 will coincide with the effective date of ISO-NE's requests for waiver accepted by the Commission as part of ISO-NE's September 30, 2008 Order 676-C compliance filing and ISO-NE's tariffcompliance changes. The Filing Parties request the coinciding effective date for the purpose of consistency between the ISO-NE OATI', Schedule 21 Common, and Schedule 20A Common.

    VlH. SERVICE

    An electronic copy of this compliance filing has been sent to ISO-NE and Participants Committee members and alternates. Additionally, a paper copy of this transmittal letter and the accompanying materials have been sent to the governors and electric utility regulatory agencies for the six New England states that comprise the New England Control Area, and to NECPUC. The names and addresses of these governors and regulatory agencies are shown in Attachment 10 to the Filing Parties' January 30 Filing.

    IX. CONCLUSION

    The Filing Parties request that the Commission accept this Compliance Filing as submitted and without modification or condition, to become effective as of December 1, 2008.

    Respectfully submitted,

    Senior Counsel Northeast Utilities Service Company 107 Selden Street Berlin, CT O6037 Tel: (860) 665-5546 Fax: (860) 665-5504 hallmix(~nu.com

    F r o AC Legal Working Group Chair on behalf of the PTO Administrative Committee

  • t0090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimberly D. Bose May 15, 2009 Page 6 of 7

    Kristine L. Mespelli Senior Analyst National Grid 25 Research Drive Westborough, MA 01582 Tel.: (508)389-2835 Fax: (508)389-4602 e-mail: [email protected]

    on behalf of the SSP Administrat ive Committee

    Carol A. Currier " J " Lead Analyst National Grid 25 Research Drive Westborough, MA 01582 Tel.: (508)389-2575 Fax: (508)389-3129 e-mail: carol.curriert~us.nm'id.com

    on behalf of National Grid

    Sonia Mendonca Dewey & LeBoeuf LLP 1101 New York Avenue, N.W., Suite 1100 Washington, D.C. 20005 Direct: +1 202 986 8195 Fax: +1 202 956 3321 [email protected]

    Attorney for Fitchburg Gas and Electric Light Company and Unitil Energy Systems, Inc.

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    The Honorable Kimbedy D. Bose May 15, 2009 Page 7 of 7

    Karen M. Asbury Director, Regulatory Services Fitchburg Gas and Electric Light Company and Unifil Energy Systems, Inc. 6 Liberty Lane West Hampton, NH 03842-1720 Tel: (603) 773-6441 Fax: (603) 773-6641 asburv~.unitil.com

    for the Unitil Companies

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    Certificate of Service

    I hereby certify that I have this day served the foregoing document on

    those parties on the official service list complied by the Secretary in this

    proceeding.

    Dated at Berlin, Connecticut this 15 th day of May, 2009

    / e / David R. Peloouin David R. Peloquin Northeast Utilities Service Company 107 Selden Street Berlin, CT 06037

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    SCHEDULE 20A

    Clean and BIackline Tariff Shee~

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric Tariff No. 3 Section I1 - Open Access Transmission Tariff Schedule 20A

    Second Substitute First Revised Sheet No. 928A Superseding Original Sheet No. 928A

    Coordinate Interchange (WEQ-004, Version 001, October 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose and Applicability, excluding Standards 004-0.1 through 004-17.2, but including 004-A through 004-D;

    Public Key InfrastructtLr¢ (PKI) (WEQ-012, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Recommended Standard, Certification, Scope, Commitment to Open Standards, and Standards 012-0.1 through 012-1.26.5; and

    Business Practices for Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 1.4 (WEQ-013, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Introduction and Standards 013-0.1 through 013-4.2.

    The Schedule 20A Service Providers have been granted a waiver of the following NAESB Version 001 Standards by Order of the Commission dated April 15, 2009 in FERC Docket Nos. ER09-626-000 and ER09-626-001.

    Area Control Error (ACE) Equation Special Cases Standards (WEQ-005, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 005-0.1 through 005-3.1.3, and 005-A;

    Manual Time Error Con'cction (WEQ-006, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 006-0.1 through 006-12;

    Inadvertent Interchange Payhack (WEQ-007, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 007-0.1 through 007-2, and 007-A;

    Transmission Loading Relief- Eastern Interconnection (WEQ-008, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 008-0.1 through 008-3.11.2.8, and 008-A through 00S-D; and

    Gas/Electric Coordination (WEQ-01 I, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Standards 01 I-0.1 through 01 I-1.6. To the extent that this standard does apply to an individual Schedule 20.4 Service Provider, the incorporation o f this standard shall be addressed within the respective Schedule 204 Service Provider-specific schedule under Part 1l o f thts Schedule 20A.

    Issued by: Kri~ne L. Mespelli Senior Analyst, National Grid USA on behalf of the Schedule 20A Service Providers

    Issued on: May 15,2009

    Effective: December 1, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket No. ER09-626-000, 4}01, issued April 15,2009, 127 FERC ¶ 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Section 11 - Open Acccn~ Transmission Tariff Schedule 20A

    ~f_c~n__d_ Substitute Fi~t Revised Sheet No. 928A Superseding Original Sheet No. 928A

    Coordinate Interchange (WEQ-004, Version 001, October 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose and Applicability, excluding Standards 004-0.1 through 004-17.2, but including 004-A through 004-I:):;

    Pub_lie K_ev In f_ra~;tt'ucture ( P K I ) (~-I?Q:(~. 12._'y'e_rs'i_on__~) 1. Oct. 31, 2(~)7. with minor corrections applied on Nov. 162(,_2L~_~)7~nchLd.mgRc~__:)m_~e]Ld__ed_,~!andard~ Certification, Sco[~-_,._~!om~itmen~ to Open Standards, and Standards 012-0. I through 012-I .26.5; anti

    Business Practices for Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 1.4 (WEQ-013, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Introduction and Standards 013-0.1 through 013-4.2.*._

    The Schedule 20A Service Providers have gled-been gL~teed.a waiver of the following NAESB Version 001 Standards by Order of the Commission dated April 15~ 2009 in FERC

    U;'~ ..r,, r._..1 Docket Nos. ER09-626-000 and ER0')-626-001.-- :n i~u==:cc . . . . . . . . Cc.:~nissi*m~dee-o~ the ~eque~ -ti*r - wai vet ~- the~'gtq~ed ute--24~Servi~e- Pr,~ riders -wiIl-modit~ h i s~ l~ tu le a_OA-lo

    Area Control Error (ACE) Equation Special Cases Standards (WEQ-005, Version 001, Oct. 3 I, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 005-0.1 through 005-3.1.3, and 005-A;

    Manual Time Error Correction (WEQ-006, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 006-0.1 through 006-12;

    Inadvertent Interchange Payhack (WEQ-007, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 007-0.1 through 007-2, and 007-A;

    Transmission Loading Relief-Eastern Interconnecfion (WEQ-008, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Purpose, Applicability, and Standards 008-0. I through 008-3.11.2.$, and 0 0 8 - A through 00S-D; and

    ~ l e c t r i c Coordination (WEQ.011, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Standards 011.0.1 through 011-1.6. To the extent that this standard does apply to an individual Schedule 20/1 Service Provider,

    Issued by: Kristine L. Mespelli Scnior Analyst, National Grid USA on behalf of the Schedule 20A Scfvice Providers

    Issued on: t~&.~-t" ~_~t.~_~ 2009

    Effective: December I, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket No. gM~.~I-_P._Q~:z~_6~

    _ • • ~ -~ r,.,~_ ,,,.. ~-~ ,, ,.~ FERC ¶ 5 L(;7 ~. (2.'.'(.:°.~,127 FERC $ 61,053 (2(~_93. ~QI, issued ~ L ~ A _ ~ v _ ! L..-~_~ ................. ' " '

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Sectio~ II - Open Access Transmission Tariff Schedule 20A

    =~_~9_,~Substitute First Revised Sheet No. 928B S ~ i n g Original Sheet No. 928B

    the incorporation of thts standard shall be addressed within the respective Schedule 20.4 Service Provider-specific schedule under Part II of this Schedule 20,4.

    Issued by: Kristine L. Mespelli Senior Analyst, National Grid USA on behalf of the Schedule 20A Service Providers

    Issued orl: F~wu~y'-1~Ma.~.J~ 2009

    Effective: December I, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket No. R~4t,s-+s-00~- ~g_Q~_-+Q21,-00~!,

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    SCHEDULE 21

    Clean and Blacld/ne Tariff Sheee,

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric Tariff No. 3 Section II - Open Access Transmission Tariff Schedule 21

    Substitute First Revised Sheet No. 1400.01 Superseding Original Sheet No.1400.01

    Business Practices for Open Access Same-Time Information Systems (OASIS) Standards & Communication Protocols, Version 1.4 (WEQ-002, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Standards 002.0.1 through 002-5.10;

    Open Access Same-Time Information Systems (OASIS) Data Dictionary, Version 1.4 (WEQ.003, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Standard 003-0;

    Public Key Infrastructure (PKI) (WEQ.012, Version 001, Oct. 31, 2007, with minor corrections applied on Nov. 16, 2007) including Recommended Standard, Certification, Scope, CommiUnent to Open Standards, and Standards 012-0.1 through 012-1.26.5; and

    Business Practices for Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 1.4 (WEQ-013, Version 00t, October 3I, 2007, with minor corrections applied on November 16, 2007) including Introduction and Standards 013-0.1 through 013-4.2.

    The Participating Transmission Owners have been granted a waiver of the following NAESB Version 001 Standards by Order of the Commission dated April 15, 2009 in FERC Docket Nos. ER09-626.000 and ER09-6264301.

    Coordinate Interchange (WEQ4)04, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Purpose, Applicability, and Standards (X)4.0.1 through 004-17.2, and 004-A through 004-D;

    Area Control Error (ACE) Equation Special Cases Standards (WEQ.005, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Purpose, Applicability, and Standards 005-0.1 through 005-3.1.3, and 005-A;

    Manual Time Error Correction (WEQ-006, Version 001, October 31, 2007, with minor conections appfied on November 16, 2007) including Purpose, Applicability, and Standards 0(K3.0.1 through 006-12;

    Inadvertent Interchange Payback (WEQ-007, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Purpose, Applicability, and Standards 007-0.1 through 007-2, and 007-A;

    Issued by: Carol Currier Chair of the Participating TO Admlnim'ative Committee

    hsued on: May 15, 2009

    Effective: December 1, 2008

    Piled to comply with order of the Federal Energy Regulatory Commiuion, Docket Nm. ER09-6264X}0 and ER09- 626-001, issued April 15, 20~, 127 FERC I! 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric Tariff No. 3 Section U - OWn Access Transmission Tariff Schedule 21

    ~ F ' ~ t Revised Sheet No. 1400.01 Superseding Original Sheet No. 1400.01

    Business Practices for Open Access Same-Time Information Systems (OASIS) Standards & Communication Protocols, Ve~ion 1.4 (WEQ.002, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Standards 002-0.1 through 002-5.10;

    Open Access Same-Time Information Systems (OASIS) Data Dictionary, Version 1.4 (WEQ-003, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Standard 003-0;

    Pvbljc Key Infrastructure (PKI} (WEO-012. Version 001. Oct. 31. 2007. with minor ¢grgeetions anDlied on Nov. 16, 2007) including Recommended Standard. Certification, Scope, Commi0nq:ot to Open Standards. a~d Standards 012-0.1 through 012-1.26.5; and

    Business Practices for Open Access Same-Time Information Systems (OASIS) Implementation Guide, Version 1.4 (WEQ.013, Version 00I, October 31, 2007, with minor corrections applied on November 16, 2007) including Intxoduction and Standards 013-0.1 through 013-4.2.

    The Participating Transmission Owners have flied-for, been wanted a waiver of the foLlowing NAESB Version 001 Standards bv Order of the Commission dated April 15. 2009 in FERC Docket Nos I~R09-626-000 and ER09-626.001 i~_^_ : . . . . . . . . . c _̂ ,:.-.~ r.^_~:~:~_. . ^.~ . . . . . ~ , k . . . . . . . • 4 f . . . . . . ; . . . . * k - - I D ~ . . t + : , . ~ - - ^ ) : - - - - * ' r . . . . l - - ; ~ - - d ' ~ . . . . . . . . . I l l - - ~ . 4 ; 4 ~ . , . ~ . l , . . * . ¢ ' q ~ k o . l , , l s 5 1 * ~

    • . v

    Coordinate Interchange (WEQ-O04, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Purpose, Appfcability, and Standards 0(O.0.1 through 004-17.2, and 004-A through 004-D;

    Area Control Error (ACE) Equation Special Cases Standards (WEQ.005, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Impose, Applicability, and Standards 005-0.1 through 005-3.1.3, and 005-A;

    Manual Time Error Correction (WEQ.006, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Purpose, Applicability, and Standards 006-0.1 through 006-12;

    Inadvertent Interchange Payback (WEQ.007, Version 001, October 31, 2007, with minor corrections applied on November 16, 2007) including Pmgose, Appficability, and Standards 007-0.1 through 007-2, and 007-A;

    Issued by:. ~ Chair of the Participating TO Admini~rative Committee

    Issued on: ~ameey-,3OMav 15, 2009

    Effective: December I, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket Noi. ~ 0 9 - 6 2 6 - 0 0 0 issued ~eb/-;4~O0gAofi, ns. ~.~09. ~ 1224 FBRC t 6 ] , ~ (200gD.

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    SCHEDULE 21-NEP

    Clean and Blackllne Tariff Sheets

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TatiffNo. 3 Section II - Open Access Tn~smission Tariff Schedule 21 - NEP

    Substitute Second Revised Sheet No. 3011 S ~ First Revised Sheet No. 3011

    H. NORTH AMERICAN ENERGY STANDARDS BOARD P~NAESB"]

    WHOLESALE ELECTRICITY OUADRANT PWEO"~ STANDARDS

    In accordance with Commission order, the NAESB WEQ Standards incorporated by

    reference in Schedule 21 are applicable to the provision of transmission service over the NEP

    transmission system, except as otherwise noted in this Schedule 21-NEP.

    On January 30, 2009, NEP requested waiver of the following NAESB Version 001 WEQ

    Standards:

    • Business Practices for Open Access Same-Time Information Systems (OASIS),

    Version 1.4 (WEQ-001, Version 001, October 31, 2007, with minor corrections

    applied on November 16, 2007) including Standards 001-1.6COX1) through 001-

    1.6(b)(3); 001-2.1 through 001-2.14; 001-2.2 through 001-2.2.2; 001-2.3 through

    001-2.3.2; 001-4 through 001-4.27; 001-5 through 001-5.6; 001-8 through 001-

    8.3.2; 001-9 through 001-9.8.1; 001-10 through 001-10.8.7; 001-11 through 001-

    11.7.1; 001-12 through 001-12.5.2, and 001-A and 001-B.

    NEP has been granted a waiver of the above NAESB Version 001 WEQ Standards by

    Order of the Commission dated April 15, 2009 in FERC Docket Nos. ER09-626-000 and ER09-

    626-001.

    Issued by: Mmheed Saidi Effective: December I, 2008 Prestckmt, New England Power Company

    Issued on: May 15,2009 Filed to comply with order of the Federal ~ Regula~ry Commission, Docket No& ER09-626-000 and ER09- 626-001, issued April 15, 2009, 127 FERC ¶ 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    [SO New England Inc. FERC Electric TeriffNo. 3 Section II - Open Access Transmission Tariff Schedule 21 - NEP

    Sub~i~w Second Revised Sheet No. 3011 Su~ing First Revised Sheet No. 3011

    II. NORTH AMERICAN ENERGY STANDARDS BOARD ("NAESB"~

    WHOLESALE ELECTRICITY OUADRANT (uWEO"~ STANDARDS

    In accordance with Commission order, the NAESB WEQ Standards incorporated by

    reference in Schedule 21 are applicable to the provision of transmission service over the NEP

    Uansmissinn system, except as otherwise noted in this Schedule 21-NEP.

    On January 30, 2009, NEP requested waiver of the following NAESB Version 001 WEQ

    Standards:

    • Business Pmedccs for Optm Access Same-Time Information Systems (OASIS),

    Version 1.4 (WEQ-O01, Version 001, October 31, 2007, with minor corrections

    applied on November 16, 2007) including Standards 001-1.0Co)(l) through 001-

    1.6(bX3); 001-2.1 through 001-2.14; 001-2.2 through 001-2.2.2; 001-2.3 through

    001-2.3.2; 001-4 through 001-4.27; 001-5 through 001-5.6; 001-8 through 001-

    8.3.2; 001-9 through 001-9.8.1; 001-10 through 001-10.8.7; 001-11 through 001-

    11.7.1; 001-12 through 001-12.5.2, and 001-A and 001-B.

    NEP has been tminted a waiver of the aboy~ NAESB Version 001 WEO Standards bv

    Order of the Commi~sinn dateH Anril 15. 2009 in FERC Docket Nos. ER09-626-000 and ER09-

    Issu~ by: Masheed Saidi Effectiw: December 1, 2005 President, New F_,nglm~d Power Company

    Issued on: M&Y.,L,'t~mmO*~, 2009 Filed to comply with order of~c F~lm'a.I Enml~ Regulatory Commission, Dock~ Nq. ~ , issued ~ : - . . ~ . 2 '., 2t~ °, L"~. , ~ L'=. f?~ C, 12'74 FERC ¶ 61,0,~-70 (200~).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    SCHEDULE 21-UES

    Clean n d Blackline Tariff Shee~

  • 10090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FEKC Electric TariffNo. 3 Section II - Open Access Transmission Tariff Schedule 21 -LIES

    Substitute Third Revised Sheet No. 4001 S u ~ Sccond Rcvlscd Sheet No, 4001

    SCHEDI.JLE 21-UES

    UnitU Ener~w Svstems~ Inc. Local Service Schedule

    L COMMON ~ERVICE PROVI~IQNS

    Unitil Energy Systems, Inc. ("UES") is a participant in the New England Control Area

    and has agreed to provide transmission and ancillary services over PTF pursuant to the Tariff.

    The services provided under this Schedule 21-UES apply only to Non-PTF, except in the case of

    service to Network Customers that have all or part of their Network Load directly connected to

    the FIT in the Local Network. These Network Customers shall pay for Local Network Service

    pursuant to Attachment H to this Schedule 21-UES. Provisions ofthis Schedule 21-UES shall

    have priority over any conflicting provisions in the Tariff.

    On January 30, 2009 DES requested confirmation of waiver of Sections 35.28, 37.5(b)

    and 38.2(aX|)-(7), the FERC Standards for Business Practices and Communications Protocols

    for Public Utilities adopted in Order No. 676 (Standard, for Business Practices and

    Communications Protacolsfor Public Utilities, Order No. 676, Ill FERC Stats. & Regs., Regs.

    Preambles 31,216 (2006)) and revised in Order No. 676-C, (Standards for Business Practices

    and Communication Protocols for Public Utilities, Order No. 676-C, 73 Fed. Reg. 43,848 (July

    29, 2008), FERC Stats. & Regs. ¶ 31,274 (July 21, 2008)). See Unifil Power Corp., Fitchburg

    Gas and Electric Light Company, and Unitil Energy Systems, Inc., Dockets No. OA96-104-O(X)

    ¢t al. (June 1, 2006) and Participating Transmission Owners (PTOs) and PTO Administrative

    Committee and the Schedule 20A Service Providers, Docket No. ER09-626-000 and ER09-626-

    001 (January 30, 2009). These standards were developed by the North American Energy

    Standards

    Issued by:. Mark H. Collin Trcmmrcr Unitil Energy Systems, Inc.

    ~ on: May 15, 2009

    Eff~'llve: ~ I, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket Nos. ER09-626-000 and ER09- 626001 ~mcd April 15, 2009, 127 FERC ¶ 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Eleclric TsriffNo. 3 Section II - Open Access Transmission Tariff Schedule 21-UES

    Substitute Second Revised Sheet No. 4001A Superseding First Revised Sheet No. 4001A

    Board and incorporated by reference through addition of Part 38 and Sections 35.28 and

    37.5(b) of the Commission's Regulations pursuant to Docket No. RM05-5-O00. UES also

    requested waiver of WEQ-008, WEQ-011 and WEQ-013. See Participating Transmission

    Owners (PTOs) and PTO Administrative Committee and the Schedule 20A Service Providers,

    Docket No. ER09-626-000 and ER09-626-001 (January 30, 2009). The request for waiver was

    granted by the Commission in its order dated April 15, 2009.

    Definitions

    1.0 Annual Trammlsslon Cost,: The total annual cost of the Local Network for

    purposes of Local Network Service shall be the amount specified in Attachment H

    until amended by UES or modified by the Commission.

    I .I Curtailment: A reduction in firm or non-firm transmission service in response to

    a transmission capacity shortage as a result of system reliability conditions.

    1.2 Load Ratio Share: Ratio of a Transmission Customers Network Load to UES's

    total load computed in accordance with Sections ILl0 and H.10(a) ofthis

    Schedule under Sections Supplementing Schedule 21 of the OATT and calculated

    on a rolling twelve month basis.

    Issued by:. Mark H. Collin Treasurer Urutil En~gy Systems, Inc.

    Issued on: May 15, 2009

    Effective: December 1, 2008

    Filed to comply with order of the Federal Energy Regulatory Commission, Docket Nm. ER09-626-000 and ER09- 626-001, issued April 15, 2009, 127 FERC 1 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    I ISO New England Inc. FERC Electric TariffNo. 3 Section II - Open Access Trammission Tariff Schedule 21 -UES

    Su~mte Third Revised Sheet No. 4001 Super~ Second Revised Sheet No. 4001

    SCHEDULE 21-UES

    Uni01 Enert, v SvstemL Inc. I~0cal Service Schedule

    I. ¢0 wgN SERVICE PROVISIQ S

    Unitil Energy Systems, Inc. ("UES") is a participant in the New England Control Area

    and has agreed to provide U'ansmission and ancillary services over PTF pursuant to the Tariff.

    The services provided under this Schedule 21-UES apply only to Non-PTF, except in the case of

    service to Network Customers that have all or part of their Network Load directly connected to

    the PTF in the Local Network. These Network Customers shall pay for Local Network Service

    pursuant to Attachment H to this Schedule 21-UES. Provisions of this Schedule 21-UES shall

    have priority over any conflicting provisions in the Tariff.

    On January 30, 2009 UES requested confirmation of waiver of Sectious 35.28, 37.5(b)

    and 38.2(a)(1)-(7), the FERC Standards for Business Practices and Communications Protocols

    for Public Utilities adopted in Order No. 676 (Standards for Business Practices and

    Communications Protocols for Public Utilities, Order No. 676, III FERC Stats. & Regs., Regs.

    Preambles 31,216 (2006)) and revised in Order No. 676-C, (Standards for Business Practices

    and Communication Protocols for Public Utilities, Order No. 676-C, 73 Fed. Reg. 43,848 (July

    29, 2008), FERC Stats. & Regs. ¶ 31,274 (July 21, 2008)). See Unitil Power Corp., Fitchburg

    Gas and ElecU-ic Light Company, and Unitil Energy Systems, Inc., Dockets No. OA96-104-000

    et ai. (June 1, 2006) and Participating Transmission Owners (PTOs) and PTO Administrative

    Committee and the Schedule 20A Service Providers, Docket No. E R 0 9 ~ and E R ~ -

    626-001 (January 30, 2009). These standards were developed by the North American Energy

    Standards

    Issued by: MeA H. Collin Treum~ Unitil Energy Systems, Inc.

    Issued on: ~ , 2009

    Effective: December 1, 2008

    Filed to comply with order of the Federal Energy Regulatory ConunSs~on, Docket N ~ ~ g ~ g , ~ ~ Amil.L~y'~, 2 0 0 ~ , ~ 12!4 ~RC 1 6 1 , 0 ~ (200~).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Section II - Open Access Transmission Tariff Schedule 2 I-UES

    Su~fitute ~ Revised Sheet No. 4001A Supeneding First Revised Sheet No. 4001A

    Board and incorporated by reference through addition of Part 38 and Sections 35.28 and

    37.503) of the Commission's Regulations pursuant to Docket No. RM05-5-O00. UES also

    requested waiver of WEQ-O08, WEQ-0) 1 and WEQ-013. See Participating Transmission

    Owners (PTOs) and PTO Adm'mistrative Committee and the Schedule 20A Service Providers,

    Docket No. ER09-626------000 and ER09-~2(7-001 (January 30, 2009). The req~f~t for waivfr

    was ~-anted by the Commission in its order dated Avril 15. 2009. ~ ; ~ e e t t a ~ s f ~ - f e s ~

    Definitions

    1.0 Annual Transmission Costs: The total annual cost of the Local Network for

    purposes of Local Network Service shall be the amount specified in Attachment H

    until amended by UES or modified by the Commission.

    1.1 Curtailment: A reduction in firm or non-firm transmission service in response to

    a transmission capacity shortage as a result of system reliability conditions.

    1.2 Load Ratio Share: Ratio of a Transmission Customer's Network Load to UES's

    total load computed in accordance with Sections H.IO and II.l 0(a) o f tiffs

    Schedule under Sections Supplementing Schedule 21 of the OATI" and calculated

    on a rolling twelve month basis.

    Issued by: Mark H. CoUln Effective: December I, 2008 Treasurer Unitil Energy Systems, Inc.

    [ ruued on: ~ , 2oo9

    Filed to comply with order of the Fedentl Energy Regulatory Commission, Docket Nolt. 6 2 6 - 0 0 1 ~ , issued/~pj~.J.~hdy-~, 2 0 0 ¢ 2 8 , ~ 1274 FERC ¶ 61,0~O (20028).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    SCHEDULE 21-FG&E

    C l a n and Blackline Tariff Sheets

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Section II - Open Access Transmission Tariff Schedule 21-FG&E

    Substitute Third Revised Sheet No. 3801 Superseding Second Revised Sheet No. 3801

    SCHEDULE 21-FG&E

    Fltchbur~ Gas and Electric Light Comvanv Local Service Schedule

    1. COMMQN SERVICE PROVISIONS

    Fitchburg Gas and Electric Light Company ("FG&E") is a participant in the New England

    Control Area and has agreed to provide transmission and ancillary services over PTF pursuant to

    the Tariff. The services provided under this Schedule 21-FG&E apply only to Non-PTF, except

    in the case of service to Network Customers that have all or part of their Network Load directly

    connected to the PTF in the Local Network. These Network Customers shall pay for Local

    Network Service pursuant to Attachment H to this Schedule 21-FG&E. Provisions of this

    Schedule 21-FG&E shall have priority over any conflicting provisions in the Tariff.

    On January 30, 2009 FG&E requested confirmation of waiver of Sections 35.28, 37.503)

    and 38.2(aX1)-(7), the FERC Standards for Business Practices and Communications Protocols

    for Public Utilities adopted in Order No. 676 (Standards for Business Practices and

    Communications Protocols for Public Utilities, Order No. 676, Ill FERC Stats. & Regs., Regs.

    Preambles 31,216 (2006)) and revised in Order No. 676-C (Standards for Business Practices and

    Communication Protocols for Public Utilities, Order No. 676-C, 73 Fed. Reg. 43,848 (July 29,

    2008), FERC Stats. & Pegs, ¶ 31,274 (July 21, 2008)). See Unitil Power Corp., Fitchburg Gas

    and Electric Light Company, and Unitil Energy Systems, Inc., Dockets No. OA96-104-000 et al.

    (June 1, 2006) and Participating Transmission Owners (PTOs) and PTO Administrative

    Committee and the Schedule 20A Service Providers, Docket Nos. ER09-626-000 and ER09-626-

    001 (January 30, 2009). These standards were developed by the North American Energy

    Standards

    lumed by. Mark H. Collin Treasm~ Fitchburg Gas and Electric Light Company

    Issued on: May 15, 2009

    Effective: ~ 1,2008

    Filed to comply with order of the Federal Energy Regulator F Cormniss/on, Docket Nos. ER09-626-000 and ER09- 626-001. iuued April 15, 2009, 127 FERC ¶ 61,053 (2009).

  • ~0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Section II - Open Access Transmission Tariff Schedule 21-FG&E

    Substitute Second Revised Sheet No. 3801A Superseding First Revised Sheet No. 3801A

    Board and incorporated by reference through addition of Part 38 and Sections 35.28 and 37.5('o)

    of the Commission's Regulations pursuant to Docket No. RM05-5-000. FG&E also requested

    waiver ofWEQ-008, WEQ-011 and WEQ-O13. See Perticipating Transmission Owners (PTOs)

    and F r o Administrative Committee and the Schedule 20A Service Providers, Docket No. ER09-

    626-000 and ER09-626-001 (January 30, 2009). The request for waiver was granted by the

    Commission in its order dated April 15, 2009.

    I Definitions

    1.0 Annual Transmission Costs: The total annual cost of the Local Network for

    purposes of Lcr, al Network Service shall be the amount specified in AUachment H

    until amended by FG&E or modified by the Commission.

    1.1 Curtailment: A reduction in firm or non-firm transmission service in response to

    a transmission capacity shortage as a result of system reliability conditions.

    1.2 Load Ratio Share: Ratio of a Transmission Customer's Non-PTF Network Load

    to FG&E's total load computed in accordance with Sections ILl0 and II.l 0(a) of

    this Schedule under Sections Supplementing Section 21 of the OATT and

    calculated on a rolling twelve month basis.

    Issued by: Mark H. Collin Trcasur~ Fitchburg Gas and Electric Light ~ y

    Issued on: May [5, 2009

    Effective: December 1, 2008

    Filed to comply with order of the Federal ~ Regulmory Commission, Dncket Nos. ER09-626-000 and ER09- 626-001, issued April 15, 2009, 127 FERC ¶ 61,053 (2009).

  • 20090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric Tm'iffNo. 3 Section II - Open Access Transmission Tariff Schedule 21 -FG&E

    S u b ~ Third Revised Sheet No. 3801 Superseding Second Revised Sheet No. 3801

    SCHEDULE 21-FC~E

    Fltehbure Gas and Electric Li~.ht Comnanv Local Service Schedule

    I. COMMON SERVICE PROVISION S

    Fitchburg Gas and Electric Light Company ("FG&E") is a participant in the New England

    Control Area and has agreed to provide transmission and ancillary services over PTF pursuant to

    the Tariff. The services provided under this Schedule 21-FG&E apply only to Non-PTF, except

    in the case of service to Network Customers that have all or part ofthch- Network Load directly

    connected to the FTF in the Local Network. These Network Customers shall pay for Local

    Network Service pursuant to Attachment H to this Schedule 21-FG&E. Provisions of this

    Schedule 21-FG&E shall have priority over any conflicting provisions in the Tariff.

    On January 30, 2009 FG&E requested confirmation of waiver of Sections 35.28, 37.5('o)

    and 38.2(aX1)-(7), the FERC Standards for Business Practices and Communications Protocols

    for Public Utilities adopted in Order No. 676 (Standards for Business Practices and

    Communications Protocols for Public Utilities, Order No. 676, HI FERC Stats. & Regs., Regs.

    Preambles 31,216 (2006)) and revised in Order No. 676-C (Standards for Business Practices and

    Communication Protacolsfor Public Utilities, Order No. 676-C, 73 Fed. Reg. 43,848 (July 29,

    2008), FERC Stats. & Regs, ¶ 31,274 (July 21, 2008)). See Unitil Power Corp., Fitchburg Gas

    and Electric Light Company, and Unitil Energy Systems, Inc., Dockets No. OA96-104-000 et al.

    (June 1, 2006) and Participating Transmission Owners (PTOs) and PTO Administrative

    Committee and the Schedule 20A Service Providers, Docket Nos. ER09-626~--000 and ER09-

    626-001 (January 30, 2009). These standards were developed by the North American Energy

    Standerds

    Issued by:. Mark H. Collin Treasurer Fitchburg Gas and Electric Light Company

    Issued on: ~ t X . j . ~ m m ~ , 2009

    Eff~w: December I, 2008

    Filed to comply with order of the Federal Energy Regulatory CononJ~ion, Docket No$ ~ , burned ~ I ~ , 2009, O t ~ 1274 FERC ¶ 61,0~3-70 (200~8).

  • t0090518-0104 FERC PDF (Unofficial) 05/15/2009

    ISO New England Inc. FERC Electric TariffNo. 3 Sectio~ II - Open Access Transmission Tariff Schedule 21 -FG&E

    Subst i~ Second Revised Sheet No. 3801A Superseding First Revised Sheet No. 3801A

    Board and incorporated by reference through addition of Part 38 and Sections 35.28 and 37.5(b)

    ofthe Commission's Regulations pursuant to Docket No. RM05-5-000. FG&E also requested

    waiver of WEQ-008, WEQ-011 and WEQ-013. See Participating Transmission Owners (PTOs)

    and F r o Administrative Committee and the Schedule 20A Service Providers, Docket No. ER09-

    626----000 and ER09-626-001 (January 30, 2009). The renuest f0~ waiver was granted by the

    Commission in its order dated April I 5, 2009, UT-== ::.'-::=.-=z =f = ~ - . ! r. . . . . . ..~_ ^ .~._

    1 Definitions

    1.0 Annual Transmission Costs: The total annual cost of the Local Network for

    purposes of Local Network Service shall be the amount specified in Attachment H

    until amended by FG&E or modified by the Commission.

    1.1 Curtailment: A reduction in firm or non-firm transmission service in response to

    a transmission capacity shortage as a result of system reliability conditions.

    1.2 Load Ratio Share: Ratio of a Transmission Customer's NOn-PTF Network Load

    to FG&E's total load computed in accordance with Sections ILlO and H.10(a) of

    this Schedule under Sections Supplementing Section 21 of the OATT and

    calculated on a rolling twelve month basis.

    Issued by:. Mark H. Collin Treasm'~ Fiw, ldm~ Gas and Electric Light Company

    Issued on: I~l.~Sh,mmW-30, 2009

    Effective: December I, 2008

    Filed to comply with order of~¢ Federal Energy Regulatory Commission, Docket Noi. ER09-626-000 and ER09- 626-00 mMo~oo~, ~ued ~ I ~ . ~ , 200~, ~ 1214 ~.RC 1 61,0~0(200~).