Magnificent Seven Final demonstration 16.3.2005. T-76.115 Project Review. Agenda. Product presentation (5 min) Overview Customer benefits Demo (20 min) Project evaluation (10 min) Project planning Implementation 1 Implementation 2 Finalization & Delivery Summary Future work - PowerPoint PPT Presentation

Citation preview

Page 1: T-76.115 Project Review

T-76.115 Project Review

Magnificent SevenFinal demonstration

16.3.2005

Page 2: T-76.115 Project Review

2

T-76.115 Project ReviewT-76.115 Project Review

Agenda

Product presentation (5 min) Overview Customer benefits

Demo (20 min) Project evaluation (10 min)

Project planning Implementation 1 Implementation 2 Finalization & Delivery Summary Future work

Discussion and questions (5 min)

Page 3: T-76.115 Project Review

3

T-76.115 Project ReviewT-76.115 Project Review

Product presentation

Page 4: T-76.115 Project Review

4

T-76.115 Project ReviewT-76.115 Project Review

Product presentationOverview

IRMii is an information resource management software, which can be used to manage any type of resources.

Based on an old tool (IRM). Essentially made for Nokia Networks to manage computer-related resources.

Interface between customers-lab personnel. Reporting tool of resource availability and other related information. Resource tracking

IRMii

Customer

Administrator

HTTP

Page 5: T-76.115 Project Review

5

T-76.115 Project ReviewT-76.115 Project Review

Product presentationBenefits

Good control over resource usage Good customer-administrator interaction Any resources can be managed Easy to learn Easy to use Integrated into Nokia intranet

Uses Nokia LDAP Nokia look&feel

Implementation Modular Easy to maintain Easy to develop further

Extended accessibility for customers myirm myprogramme Easy to follow what is happening

Page 6: T-76.115 Project Review

6

T-76.115 Project ReviewT-76.115 Project Review

Demonstration

20 min

Page 7: T-76.115 Project Review

7

T-76.115 Project ReviewT-76.115 Project Review

Project evaluation

Page 8: T-76.115 Project Review

8

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationProject planning

First meetings with the customer to discuss the project domain. Setup of infrastructure

Development platforms Documentation system Et cetera

Documented work practices Deliverables

Project plan Requirements document Use cases

Problems Unbalanced working hours Slow start with PEAR learning Requirements not studied enough Installation of old IRM

Page 9: T-76.115 Project Review

9

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationImplementation1

System architectural work done. Minor testing done. Deliverables

Technical specification Test plan and QA plan Demonstration version of IRMii

Problems Requirements changing. Everyone still not understanding the system. GUI specifications not done. Installation of IRM

Page 10: T-76.115 Project Review

10

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationImplementation2

Most of implementation done. Extraordinary work done despite materialized risks and problems. Testing Deliverables

Test cases Test log Test report Peer test plan Database migration plan User’s and administrator’s guide First version of IRMii

Problems Lack of motivation Slow progress Hour usage

Page 11: T-76.115 Project Review

11

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationFinalization & Delivery

Finalization of system Testing and bug fixing Peer-testing Deliverables

Final report Final version of IRMii

Problems Too few hours to do any new implementation

Page 12: T-76.115 Project Review

12

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationSummary – customer goals

Goals of the customer 8 goals have been met:

IRM as baseline Fully-functional core system Modular and extendable implementation Source code follows conventions GUI uses Nokia guidelines Intranet-integrated authentication mechanism Integrated customer front-end and administrator back-end Migration plan for old data

1 goal still to be verified by the customer: Light-weight and minimal overhead

1 goal not completely met: Well-documented

Page 13: T-76.115 Project Review

13

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationSummary - requirements

Total 129 requirements of which 101 implemented. Most requirements have been implemented and verified A couple mandatory still not implemented, but they should maybe had

been lower priority requirements. Unbalanced prioritization

“impossible” to divide them in any other way. IRM as baseline

Page 14: T-76.115 Project Review

14

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationSummary – quality assurance

12755 lines of code 7200 lines of comments

Only three bugs open 46 bugs closed

Quality assurance OK

All bugs Open bugs

Page 15: T-76.115 Project Review

15

T-76.115 Project ReviewT-76.115 Project Review

Project evaluationFuture work

Real-environment deployment will determine the level of quality.

What would be nice? Searching/sorting functionalities Reports Notifications and announcements Binary attachments Fine-tuning the code Event logging (Automated) unit testing for all classes and GUIs Documentation for users, administrators and developers Roll-back option for actions (undo) Knowledge base add-on

Page 16: T-76.115 Project Review

Thanks toOur customerOur mentor

Course personnel