System Analysis and design by Balirwa Moses 2010
1
Systems Analysis and Design
Instructor: Balirwa Moses
Email: [email protected]
System Analysis and design by Balirwa Moses 2010
2
Introduction
•The Systems Development Process (Overview)•Project Selection and sources of Projects
System Analysis and design by Balirwa Moses 2010
3
Course Overview Business and government rely heavily on information systems to support their missions and goals. In fact it is almost impossible to conduct substantial business these days without 'computers''. Many people use the word "computers" as a surrogate for the information system on which they are relying.
This is an introductory resource for systems analysis, design, and implementation of information systems. Systems analysis, design, and implementation are, in the broadest sense, the processes used by professionals to develop or maintain information systems.
System Analysis and design by Balirwa Moses 2010
4
Objective
• To give an understanding of the methodologies and the applicability of the steps involved in analysing, designing, testing and implementing a computer / information system.
Why?• Projects do not succeed by chance• Successful IT projects follow systematic “analysis
and design” process
System Analysis and design by Balirwa Moses 2010
5
Introduction
• Earlier applications that used computers were business applications, such as keeping records of transactions, Airline reservations etc.
• Computers are now becoming part of virtually every activity in an organization.
System Analysis and design by Balirwa Moses 2010
6
What Information Systems Can Do
PORT OF ROTTERDAM
• Largest commercial port
• 30,000 ocean going vessels & 150,000 river boats per year
• 300 million tons of cargo per year
• $35 billion in revenue per year
• Fierce competition from other ports
• Develop plan 2010 - $23 billion to be spent on developing IS
System Analysis and design by Balirwa Moses 2010
7
• Port business is very dependent on quick information exchange between the companies involved
• Large oil companies, freight forwarders, custom brokers need to get there IS connected with that of the port for fast exchange of cargo manifests, import permits etc.
• All such documents in digital form
• Similar methods adopted by Port of Singapore
• Processing time reduced from 2-4 days to 15 minutes
System Analysis and design by Balirwa Moses 2010
8
• Keeping a ship in dock for an extra day costs its owners dearly, amounting to millions of dollars
• Singapore port has cut down it’s processing staff by 75%
• Volume of shipment has doubled• Economies of EDI benefits both customers & the
port• Container handling companies can prepare the
appropriate freight just in time for truck arrival• The times that trucks spend in the port has been
cut down to 15 to 20 minutes from a previous 1-2 hours
System Analysis and design by Balirwa Moses 2010
9
• Even a small company now stops at the port 50-55 times a day
• Vessel Traffic Management System – provides traffic controllers with a complete overview of traffic in the port 24 hrs. a day
• Maintains historic data too for seagoing ships
• Helps managers to control current operations as well as plan for the future
• Gets help from Rotterdam’s Erasmus University
• Will create many job opportunities in the IT sector
System Analysis and design by Balirwa Moses 2010
10
Definition
• SA & D covers the entire systems development process from planning all the way through implementation, maintenance, and evolution.
• It is a process that includes all activities performed to produce an automated IS.
System Analysis and design by Balirwa Moses 2010
11
Justification of SA & D
What an organization needs to do in order to computerize.
System Analysis and design by Balirwa Moses 2010
12
What is a System?
• A System is set of interrelated components, working together for a common purpose.
• A generic systems model consists of six components – inputs, outputs, controls, feedback, and boundary.
• Using predetermined controls, a system accepts inputs at its boundary, processes them into outputs, and provides a feedback mechanism for taking any necessary corrective action.
System Analysis and design by Balirwa Moses 2010
13
Cont…
• The internal control subsystem either directly implements change to the IS or notifies the end-user that the system is not functioning properly.
• Controls ensure that input data is valid before its processed, that file and database data are protected against unauthorised access and update, that recovery procedures are available for a system catastrophe, that output information is disseminated to proper end-users, and that other relevant conditions are met.
System Analysis and design by Balirwa Moses 2010
14
System Boundary• A boundary (scope) is the perimeter or border of
the system – elements, features, options, that will be included in the system.
SystemProcessing
Boundary
Inputs Controls
Feedback Outputs
Systems Model with six components
System Analysis and design by Balirwa Moses 2010
15
Components of an Automated Information System
• An IS is an arrangement of interdependent human and machine components that interact to support the operational, managerial, and decision-making information needs of the business’s end-users.
• An IS is made up of:-• Hardware• Software• People• Data• procedures
System Analysis and design by Balirwa Moses 2010
16
An Automated Information System
Data People
Procedures
Hardware
Software
System Analysis and design by Balirwa Moses 2010
17
Characteristics of an Information System
• Data – are either (I) input via some data entry device, (II) already in the system and stored on a storage device, or (III) displayed or printed on an output medium.
• Function (process, method) – is a transformation or action taken by the IS. Functions carry out and enforce business policies, rules, and procedures.
• Behaviour – is the observable effects of a request.
System Analysis and design by Balirwa Moses 2010
18
Basic Characteristics of an IS
• Data: input, stored, or output• Function: business activity performed• Behaviour: the observable effects of a request
Data Functions
Behaviour
System Analysis and design by Balirwa Moses 2010
19
Systems Development Process(Overview)
• SA & D takes a much broader perspective and focuses on:
• Systems Planning – performing planning and initial feasibility activities to determine which IS projects take priority over others.
• Systems Analysis – understanding and documenting the requirements of a specific problem domain. A problem domain refers to the business problem or function being planned, analysed, designed, and ultimately implemented as an automated IS.
System Analysis and design by Balirwa Moses 2010
20
Cont…
• Systems design – designing an appropriate solution for the problem domain based on the documented requirements from SA.
• Systems Implementation – constructing, testing and installing the information system and having the users use the IS.
• Systems Evolution – maintaining and enhancing an IS so that it continues to meet the needs of the business.
System Analysis and design by Balirwa Moses 2010
21
What does a Systems Analyst Do?
• A systems analyst studies the problems and needs of an organisation to determine how people, methods, and computer technology can best accomplish improvements for the business.
Duties of a Systems Analyst• Look at how information is used, handled and
manipulated in an organization.
System Analysis and design by Balirwa Moses 2010
22
Cont…
• Identifying inefficiencies in the current system that the organization is using e.g. delays, high operating costs, huge clerical effort.
• Analyze the results of the investigation that will lead to designing the system.
• Design and specification of a new system which overcomes the inefficiencies and meets organization objectives.
• Oversees the process of testing during the testing of the system.
System Analysis and design by Balirwa Moses 2010
23
• Qualifications of SA– Very wide and deep understanding of the
concepts of IT.– Ongoing interest in updating one’s knowledge
in IT.• Qualities of a SA
– Working knowledge of IS Techniques and Technology
– Computer Programming Knowledge– Problem-solving skills (creativity)– Interpersonal Relations skills (confidence,
persistent, patience)– Interpersonal communication skills
System Analysis and design by Balirwa Moses 2010
24
Systems Analyst
Vendors
Steering Committee
Users
Managers
Database Administrators
Programmers& Technical
Staff
Stakeholders of an Information System
System Analysis and design by Balirwa Moses 2010
25
Cont…
• NB. These teams will be created and disbanded as projects are started and completed or cancelled.
What is the analyst’s role in the systems project?• The analyst may be viewed as a facilitator. The
analyst acts as the interface among many different types of people and facilitates the development of computer applications through these people.
• The analyst may well be the only individual who sees the big picture of the system.
System Analysis and design by Balirwa Moses 2010
26
Steering Committee
Role of the Steering Committee• This committee is formulated in the organization
to oversee the Systems Study and thereafter.• Steering Committee is usually composed of cross
functional, senior managers within a business:– Personnel from IT department– Vice presidents / directors– Accounts department– Administration
System Analysis and design by Balirwa Moses 2010
27
Cont…
– Data processing department– SA team (if it’s from outside)– Senior Information Systems Manager
Functions of the Steering Committee:• The main role of this group is to conduct high-
level reviews and evaluations of proposed IS development projects and make recommendations for prioritization and resources for the projects.
System Analysis and design by Balirwa Moses 2010
28
Cont…
• Study, determine and maintain an IT policy for the organization.
• Get views and requirements of the user dept to be represented as they try to look for solutions for the entire organization.
• Initiating IT systems development projects.• Interviewing and appointment of IT personnel.• Selecting suppliers and negotiating supply
contracts with them and include penalty clauses.
System Analysis and design by Balirwa Moses 2010
29
Cont…
• Vendors are those businesses which support the IS development effort, such as consultants, hardware, software companies, training companies, telecommunication companies, documentation companies, and so on.
System Analysis and design by Balirwa Moses 2010
30
Stakeholder
Information Technology staff
AnalysisDesign
&Implementation
ProblemDefinitionSkills (2)
Requirements(1)
ContinuedInvolvement (5)
RequirementSpecification (3)
Problem Solution Skills (4)
InformationSystem (6)
General model of Systems Analysis, Design & Implementation
System Analysis and design by Balirwa Moses 2010
31
Where do Systems Projects Originate?
• New or changed IS development projects come from problems, opportunities, and directives and are always subject to one or more constraints. Most maintenance of existing IS projects come from users discovering real problems with existing IS.
• Problems – may either be current, suspected, or anticipated. Problems are undesirable situations that prevent the business from fully achieving its purpose, goals, and objectives.
System Analysis and design by Balirwa Moses 2010
32
Cont…
• An Opportunity – is a chance to improve the business even in the absence of specific problems. This means that the business is hoping to create a system that will help it with increasing its revenue, profit, or services, or decreasing its costs.
• A Directive – is a new requirement that is imposed by management, government, or some external influence. I.e. are mandates that come from either an internal or external source of the business.
• Constraints are limitations and compromises that come with the soon to be developed IS.
System Analysis and design by Balirwa Moses 2010
33
Systems Development Life Cycle• The Systems development life cycle (SDLC) is
the process by which an IS comes to life and maintains its usefulness to a business as it moves from inception to replacement.
Phases include:• Systems planning – planning for the new system.• Feasibility study (optional) – determines whether
or not significant resources should be committed to the other phases of the life cycle.
• Systems study and Analysis – requirements determination.
System Analysis and design by Balirwa Moses 2010
34
Cont…
• Conceptual (logical)– define the inputs, files, processing, and outputs for the new system.
• Physical design – outputs, inputs, files, methods, and procedures, internal controls, (these can be done by prototyping).
• Construction, and testing, or purchase, testing, and integration.
• Implementation – Conversion from current system to new or changed system; Training.
• Evolution for enhancements and maintenance – continuous systems support.
System Analysis and design by Balirwa Moses 2010
35
Principles to guide Systems Development• The system is for the end-user. Get the end-user
involved through out the systems development.• Establish phases and tasks to better manage systems
development projects.• Systems development tasks aren't strictly sequential.
They can overlap. Also, you may need to backtrack / revisit to correct mistakes.
• Systems are capital investments. They should be economically justified as such.
• Establish checkpoints to re-evaluate feasibility, and don’t be afraid to cancel infeasible projects despite sunk costs.
• Documentation should be the natural, working by-product of systems development. Don’t post document phases or tasks.
System Analysis and design by Balirwa Moses 2010
36
Feasibility Analysis and Requirements Determination
•Feasibility Types – Technical, Operational and Economic, and others
•Requirements Determination Sub activities
•Fact gathering techniques
System Analysis and design by Balirwa Moses 2010
37
How to Survey Feasibility of the project and study the current System
Purpose and objectives of the Survey and Study: • To understand the current system and its problems
and to determine if solving the problems would be beneficial.
• NB: The Survey phase is a preliminary investigation of the system, whereas the study phase is a much more detailed investigation.
System Analysis and design by Balirwa Moses 2010
38
Feasibility Study
• Feasibility study:• Is the measure of how beneficial the development
or enhancement of an IS would be to the business. • A preliminary investigation is done at this stage.
Purpose of the feasibility study:• Define the problem – it provides a broad statement
of user requirements in users terms, or what the users expect the system to do (project goals)
System Analysis and design by Balirwa Moses 2010
39
Cont…
– This phase also sets project bounds, or scope of the system which defines what part of the system can be changed by the project and what parts are to remain unchanged. Document flow diagrams & a context diagram may help at this stage.
– Identify the users of the system.– Specify the resources to be made available for
the project (resource limits).
System Analysis and design by Balirwa Moses 2010
40
Cont…
– Propose general Hardware/systems software options in broad terms (client-server configuration), which is necessary to size the project.
– Perform a value assessment, such as the cost-benefit analysis, based on the project size.
– Assess the project risks.– Recommend whether to proceed with the
project or abandon the project
System Analysis and design by Balirwa Moses 2010
41
Cont…– project goals, project bounds and resource
limits are some times called a project’s terms of reference and set by the management of the organization.
a) Feasibility Types• Operational feasibility – is the measure of how
well a particular IS will work in a given environment. I.e. will the solution fulfil the end-users’ requirements? Will the organizational change result in an acceptable quality of working life for those affected by the system?
System Analysis and design by Balirwa Moses 2010
42
• Technical feasibility – is the measure of the practicality of a specific technical IS solution and the availability of technical resources. I.e. Do we have the technology & skills needed to develop & operate the system?
• Economic feasibility – is the measure of the cost-effectiveness of an IS solution. I.e. Will the system result in competitive advantage to the enterprise?
• Legal – Will the proposed system conform to laws & regulations?
• Ethical – Will the proposed system conform to the norms of ethics?
System Analysis and design by Balirwa Moses 2010
43
b) Other aspects of feasibility study:• What volumes of data will be handled, what
numbers of users in various categories will be supported and with what levels of service, what file & database capacities the system will need to maintain, and other quantitative estimates of this type.
• What interface will be provided for the users to interact with the system, based on the skills & computer proficiency of the intended users.
• What control measures will be undertaken in the system.
System Analysis and design by Balirwa Moses 2010
44
Requirements Determination• It addresses the gathering and documenting of the
true and real requirements for the IS being developed.
• A Problem Domain – refers to the business problem, area, or function being investigated and analysed.
• The purpose of the investigation and analysis is to determine the need to purchase, make, or revise an IS to enhance the business activity of the problem domain.
• Requirements is the wants and /or needs of the user within a problem domain.
System Analysis and design by Balirwa Moses 2010
45
Frameworks for understanding and doing Requirements Determination
1. Requirements Determination Sub activities - Requirements determination is the general data-gathering activity done during analysis. It has 4 sub activities: -
• Requirements anticipation – the SA hypothesizes that particular requirements are relevant based on his or her previous experience with other similar systems and knowledge about the problem domain.
• Requirements Elicitation – the SA uses this activity to gather the essential requirements from the stakeholders employing a variety of techniques, such as interviews, questionnaires.
System Analysis and design by Balirwa Moses 2010
46
Cont…• Requirements Assurance – the SA uses this activity of
requirements assurance to validate and verify the requirements with the user as being the real and essential requirements.
• Requirements Specification – this is the activity that the SA uses to explicitly catalo and document the requirements either during or after the elicitation and assurance activities. This is a doc that outlines all the requirements that the proposed system must address. It forms a contract btn the system analyst and the customer the specification document further provides a basis for system testing and validation. It also helps in system in trouble shooting.
System Analysis and design by Balirwa Moses 2010
47
Cont…2. The PIECES Framework - Focuses on the
actual work of doing requirements determination. The model is used to classify identified requirements into one of six subject areas:- Performance, Information, Economy, Control, Efficiency, and Services.
• Performance questions address how the system needs to perform for the user. Issues of throughput and response time are considered.
• The Information category provides the basis for the information or data model that the system needs to maintain. Issues dealing with input data, output data, and stored data are considered.
System Analysis and design by Balirwa Moses 2010
48
Cont…• Economy addresses project development and
operational cost information along with any objectives that may relate to economy or savings associated with the system.
• The Control category is closely associated with system security issues as well as the editing required on the incoming data. Any issues related to controlling the use of the system, its outputs and inputs, or required controls over the data can be included in this category.
• Efficiency is a measure of method correctness. I.e. are things being done right?
• Services are functional requirements of the system.
System Analysis and design by Balirwa Moses 2010
49
Cont…
3. Object-oriented Requirements Determination Modelling Activities – emphasizes objects, patterns, responsibilities, and scenarios.
• An object is a person, place, or thing, such as student, faculty, sales clerk, city hall, ATM machine.
• A pattern is a template of objects with stereotypical responsibilities and interactions; the template may be applied again and again, by analogy. Pattern instances are building blocks used to assemble effective object models.
• Responsibility is associated with objects and has three aspects to it: “What I know,” “who I know,” and “what I do.”
System Analysis and design by Balirwa Moses 2010
50
• What the object knows about itself – the things that an object knows about itself are called attributes. An attribute is a characteristic associated with a person, place, or thing object. Each characteristic has a state or value.
• Who the object knows – a problem domain has many objects within it. Who the objects knows identifies relationships between objects.
• What the object does – this translates into a list of services for each object. A service is some functionality that an object is responsible for performing.
• A scenario is a time-ordered sequence of object interactions to fulfil a specific responsibility. A scenario would be developed for each of the preceding services.
System Analysis and design by Balirwa Moses 2010
51
Cont…
• Coad’s object-oriented requirements determination modelling approach would involve the following four major activities:-
• Identify purpose and features of the IS.• Identify objects and patterns.• Establish object responsibilities: “What I know,”
“who I know,” and “what I do.”• Work out the system’s dynamics using scenarios.
System Analysis and design by Balirwa Moses 2010
52
Methods Used to gather an IS Requirements
Information Gathering Techniques
Asking the users
Deriving from an
Existing System
Deriving from the Analysis of
the Business Area
Experimentingwith the system
underdevelopment
InterviewingQuestionnairesGroup Decision Making Process Data analysis
Document analysisObservationParticipation
Business SystemsPlanningCritical success FactorsDecision analysis
ThrowawayprototypingEvolutionaryprototyping
System Analysis and design by Balirwa Moses 2010
53
Information Gathering Techniques
1. Asking the usersa) Interviews - Is a planned meeting during which
you obtain information from users of the existing system.
• Advantages of interviews– An opportunity to gather information from
respondents who are knowledgeable about the system under study.
System Analysis and design by Balirwa Moses 2010
54
Cont…
– Best source of qualitative information I.e. opinions of people, policies, and subjective description of activities and problems.
– Useful for respondents who do not communicate properly in writing or are lazy to complete questionnaires.
– Allow SA to discover areas of misunderstanding unrealistic expectations and indications of resistance to the proposed system.
System Analysis and design by Balirwa Moses 2010
55
Cont…
• Disadvantages– Subjective and sometimes irrelevant.– Communication problems– Misunderstandings can rise from different user
values, or technical jargons by the SA.• Guidelines to interviewing
– The interviewer should acquaint him/herself with the work of the person he/she is going to interview.
System Analysis and design by Balirwa Moses 2010
56
Cont…
– Prepare before hand.– Make an appointment, and the interview takes
place away from the interviewee’s place of work to avoid interruptions.
– The interviewer should do little talking, let the interviewee do more talking, and make sure the discussion stays on truck.
– Be able to separate his/her opinion from facts and fictions from facts.
– Interview one person at a time.
System Analysis and design by Balirwa Moses 2010
57
Cont…
– Avoid the temptation to try and cover too much ground.
– End with a brief statement of what has been discussed. I.e. give a summary to the interviewee to cross-check with what been discussed, and if there are any misconceptions, corrections are made.
System Analysis and design by Balirwa Moses 2010
58
Cont…
b) Questionnaires – is a document containing a number of standard questions that you ask of a large number of people.
• Advantages– Can be filled by a large number of
respondents.– Can get reliable information.– Allow collection of data and can be filled in
at leisure.
System Analysis and design by Balirwa Moses 2010
59
Cont…
– Use of standardized formats yield more and reliable data.
– It also ensures anonymity of respondents which can lead to more honest responses.
• Disadvantages– Misinterpretation of the question.– Does not lead to further/deep probing.– They don’t allow analysts the opportunity of
observing and sensing reactions.
System Analysis and design by Balirwa Moses 2010
60
• Guidelines to Questionnaire design– Should begin with a preamble – Bear in mind the level of intellect and the level
of interests of the respondents– Keep questions short, unambiguous and
unbiased, and where possible have multi-answers.
– If possible avoid too much branching.– If the survey is extensive, you may consider use
of automated means of reading responses.– Pretest the questionnaire before using it for the
purpose of checking whether all the questions will be easily understood.
System Analysis and design by Balirwa Moses 2010
61
c) Group Decision-making process/Formal Sessions
– Workshops and Brainstorming sessions are increasingly being used to draw out new ideas for systems.
– Get people who are familiar with the issues together to spontaneously explore ways of improving a system.
– Delphi technique, group members may be scattered around the world. A questionnaire may be circulated.
System Analysis and design by Balirwa Moses 2010
62
Cont…
Important factors:
No criticism
“Anything goes”
The more the better
Build on the ideas of others
System Analysis and design by Balirwa Moses 2010
63
Cont…
2. Deriving from an existing system
Possibilities here are:
• The system that will be replaced by the proposed system
• A system similar to the proposed one that has been installed elsewhere & is accessible to the analyst
• A proprietary package, whose functionality may be analyzed.
System Analysis and design by Balirwa Moses 2010
64
Cont…
a) Data analysis: The requirements for the proposed system are derived from the data contained in inputs (orders, invoices, time cards etc.) or data contained in the outputs (reports, worksheets) of the existing system
b) Sampling of existing Documentation – when you are studying an existing system, you can get a good idea by studying existing: documentation, forms, and files
System Analysis and design by Balirwa Moses 2010
65
Cont…
– First document that analyst should seek out is the organizational chart
– Be sure that they are relevant and up-to-date
– Document analysis usually accompanies the “asking” methods, as documents are difficult to be interpreted independently.
System Analysis and design by Balirwa Moses 2010
66
c) Observational Studies
– Systems Analyst participates in or watches a person perform activities to learn about the system.
– often used when validity of data collected through other methods is in question or when the complexity of certain aspects of the system prevents a clear explanation by the end users.
– People usually feel uncomfortable when being watched.
System Analysis and design by Balirwa Moses 2010
67
Cont…
• Advantages of Observations– Permits correction of any misconceptions or
erroneous impressions made before.– Permits verification of statements made in
interviews as well as determine if procedures operate as specified in the system documentation.
– You become better acquainted with the operating personnel who will be implementing the new or changed system.
System Analysis and design by Balirwa Moses 2010
68
d) Measuring – It is important in systems investigation, analysis and design in terms of:-
– Magnitude of the exercises– Processes– Quantity of work– Time taken to accomplish work (time frame
works)– Rates of doing work– Intervals• These help to determine the systems
requirements, e.g. s/w, h/w e.t.c…
System Analysis and design by Balirwa Moses 2010
69
3. Deriving the requirements from the analysis of the business areaUsing Business Systems Planning (BSP)
Define Business Processes
Define Business
Data
Define IS Architecture
Analyze Current System support
InterviewExecutives
Define findings& conclusions
DetermineArchitecture
priorities
Review informationresource management
Develop recommendations
Reportresults
System Analysis and design by Balirwa Moses 2010
70
b) Critical Success Factors methodology“Those few critical areas where things must go right for the business to flourish”
Obtain CSF of
Manager B
Obtain CSF of Manager C
Combine individual CSFs
into Organizational CSFs
Derive Informational requirements
to support CSFs
Use CSFs to redesign the organization
and use informational requirements to plan IS
Obtain CSF of
Manager A
System Analysis and design by Balirwa Moses 2010
71
c) Establish informational needs of an individual manager by decision analysis
• Identify the key decisions that a manager makes
• Define the process by which the manager makes these decisions
• Define the information needed for the decision process
• Establish what components of this information will be delivered by the information system and what data will be needed to do so.
System Analysis and design by Balirwa Moses 2010
72
Cont…
4. Prototyping
– A method used to test or illustrate an idea and build a system in an explorative way.
– Used to discover user requirements
– Allows analyst to quickly create mock forms and tables to simulate the implemented system.
System Analysis and design by Balirwa Moses 2010
73
Identify basicUser requirements
Rapidly developprototype
Enable users to work with the prototype
Obtain user feedback
Modify the prototype
“Evolutionary Development” – complete document the final version, field it as the operational system
ThrowawayPerform furtherSystem devtWith lifeCycle, discardprototype
System Analysis and design by Balirwa Moses 2010
74
Advantages of a Prototype– Valuable for the design of the end user
interface of an IS. Users’ needs and behavior are not entirely predictable and are strongly dependent on the context of the situation. So it enables users to react immediately to the parts of the system they will be dealing with.
– It is more likely to produce a system that will fulfill user requirements, especially when it is used for decision-support applications.
System Analysis and design by Balirwa Moses 2010
75
Cont…
– It promises to eliminate excess development costs and design flows that occur when requirements are not fully captured the first time round.
– User satisfaction and morale are usually heightened because users can be presented with an actual working system, preliminary though it may be in a very short period of time.
System Analysis and design by Balirwa Moses 2010
76
Cont…
• Disadvantages– Prototyped systems still need to be fully
documented and tested, but often these steps are shortened.
– The final step to convert the prototype into a polished production system may not be carried out. I.e. if it works reasonably, management does not / may not see the need for reprogramming and redesigning.
System Analysis and design by Balirwa Moses 2010
77
Systems Analysis – Tools and techniques:
•Users Requirement Document
•Decision Tables, Decision Trees, Structured English
•Process Modeling with Data flow diagrams (DFDs).
•Data Modelling with Entity Relationship Diagrams (ERDs).
System Analysis and design by Balirwa Moses 2010
78
Requirements Analysis
• This process is usually characterized by the following activities:
• What outputs the system will produce, what inputs will be needed, what processing steps will be necessary to transform inputs into outputs, and what data stores (files or databases) will have to be maintained by the system.
System Analysis and design by Balirwa Moses 2010
79
Types of Requirements
• User Requirements – Statements in natural language plus diagrams of
the services the system provides and its operational constraints. Written for customers.
• System Requirements – A structured document setting out detailed
descriptions of the system services. Written as a contract between client and contractor.
System Analysis and design by Balirwa Moses 2010
80
User Requirement Document
• User Requirement Document (URD) – What the system should do (user requirement analysis).– Systems Analysts have to work out between
themselves on what the system should do. They are guided by the URD. The URD has 4 categories of information:
System Analysis and design by Balirwa Moses 2010
81
• Functional Requirements – these describe the desired functionality of the new system I.e. what is expected of the system in behavior terms e.g. outputs and inputs of the system.
Examples of Functional Requirements:• The user shall be able to search either all of the
initial set of databases or select a subset from it.• The system shall provide appropriate viewers for
the user to read documents in the document store.• The system shall be designed in a way that makes
it easy to update and easy to use.
System Analysis and design by Balirwa Moses 2010
82
• Non-Functional Requirements – these have the effect of limiting the choice so that if there many possible designs can be eliminated and don’t have to be assessed. They’re sometimes referred to as constraints. Usually concerned with the h/w, s/w, time and money constraints. Examples of NFR:
• The system shall not disclose any personal information about customers apart from their name and reference number to the operators of the system.
• The product shall use the company colors. • Only direct managers can see the personnel
records of their staff.
System Analysis and design by Balirwa Moses 2010
83
• Design Objectives – these are attributes of s/w that would enable comparison. Once the designer appreciates the relative importance that the user attaches to a certain property then that would be the most outstanding design objective e.g. should be user friendly, maintainable, easy to develop.
• Design Decisions – these are premature statements usually requested by experienced users e.g. how the behavior is to be achieved rather than what behavior is required. – Such statements should be withdrawn or interpreted
as non-functional requirements.
System Analysis and design by Balirwa Moses 2010
84
URD Diagram
URD
Analysis
SOR
D
RA DONFRFR
System Analysis and design by Balirwa Moses 2010
85
Example of A Decision Tree for a Discount Authorization process
Condition 1 Condition 2 Action
Pay within 10 days
Size of order over 10.000/=
Take 3% discount from invoice total
Pay within 10 days
5000 – 10000/= Take 2% discount from invoice total
Pay within 10 days
< 5000/= Pay full invoice amount
System Analysis and design by Balirwa Moses 2010
86
Example - Discount Authorization Process
Discount Authorization
Process
Pay within10 days
Pay after 10 days
Over 10.000 --- 3%Discount
5.000 – 10.000 --- 2%Discount
<5.000 --- pay full amount
----- No discount, payInvoice amount
System Analysis and design by Balirwa Moses 2010
87
Cont…
– Decision Tables – It is a tabular description of a selection structure. I.e. It is a graphic method for describing the logic of decisions. It provides a means of documenting procedures in which several complex decisions have to be made.
System Analysis and design by Balirwa Moses 2010
88
Decision Table diagram
Condition Statement
Condition Entries
Action Entries
Action Statement
1 2
3 4
System Analysis and design by Balirwa Moses 2010
89
Cont… Decision Tables
– Condition Statement – identify relevant items– Condition Entry – identify which value if any
apply a particular condition.– Action Statement – will list all the steps that
can be taken when a certain condition occurs.– Action Entry – identifies what specific actions
in the set to take when selected conditions or combinations of conditions are taken.
System Analysis and design by Balirwa Moses 2010
90
Example: Insurance Application Process
• Instructions to an insurance clerk reads as follows:
• Policy type 22 may be issued if the applicant has been issued with policy type 19 and is a married male or has been issued with policy type 19 and is married and under 25years. Alternatively if the applicant has not been issued with policy type 19 and is married female, policy 22 may be issued. Then a policy may also be issued to a male under 25 years, or married person who is 25 years or over. All other applicants are refused.
System Analysis and design by Balirwa Moses 2010
91
Insurance Application Process
Rule Else
Condition Stub 1 2 3 4 5
Has policy type 19? Y Y N . .
Married? Y Y Y . Y
Male? Y . N Y .
Under 25? . Y . Y N
Action Stub
Issue policy type 22 X X X X X
Reject X
System Analysis and design by Balirwa Moses 2010
92
Cont…
• Advantages of Decision Tables– Is concise, unambiguous, clearly conveying the
logic involved, hence less danger of omitting a logical possibility.
– Enhanced communication with action separated from conditions.
– Easier to draw and they’re easily understood.– Produces an automatic compact program
documentation.
System Analysis and design by Balirwa Moses 2010
93
Cont…
– Its format is highly standardized.– Can be checked mathematically for
completeness and that all test combinations have been considered.
– Disadvantage – however, they don’t show the sequence of decisions.
System Analysis and design by Balirwa Moses 2010
94
• Structured English - It is based on structured logic, or instructions organized into nested and grouped procedures and simple English statements such as add, multiply, move e.t.c.. I.e. it describes logical processes precisely and concisely. I.e. it uses narrative statements to describe a procedure.
• Developing Structures which express problem solutions:
• Sequence Structures – Is a single step or action included in a process. I.e. the completion of one process step in sequence after another process step. It doesn’t depend on the existence of any conditions, so when encountered, it is always taken.
System Analysis and design by Balirwa Moses 2010
95
Cont…• Decision Structures – Occurs when two or more
actions can be taken. I.e. the completion of one or two process steps based on the results of a test or condition. One must assess the condition and then make a decision to take the stated actions. E.g. the If statement.
• Iteration Structures – the completion of a process step repeated until the results of a condition terminates this repetition. e.g. Loops
• Discussion Question– When should a Systems Analyst choose a particular
process description tool / technique to use? (Guidelines for choosing a technique to use).
System Analysis and design by Balirwa Moses 2010
96
Structured Analysis
• It deals more with the logic of the system – requires the analyst to define what the system should do. I.e. breaking down the system into manageable subsystems – method for defining systems inputs, processes, and outputs, and for partitioning systems into subsystems or modules that show a logical graphic model of information flow.
• Objective of Structured Analysis - Is to document all the end user requirements for the proposed IS and present these requirements in the systems requirement document.
System Analysis and design by Balirwa Moses 2010
97
• Structured Analysis accomplishes the following:-– Views the system from the top to down.– Specifies the interfaces that exist between
modules.– Rigorously specifies the processes or
transformations that occur within each module.
Components of Structured Analysis • Data Dictionary – description of all the
data used in the system.
System Analysis and design by Balirwa Moses 2010
98
Cont…
• Graphic Symbols – icons and conventions for identifying and describing the components of a system and relationship among these components.
• Procedure and Process description – formal statements using techniques and languages that enable systems analysts to describe important activities that make up a system.
System Analysis and design by Balirwa Moses 2010
99
Cont…
Rules – standards for describing and documenting the system correctly and completely.
Data Flow Diagrams – show how data moves and changes through an IS in a graphical top-down fashion. I.e. a graphic representation of a system’s components processes and the interfaces between them.
System Analysis and design by Balirwa Moses 2010
100
• Process Modeling with Data flow diagrams (DFDs)
• DFDs are useful for modelling the scope of a systems project in terms of its interfaces with other systems, the business as a whole, and the outside world.
• DFDs show how data flow to, from and within an IS and the processes that transform data. They also show where the data are stored.
Symbols for drawing DFDs
System Analysis and design by Balirwa Moses 2010
101
Cont…
• DFDs are constructed using 4 symbols:
– Data flows ( ) - these show the movement of data between processes, external entities, and data stores in a DFD.
– Processes ( ) – they portray the transformation of input data flows to output data flows in DFDs.
System Analysis and design by Balirwa Moses 2010
102
Cont…
– Data Store ( ) – are either manual or automated inventories of data. E.g. computer files or databases, file cabinets, card files, microfiche e.t.c…
– External Entity ( ) – are originators or receivers of information outside the scope of the IS portrayed in the data flowing.
System Analysis and design by Balirwa Moses 2010
103
Cont…• General rules for drawing DFDs
– Any data flow leaving a process must be based on data that is input to the process.
– All data flows are named and the name reflects the data flowing between the processes, sources, and data stores.
– All the data needed to perform the process should be input to that process.
– The process should be independent of any other in the system – each process has its own input and output.
System Analysis and design by Balirwa Moses 2010
104
GENERATE BILL
CUSTOMER
GENERATE BALANCE
GENERATE REPORT
MANAGER
PAYMENTFILE
CUSTOMERFILE
Data FlowData Flow DiagramDiagram
System Analysis and design by Balirwa Moses 2010
105
Order processing systemCustomer
WarehousePicking-labels
Order
Out-of-stock-notice
Order-rejection-notice
Invoice
Context diagram of an order processing system
System Analysis and design by Balirwa Moses 2010
106
• Context diagram - It is a simple DFD that depicts the system being studied as it relates to other systems, the business, and the outside world – the interfaces flowing to or from external entities.
• DFDs can be drawn in various levels of details using a technique known as levelling, ranging from depicting an entire system’s “big picture” to showing the detailed processing of a single transaction. The entire collection of DFDs is called a levelled set.
System Analysis and design by Balirwa Moses 2010
107
Document Flow Diagram• A diagramming technique which is used to
identify physical movement of documents.• It shows where the document comes from,
where it goes to , and what it is called.
• The source and destination of the document are usually shown using an elliptical shape.
• For each document or communication that occurs in the system, identify the source and the target. This will help in developing a context diagram during analysis.
System Analysis and design by Balirwa Moses 2010
108
Document Flow Diagram of a Purchasing System
Supplier PurchasingDept
Stores
Order
Invoice
Delivery notes
System Analysis and design by Balirwa Moses 2010
109
Data Modelling using Entity Relationship Diagrams
Customer OrderPlaces
Contains Product
One Many
Customer No.
Name
Address
Balance due
Order No
Order Date
Order Price
Shipping Cost
Product No.
Product Name
Price
Many
Many
System Analysis and design by Balirwa Moses 2010
110
Data Modelling using Entity Relationship Diagrams
• A data Entity is anything, real, or abstract about which we want to store data. Most entities correspond to persons, objects, events or locations in the business environment.
• A data Relationship is a natural association between entities. All relationships are further described by words or symbols that indicate the number of occurrences of one entity that can exist for a single occurrence of the related entity.
System Analysis and design by Balirwa Moses 2010
111
• In the definition phase, we look at requirements independently. I this phase, data modelling is performed. Entities, data elements and relationships are identified.
• Data models complement process models. • In the selection phase, the following are
addressed:• The new files and databases to be designed are
identified.• How much data should be automated?• Should it be central or distributed data storage?• How relationships between data entities be stored?
System Analysis and design by Balirwa Moses 2010
112
Systems Design
•Architectural design process
•Output design, input design, User interface design, file & database design, program specification design
•Prototyping
System Analysis and design by Balirwa Moses 2010
113
• Systems Design – details how a system will meet the information requirements as determined by systems analysis.
• Note that the primary input to design is the requirements specification document, which is the output from analysis. This document is critical to the success of the system because it represents the users’ requirements for the system.
Systems Design
System Analysis and design by Balirwa Moses 2010
114
Cont…• Much of the contents of this document get
transformed into design equivalents as the systems analysts begin to customize the proposed IS for the specific h/w and s/w platforms to be used for its creation and ultimate operation in some production environment within an organization.
• These specifications should be detailed enough to become inputs to the programming stage that follows the design. The design process is usually broken down into two parts.
System Analysis and design by Balirwa Moses 2010
115
Cont…
• Logical design – produces the general specification of the resources that will make up the system - lays out the components of the IS and their relationship to each other as they would appear to users.
• Physical design – produces a complete, detailed specification of the named program components and of the databases to be maintained by the system - the process of translating the abstract logical model into the specific technical design for the new system.
System Analysis and design by Balirwa Moses 2010
116
Cont…
– This activity addresses all of the environment, platform, and human-computer interface specifics for the proposed information system. Issues to be discussed and decided here include all aspects of the five components of an information system such as: hardware, software, data, people, procedures.
System Analysis and design by Balirwa Moses 2010
117
Objectives of Systems Design
• Specify logical design elements – detailed design specifications that describe the features of an IS: I/P,O/P, files, databases, and procedures.
• Support business activities – results of using the system help business performance. Design fits the way the firm conducts its business.
System Analysis and design by Balirwa Moses 2010
118
Cont…
• Meet user requirements – in terms of:- performing appropriate procedures correctly; presenting proper form of information; providing accurate results; using appropriate methods of interaction; providing overall reliability.
• Easy to use – favorable human engineering; ergonomic design that is physically comfortable and contributes to user effectiveness and efficiency.
System Analysis and design by Balirwa Moses 2010
119
Cont…
• Provide software specifications – specific components and functions with adequate detail to construct application software.
• Confirm to design standards – design and specification of the design in accordance with prescribed rules and practices of the organization.
System Analysis and design by Balirwa Moses 2010
120
Architectural Design
- The design process of identifying subsystems of a large system and establishing a frame work for sub-system control and communication.
- It involves identifying major system components and their communications.
• A sub-system is a system in its own right whose operation is independent of the services provided by other sub-systems.
• A module is a system component that provides services to other components but would not normally be considered as a separate system
System Analysis and design by Balirwa Moses 2010
121
Architectural design process
• System structuring– The system is decomposed into several principal
sub-systems and communications between these sub-systems are identified
• Control modelling– A model of the control relationships between the
different parts of the system is established
• Modular decomposition– The identified sub-systems are decomposed into
modules
System Analysis and design by Balirwa Moses 2010
122
What features must be designed – Logical Design
• Design specifications describe the features of a system. These are the elements of the system and their appearance to the users. These include:– Data Flows – the movement of data into,
around, and out of the system are specified.– Data Stores – temporary or permanent
collections of data are specified
System Analysis and design by Balirwa Moses 2010
123
Cont…
– Processes – activities to accept, manipulate, and deliver data and information, may be manual or computer-based are specified.
– Procedures – methods and routines for using the IS to achieve the intended results are specified.
– Roles – the responsibilities of all persons involved with the new system, including end-users, computer operators, and support personnel are specified.
System Analysis and design by Balirwa Moses 2010
124
Cont…
– Controls – standards and guidelines for determining whether activities are occurring in the anticipated or accepted manner I.e. under control. It also specifies actions to take when problems or unexpected circumstances are detected. May include the reporting of exceptions or procedures for correcting problems.
System Analysis and design by Balirwa Moses 2010
125
Physical design
• When physical design is completed, the following aspects of the system will have to be specified:
• System outputs – report layouts, document designs, screen designs
• System inputs – data inputs & their validation procedures
• User-system interface – exact protocols of user-system interaction (menu trees, icons for graphic interfaces etc.)
• Platforms – H/W & S/W platform (s)• Acquisition method – the way each component of
the application will be acquired
System Analysis and design by Balirwa Moses 2010
126
• Modular design of the programs that will be developed for the application, interfaces between the modules, and the specification of the logic of the individual modules. The algorithms to be implemented in each module will be selected.
• Detailed test plan – the plan for various levels of testing to be conducted during the later stages of development & a test suite containing the sets of tests for these levels.
• Database – logical & physical designs. Needed capacities of files & databases have been estimated.
• Controls – application-specific controls, as well as the necessary general controls.
System Analysis and design by Balirwa Moses 2010
127
Cont…
• Documentation – a full set of documentation to be delivered with the system is specified. The documentation will include the user manual, systems & operation documentation, maintenance documentation. The requirement specification & the system design documentation will also be included in the documentation package.
• Conversion plan – the plan for converting the present way of doing things to the new system
System Analysis and design by Balirwa Moses 2010
128
Techniques & Tools used in design
• Structured design - The principal product of logical design are structure charts of the programs that need to be coded & tested. They are of 2 kinds:-
• Modular structure
• Hierarchical design
System Analysis and design by Balirwa Moses 2010
129
COMPUTE-SALES-TOTAL
OUTPUT-TOTAL
READ-SALES-TRANSACTION
ADD-TO-TOTAL
Sales
Transaction Sales
TransactionSales Total
Sales Total
A
CB
Modular Design
Hierarchical Design
System Analysis and design by Balirwa Moses 2010
130
PROCESS A
PROCESS B
SEQUENCESEQUENCE
PROCESS CPROCESS D
R
TRUE
SELECTIONSELECTION
PROCESS E
S
TRUE
ITERATIONITERATION
Program Program FlowFlowchartchart
System Analysis and design by Balirwa Moses 2010
131
LOAD & VALIDATE
COMPARE & UPDATE
VALID TRANS-
ACTIONS
PAYROLL SYSTEM
TIME CARDS
HUMAN RESOURCES
DATA
PAYROLL MASTER
UPDATED PAYROLL
MASTER
DIRECT DEPOSITS
GENERAL LEDGER
PAYROLL REPORTS &
CHECKS
PAYROLL MASTER
System Flowchart
System Analysis and design by Balirwa Moses 2010
132
DOCUMENT
DATABASE
ON-LINE DISPLAY TELECOMMUNICATIONS LINK
INPUT/OUTPUT PROCESS MAGNETIC TAPE
PUNCHED CARD MANUAL OPERATION ON-LINE STORAGE
ON-LINE INPUT
System System FlowchartFlowchart SymbolsSymbols
System Analysis and design by Balirwa Moses 2010
133
BEGIN OREND
DIRECTION
PROCESS
DECISION
INPUT OROUTPUT
SUBROUTINE
MANUALOPERATION
CONNECTOR
Program Flowchart Symbols
System Analysis and design by Balirwa Moses 2010
134
Cont…• After the logical design stage, the processing steps
to be carried out by individual modules are specified in physical design.
• Prototyping – 4GLs, AG
• Joint application development (JAD) – participative development
• Rapid application development (RAD)
• Object oriented design (OOD)
System Analysis and design by Balirwa Moses 2010
135
USER INTERFACE DESIGN
• User interacts with the computer system through a combination of means – User Interface
• User Interface is the yardstick by which the system is judged by the user
• Difficult to use Interface will cause errors, the system may be discarded, meaning of information may be misunderstood, may corrupt data, may cause system failure
• Text based interfaces were used in the early days
• Replaced by Graphical User Interfaces (GUI)
System Analysis and design by Balirwa Moses 2010
136
Cont…
• Windows – Several windows on the screen enable the user to work with several programs, either simultaneously (multitasking) or on one
• Icons – little pictures which may represent files or processes
• Menus – Commands selected from a menu rather than typed in a command language
• Pointing – Pointing devices such as a mouse to point at a selection from a menu or point at an icon & then click to issue the command
System Analysis and design by Balirwa Moses 2010
137
Cont…• Graphics – Graphical elements mixed with text in
the same display
• User Interface design must take into consideration the capabilities of the user
• Prototyping may be helpful• Short-term memory of humans is limited, do not
overload with information• Consistency in the Interface helps to reduce errors,
comparable operations should be activated in the same manner
System Analysis and design by Balirwa Moses 2010
138
Cont…• Use terms & concepts familiar to the user
• Recoverability – Confirmation of destructive actions, Undo facility
• Help facilities – Structured help facility at different levels, Context sensitive help
User-System Interaction is two ways:
• Information from the user to be given to the Computer system
• Information from the Computer system to be presented to the user
System Analysis and design by Balirwa Moses 2010
139
• Direct manipulation ( as in word processing, screen editors, form-based interfaces)
Interface Models• Desktop metaphor
Screen is used as a Desktop
System entities are represented as icons
In addition the use of a controlpanel with buttons, switches, menus,indicators, displays, sliders
System Analysis and design by Balirwa Moses 2010
140
Cont…
• Menu Systems
May type the name of the commandPoint with a mouseMay use cursor moving keysOn touch-sensitive screens use the finger
or penDo not need to remember commands
System Analysis and design by Balirwa Moses 2010
141
Typing effort is minimalUser errors of a certain type can be avoidedMost frequent operations at the top of a menuMost destructive operations at the bottom
Command-line Interfaces
Allow faster interaction
Command language has to be learnt
Command language programs can be written
Cause more errors
Interface cannot use pointing devices, interaction is through the keyboard only
System Analysis and design by Balirwa Moses 2010
142
Out put design
• Characteristics of good output – there are several characteristics that make information a candidate to be considered both highly quality and usable:– Accessibility – This characteristic refers to how easy
it is to use the information when a person gets it.
– Timeliness – This characteristic refers to the amount of elapsed time it takes to obtain specific information that is needed
System Analysis and design by Balirwa Moses 2010
143
Cont…
– Relevancy – this characteristic refers to whether the information as presented is free from trivial or superfluous details or lacking in sufficient details.
– Accuracy – This characteristic addresses the issue of error-free information.
– Usability – This characteristic refers primarily to the presentation style of the information, I.e. its format. E.g. text, numbers, graphics, graphs e.t.c…
System Analysis and design by Balirwa Moses 2010
144
Cont…
• Output types– Internal, External, and Turnarounds Outputs –
Internal outputs are intended to be used by people or other information systems within a business.
– External outputs are intended to be used by people or other information systems outside the business.
– Turnaround outputs this type of output is generally external and people oriented and has the dual purpose of serving as output to the user and input to the information system from the user.
System Analysis and design by Balirwa Moses 2010
145
Cont…
– Static and Dynamic outputs – Static outputs are those that can be
predetermined and planned for. – Dynamic Outputs are those that cannot be
easily predetermined or planned for during information systems development.
• Output devices and media• Plotters are most often used to draw maps,
architectural drawings, and blueprints, graphs, and pictures.
System Analysis and design by Balirwa Moses 2010
146
Cont…
– Computer output on Microfilm or microfiche are devices that, as their name implies, produce microfilm or microfiche output.
System Analysis and design by Balirwa Moses 2010
147
Interface Evaluation
• Usability of the Interface• Meets the user requirements• Learn ability - How long it takes a new user to
become productive with the system?• Speed of Operation – How well does the system
response match the user’s work practice?• Robustness – How tolerant is the system of user
error?• Recoverability – How good is the system at
recovering from user errors?• Adaptability – How close is the system tied to a
single model of work?
System Analysis and design by Balirwa Moses 2010
148
Cont…
Methods of Evaluation
• Questionnaires, Observation of users at work, Inclusion of SW in the code to collect information about most-used facilities and most common errors.
• Specific questions must be asked from users for evaluation (e.g. Error messages)
System Analysis and design by Balirwa Moses 2010
149
Files and Database Designs
• Files for data storage Files are generally used to store sequences or lists of data in a format that has been optimized for some particular type(s) of transaction, and require routines specifically written for those formats and transactions.
• Generally these are organized sequentially, adding new data records to the end of the file. They are often arranged in a linked-list format for ease of manipulation.
System Analysis and design by Balirwa Moses 2010
150
File types by their area of application
• Master files: are files used to record key business information which is maintained over a long period of time. Typical examples include order information, customer and account information, etc.
• Lookup files: are files containing static values, generally used for validation. Common examples are postal codes, province, state, and city names, etc.
System Analysis and design by Balirwa Moses 2010
151
Cont…
• Transaction files: are files which hold information used to update the master files. For instance, we might have a transaction file which records all the orders placed today and is used to periodically update the master file. Thus the "current" state of the system is maintained in memory, but in the event of a discrepancy or system failure we can check the master file against the day's transactions to determine where the failure occurred and how to correct it.
System Analysis and design by Balirwa Moses 2010
152
Cont…
• Audit files: audit files are used to record key information immediately before and after a transaction is applied. For instance, we could take a snapshot of an account immediately before applying a withdrawal transaction, and another immediately afterwards. Again, in the event of an error or system failure during the transaction the combination of master file, transaction file, and audit file allow us to pinpoint exactly what went wrong and how to correct it.
System Analysis and design by Balirwa Moses 2010
153
Cont…
• History files: many such systems collect vast amounts of data over time, and much of that data is rarely required. As such, it is common to create an archive of old data - data moved into a more compact and/or cheaper storage mechanism so that the overall system is more efficient but the data is still recoverable if necessary.
System Analysis and design by Balirwa Moses 2010
154
File Access and Organisation
• File Access: refers to the method of reading or writing records within a file.
• File Organisation: refers to the method of storing records within a file.
• Two methods for accessing records in a file: sequentially and directly
• Four ways of storing data in files: serial, sequential,direct, and indexed.
System Analysis and design by Balirwa Moses 2010
155
Methods for accessing records in a file
• Sequential access: is access by physical record location or position within a file (i.e. Starting at record one and sequentially reading or writing every record to the end of the file).
• Direct access: is access by physical address (i.e. ability to go directly to certain records within files without having to sequentially scan from the first record in the file).
System Analysis and design by Balirwa Moses 2010
156
Methods of File Organisation
• Sequential file organisation: a method of storing data records in which the records must be retrieved in the same physical sequence in which they are stored (e.g. batch processing applications such as a payroll).
• Direct/ Random file organisation: a method of storing data records in a file so that they can be accessed in any sequence without regard to their actual physical order on the storage media.
System Analysis and design by Balirwa Moses 2010
157
Cont…
• Serial file organisation: is the storing of records in a file in chronological order (e.g. Recording of a bank’s ATM transactions as they occur).
• Indexed file organisation: uses and maintains a sorted index in key order, which stores the record location of the actual data file record as part of the index.
System Analysis and design by Balirwa Moses 2010
158
Cont…
• Databases for data storage Databases are used to store logical data groupings and their relationships, and require a database management system (DBMS) to maintain and access the data. Databases come in a vast range of sizes and complexity, from small scale systems such as Microsoft Access to full-fledged business or enterprise DBMSs such as Oracle.
System Analysis and design by Balirwa Moses 2010
159
General categories of database systems
• Legacy databases: are databases using older, outdated technologies. They are frequently encountered in large organizations where the cost of replacing the database is prohibitive.
• Relational databases: are the most common/popular current form of database, primarily because they are much easier systems to perform development and maintenance on. These databases are composed of a set of tables, composed of a fixed number of rows (records) and columns (fields within each record).
System Analysis and design by Balirwa Moses 2010
160
Cont…
• Each table has a primary key (uniquely identifying each record in the table) and which may have one or more foreign keys. These foreign keys define the relationship to another table, and would be the primary key of the other table. • Some of the most common RDBMSs include
Access, Oracle, DB2, and Microsoft SQL Server.
System Analysis and design by Balirwa Moses 2010
161
Cont…
• Object databases: are databases which try to encapsulate logical data entities and their associated processes as separate objects. This makes it easier to alter portions of the database, since changes within one object do not impact other objects. Object-oriented data base management systems (OODBMSs) are primarily used in supporting multimedia applications, but they are also becoming more common in large scale electronic commerce systems.
System Analysis and design by Balirwa Moses 2010
162
Software Construction and Testing
•General software design principles
•Construction strategies
•Testing principles
•Testing strategies
•The Generic software testing methodology
System Analysis and design by Balirwa Moses 2010
163
General software design principles
• The software must conform to the requirements specification document created during the analysis portion of the project and any modifications added later during design – with time the original specification requirement document becomes obsolete, hence changes may not be reflected.
• The software must be reliable over time while processing a potentially limitless combination and types of data, as well as user keystrokes and pointing device (mouse clicks).
System Analysis and design by Balirwa Moses 2010
164
Cont…
• The software must be maintainable and evolutionary over time – upgradeable to accommodate changes.
• The software must be easy to use (user friendly).• The software should be easy to test and
implement using the test plans.• The software should use computer resources
efficiently – minimize computer resources e.g. memory, processing power.
• The software should work correctly – should avoid errors.
System Analysis and design by Balirwa Moses 2010
165
Software Construction Strategies
• Top-Down software construction – follows the functional decomposition approach to problem solving. It starts with the design overview or high-level view (control or management oriented e.g. menus & calling modules) of the system and then creation of the program code for it. Next the details of the system are written for the program code, layer by layer, until the bottommost modules are programmed (operational or worker oriented e.g. modules which calculate results, update databases, print lines on a report).
System Analysis and design by Balirwa Moses 2010
166
Cont…
• Bottom-up software construction – starts with writing the program code for the lowest-level details of the system and proceeds to higher levels by a progressive aggregation of details until they collectively fit the requirements for the system. Next is the construction of the code for the modules or modules that calls these bottommost modules.
System Analysis and design by Balirwa Moses 2010
167
Cont…• Middle-out software construction – starts
somewhere in the “middle” of the system that seems convenient, and proceeds both upward to higher levels and downward to the lower levels as appropriate (e.g. coding a low-level module that opens a file, or calculates sales tax (bottommost modules)).
• The Hybrid combination of top-down, bottom-up, and middle-out software construction may be suitable for certain environments or projects.
System Analysis and design by Balirwa Moses 2010
168
Software Testing Principles
• It should conform to at least three principles:• First principle is that Software testing begins
with plans for the tests and ends with the user accepting the tested software. Software test plans should be developed at the same time the requirements specification document is being developed and can be refined and updated during design as well. The plans for the user acceptance test should conform to the user requirements as documented in the requirements specification document.
System Analysis and design by Balirwa Moses 2010
169
Cont…
• By doing so, the development loop is completed, and the software is certified to be in compliance with the requirements specification document. User acceptance test plans include more than just the software; they include the other four IS components-hardware, procedures, people, and data.
• The second software testing principle is that testing’s intent is to cause and discover errors – testing should be done with as little pride of ownership as possible.
System Analysis and design by Balirwa Moses 2010
170
Cont…
• The third software testing principle is that rules of reasonableness should prevail – testing should follow commonly accepted testing techniques designed to provide a certain threshold of statistical confidence in the tests (e.g. rather than testing every record in a large database for a certain sequential processing situation, one commonly accepted testing technique is to test the first record, a few records in the middle of the database, and the last record I.e. test the huge actual database).
System Analysis and design by Balirwa Moses 2010
171
Software testing strategies
• Top-down testing – follows the functional decomposition approach to problem solving. It starts at an overview or high-level view of the system to be tested, then works its way down into details of the system, layer by layer until reaching the bottommost programmed modules.
• Bottom-up – testing starts with details of the system and proceeds to higher levels by a progressive aggregation of details until they collectively fit the requirements for the system.
System Analysis and design by Balirwa Moses 2010
172
Cont…
• Middle-out testing – starts somewhere in the “middle” of the system that seems convenient, and tests both upward to higher levels and downward to lower levels as appropriate.
• Hybrid is a combination of the three above.• Regardless of which testing strategy is chosen,
software testers view portions of the system, subsystem, programs and modules as either a white box or a black box as they test.
System Analysis and design by Balirwa Moses 2010
173
• White box is the portion of the system that we are testing from an inside perspective. I.e. there is the ability to actually look at the code statements within the white box portion being tested and make changes to them should they not work correctly.
• Black box is the portion of the system that we are testing from an outside perspective. I.e. the tester doesn’t have the ability to look at the code statements and change them. (Usually done when programmers need to integrate that part of the system with the part of the system they are creating and testing). Usually done on software wrote by someone else.
System Analysis and design by Balirwa Moses 2010
174
Cont…
• Alpha testing is testing done in-house by testers such as programmers, software engineers and internal users. I.e. a first cut at the acceptance tests is done in-house by in-house staff.
• Beta testing usually involves a select group of customers to perform tests on the software as they would use it in their normal environment. In exchange, the customers get an advance copy of the soon to be released software, which usually has new features in it.
System Analysis and design by Balirwa Moses 2010
175
A Generic Software Testing Methodology
Software Testing Methodology Showing Feedback/fallback loop
User Acceptance Testing
System Testing
Function TestingIntegration Testing
Unit Testing
System Analysis and design by Balirwa Moses 2010
176
A Generic Software Testing Methodology
• The above generic testing methodology can be utilized regardless of whether the resulting software is to be used in house or is to be available for public sale at computer stores. Note the feedback or fall back arrows in the diagram. Whenever testing discovers errors at any level of the methodology, the programming staff will need to make coding changes followed by a trip back through the layers to ensure defect-free code in all test levels.
System Analysis and design by Balirwa Moses 2010
177
• As testing takes place, keep in mind that code changes made by programmers in one module or section of a program may fix the identified bug but may cause an error in some other seemingly unrelated section of the program when it is tested again.
• Large systems are built of sub-systems which are built out of modules which are composed of procedures & functions.
• The testing process should be carried out in stages:
• Unit/ Module testing – individual components are tested. I.e. Individual program modules are tested by their developers.
System Analysis and design by Balirwa Moses 2010
178
Cont…
• Integration Testing – is the combining of several units or modules for the purpose of testing them as a whole.
• As software is being constructed and simultaneously being tested for integration with other software modules by the programmer, a technique known as stub testing is often used. Stub testing is a test performed on individual modules as they are being integrated in a top-down, bottom-up, or middle-out manner.
System Analysis and design by Balirwa Moses 2010
179
LEVEL 1
Level 2 stubs
Level 3 stubs
LEVEL 2LEVEL 2 LEVEL 2 LEVEL 2
LEVEL 1
TOP-DOWN TESTING
Testing sequence
System Analysis and design by Balirwa Moses 2010
180
• Function testing – is the combining of one or more integration tested groups of modules that collectively perform a user identified function, as documented in the requirements specification document.
• System testing – combines all of the user-defined functions together to form the subsystem or system.
• Acceptance testing – is similar to system testing. However the user is the one who usually does the testing. These tests are most often conducted with well-defined test data, as well as the actual, real data.
System Analysis and design by Balirwa Moses 2010
181
• The diagram below represents a framework for the methodology and how it interrelates with the other activities and deliverables of IS development.
Systems Design
Systems Design
Program Design
Module Design
User SpecificationSystems Analysis
System Specification
Software Specification
Program Specification
Module Specification
Acceptance Testing
System Testing
Function Testing
Integration Testing
Unit Testing
Programming
Framework for Information Systems Testing
System Analysis and design by Balirwa Moses 2010
182
• System Development and Implementation– Individual system components are built and
tested – User interfaces are developed and tried by users– Database is initialized with dataAt the end of this phase :
• Users are provided with a working system (programs and database)
• System documentation describing the programs is also completed.
• All users are trained and can use the new system.
System Analysis and design by Balirwa Moses 2010
183
Systems Implementation; Evaluation & Review
•Installation – conversion strategies; Activate; Institutionalization
•Implementation Critical success factors
•Evaluation and review
System Analysis and design by Balirwa Moses 2010
184
• Implementation - is the conversion of data to the new system’s files, final training of the end users, and transition from the old system to the new system.
• Marks the end of development for now, and begins the user’s realization of the new or changed information system.
• Implementation is a critical time for users because the user must switch from the old to the new system, and the user must take responsibility for the successful utilization of the new system.
System Analysis and design by Balirwa Moses 2010
185
Cont…
• The IS development team must anticipate, even expect, problems during implementation. Hopefully, the problems can be turned into opportunities.
• Implementing a system consists of 3 phases : Install, Activate, Institutionalization.
• Install – Is putting the new IS in place. I.e. physically install all of the five components:– h/w, s/w, people, procedures, data, of an IS. People are trained or prepared as part of the install phase.
System Analysis and design by Balirwa Moses 2010
186
Install Phase
• A very significant part of the install phase has to do with conversion. Conversion is the switching from one thing to another. I.e. a new IS is replacing an obsolete manual or automated IS. NB. Conversion affects each of the components of an IS.
• There are three Conversion strategies of :-
System Analysis and design by Balirwa Moses 2010
187
Old System
New SystemParallel Operation
Old System
New SystemDirect Conversion
Old System New SystemPhased Conversion
Conversion with a pilot Version
Old System New System
System Analysis and design by Balirwa Moses 2010
188
Conversion
• Cutover/Abrupt/Direct Conversion – is one in which the user uses the old system up to a specific point in time after which the user starts using the new system.
• Advantages - – No duplication of effort for users.– No transition costs with the old system.– Learning advantage for groups converted later,
if Cutover is done by groups. The costs of running parallel systems.
System Analysis and design by Balirwa Moses 2010
189
Cont…
• Disadvantages of Cutover Conversion -– High risk I.e. It may disrupt operations if it
fails.– Cannot compare results.– Sense of user insecurity I.e. no period of
adjustment could lead to resistance to change.
System Analysis and design by Balirwa Moses 2010
190
Cont…
• Parallel Conversion – is one that allows the user to continue use the old system and the new system simultaneously for a period of time, eventually discarding the old system.
• Advantages – – Low risk I.e. it guarantees continuing incase the
new system fails.– Sense of user security – Ability to compare results with old system.
System Analysis and design by Balirwa Moses 2010
191
Cont…
• Disadvantages of Parallel Conversion – – Duplication of effort for users– Transition costs I.e. Expensive– Additional processing strain on the computer.
System Analysis and design by Balirwa Moses 2010
192
Cont…
• Pilot Conversion – is one in which the new system is implemented in one part of the organization such as a single department, and eventually extended to other departments.
• Advantages – – Incase of failure, the rest of the organization is
not affected.
System Analysis and design by Balirwa Moses 2010
193
Cont…
– Based on feed-back, changes are made and the system is installed in the rest of the organization by one of the other methods.
– It provides experience and live tests for implementation.
– Gives an opportunity to the implementers to display the advantages of the new system.
System Analysis and design by Balirwa Moses 2010
194
Cont…
• Disadvantages of Pilot – – May give the impression that the new system is
un-reliable and not error-free, depending on the effectiveness of the implementers.
– May give the impression that the old system is un-reliable and not error-free because staff may loose confidence in the old system.
System Analysis and design by Balirwa Moses 2010
195
Cont…
• What do Software Engineers base their conversion strategy decision on?– The design of the information system.– User needs and preferences.– Risk factors.
(Give your understanding of what we mean by each of the above.)
System Analysis and design by Balirwa Moses 2010
196
Activate Phase
• The second phase of Implementation, the Activate phase, deals with getting the user to use the new or changed IS.
• Once the IS has been installed and the conversion performed, the implementation moves naturally into the activate phase as the predetermined users begin exercising and using the new system.
System Analysis and design by Balirwa Moses 2010
197
Cont…
• During this critical phase the development team may continue training the users on an as-needed basis.
• The team should also anticipate and expect problems and be prepared to correct them.
• The team should also monitor the user’s usage of the IS, taking note of what the users like and dislike, patterns of user usage, shortcut opportunities to improve the IS effectiveness, e.t.c.
System Analysis and design by Balirwa Moses 2010
198
Cont…
• In short, the development team needs to pay serious attention to the IS and its use by the users during this phase and be prepared to maintain, fix, and enhance it as the need and opportunity to do so become available.
• Maintenance and Review – changes in h/w, s/w, documentation or procedures to a production system to correct errors, meet new requirements, or improve processing efficiency.
System Analysis and design by Balirwa Moses 2010
199
Cont…
• Evaluation – this is to determine whether the IS operates as expected, and if the costs and benefits are as anticipated. I.e. identify the strengths and weaknesses of the IS.
• Why Maintenance is important?– Necessary to eliminate errors in the system during
its working life (corrective maintenance)– Enhancing & modifying the system to respond to
changing user environment & organizational needs, improving system efficiency, & enhancing documentation (perfective maintenance)
System Analysis and design by Balirwa Moses 2010
200
Cont…
– Changing the application to adapt it to a new H/W or S/W environment (adaptive maintenance)
– Information system planners must always plan for resource availability to carry out these maintenance functions.
• Institutionalization phase – means that the new or changed IS becomes the new status quo within the business.
System Analysis and design by Balirwa Moses 2010
201
Cont…
• Status quo doesn't guarantee 100% use by the users, but it does imply that the new IS is now the standard for the business and that a certain percent of user critical mass has adopted and is using the new IS.
• What are some of the reasons that lead to resistance of a new Information System by the users? Discuss in class.
System Analysis and design by Balirwa Moses 2010
202
Implementation Critical Success Factors
• From an Organizational change perspective, successful IS implementation depends on the following critical success factors:
• User Commitment – the user must be the champion or advocate for the new IS. I.e. the user should take ownership and responsibility for the new system.
• Organizational trust – management and staff within the business, both IS types and user types, must have a high degree of trust in one another.
System Analysis and design by Balirwa Moses 2010
203
• Open communication between IS management and staff and user management and staff – communication problems and breakdowns can cause significant harm to an IS development project and the IS implementation.
• Financial commitment from user management – lack of or limited funding for the new system can cause significant problems during the development process and during the system's implementation.
• Common view of the IS development and implementation strategy between management and staff.
System Analysis and design by Balirwa Moses 2010
204
Project Management
•The project management causes of failed projects
•The basic functions of the project manager
•Project management tools and techniques
System Analysis and design by Balirwa Moses 2010
205
What is Project Management
The purpose of this module is to introduce you to project management.
Why? • Project Management is applied during Systems
Analysis, Systems Design and Systems Implementation. Information Systems development is almost always done under the auspices of a project.
System Analysis and design by Balirwa Moses 2010
206
Definition of Project Management
Definition: Information Systems Project Management is a process of directing the development of an acceptable Information Systems at a minimum cost within a specified time frame.
NB: The acceptability, deadline and budget criteria must all be for a project to be considered completely successful. The role of Project Management is to recognize such factors to eliminate or minimize their negative effects.
System Analysis and design by Balirwa Moses 2010
207
Sources of Systems Development Projects
Systems Development Projects come from one of three sources: -
A directive or mandate from some person, such as a president, vice president, or senior Manager, or an organization such as a labor Union or Uganda Revenue Authority.
An opportunity to exploit. The opportunity usually results in increased revenues and/ or profits reduced costs, or increased or improved services.
A problem to solve. Something usually isn’t working correctly and needs fixing.
System Analysis and design by Balirwa Moses 2010
208
Systems Development Failures
• Use of undisciplined development methodologies or approaches.
• Inadequate or not understood or appreciated Systems Development tools.
• Project Scope was not clearly defined in the beginning.
• Use of no or poor estimating techniques.• Schedule delays.
System Analysis and design by Balirwa Moses 2010
209
Cont…
• Beliefs in the mythical person- month syndrome. E.g. a Manager with this mindset thinks that if two developers can do or finish up a project in six weeks, then simply adding a third developer to the project will allow it to be completed in 4 weeks. The reality is much different than this.
System Analysis and design by Balirwa Moses 2010
210
What constitutes a Systems Development project failure
• The organization completely abandons the project at some point prior to its implementation.
• The organization must rework a significant amount of the project, so much so that they deem it a failure but do go ahead and initiate the network.
• The delivered Information Systems is okay, but the project was way over time and budget, therefore, it is defined a failure.
• The delivered Information Systems doesn’t meet the user requirement or expectations, therefore; it is deemed a failure.
System Analysis and design by Balirwa Moses 2010
211
Functions of the Project Manager
• Planning Project tasks and staffing the project team – a good manager always has a plan. The manager estimates resource requirements and formulates a plan to deliver the target system. Each task required to complete the project must be planned. Some of the planning issues include: How much time will be required? How many people will be needed? How much will the task cost? What tasks must be completed before other tasks are started? Can some of the tasks overlap?
System Analysis and design by Balirwa Moses 2010
212
• Organizing and scheduling the project effort – members of the project team should understand their own individual roles and responsibilities as well as their reporting relationship to the project manager. The project schedule should be developed with an understanding of task time requirements, personnel assignments, and interties dependencies.
• Directing and controlling the project – once the project has begun the project manager becomes the project leader. As a leader the project manager directs the team’s activities and evaluates progress. The manager must frequently report progress to superiors. The manager’s job is to monitor tasks, schedules, and costs in order to control those elements.
System Analysis and design by Balirwa Moses 2010
213
Project Management Tools and Techniques
PERT Network and Gantt chart
There are 2 commonly used Project Management tools:
• Programmed Evaluation and Review Techniques (PERT) charts which are most useful for project planning and modification.
• Gantt charts which are for project scheduling and progress reporting.
System Analysis and design by Balirwa Moses 2010
214
Cont’ of Tools
A PERT network is • A graphical representation of project tasks laid out
in the form of a critical path network
A Gantt chart shows• Project tasks and their deviations in a bar chart
format in the planning and estimating of a project prior to its inception.
System Analysis and design by Balirwa Moses 2010
215
• Steps to Create a PERT Chart• Determine the duration time for each task• Assign a task identification letter to each task• Draw the PERT network, number each node.• Label each task with its task identification letter.• Connect each node from start to finish• And put each task’s duration on the network• Determine the need for any dummy tasks• Determine the earliest completion time for each
task node• Verify the PERT network for correctness.
System Analysis and design by Balirwa Moses 2010
216
PERT ChartPERT Network Strengths• Determine task dependencies• PERT network is continuously useful to project
managers prior to and during a project.• PERT network is straightforward in its concept
and is supported by soft war.• PERT network can be a valuable tool for project
managers, but the tool is only as good as the data that are input to it. Its strengths include:
System Analysis and design by Balirwa Moses 2010
217
Cont…• The PERT network’s graphical representation of
the project’s critical path and task slack time allows the project manager to focus more attention on the critical aspects of the project-time, costs, and people.
• The project management software that creates the PERT network usually provides excellent project tracking documentation.
• The use of the PERT network is applicable in a wide variety of projects.
System Analysis and design by Balirwa Moses 2010
218
• Weaknesses of the PERT network:• In order for the PERT network to be useful,
project tasks have to be clearly defined as well as their relationships to each other.
• The PERT network does not deal very well with task overlap. PERT assumes that following tasks after their preceding tasks end.
• The PERT network is only good as the time estimates that are entered by the project manager.
• By design, the project manager will normally focus more attention on the critical path tasks than other tasks, which could be problematic for near-critical path tasks if overlooked.
System Analysis and design by Balirwa Moses 2010
219
The Gantt chart
The Gantt chart is based on a two-dimensional graph scale.
Each of the significant project tasks is listed along the vertical axis of the graph, and the estimated elapsed calendar time to complete the entire project is listed along the horizontal axis.
An appropriate calendar time interval, such as days, weeks, or months is selected for the horizontal axis.
System Analysis and design by Balirwa Moses 2010
220
The Gantt chart is at its best for visually showing each of the project’s task status at any moment in time simply by drawing a vertical bar from top to bottom on the chart at the calendar time you are interested in.
Once drawn, a visual inspection of the shading within each of the bars on the chart gives you an indication of project task status for each task.
It is also useful for showing any overlapping or parallel tasks. It does not clearly show task dependence, even though it does show task start and stop times, and you can clearly see that tasks start after others have already begun or are already finished.
Gantt chart strengths & weaknesses
Gantt Chart Strengths
Being able to see overlapping or parallel tasks.
Being able to see the status of each project task at any point in time.
Gantt Chart Weaknesses
Not being able to definitely tell from the Gantt chart whether the entire project is on time, behind time, or ahead of schedule.
Not showing task dependencies.
System Analysis and design by Balirwa Moses 2010
221
Dfgasdfawdwtyhtrftgsw
System Analysis and design by Balirwa Moses 2010
222
Characteristics of good information
• Accurate
• Concise
• Complete
• Understandable
• Relevant
• Authoritative
• Timely
• Ease of use
System Analysis and design by Balirwa Moses 2010
223