I. Industry Analysis
A. Industry Description & Analysis
The iron and steel industry is a critical component of Philippine inclusive
economic growth and sustainable development. The industry plays a pivotal role in
long term economic development because it provides key material inputs for the
construction of roads, buildings, houses and factories as well as the manufacturing of
high growth exportable products such as automobiles, ships and electronics. This
well-established fact has led to the inclusion of the steel industry as among the 13
priority sectors identified under the 2011 Investment Priorities Plan (IPP) of the Board
of Investments from which strategic roadmaps are essential to the
development of the comprehensive national industrial policy as mandated in the
PhilippineDevelopment Plan 2011-2016. This new industrial policy seeks to spell out
opportunities,coordinate and promote the growth of forward and backward linkages in
priority areas and high potential growth sectors, and prepare other industries to attract
investments and generate jobs.
The current problems facing the iron and steel industry have gradually evolved
from the last decade when Vicente (2005) noted that the primary obstacles of
overcapacity, high cost of raw materials and energy, availability of raw materials,
macroeconomic instability and market uncertainty are the very same ones cited in the
1970s and 1980s studies of the Metals Industry Research and Development Center
(Department of Science and Technology). Since then, the steel industry hasundergone extensive consolidation after the shutdown of the Global Steelworks
(formerly National Steel Corporation) in following the still unresolved legal dispute
over real estate back taxes of NSC which caused supply disruptions sector-wide.
Global Steel was the dominant producer of cold rolled steel and the country’s sole
producer of hot rolled coils and plates.
Treasure Steel Corporation assumed the operation of Global Steel’s billet shop
and became the dominant manufacturer of billets for resale to end-users primarily the
rebar manufacturers in 2012.. In addition, the real estate surplus from the Asian
Financial Crisisand the recurring fiscal crisis limited private and public construction.
Consequently, sector output and employment fell by about 10 percent1 as local
production of hot-rolled coil/sheet, cold-rolled coil/sheet, tinplates, and wire rods were
completely displaced by cheap imports particularly from China.
1
8/16/2019 Sys Eng Final
2/69
The business conditions for steel firms since 2005 have considerably changed.
The public image concerning the country’s macroeconomic instability and market
uncertainty has significantly improved as evidenced by the recent upgrade in credit
ratings and rise in global competitiveness rankings. While surplus capacity does exist
counting the rated capacity of mothballed plants that can still be re-opened, the reality
is that a significant portion of the capacities under consideration maybe considered
obsolete and/or not operating (even inoperable). The cost of semi-finished steel like
hot rolled coils, hot rolled plates, cold rolled coils is no longer high with the gradual
phase out of MFN tariffs and the ready availability of cheap imports (although
imported scrap is still subject to 3% MFN tariffs.) The country remains a net-exporter
of scrap, indicating the relatively low price of domestic scrap for production inputs. In
fact, the low-input price scenario has produced the opposite but negative effect of
local steel plants forced to rely on steel imports.
Competitors
2
8/16/2019 Sys Eng Final
3/69
Market Share
Market Size
3
8/16/2019 Sys Eng Final
4/69
B. Porter’s Five Forces Model Analysis
1. Current Impacts of Five- Forces
• Bargaining Power of Buyers - HIGH
Due to the increase in competition in the steal sector, the options for
buyers are on the rise. They have low product differentiation. The switching
costs of the customer is only medium to low, due to standard pricing of steal.
Buyers that are buying in large scale posses strong negotiating power.
• Bargaining Power of Suppliers - HIGH
Scarcity of raw materials like steel shreds, iron ore,coke, and recycledsteel. Their are only few suppliers of raw materials locally. Most of the raw
materials are imported.
• Internal Rivalry - MEDIUM
The industry has only few players, including the small companies that are
emerging. There is an existing intense rivalry when it comes to product pricing.
Since their products are standard steel their is no way to have a product
differentiation with competitors.
• Threat of Substitutes - LOW
There is no existing primary substitute for steal. Secondary substitute can
be aluminium, plastic & wood, but still the sales of steal are not affected.
• Threat of New Entrants - LOW
Huge capital requirements to start a steel production company. New
entrants will not be able to offer anything new due to lack of product
differentiation. There is a low access to raw materials causing problems in their
production.
4
8/16/2019 Sys Eng Final
5/69
2. External Forces Analysis
• Political
The Philippine government, in its efforts to establish a local iron and steel
industry issued RA 7103 to set goals and strategies to promote local steel
production. However, even though it is able to identify the critical sectors of the iron
and steel industry, it still falls short in terms of implementation. Of the goals
promoted by the Philippine Iron andSteelIndustry
Act, very few of the strategies have been realized:
a. Power, Infrastructure, and Auxiliary Facilities. The cost of power continues to
be high and the impact of energy reforms are yet to be seen in the power industry,
especially in the industrial areas of Manila. No cost advantage is enjoyed by
energy intensive steelmaking activities, exacerbated by poor power quality.
Infrastructure, primarily ports, is still poor with inadequate handling equipment that
cost losses.
b. Financing and Other Loans. Financing is not considered a major problem in the
industry, but needed investments in integrated steel mills and in the modernization
of steelmaking technologies are low despite current incentives granted to
interested investors.
c. Tax and Duty Exemption on Imported Machinery and Tax Credit on
Domestic Capital Equipment and Other Incentives. These incentives are available
subject to eligibility requirements and certification by the Bureau of Investments.
Industries can also be declared by the Philippine Economic Zone Authority (PEZA)
to be special economic zones to enjoy a different menu of incentives.
d. Rational Tariff Incentives and Protection Scheme. Protection is down for
steel products, generally in the range of 0%-5%, which is relatively low compared
to our neighbors in Southeast Asia. Distortions are present in a number of product
codes, occurring between billets and other intermediate products. Some of the
current efforts to address tariff distortions include: a comprehensive tariff review by
the Tariff Commission and a resolution issued early this year in response to the
GSII’s application for tariff protection, the successive issuance of EO 375, and the
strong lobbying of downstream players against higher tariffs on raw materials.
5
8/16/2019 Sys Eng Final
6/69
• Technological
Steel Asia, the country’s largest steel manufacturer, is investing P6 billion to put
up the biggest steel plant in the country.Steel Asia said the plant in Plaridel would
be among the most modern in the world.“It will be using the latest available
technology that allows production efficiency and environmental protection at thesame time,” the company said. The Plaridel plant will have a production capacity of
1.2 million metric tons, more than double the capacity of its recently inaugurated
P3 billion Davao plant which is at 500,000 metric tons.The Davao plant generated
around 2,000 direct and indirect jobs while the Plaridel plant is expected to create
nearly 3,000 direct and indirect jobs, Steel Asia said. Roberto Cola, Steel Asia vice
president, said the Plaridel plant would feature an array of environmental measures
that will allow the company to fully comply with existing laws.
Despite various groups who are against the project, Steel Asia said majority of
the residents of Plaridel are now supporting the rolling mill project in the area. Steel
Asia said an independent survey conducted by Greenboroughs Tech Inc. showed
82 percent of the sampling from the direct impact area support the project. The
company said it has been conducting continuing efforts to explain the technical and
environmental aspects of the plant, and its benefits to the community and its
environment. In an official public consultation conducted last month, Steel Asia said
the project has obtained the support from more than 5,000 federation of tricycle
associations of Plaridel. The project was also supported by the youth many of
whom have already taken advantage of the free skills upgrade training program
Steel Asia has been conducting for the community, the steel manufacturer said.
“Being open and transparent with the community was key to the support we are
getting for our project. We even brought some members of the Plaridel community
to our newly opened Davao plant for them to see and appreciate that we are real
partners in progress and we care for the environment as we go about our
business,” Cola said. Steel Asia has existing plants in Cagayan de Oro, Davao,
Cebu, Batangas, and two in Bulacan.
• Economic
Steel has enabled our modern way of life. It has helped lift societies out of
poverty, spurring economic growth, and continues to do so around the world today.
Iron, steel’s precursor, fueled the industrial revolution starting in 1750, enabling
manufacturing equipment in factories and rail transport. Modern steelmaking was
developed 150 years ago with the invention of the Bessemer process allowing for
the affordable mass-production of steel (an iron alloy). This set off a second
6
8/16/2019 Sys Eng Final
7/69
industrial revolution, and sustained economic growth.
• Legal & Institutional
The Department of Trade and Industry (DTI) has issued notices of violation to
two retailers for selling sub-standard construction materials. In a statement, the DTI
said the notices were issued to Xtreme Unite Steel Inc. and WDL Enterprises whichwere both found to be selling uncertified and substandard construction materials
such as steel bars, angle bars and ceramic tiles during the recent market
monitoring conducted in Caloocan City. The DTI confiscated 1,650 pieces of
underweight steel bars and 48 pieces of underweight angle bars from Xtreme Unite
Steel, while 150 pieces of underweight steel bars, 69 pieces of underweight angle
bars, 10 pieces of uncertified angle bars, 8,250 uncertified ceramic tiles in 750
boxes and four rolls of uncertified galvanized iron wires were taken from WDL
Enterprises. The underweight steel bars and angle bars from Xtreme Unite Steel
showed the Continental and Dragon Asia brands, respectively.
On the other hand, underweight steel bars, underweight angle bars, and
uncertified ceramic tiles from WDL Enterprises displayed the brands Cathay
Pacific, Mackay, Somico, Arizona and THR. Continental, Dragon Asia, Cathay
Pacific, Mackay, and Somico have been issued the Philippine Standards (PS)
license by the DTI’s Bureau of Product Standards.
• Social
The most important issue in Steel Companies around the world is safety andwork place. Steel manufacturing is an industry where safe working procedures are
important, as workers face many risks due to the nature of the job. The work
environment is often hot and noisy, and work tasks regularly heavy and demanding
on the body, and there is an always present risk for crushing injuries and burns.
Figures from Sweden show that metalworkers were subjected to the largest
number of accidents annually (2006–2010) compared to other occupations (AFA
Insurance, 2012). The risk for new cases of long-term sick leave (>90 days) for
metalworkers was more than double that of the average worker (AFA Insurance,
2012). Metalworkers also had the largest number of cases of recognized work-related diseases among Swedish occupational groups during 2008 and 2009, with
0.7 cases per 1000 employed (AFA Insurance, 2012). Due to the types of risky
workplaces that steel manufacturing plants constitute, the companies need to
assure safe working conditions through systematic and regular safety audits and
risk analyses (AFS, 2001, SFS, 1977 and The Council of the European
Communities, 1989). Safety procedures and regulations need to be followed by the
management as well as the workers.
7
8/16/2019 Sys Eng Final
8/69
• Ecological
Power Steel promotes focusing water more efficiently because of increasing watershortages. All retailers report supporting charitable causes forming partnerships withenvironmental nongovernment organizations. Participation in local communityenvironmental projects is effective for staff retention and creating good will in the
marketplace.
C. Opportunities and Threats
Opportunities
• Continuously improve services. Since there is a very low chance of product
differentiation they should focus on satisfying their customers when it comesto their services to develop loyalty.
• Strive to attain future opportunity for market expansion • Explore steel recycling to lessen the importance of raw materials.
Threats
• Customers can always choose to conduct business with other competitors.
• Competitive pricing • Job Hazards and safety risk are present
8
8/16/2019 Sys Eng Final
9/69
II. Business Analysis
A. Business Description and Overview
1. Corporate Vision & Mission
Vision
As it was from the very beginning, the vision of Power Steel is to provide
quality steel products at a competitive price to meet the construction needs of
our customers. From households to large corporations, we aim to be the top of
mind steel company.
Mission
Power Steel is one of the most trusted distributors of metal products like
deform bars, angle bars, cr & hr plates, coils & beams in the Philippines. It is the
choice of contractors, architects, industrial users and purchasers mainly
because of our quality of service and the competitive pricing that we offer.
9
8/16/2019 Sys Eng Final
10/69
1.2 Organizational Structure
The table above shows the basic organizational chart for each warehouse,
where most of the main operations of the company takes place.
1.2.1 Subsystems/ Departments
Strategy:
• Quality steel products at an affordable price compared to competitors.
• Has wide and complete steel products.
• They are creating warehouses in major roads like C1-C5 to be able tobe more accessible, therefore reaching markets that they haven't
served.
• They are planning to be able to import steel in the future.
10
8/16/2019 Sys Eng Final
11/69
1.3 Leadership styles, employee skills and employee development
Style
Power Steel is committed to the highest standard and our guiding
principles that help us achieve it. With the best practices of our organization and
the best efforts of all our employees, we continually strive to be the no. 1 steel
supplier in the Philippines. The style of leadership behind our success is about
having a democratic leadership. This makes the firm improve through the years
in terms of innovation, marketing strategies and inventory management
upgrades, all comes through having better ideas from within each responsible
members of the organization. This is the main reason why Power Steel remains
to be one of the top competitors through the years. They continue to reach outnot just only to their customers, but also with the people who work inside the
firm.
Staff
Power Steel team is treated with respect, courtesy and fairness. Tent to
rest on past accomplishments, constantly challenge themselves and their
colleagues to find innovative ways to create value, increase efficiency and
provide the highest level of service to our clients and partners.
Skill
In Power Steel, we definitely value customer satisfaction, and with this,
we have employees who carry our values and morals with competency and
discipline. Employees are dynamic and productive here in power steel they
provide exposure to various facets of the industry enhancing both professional
and personal skills. They also provide extensive training of employees specially
for those who are assigned in production. They also conduct team buildings that
help the employees learn to work together as a unit.
11
http://www.powersteel.com.ph/http://www.powersteel.com.ph/
8/16/2019 Sys Eng Final
12/69
Shared Value
Power Steel exists to provide one thing customer satisfaction and that is
why we offer personalized service. Unlike other companies that are focused on
shareholders, ours is a family operated business. Hence, we remain committed
to the values instilled to us by our forefathers and that is to provide total
customer satisfaction.
12
8/16/2019 Sys Eng Final
13/69
1.5 Systems
According to our interview, the only existing inhouse system is quickbook
and the basics which is excel and POS. They are planning to add SAP to their
system in the future.
B. Value Chain Analysis
!
13
8/16/2019 Sys Eng Final
14/69
To further explain the
operation done in the inbound
and outbound delivery we have
included the swim lane of
activities done to successfully
perform the activity. We also
included the input process
output of production.
14
8/16/2019 Sys Eng Final
15/69
C. Financial Analysis
Gantt Chart
!
The gantt chart shows a graphical image of the percentage of sales per class of
each product. The products are also divided into classes which is class A, B & C.
15
8/16/2019 Sys Eng Final
16/69
The Table above show the monthly sales of each product and the total percentage of
sales for each class. It shows that class A has the most sales. Their average monthly sales is
Php.105,164,488.85
.
16
8/16/2019 Sys Eng Final
17/69
This is the cash flow of power steel from Jan.1-Feb.16 2015.It can be seen that Power Steel is really doing a good job ofkeeping the ratio of inflows higher to the outflow. There are
just some notable points where they have a very highamount of receivables and payables which are not a goodsign in terms of liquidity and sustainability for the company.
17
8/16/2019 Sys Eng Final
18/69
18
8/16/2019 Sys Eng Final
19/69
From the following balancesheet, it can be clearly seen thatthe current ratio (current assests/current liabilities) 641,493,685.85/617,111,367.04 = 1.04% meaninga general rule of thumb is that itshould be at least 2:1. A lowercurrent ratio means that thecompany may not be able to payits bills on time, while a higherratio means that the company hasm o n e y i n c a s h o r s a f einvestments that could be put tobetter use in the business
Another notable figure isthe amount of accounts payableof 402 M which is almost 65% of
their total liabilities. This meansno harm but it does mean thatmost of Power Steels liabilitiescome from suppliers which aremostly the items they retail.
19
8/16/2019 Sys Eng Final
20/69
D. Strengths and Weaknesses
Strengths
1. Produces economical and efficient steel and power.
2. Sports a product portfolio that caters to varied needs in the steel market.
3. Has force of innovation, adaptation of new technologies and the collective skills ofits strong, committed workforce
4. Has an enterprising spirit and the ability to discern future trends
5. Has operations in Steel, iron, electricity generation and distribution
Weaknesses
1. Shortage of coking coal and is largely dependent upon its import
2. Weak performance on the back of the higher raw material cost and the power &
fuel cost
20
8/16/2019 Sys Eng Final
21/69
III.PROBLEM STATEMENT
A. Problem Identification
The problem statement will be computed using this formula:
2. of Problem= Total Waste Cost / Total Sales
C.of Problem = "13,758,338.56/"67,695,353.24
of Problem = 20.32%
According to the average sales(per month) and waste cost document of Power steel
the company experienced a 20.32% waste cost last 2014 and early 2015 that will
amount to 13,758,338.57.
21
8/16/2019 Sys Eng Final
22/69
22
8/16/2019 Sys Eng Final
23/69
Review Of Documents
G33
G40
23
8/16/2019 Sys Eng Final
24/69
G60
I-Bar & Z-Bar
24
8/16/2019 Sys Eng Final
25/69
Angle Bar
MSCP
25
8/16/2019 Sys Eng Final
26/69
C- Purlins
SB
26
8/16/2019 Sys Eng Final
27/69
Flat Bar
27
8/16/2019 Sys Eng Final
28/69
MSP
PRB
28
8/16/2019 Sys Eng Final
29/69
GIP
29
8/16/2019 Sys Eng Final
30/69
BIP
Based on our interview not all items that are accounted as waste cost are defective
items, some are items that cant be found or items that are not recorded in their system.
As of today, the system that they use to account their inventory is through excel only
which makes it hard for them to keep track of returns and randomly observed damaged
products.
30
8/16/2019 Sys Eng Final
31/69
3.2 Objectives
The objectives for improvement:
• Identify the root cause of the waste.
• Reduce waste by 15%.
• To design a system that will avoid reoccurrence of problem.
31
8/16/2019 Sys Eng Final
32/69
IV. CAUSAL ANALYSIS
4.1 Current System & Subsystems
32
8/16/2019 Sys Eng Final
33/69
33
8/16/2019 Sys Eng Final
34/69
34
8/16/2019 Sys Eng Final
35/69
Based on the interview that we have conducted we were able to list down all the
occurring problems for each activity.
• INBOUND ACTIVITIES
! Delivery from Suppliers
There is only one checker per delivery & due to this he misses a lot
of defected units, that are only seen when the items are being prepared
for delivery to customers.
35
8/16/2019 Sys Eng Final
36/69
! Returns
They receive a lot of returns from customers that are not only
minor defects, mostly unrepeatable defects that leads to waste & unsold
items.
! Backloading
Same problem with delivery from suppliers.
! Transfer
Transfer items, are items that came from other warehouse branch
of Power Steel, which adds cost to the company. This occurs when they
do not have enough stocks to meet customers demands. Which leads
us to our next problem, which is their current way of encoding theirstocks which is through excel, that makes it hard for the warehouse
secretary to keep track of defected stocks and the current stocks that
they have.
• OUTBOUND ACTIVITIES
! Delivery to customers
Since 2 checkers are assigned in this area, this is where they find
most of their defected items. When they find defected items it is totalled
and tell it to the warehouse secretary. It is the encoded in excel but
since everything is manual not every item is successfully encoded
properly in excel thus resulting to stocks & sold items are not balanced
which leads to waste costs.
! Pick-Up
Since customers are allowed to check their purchased items once
they sign the receipt, they only have 3 days to have it replaced thatminimises the companies returned items.
Currently, they do not have a copy of data showing where the defects
came from because when the defects are seen on the inbound delivery from
supplier it is automatically deducted to total units purchased. All the defected
items after that, is recorded together and taken away to check if it can be
repaired if not it is considered as junk or waste.
36
8/16/2019 Sys Eng Final
37/69
Current Warehouse Process
37
8/16/2019 Sys Eng Final
38/69
This is the current process of stocking the products inside the warehouse. The
researchers have observed that they don't have any protective material that
prevents the steel from touching the surface to prevent rusting. Also the products
are directly just pilled up using a single crane that may cause deforms and defectson the product. During the tour the researchers observed that there is no standard
work flow procedure and that the employees have minimal control over their
responsibilities, resulting to inefficient manpower assignment. Their employees are
also not wearing any protective gear that causes job hazard in the warehouse.
The current material handling that the company observe is, from the delivery
trucks they load the steal on a crane and pile the products above each other. Some
products are manually carried by their employees. When the products are pilled up
deformation could occur and damage the products. If proper machineries and
equipment would be implemented or used pilling up or stocking of products will be
much easier and they could prevent manual stocking of products because stocking
of products would be a lot easier if they will use machines that are up to date and
accommodate large quantity of items each time it unloads a delivery truck.
38
8/16/2019 Sys Eng Final
39/69
ac y
The researchers have also observed a huge pile of junk around the warehouse.
This are some of the items that have defects and can no longer be sold. They just
put it on a side with the rest of the products, this pile of junk can easily cause a
hazard or a discrepancy on their inventory.
39
8/16/2019 Sys Eng Final
40/69
Data Review
With the use of Pareto Analysis we have narrowed down the list of items
that produce a significant amount of waste cost.
A. G40
B. Angle Bar
C. G60
D. G33
E. GIP
F. MSP
G. C- Purlins
By the 80-20 rule the researchers decided to focus on 7 item category.
40
8/16/2019 Sys Eng Final
41/69
41
8/16/2019 Sys Eng Final
42/69
42
8/16/2019 Sys Eng Final
43/69
43
8/16/2019 Sys Eng Final
44/69
The data shown above are the sample end of the month inventory of
Power Steel. Based on our interview this particular data shows, Expected Units
Sold includes the orders made at the start of the month minus the stocks they
have & all the transferred units they’ve had. While, Actual Units Sold includes
items that are directly ordered by the customers, transferred items that are sold
are not included here. The Defect Items are the encoded / reported number ofdefect items.
As the data show, there is a discrepancy with the number of expected
units sold, actual units sold. This items are the missing items that were not
accounted in their inventory. This only proves that their inventory system needs
improvement. There is also a large number of defect per item that shows that
their quality maintenance needs further improvement.
We have computed for the percentage of waste cost produced from the
defects and missing items. Using the formula:
%of Defected Items= Total Defects/Total Waste
%of Defected Items= 8,790/11,939
% of Defected Items= 74%
%of Missing Items= Total Missing/ Total Waste
%of Missing Items= 3,149/11,939
% of Missing Items= 26%
This computation clearly shows that the defected items contribute more
to Power Steel’s waste costs.
44
8/16/2019 Sys Eng Final
45/69
Facility Defects Contribution
Materials handling – causing defects inside warehouse
In the power steel warehouse, defects occur from the picking up and placing
down of steel products as it was handled down by a centralized gantry crane located
in the warehouse ceiling alongside with 13 forklifts used to transport the products into
the 12 wheeler trucks. The point where defects occur are from the following reasons;
1) falling steel products from the gantry crane and forklift due to untightened cables
and ropes that causes deformation and corrosion 2) excessive weight loaded to the
forklifts causing the items below to deform. 3) in a rare case, storing the steel
products with cramped spaces inside the warehouse, causing deformities or corrosion
when some items moist through time.
45
8/16/2019 Sys Eng Final
46/69
46
8/16/2019 Sys Eng Final
47/69
47
8/16/2019 Sys Eng Final
48/69
48
8/16/2019 Sys Eng Final
49/69
Systems Flow (inbound)
Manufacturer to Warehouse
*Highlited in red are the process that contributes defects
49
8/16/2019 Sys Eng Final
50/69
General Process Outflow (Warehouse to
Customer)
*Highlited in red are the process that contributes defects
50
8/16/2019 Sys Eng Final
51/69
Facility and Materials Handling Analysis
Stante for MSCP
Plates
DRB & ABSmallSizes
Plain Round Bar
Flat Bar
PRB/SB (Thick)
DRB 10x6 g33
DRB 16x6DRB 12x6
CBSTWF
RB/SBDRB 10x6 g40
SBPRB
CB
Pipes
MSP
Angle Bars
Pipes
Angle Bars
BackloadOFF LENGTHS
DRB g60
TRUCKMAINTENANCE
AB Small SizesPRBZBIB
PRB
DRB 12x6 g33
DRB G60
WF
DRB 10x6 g40DRB 12x6 g40
OFF LENGTHS
DRB g60
OFFICE
Gate
51
8/16/2019 Sys Eng Final
52/69
Class Item Monthly AVE% ofSales %Cumulative % of Sales
A
DRB 42,743,143.98 40.64% 40.64%
87,203,168.26
BARS
15,484,825.2014.72% 55.37%
Beams
10,595,194.8910.07% 65.44%
Pipes
9,467,179.679.00% 74.45%
Plates
4,579,094.324.35% 78.80%
Tubes 4,333,730.194.12% 82.92%
B
CP
3,012,024.082.86% 85.78%
14,438,577.39
WWM
1,964,867.361.87% 87.65%
Wires
1,887,358.211.79% 89.45%
Sheets 1,879,394.13 1.79% 91.23%
hardware
1,791,453.521.70% 92.94%
Fab
1,787,238.401.70% 94.64%
PRB 1,092,806.581.04% 95.68%
SS 1,023,435.13 0.97% 96.65%
OS
984,044.180.94% 97.59%
ConP
685,233.380.65% 98.24%
CRS 501,700.070.48% 98.71%
52
8/16/2019 Sys Eng Final
53/69
The positioning of steel products in the facility is based on the following criteria:
• Ease of access of the lead selling products (based on ABC analysis)
• Flow of movement (material handling equipment like forklifts and the overhead
gantry crane at top)
• Space utilization (utilizing about 83% of the total 1,540 sq.m) for the storage
and the remaining for the rooms like the office and the spare parts room for the
trucks
• Ease of communication and support (office and truck maintenance spare part
room located near the front gate)
For the ease of access of the lead selling products
• Products which sells more are positioned nearer to the gate than the others,
for the reason to lessen the travel times from the material handling equipment
like the crane and forklift and will surely lessen handling times when counted at
a long time and will incur less effort and costs.
C
cts 483,057.540.46% 99.17%
3,522,743.20
WR
371,552.490.35% 99.53%
FT 273,401.280.26% 99.79%
ZP001
107,158.920.10% 99.89%
KS
55,554.560.05% 99.94%
FTB
50,868.580.05% 99.99%
AP
6,110.580.01% 100.00%
AFB
3,962.250.00% 100.00%
HB
99.380.00% 100.00%
105,164,488.85
53
8/16/2019 Sys Eng Final
54/69
For flow of movement
• Allotted with 2 lanes for easy access of forklifts to the product that is needed to
be extracted.
Space Utilization
• The space utilized is 83% (that is 95% of the time) meaning the stocks of steel
products inside never go on a critical low level due to proper inventory
management
Ease of Communication and Support
• Orders and deliveries need validation from the office (checking and receiving
of invoices) and also truck spare parts storage like spare tires and tools like
tire wrench, screws and car jack.
Inventory Improvement System
The current inventory system that the Power Steel have is a manual input
system that uses the excel software. Common errors and disadvantages in the
current inventory management process will be the following; 1) Error in manual data
input 2) Inability to track historical trends and ability to make informed forecasts for
future needs. 3) Needs more time, effort and incur more costs like utility expense etc.
4) has the risk of having fraud or falsified data with the limit of data encryption to
selected users only
These are the actual effects of manual excel inventory management
• Interchanged the codes of certain steel products (eg. DRB to PRB) which
creates inventory figure discrepancy like sales and items currently on hand vs
items currently sold
• Trends in steel products sales can be seen by only through manual scanning,
therefore can incur unmeasurable amounts of opportunity loss when eg. There
is a need of increasing production capacity in the months of October to March,
but did not execute due to lack of proper procedures and data analysis.
• Consumes more time, effort and cost. Utility expenses incurred through long
usage of computers in workplace just for manual inputs and checking of data
integrity. Need also a lot of man power to process certain data and information
that can be executed through a better way like having an automated system
• The excel file used can be accessed by almost anyone. Having excel files with
critical data inside it will surely have risks of having frauds and falsified data.
Data integrity will be questionable through this manual process.
54
8/16/2019 Sys Eng Final
55/69
8/16/2019 Sys Eng Final
56/69
4.2 Identify the root causes of the problem
By using all the data, interview knowledge & observations the
researchers have came up with some of the of the problems. To be able to trace
down the root cause of the problem. Stream Diagnostic chart will be used.
56
8/16/2019 Sys Eng Final
57/69
Conclusion
Symptoms
Large number of Items with defects.
Core Problem
Products are not properly stored.
Fundamental Core Problem
Items are not declared in the inventory.
Why Why Diagram
57
8/16/2019 Sys Eng Final
58/69
V. Decision Analysis:
Cost Benefit Analysis
58
8/16/2019 Sys Eng Final
59/69
Installation of SAP could help the company because this system could be an
easier way of keeping track of their inventory. If an item is missing or defected it can
easily be classified in the system. Also this system can automatically trace
discrepancies on their inventory to reduce items that are missing or not declared on
their inventory.
Since at the moment we have no means of finding out how this
implementation alternatives would work on their system. We decided to benchmark
on previous studies that has the same problems as ours. We found out that to be
able to effectively reduce waste costs and defects it is very important to have a
properly oriented employees. Employees should be well trained in handling stocks
and stocking them. We also based our estimation of waste reduction on the past
studies that we have acquired though some of the estimation are altered to fit our
study and the company needs.
Another alternative that is greatly needed and well known to prevent defects
are the addition of machines and equipments which are used to stock the products
properly. With the use of proper quality & quantity of the said equipment we can
avoid deformations and rusting on the products. With the help of the crane and forklift
the employees chances of having to manually unload and stock the items will
decrease therefore items will be handled properly and prevent unnecessary pressure
or coalition between items.
59
8/16/2019 Sys Eng Final
60/69
Scoring Model:
( 1-5, 1 being the lowest and 5 the highest)
60
8/16/2019 Sys Eng Final
61/69
Discussion of weight:
a.) project cost (0.4) = the cost of the project the lower the better
b.) probability of reducing waste (0.3) = the chance of achieving reduction of waste etc. the
higher the chance the better.
c.) probability of improved work system (0.3) = the chance of achieving an improvement of
work system in the company. the higher the better.
Alternatives:
Criteria weight score weighte score weighte score Weighte
( A) d (B) d (C) d score
score score
Project 0.4 3 1.2 5 2 3 1.2
Cost
probabili 0.3 3 0.9 1 0.3 4 1.2
ty of
reduced
Waste
probabili 0.3 3 0.8 2 0.6 4 1.2
ty of
improve
d work
system
Total: 3 2.9 3.6
61
8/16/2019 Sys Eng Final
62/69
According to the Alternative scoring model and cost benefit analysis method the right
choice or alternative is, Alternative C that has a weighted score of 3.6. Meaning power steel
should consider the choice of having additional equipment and machines.
How-how
Risk Analysis
RISK Possible Loss Mitigation Method
Deformed and Rusted Steels Loss of Sales and Profits Improve Facility
Improper placing of Inventory Loss of stocks Proper Training of employees
No proper process ininventory management
Loss of stocks Planning
Items are not qualifying fromthe standards
Shortage of stocks Weekly supplier check
62
8/16/2019 Sys Eng Final
63/69
Consequence of choice (install SAP):
a.) Current employees will have difficulties in using SAPb.) Maintenance cost of the SAP software
Consequence of choice (New work standard):
a.) additional labor costb.) Small probability that waste percentage will decreasec.) Confusion on new work procedures if not properly orientedd.) idling of additional workers
Consequence of choice ( additional machine and equipment):a.) Maintenance cost of the additional overhead crane and forkliftb.) Additional training to current employees
63
8/16/2019 Sys Eng Final
64/69
VI.) Develop/ Design Improvement:
By using cost benefit analysis the researchers came to see the different cost of each
alternative and their corresponding effects and estimated benefit. According to the analysis
the researchers made choice of alternative C or the additional crane and forklift.
The cost of the said alternative is totaled to the amount of 1,265,000, and
composed of a over head crane ( PHP 300,000) that functions as to move extremely heavy or
bulky loads through the overhead space in a facility, instead of through aisles or on the floor,
an overhead crane (also called an industrial crane, crane, or overhead traveling crane is a
machine that lifts, lowers and moves a load horizontally. Overhead cranes have high lifting
capabilities for load movement. Fork lift ( PHP 825,000) They are used for loading and
unloading trucks and for transporting goods. Forklifts come in many different styles and sizes
to suit particular lifting operations. They range from small, pedestrian-operated machines to
heavy-duty, driver-operated trucks. Some are compact in order to fit through narrow aisles.
The researchers identified this machines as a vital part of the warehouse process of the
company since this machines is responsible of proper lifting and placing of the products.
Preventive mats (PHP 140,000) which will prevent the steel from touching the ground,
reducing the probabilityy of rusting. The estimated benefit or the chance that the choice can
offer to the company is 35% that amounted to PHP3,545,379reduction on waste cost.
Same results showed in the alternative scoring model where the researcher is tasked
to compute for the total weighted score, by multiplying the score of a alternative with the
criteria weight. The result of the said model is the same with the cost benefit analysis arriving
with additional equipment and machines as the choice with the score of 3.4.
Since the the said company has employees knowledgeable enough to operate
the machines selected, the proposed solution is a proper or additional operator in order to
fully utilize the said machines. Proper man power allocation and operator are need to fully
utilized the productivity of using this machines.
64
http://www.mhi.org/glossary?q=%2522overhead+crane%2522&pb=1&fq=&sort=score+desc
8/16/2019 Sys Eng Final
65/69
VII.) System Implementation and Evaluation:
The researchers analyze and came up with the proper man power requirement
need to optimally operate the warehouse process of the company with the additional
equipments.
current:
As we can see from the current man power requirement the company only has one
crane operator and forklift in zone 1 to 4.
proposed:
The researchers man power requirement schedule for power steel with the
additional over head crane and forklift. this could be the key to achieve the estimated
51.8% reduction on waste products.
65
8/16/2019 Sys Eng Final
66/69
Sample Computation:
current waste cost = 20.32%
waste percentage from deformed products = 10,129,653
by properly applying chosen alternative with estimated benefit of 35% (PHP3,545,379)
waste cost from deformed products - estimated benefit of alternative
= 10,129,653-3,545,379
=6,584,275
*the waste cost from deformed products will reduce from 70% to 48%
Total Computation:
% of waste cost if the chosen alternative is properly implemented
Proposed:
Waste cost= 13,758,338.57-3,545,379
=Php10212959
Waste Cost Percentage= (10,212,959/67,695,353.24 ) *100
=15%
With this computation we are able to prove that with the chosen alternative we willbe able to reduce the current waste cost from 20.32% to 15%. By the computationprovided we can easily see that the objective is already achieved but, their inventorysystem can also be a big help in preventing the waste costs.
Waste Cost produced by Missing items minus Proposed Benefits of installing anew system will give us the waste cost that will remain after applying the alternative.
=3,628,685-362,869=3,265,817
*from 26% waste cost by missing items is reduced to 24% a total of 2% reduction
If this alternative will be implemented together with the additional machines andequipments the total waste cost would be Php9,850,091.36 resulting to a 0.45%reduction in waste cost percentage which will be 14.55%.
66
8/16/2019 Sys Eng Final
67/69
Step-by-Step Implementation
Management
should
authorized a
new standard
plan that to
be followed
by employees
Provide right
amount of
budget for
hiring of
employees
and
additional
machines
Search for
qualified/fit
employees
for every job
description
that will be
assigned
Assign thequalified
employees to
the new
machines that
to be fill up
Observe theflow of work
for a year and
compare it if
the workflow
improved
If it issuccessful try
to provide
some cost
reduction to
lessen the
expenses of
hiring and
buying ofmachines
67
8/16/2019 Sys Eng Final
68/69
Step by step implementation:
1. Purchase of the ordered equipment (overhead crane and forklift)
2. Proper placement/installation of overhead crane and forklift in designated zone
3. Proper orientation of employees on proper use and maintenance of the equipments,proper
material handling to avoid deformation
4. Analyze and came up with the proper man power requirement need to optimally operate
the warehouse process of the company with the additional equipments.
68
8/16/2019 Sys Eng Final
69/69
VII.) Conclusion:
Based on the analysis of the available information and using different IE-EMG
tools researchers found out that Power steel a retailer of steel products experienced a
waste cost of 20.32% amounting to 13,758,338.57 last jan 2014 - march 2015. Caused
by the identified core problems about the huge amount of defects that they are currently
experiencing. Using the data & observation available to the researchers, they were able
to get the root cause of the problem, which is the improper stocking of their products.
The researchers also observed that a percentage of their waste cost comes from
improper inventory and listing of defected products.
With all the data and observed problems in mind, the researchers came up with 3
alternatives. The first alternative is installation of a new inventory system (SAP) to help
manage the their current inventory. The second alternative is to implement a new work
standard that could help the company to grow by training their employees to do their job
properly and to make sure that they know their responsibilities. The third and last
alternative is to add additional equipment that will particularly protect the products from