SUSTAINABLE POLICIES PROJECTS AND ON GOING EFFORTS NoorEAlam Executive Engineer Roads and Highways Department Ministry of Communication

SUSTAINABLE POLICIES PROJECTS AND N GOING EFFORTS Sustainable initiatives , projects and...at Titas Upazila • Sustainable design of infrastructures considering climate change adaptation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

SUSTAINABLE POLICIESPROJECTS AND ON GOING

EFFORTS

Noor‐E‐AlamExecutive Engineer 

Roads and Highways DepartmentMinistry of Communication

• Policy initiatives• Policy initiatives1

• On going  Projects and efforts

• On going  Projects and efforts2

• BRT (Gazipur –Airport)  • BRT (Gazipur –Airport)  3

Presentation Outline

Policy Initiatives 

National Land Transport Policy’  2004• Providing a safe and dependable transport service•Maintain an economic and environmental balance • Introduction of an integrated transport system and provision of alternate transport Systems

• Promoting the use of cleaner technologies for fuel and vehicle

• Creating awareness for better standards of safety in transport sector

Sustainable Initiatives 

National Land Transport Policy’  2004• Create better environment for pedestrian• Fostering safer non‐motorised vehicle operations• Encouraging the shifting from diesel based vehicle to more environmental friendly fuel, e.g, CNG

• Emphasizing banning of 2‐stroke engine from Dhaka 

• Discourse private car use in Dhaka with a target to keep it below 30% of mechanised trips in by 2022

Policy Initiatives 

National Integrated Multimodal Transport Policy’  2013

• The Paradigm Shift: More investment towards the concept of sustainable mobility

• Improve safety and reduce accident rate• Reduce the worst environmental effects of transport• Ensure that transport meets social needs in terms of cost  and accessibility to all sectors of society

• Improve integration of the overall transport network and foster measures to make interchange between modes easier

• Reduce the need for travel by better land use planning• Improve fuel and energy security

Sustainable Initiatives 

National Integrated Multimodal Transport Policy’  2013

• More investment in rail and waterway• Promote walking by ‘Pedestrian First’ program• Promote non‐motorized transport• Promote  public transport and integration • Promote rural transport development • Integration with policies for education, health, economic growth, gender and social equity            and poverty reduction

Policy Initiatives 

Strategic Transport Plan (STP) for Dhaka 

• Establish a sound policy framework to ensure the sustainability of the current and future investments in transport sector. 

• 50  road projects focusing on developing more east west connections .

• Construction of 3 Bus Rapid Transit (BRT) and 3 rail based Mass  rapid transit (MRT) system. 

• Creation of a ‘Pedestrian First Priority’ system to enhance the provisions and protection for pedestrians.

• Creation of a clean environment by placing emphasis on noise and exhaust emissions controls.

8

STP 2004 (World Bank)Mass Transit route , STP 

Ongoing Major Projects

Road• Inter Urban Project• Urban Project

Rail• Inter Urban Project• Urban Project

Water• Inter Urban Project• Urban Project

Road Project 

• Upgrading of 192.0 KM Highway• Expected to be completed by  Dec 2015

Improvement of Dhaka‐Chittagong Road 

• Upgrading of 90 KM National Highway• Expected to complete by June 2015

Improvement of Joydebpur‐Mymensing

Road 

• Upgrading of 70 KM National Highway• Bid invited for Construction • Expected to complete by December 2018

Improvement of Joydebpur‐ Elenga Road 

• 6.18 Kilo meter over the River Padma• Expected to Complete by 2018Padma Bridge

Cross Section: Joydebpur‐Elenga Road 

Road Project 

• Uttara‐Mirpur 10 – Farmgate –Sonargaon ‐Press Club‐Paltan and Bangladesh Bank, 20 KM

• Expected to be completed by 2024.MRT Line‐6

• Hazrat Shahjalal International Airport to Gazipur, 20 KM

• Excepted to be completed by 2017

BRT Line ‐3(North)

• Hazrat Shahjalal International Airport to Jilmil (keranigong), 22KM

• Excepted to be completed by 2018

BRT Line‐3 (South)

Road Project 

• Dhaka Elevated Expressway  (23 KM)• Dhaka – Ashulia Elevated  Expressway (34KM) • Shantinagar to Dhaka‐Mawa Road (Jhilmil) via 4th (New) Bridge over Buriganga river (11 KM)

Elevated Express way

• Jahangir gate –Rokeya Sarani tunnel• Tunnel under Kurnofuli river, ChittagongTunnel

• Focus on reducing conflict between motorized and non‐motorized transport (NMT) and congestion

• Better mobility for those who walk and use public transport, particularly, working women

• Bus route  restructuring 

CASE Project(DTCA, DoE, 

DCC) 

Road Project 

• Pilot project for development of rural waterway at Titas Upazila

• Sustainable design of infrastructures considering climate change adaptation 

Rural Transport Improvement Project‐II 

• Sustainable design considering climate resilience

• Sustainable Maintenance Program (Considering toll road on pilot basis)

Sustainable Rural 

Infrastructure Improvement 

Project 

Rail Project

• Construction of 22 Kilometre New rail Track• Convert to dual gauge 90 kilometre • Procure new locomotives, carriages and wagons for enhancing services

• Modernization of signalling system and remodelling of important  stations

• Dhaka‐Chittagong Double line  and Chittagong –Coxbazar line

National

• Construction of 3rd & 4th Dual Gauge Railway Track between Dhaka‐Tongi section 

• Construction of a Dual Gauge  Line in Dhaka‐Narayanganj and Joydebpur‐Mymensingh Section.

• commuters service with Demo Train

Urban

Waterway Project 

• Construction of Sonadia deep sea port  at cox bazar  and Paira sea port at potuakhali

• Improvement  of Inland container river port at Ashugang.• Inland Container Terminal (ICT) at Pangaon.• Dredging of 12 important river route and capital dreging of 53 river route in Inland waterways.

• BIWTA master Plan

National 

• Circular Waterway (sadarghat‐Gabtoli‐Asulia)• BIWTA also running Water bus from Sodorghat –Aminbazar on pilot basis which also reduces pressure on road along this corridor.

Urban  

Efforts

Towards a sustainable future

• Road safety improvement Projects• Reducing Black Carbon Emission from Heavy duty Diesel Vehicles(HDV) and Engines

• Inner circular road (Dhaka)• Circular railway around Dhaka• Institutional strengthening of DTCA   • Regional Development Planning (RDP) Project  Taken by RAJUK for greater Dhaka, 2016‐2035 

• Provide well connectivity among 

the potential centers

• Ring road concept

• TOD along the MRT/Commuter 

corridor

• Future extension of BRT and MRT

• Provide East‐West connectivity

• Pedestrian & Bicycle friendly 

environment

CONCEPT OF TRANSPORT PLANNING ‐RDPCONCEPT OF TRANSPORT PLANNING ‐RDP

Thank You

Jahangir gate –Rokeya sarani tunnel

m`iNvU - Avïwjqv = 30.00 wK.wg.;

Avïwjqv - UsMx -KvPucyi = 40.00wK.wg.

KvPucyi -gxiKvw`g -m`iNvU = 40.00 wK.wg.|

Avïwjqv

m`iNvU

UsMx

KvPucyi

gxiKvw`g

bvivqbMÄ

• Construction of  dedicated lanes for bus • 15.5 kilometre at grade  & 4.5kilometer elevated

• Two mixed traffic lanes in each direction• NMT lane and service lane 

Features

Greater Dhaka Sustainable Urban Transport Project (GDSUTP)

Gazipur Centre

Joydebpur

Tongi

Airport

Railway

Uttara extension

Dhaka BRT corridor(WB project)

Intermodal Areas

Main trunk

Extensions

Railway

Gazipur Centre

Joydebpur

Tongi

Airport

Railway

Uttara extension

Dhaka BRT corridor(WB project)

Intermodal Areas

Main trunk

Extensions

Railway

• 20 km bus lanes and mixed lanes• Tongi Bridge and 4.5 elevated section• 31 stations, 2 terminals ,One depot• 141 access road and 10 kitchen market

Civil works

• Airport to Gazipur (20 kilometre)Route

• USD 255.0 million• 48 month

Project cost Implementation Period

Promoting Bike 2 Work

24

Future  Mass Rapid Transport

STP 2004 (World Bank)

FORMULATE POLICY FOR ELECTRI VEHICLE(EV) AND HYBRIDE VEHICLE