66
SURVEYING I (CE- 128) 1 NUST Institute of Civil Engineering/Engr Muhammad Ammar COURSEPACK FOR UG

SURVEYING – I (CE- 128)

  • Upload
    kioko

  • View
    103

  • Download
    0

Embed Size (px)

DESCRIPTION

SURVEYING – I (CE- 128). COURSEPACK FOR UG. SURVEYING – I (CE- 128). OBJECTIVES COURSE OUTLINE DETAILED SYLLABUS LESSON PLAN. SURVEYING – I (CE- 128). OBJECTIVES. SURVEYING – I (CE- 128). OBJECTIVES. To enable students to understand theory and practical of surveying - PowerPoint PPT Presentation

Citation preview

Page 1: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

1NUST Institute of Civil Engineering/Engr Muhammad Ammar

COURSEPACK FOR UG

Page 2: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

2NUST Institute of Civil Engineering/Engr Muhammad Ammar

o OBJECTIVES

o COURSE OUTLINE

o DETAILED SYLLABUS

o LESSON PLAN

Page 3: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

3NUST Institute of Civil Engineering/Engr Muhammad Ammar

OBJECTIVES

Page 4: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

4NUST Institute of Civil Engineering/Engr Muhammad Ammar

OBJECTIVES

o To enable students to understand theory and practical of surveying

o To develop skills to use the modern survey instruments

Page 5: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

5NUST Institute of Civil Engineering/Engr Muhammad Ammar

COURSE OUTLINE

Page 6: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

6NUST Institute of Civil Engineering/Engr Muhammad Ammar

COURSE OUTLINEo COURSE TITLE: SURVEYING – I

o COURSECODE: CE – 128

o CREDIT HRS: 3 THEORY: 2 PRAC: 1

o NO. OF WEEKS: 18

o INSTRUCTOR: ENGR MUHAMMAD AMMAR

Page 7: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

7NUST Institute of Civil Engineering/Engr Muhammad Ammar

SCHEDULEo WEEK # 01: General Introduction to Survey (Lec 1)

o WEEK # 02: Distance Measurement & Chain/Compass Surveying (Lec 2)

o WEEK # 03: Plane Table Surveying (Lec 3)

o WEEK # 04: Traversing (Lec 4)

o WEEK # 05: Traversing (Lec 5)

o WEEK # 06: Traversing (Lec 6)

Page 8: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

8NUST Institute of Civil Engineering/Engr Muhammad Ammar

o WEEK # 07: Leveling (Lec 7)

o WEEK # 08: Leveling (Lec 8)

o WEEK # 09: Leveling (Lec 9)

o WEEK # 10: Contouring (Lec 10)

o WEEK # 11: Contouring (Lec 11)

o WEEK # 12: Computation of Areas (Lec 12)

o WEEK # 13: Computation of Volumes (Lec 13)

Page 9: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

9NUST Institute of Civil Engineering/Engr Muhammad Ammar

o WEEK # 14: Modern Instruments in Survey (Lec 14)

o WEEK # 15: Modern Instruments in Survey (Lec 15)

o WEEK # 16: Practical Survey Training (SURVEY WEEK)

Page 10: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

10NUST Institute of Civil Engineering/Engr Muhammad Ammar

DISTRIBUTION OF MARKSo THEORY 4 x Quiz 15 Marks 2 x Assignment 05 Marks2 x One Hour Test (OHT) 30 Marks1 x Final Exam 50 Marks

o PRACTICAL* Practical Work/Projects 60 MarksFinal (Viva) 30 MarksPerformance in field work/attendance 10 Marks

* Details will be conveyed to you before the start of survey week

Page 11: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

11NUST Institute of Civil Engineering/Engr Muhammad Ammar

RECOMMENDED BOOKS

o Surveying Principles and Applications by Kavanagh

o Surveying and Leveling Vol. 1 by Kanetkar

o Surveying for Construction by Irvine (Reference Book)

o Surveying Theory and Practice by Davis; McGraw Hill

(Reference Book)

Page 12: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

12NUST Institute of Civil Engineering/Engr Muhammad Ammar

DETAILED SYLLABUS

Page 13: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

13NUST Institute of Civil Engineering/Engr Muhammad Ammar

1. GENERAL INTRODUCTION: Definition of survey, principle of survey, types of survey, classification of survey, instruments used in survey, precision and accuracy, accuracy ratio, scale and its construction, distance measurement and use of instrument for distance measurement, errors, distance measured by tape and errors involved, methods of chain surveying and errors involved.

2. PLANE TABLE SURVEYING: Part and accessories of plane table, setting and orientation, methods of plane tabling.

3. TRAVERSING: Methods of traversing, bearings and calculation of angles from bearings, traversing with chain and compass.

DETAILED SYLLABUS

Page 14: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

14NUST Institute of Civil Engineering/Engr Muhammad Ammar

4. LEVELING: Definitions, types of levels, Staff, principles of leveling, reduction of levels, profile leveling, curvature, refraction, effect of curvature and refraction, corrections, barometric leveling, hypsometry, errors in leveling.

5. CONTOURING: Definitions, characteristics & uses, locating contours, interpolation of contours, setting grade stake for sewers.

6. COMPUTATION OF AREAS: introduction, determination of areas, computation of areas from plans, trapezoidal rule, simpson rule

Page 15: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

15NUST Institute of Civil Engineering/Engr Muhammad Ammar

8. COMPUTATION OF VOLUMES: measurement of volumes from cross-sections and various formulas for computation of volumes, determination of capacity of reservoir.

9. MODERN METHODS IN SURVEYING: principles of EDMI, EMD characteristics, total station, Global Position System.

Page 16: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

16NUST Institute of Civil Engineering/Engr Muhammad Ammar

LESSON PLAN

Page 17: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

17NUST Institute of Civil Engineering/ Engr Muhammad Ammar

LECTURE # 01: INTRODUCTION TO SURVEY1.Definition: - Surveying is the art of making such measurements as will determine the relative positions of distinctive features on the surface of the earth in order that the shape and extent of any portion of earth`s surface may be ascertained and delineated on a map or plan. It is essentially a process of determining positions of points in a horizontal plane. OR

Surveying is the art and science of measuring distances, angles & positions, on or near the surface of the earth.

“Leveling is art of determining the position of point in vertical plane”.2.Object of Survey: -

The primary object of surveying is the preparation of a plan or map. A plan is therefore, the projected representation to some scale, of the ground

and the object on the horizontal plane which is represented by the plane of the paper on which the plan is drawn. The representation is called a map, if the scale is small, while it is called a plan, if the scale is large, e.g. a map of UK, a plan of a building.

The science of surveying has been developing from the very initial stage of human civilization according to his requirement. Earliest surveys were performed only for the purpose of demarcating its boundaries of plots of land.

Page 18: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

18NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Due to advancement in technology, the science of surveying has also attained its due importance. In the absence of accurate maps, it is impossible to lay out the alignments of roads, railways, canals, tunnels, transmission power lines, & microwave or television relaying towers.

Detailed map of the sites of engineering projects are necessary, therefore, surveying is the first step in the execution of any project

3. Types of Surveys:- (1) Plane Surveying and (2) Geodetic Surveying

Plane surveying: In plane surveying the curvature of the earth is not taken into account, as the surveys extend over small areas. In dealing with plane surveys, the knowledge of plane geometry & trigonometry is only required. Surveys covering an area up to 260 sq. km may be treated as plane surveys because the difference in length between the arc & the subtended chord on the earth surface for a distance of 18.2km is only 0.1m.

Scope & Use of Plane Surveying: Plane Surveys are carried out for engineering projects on sufficiently large scale. They are used for the layout of highways, railways, canals, fixing boundary pillars, construction of bridges etc. For majority of engineering projects, plane surveying is the first step to execute them.

Page 19: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

19NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Geodetic Surveying: The surveys in which curvature of the earth is taken into account & higher degree of accuracy in linear as well as angular observations is achieved are known as Geodetic Surveying. As the surveys extend over large areas, lines connecting any two points are on the surface of the earth are treated as arcs. A knowledge of spherical trigonometry is necessary for making measurements for the geodetic surveys.

Scope & Use of Geodetic Surveying: Geodetic Surveys are conducted with highest degree of accuracy to provide widely spaced control points on the earth’s surface for subsequent plane surveys. In Pakistan, Geodetic Surveys are usually carried out by the survey of Pakistan.

4. Classification Surveys may be classified in a variety of ways: a. Classification based upon the nature of the field of survey:(1) Land Surveys.(2) Hydrographic Surveys.(3) Astronomical Surveys.

b. Classification based upon the object of survey:(1) Archaeological Surveys for unearthing relics of antiquity

(2) Geological Surveys for determining different strata in the earth’s crust.

Page 20: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

20NUST Institute of Civil Engineering/ Engr Muhammad Ammar

(3) Mine Surveys for exploring mineral wealth such as gold, coal, etc.(4) Military Surveys for determining points for strategic importance both

offensive and defensive.(5) Engineering Surveys for determination of quantities for designing

engineering works.

c. Classification based upon the methods employed in survey: (1) Triangulation Surveys.(2) Traverse Surveys.

d. Classification based upon the instrument employed:(1) Chain Surveys.(2) Theodolite Surveys.(3) Tachometric Surveys.(4) Compass Surveys(5) Plane Table Surveys.(6) Photogrammetric Surveys.

Page 21: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

21NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 22: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

22NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 23: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

23NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 24: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

24NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 25: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

25NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 26: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

26NUST Institute of Civil Engineering/ Engr Muhammad Ammar

6. Land surveys may be further sub-divided into the following classes: (a) Topographical Surveys for determining the natural features of a

country such as hills, valleys. Rivers, nallas, takes, woods, towns, villages etc.(b) Cadastral surveys in which additional details such as boundaries of

fields, houses and other properties, path ways, are determined. (c) City Surveys for laying out plots and constructing streets, water supply

systems, and sewers.

7. Engineering Surveys may be further sub-divided into: (i) Reconnaissance surveys for determining the feasibility and rough cost

of the scheme. (ii) Preliminary surveys for collecting more precise data to choose the

best location for the work and to estimate the exact quantities and costs (iii) Location surveys for setting out the work on the ground.

8. Principles of Surveying: - The two fundamental principles upon which various survey methods are based are:

Page 27: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

27NUST Institute of Civil Engineering/ Engr Muhammad Ammar

1. To work from the whole to the part: The main principle of surveying is to work from the whole to the part. To achieve this in actual practice, a sufficient number of primary control points are established with higher precision in & around the area to be detail surveyed. Minor control points in between the primary control points are then established with less precise method. Further details are surveyed with the help of these minor control points by adopting any one of the survey methods. The main idea of working from the whole to the part is to prevent accumulation of error & to localize minor errors within the framework of the control points. On the other hand, if survey is carried from the part to the whole, the errors would expand to greater magnitudes & the scale of the survey will be distorted beyond control.

2. Location of a point by measurement from two control points: The control points are selected in the area & the distance between them is measured accurately. The line is then plotted to a convenient scale on a drawing sheet. The location of the required point may then be plotted by making two measurements from the given control points as follow:

Let A & B be two given control points. Any other point, say D can be located with reference to these points, by any one of the following method:

Page 28: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

28NUST Institute of Civil Engineering/ Engr Muhammad Ammar

• Rectangular coordinates by the perpendicular dD and the distance Ad. The distance Bd may be measured instead of Ad (fig--)

• Trilateration: by the two distances AD and BD (fig--)

• Polar coordinates: the angle BAD measured at A and the distance AD. Instead, by angle DBA measured at B and the distance BD (fig--)

• Triangulation: by the two angles BAD and ABD measured at A and B (fig---)

Page 29: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

29NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 30: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

30NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Plain Scale: On a plain scale it is possible to read only two dimensions such as meters and decimeters, units and tenths etc.

Example: Draw a scale 1cm = 4m to read to a meter and show on it 47m. Const: Draw a line 20 cm long and divide it into eight equal parts. Subdivide the first division from the left into 10 equal parts each subdivision reading 1 meter. Place the zero between the subdivided part and the undivided part and mark the figures counting from zero in both dir. To read 47m place one leg of the dividers at 40 and the other at 7.

10. Stages of Survey Operations: The entire work of a survey operation may be divided into three distinct stages:

1. Field work-Reconnaissance, Observations, Field Records2. Office work-Drafting, Computing, Designing3. Care & adjustment of the instruments

11. Accuracy Of Surveyed Quantities: Surveyors’ primary objective is to achieve accuracy in their measurements. Survey is of little value if it is not accurate. In surveying, the most common task is to find the 3D positions of a series of

Page 31: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

31NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 32: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

32NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 33: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

33NUST Institute of Civil Engineering/ Engr Muhammad Ammar

points, the x, y & z coordinates. Physical measurements are therefore required in the form of linear, angular & height dimensions. There will be error in these quantities which must be eliminated, discounted or distributed.

a). Classification of Errors:

Gross: They are simply mistakes. They arise mainly due to the inexperience, ignorance or carelessness of the surveyor. These errors cannot be accommodated & observations have to be repeated. Examples: reading the tape wrongly, recording a wrong dimension when booking, turning the wrong screw on an instrument.

Systematic: These are errors which arise unavoidably in surveying & follow some fixed law. Their sources are well known. A simple example is illustrated by the temp error in tape measurements. A tape is only correct at a certain standard temp; therefore if the ambient temp on a certain day is higher or lower than standard, the tape will expand or contract & cause an error which will be the same no matter how often the line is measured.

Page 34: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

34NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Constant: These are errors which do not vary at any time, in other words, they have the same sign, either positive or negative. As an illustration, consider the nature of the dimensions required for plotting on maps & plans. These must be horizontal & if no attention is paid to the slope of the ground when making a measurement, the dimension so obtained will be too long. No matter how often the measurement is made or how many other slopes are measured, the results will always be too long.

Likewise, if a tape has stretched through continuous use, any resultant measurements will always be too short.

Constant errors are well known & appropriate corrections are applied to obtain the correct result.

Accidental/Random: These are the small errors which inevitably remain after the others have been eliminated. There are three main causes: Imperfections of human sight & touch (human errors), Imperfections of the instruments being used at the time & Changing atmospheric conditions.

A good example arises in the measurement of an angle using an instrument called a theodolite.

Page 35: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

35NUST Institute of Civil Engineering/ Engr Muhammad Ammar

b). Accuracy & Precision: Accuracy & Precision are not synonymous. The difference is illustrated in the following example:

A line of survey is measured six times & all six measurements lie within an error band of ± 2mm. However, the tape when checked, is found to have stretched by 10mm through continuous use.

The results of the six measurements are precise in that they have little scatter but they are not accurate because each is in error by 10mm.

In surveying, accuracy is defined by specifying the limits between which the error of a measured quantity may lie, for example, the accuracy of the measured building might be (20.54 ± 0.01) metres.

Accuracy Ratio: The accuracy ratio of a measurement or series of measurements is the ratio of error of closure to the distance measured. The error of closure is the difference between the measured location & the theoretically correct location.

To illustrate, a distance was measured & found to be 250.56 ft. The distance was previously known to be 250.50 ft. The error is 0.06 ft in a distance of 250.50 ft.

Page 36: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

36NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 37: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

37NUST Institute of Civil Engineering/ Engr Muhammad Ammar

accuracy ratio = 0.06/250.50 = 1/4175 = 1/4200

The accuracy ratio is expressed as a fraction whose numerator is unity & whose denominator is rounded to the closest 100 units.

Page 38: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

38NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 39: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

39NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 40: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

40NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 41: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

41NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 42: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

42NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 43: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

43NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 44: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

44NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 45: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

45NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 46: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

46NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 47: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

47NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 48: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

48NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 49: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

49NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 50: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

50NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 51: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

51NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 52: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

52NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 53: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

53NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 54: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

54NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 55: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

55NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 56: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

56NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 57: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

57NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 58: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

58NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 59: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

59NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 60: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

60NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 61: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

61NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 62: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

62NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 63: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

63NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 64: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

64NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 65: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

65NUST Institute of Civil Engineering/ Engr Muhammad Ammar

Page 66: SURVEYING  –  I (CE- 128)

SURVEYING – I (CE- 128)

66NUST Institute of Civil Engineering/ Engr Muhammad Ammar