SunGuide SunGuide TM TM Software Development Project Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Release 4.2 FHP/CAD + AVL/RR Design Review Review January 8, 2009 January 8, 2009 Jan 8, 2009 1 R4.2 Design Review

SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Embed Size (px)

Citation preview

Page 1: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

SunGuideSunGuideTMTM Software Development Project Software Development Project

Release 4.2 FHP/CAD + AVL/RR Design ReviewRelease 4.2 FHP/CAD + AVL/RR Design ReviewJanuary 8, 2009January 8, 2009

Jan 8, 2009 1R4.2 Design Review

Page 2: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 2

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 3: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 3

Introductions

Page 4: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 4

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 5: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 5

Meeting ObjectivesMeeting Objectives

Requirements:– Provide a high level review– Provide SwRI’s interpretation (via a design) of

the requirements

Design– High level architectural overview– Operator actions and reactions – Prototype screens / reports

Not an objective:– Revise requirements

Page 6: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 6

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 7: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 7

Release 4.2 Development Release 4.2 Development ActivitiesActivities

Page 8: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP/CAD OverviewFHP/CAD Overview

Jan 8, 2009R4.2 Design Review 8

FHP CADFHP CAD Interface Server

Goal is to make the communication of event information between FHP dispatchers and FDOT operators faster and more efficient

FHP CAD Interface Server consolidates, filters, and redistributes FHP CAD data to each subscribing SunGuide deployment

SunGuide allows the operator to process incidents as well as process updates to those incidents.

Page 9: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 9

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 10: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FDOT Concept of Operations

Page 11: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Operational ConceptOperational Concept

Fort Myers

Jacksonville

Lake Worth

Miami

Orlando

Tampa

Tallahassee

Statewide FTP Site

FHP CAD

Interface Server

FHP Incident Driver IDS

FHP Incident Driver IDS

FHP Incident Driver IDS

SunGuide District 2

SunGuide District 7

SunGuide District 1

RegionalCommunication

Centers

Page 12: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Operational ConceptOperational Concept

FHP Interface Service– Retrieves alerts from the FHP CAD FTP site and

distributes to the FDOT districts based on subscriptions IDS FHP Incident Driver

– Handles the connection between the FHP CAD Interface and Incident Detection Subsystem (IDS)

IDS Subsystem Update– Notifies GUI of new and updated alerts– Stores alerts and responses to alerts in the database

GUI Updates– Displays FHP Alerts to the operator– Provides response dialog and event creation dialog– Display events on the Operator Map

Jan 8, 2009R4.2 Design Review 12

Page 13: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP Alert GUIFHP Alert GUI

FHP Incident Alert Dialog– Consistent with other types of alerts generated by IDS

Jan 8, 2009R4.2 Design Review 13

Page 14: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP Alert GUIFHP Alert GUI

Action Choices– Create New Event– Create Secondary Event– Set Responder Arrival– Dismiss as Already

Detected– Dismiss as False Alarm– Associate to Existing

Event– Acknowledge, Take No

Action

Jan 8, 2009R4.2 Design Review 14

Page 15: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP Alert GUIFHP Alert GUI

Event Field Population– Populated with the closest EM location found– All information contained in the alert is logged in the comments

section of the event

Jan 8, 2009R4.2 Design Review 15

Page 16: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Alert Processing ChoicesAlert Processing Choices

Create New Event

– Creates a new Event Create Secondary Event

– Creates a new Secondary Event Set Responder Arrival

– Fills in the FHP incident number in a selected event

– Sets the responder arrival field in the selected event

– Operator is required to own the event Associate to Existing Event

– Fills in the FHP incident number in a selected event

– Operator is required to own the event

Jan 8, 2009R4.2 Design Review 16

*These actions will allow updates. When updates are displayed, the Event ID of the event that was previously created or associated is displayed in addition to the information about the alert.

Page 17: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Alert Processing ChoicesAlert Processing Choices

Acknowledge, Take No Action– Logs alarm as acknowledged – Allows updates

• Updates are treated as new alerts

Dismiss (False Alarm or Already Detected)– Logs alarm as dismissed– Does NOT allow updates

• This action is NOT reversible so alert updates with the same ID will NOT be seen by the operator

Jan 8, 2009R4.2 Design Review 17

Page 18: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Communication AlarmsCommunication Alarms

Loss of FHP Interface Server Connection– Occurs if the FHP Interface Server disconnects

suddenly or is not connected within 1 minute of the FHP Incident Driver being started

– All deployments will receive this alert

Jan 8, 2009R4.2 Design Review 18

Page 19: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Communication AlarmsCommunication Alarms

Loss of FTP Server Connection– Occurs when the FHP Interface Server fails to connect

to the FTP site to retrieve alert information

– All deployments will receive this alert

Jan 8, 2009R4.2 Design Review 19

Page 20: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Communication AlarmsCommunication Alarms

Stale FHP CAD RCC Files– Issued only if a file that contains a county that IDS has

subscribed to has not been updated in a configured amount of time.

– Only issued to the deployments subscribing to counties included in the stale file.

Jan 8, 2009R4.2 Design Review 20

Page 21: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP Interface Server FHP Interface Server Configuration OptionsConfiguration Options

FTP Site– Host, port, username, password– Local Directory to store current FTP files– Interface only supports data from a single FTP site

Access– List of usernames and passwords for all users

Timing– Retrieve Interval

• How often to get new alerts from the FTP site– Stale Data

• The maximum time limit a file should go without an update

– Stale Data Multiplier • Number of retrievals containing stale data before next

Stale Data Message is sentJan 8, 2009R4.2 Design Review 21

Page 22: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

FHP Incident DriverFHP Incident DriverConfiguration OptionsConfiguration Options

Each SunGuide deployment can have a unique filtering configuration County Filtering

– Can subscribe to any county in the state

– Supplying no counties will return all alerts in the state

– Case-insensitive, punctuation insensitive

• St. Lucie = ST LUCIE, stLUCIE, ST.LuCiE

• “St. Lucie” DOES NOT match “South St. Lucie” Roadway Filtering

– Filters alerts after the county filter has been applied

– Case-insensitive and punctuation insensitive

– Searches for given text inside a given roadway

• I-95 = i95, i 95, i-95, I 95, I95 (DOES NOT match SR-95)

• I-95 DOES match “South I-95” or “i-95 Florida Drive” FHP Interface Server location

– Host, port, username, password

Jan 8, 2009R4.2 Design Review 22

Page 23: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Limitations of FHP DataLimitations of FHP Data

Inconsistent Roadway Naming

– I-95 and SR-9 are the same road require two different entries in the subscription list (unless returning all roadways)

Linear References and Directions

– Uses a predefined list of references and directions to parse data Incorrect Formatting

– Worst case

• 16450 SE FEDERAL HIGHWAY [JDSP MAIN ROAD] [HOBE SOUND]

– Missing “x[“ to split the roadway and cross street

– Alert is disregarded because it can not be parsed correctly

– Other cases

• I-75 SB [I-75 SB] x[MM116.0] [BONITA SPRING]

– Roadway = I-75, Dir = Southbound, Linear Reference = I-75 SB

• Could result in odd references, but will still result in a valid alert For parsing specifics, refer to the FHP Data Parsing document

Jan 8, 2009R4.2 Design Review 23

Page 24: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 24

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 25: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 25

Questions?

Page 26: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 26

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 27: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 27

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 28: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

OverviewOverview

Jan 8, 2009R4.2 Design Review 28

Current AVL/RR implementation feeds Event Update and EM and AVL configuration data from SunGuide to the Road Ranger. The information pushed into SunGuide from the Road Ranger is: Vehicle status and location (AVL information) Event comments

AVL/RR communications interface needs to be enhanced to include a additional bi-directional flow of information.

Page 29: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 29

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 30: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

District 7 ConOps V2District 7 ConOps V2

Jan 8, 2009R4.2 Design Review 30

Page 31: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

AVL/RR ArchitectureAVL/RR Architecture

Jan 8, 2009R4.2 Design Review 31

Page 32: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Operational ConceptOperational Concept

Receive event data from tablet– Add a new, in-progress event– Update event data, including:

• Lane blockage• RR activities• Involved Vehicles

– Ability to close an event (or leave open, ex: abandoned vehicles)

Does not change existing functionality– Enhanced behavior is driven by new data being sent by

the RR device.– If the RR device does not use any of the new schemas,

then system maintains the SG 3.x functionality No changes to GUI (Operator Map, Admin Editor)

Jan 8, 2009R4.2 Design Review 32

Page 33: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

AVL/RR ModificationsAVL/RR Modifications

AVL/RR subsystem and driver updated to handle enhancements to RRMA ICD

Three new messages added to RRMA ICD:– New Event– Update Event (lane blockage, RR activities, involved

vehicles)– Change Event Status

New data is forwarded on to EM subsystem for processing

Jan 8, 2009R4.2 Design Review 33

Page 34: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

EM Modifications / LimitationsEM Modifications / Limitations

EM Modifications

– EM subsystem updated to process an entire event record in one message

– EM will process event updates from AVL/RR

Limitations

– TMC Operator and Road Ranger should avoid editing an event at the same time

• Events created by AVL/RR will initially show up as being owned by the AVL/RR subsystem

• A TMC operator can then take ownership of the event; however, this will not prevent updates received from the RR from being saved

• If RR provides new data, unsaved data entered on EM details window for that event will be lost

Jan 8, 2009R4.2 Design Review 34

Page 35: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 35

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 36: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 36

Questions?

Page 37: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 37

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 38: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Documentation / ScheduleDocumentation / Schedule

Documentation (ones in yellow have already been provided to FDOT):– SRS (Software Requirements Specification)– SIP (Software Integration Plan)– SICP (Software Integration Case Procedures)– SDD (Software Design Document)– SUM (Software Users Manual)– VDD (Version Description Document)

Schedule– FAT currently scheduled for week of Feb 16th – Deployments are not yet scheduled

Jan 8, 2009R4.2 Design Review 38

Page 39: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 39

AgendaAgenda

Time Activity Who9:05 – 9:10 High Level Overview – meeting objectives Heller9:10 – 9:20 FHP/CAD Overview (from FDOT specifications) Heller

9:20 – 10:00 FHP/CAD Design Overview:Operational ConceptFHP Alert GUIAlert Processing ChoicesCommunication AlarmsLimitations of FHP DataConfiguration Options

Brisco / Brown

10:00 – 10:25 Questions / Answers All

10:25 – 10:40 Break

10:40 – 10:50 AVL/RR Overview (from FDOT specifications) Heller10:50 – 11:20 AVL/RR enhancements Design Overview

Operational ConceptAVL/RR ModificationsEM ModificationsIssues and Limitations

Clauss / Alban

11:20 – 11:40 Questions / Answers All11:50 – 11:50 Documentation / Schedule SwRI11:50 – 12:00 Action Item Summary All

Page 40: SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review

Jan 8, 2009R4.2 Design Review 40

Action Item Summary