Upload
andrew-long
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Database Management
ACTION PLANS
www.kornteam.com/cyberstars
Instructions to set up an action plan.
This is using Top Producer, but very similar in other Databases
Set Up Plans in Advance
• Design your plan on paper– What does it look like?
• Tip: no more than 7 emails• Tip: more personal touch the better
– Phone calls and drop by’s will amplify your mailings TEN FOLD
• Go to www.kornteam.com/cyberstars
www.kornteam.com/cyberstars
Example
• 8x8– 0 days – write handwritten note– 1 day after – send letter – Resume– 8 days after – send letter– 15 days after – send letter– 22 days after – phone call– 28 days after – letter– 35 days after – letter– 42 days after – send an item of value– 49 days after – phone call– 49 days after – set up 33 touch (or next plan)
Set Up Blank Documents
• First Step is to Create Blank Documents and Save Them– Neutral Titles (so content can be changed)– Set up the Plan and Schedule Activities
• Copy & Paste the Content– Don’t worry about wether or not you like it right now. Just
get the plan started. You can always change it later!
www.kornteam.com/cyberstars
Setting Up Your Action Plan
• Select Create a New Activity for the 1st Action Item
• Then set up the Appropriate Activity Based on your Written Out Plan
Setting Up Your Action Plan
• Give Activity a Name, and Select the “Perform event” days and select “Enter Next” to add the next Action Item.
Setting Up Your Action Plan
• Next Item is Letter (in this plan). Select Letter
• Click “Select Letter Template”
Setting Up Your Action Plan
• Select Your New Action Plan from the List
• Double Click to Select Your Letter from the List
Setting Up Your Action Plan
• Select the How Many Days After the Plan Starts that You would Like the Item to Print
• Select “Enter Next” for Next Action Item
Setting Up Your Action Plan
• Next Letter is Set Up to Print 8 Days Later
• Repeat for Each Action Item…. AND
REMEMBRER to Set Up One Last Item
Set Up Plans
• Set up Action Plans for all of your checklist– Follow up Plans
• Prospective Buyers• Prospective Sellers• FSBO’s• Expireds• Generic plan for anyone not in these groups
– New List to Offer– Contract to Close
Special Tips
• After you Create any Action Plan… ALWAYS add one more step….
• Have 3 Different Plans– Duplicate your plans
• Set up one as ALL MAIL• Set up one as ALL E-MAIL• Set up one as Mail/Email mix
– Cut postage in half
• Build Letterhead into the letter