Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
SUCCESSFUL IMPLEMENTATION OF STEEL COATING AND BRIDGE REHAB PROJECTSAaron Garza, P.E.
10/11/17
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Table Of Contents
2
5
6-26
27-32
33-37
38-43
3-4Rainbow Bridge: Overview
Rainbow Bridge: Inspection Records
Rainbow Bridge: Paint Defects/Repairs
Rainbow Bridge: Contract Estimate and Total Cost
Rainbow Bridge: Successes
Successful Rehabilitation Implementation
1
2
3
4
5
6
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
SH 73 WB over Neches River
Bridge Length: 7707’-0”
Built: 1938
Rehab: 1997
Rainbow Bridge: Overview
3
Image by KBMT-TV via 12newsnow.com
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Overview
4
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Inspection Records
2011 Fracture Critical Inspection
– Cracks in floorbeams, widespread corrosion, pack rust and section loss,
2012 Routine Inspection
– Deck: 6
– Super: 4
– Sub: 5
2013 Coating Assessment
– Overcoating not practical.
5
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17 6
Rainbow Bridge: Paint Defects (Typical)
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Defects (Typical)
7
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17 8
Rainbow Bridge: Paint Defects (Typical)
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Defects (Typical)
9
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17 10
Rainbow Bridge: Paint Defects (Structural?)
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Defects (Structural?)
11
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Defects (Structural)
12
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
13
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
14
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
15
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
16
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
17
Up to 40% Section Loss
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
18
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
19
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
20
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
21
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
22
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
23
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
24
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
25
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Paint Repairs (Structural)
26
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
27
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
28
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
29
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
30
Traffic Control: $249,902.75
Steel Repair: $1,294,580
Other: $49,202.66
Total: $1,593,685.41
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
31
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Contract Estimate and Total Cost
32
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Successes
Good consultant team.
Experienced structural rehab contractor.
– Good working relationship
– Hands on
– Looked for opportunities
Traffic Control Improvements
– Full access to bridge
– Overheight loads had a safe detour route
33
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Successes
34
Rainbow Bridge Veterans
Bridge
Good consultant team.
Experienced structural rehab contractor.
– Good working relationship
– Hands on
– Looked for opportunities
Traffic Control Improvements
– Full access to bridge
– Overheight loads had a safe detour route
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Successes
35
Rainbow Bridge
WB
EB
Veterans
Bridge
Good consultant team.
Experienced structural rehab contractor.
– Good working relationship
– Hands on
– Looked for opportunities
Traffic Control Improvements
– Full access to bridge
– Overheight loads had a safe detour route
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Successes
36
Rainbow Bridge
(Full Closure)
WB
EB
Veterans
Bridge
Morning Rush
(Before 9:00 AM) Good consultant team.
Experienced structural rehab contractor.
– Good working relationship
– Hands on
– Looked for opportunities
Traffic Control Improvements
– Full access to bridge
– Overheight loads had a safe detour route
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Rainbow Bridge: Successes
37
Rainbow Bridge
(Full Closure)
WB
EB
Veterans
Bridge
9:00 AM – 3:00 PM
Good consultant team.
Experienced structural rehab contractor.
– Good working relationship
– Hands on
– Looked for opportunities
Traffic Control Improvements
– Full access to bridge
– Overheight loads had a safe detour route
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
38
Meetings /
Coordination
Project
Specific
Awareness
Schedule /
Sequence
of Work
Traffic
Control
Field Visit / AssessmentBridge
Condition SurveyPlan Preparation Rehab / Construction Document
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
39
Meetings /
Coordination
Project
Specific
Awareness
Schedule /
Sequence
of Work
Traffic
Control
Field Visit / AssessmentBridge
Condition SurveyPlan Preparation Rehab / Construction Document
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
40
Paint Systems When to Use?
System I-A Used as a maintenance overcoat
System I-B Used as an overcoat in high corrosive environments.
System II Used for field painting bridges throughout the state except along the coast.
System III-A Used for field painting coastal bridges.
System III-B Used for shop painting new steel intended for the coast.
System IV Used for shop painting new steel not intended for the coast.
www.txdot.gov → Inside TxDOT → Divisions → Bridge → Webinars
Painting Practices – Preferred Practices Johnnie Miller
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
41
Departmental Material Specifications (DMS)
– Special Material Requirements
Home > Inside TxDOT > Division > Construction
Material Producer List
Home > Inside TxDOT > Division > Construction
Concrete Repair Manual
– Damage Assessment and Repair Types
– Repair Materials and Procedures
Crossroads > TxDOT Manuals
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
42
Meetings /
Coordination
Project
Specific
Awareness
Schedule /
Sequence
of Work
Traffic
Control
Field Visit / AssessmentBridge
Condition SurveyPlan Preparation Rehab / Construction Document
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17
Successful Rehabilitation Implementation
43
Coatings and Traffic Materials Branch
– Paint Inspection Team
Structural Steel Inspectors
– Ron Reeves
– Angelo Engelhardt
– Wade Vogues
Bridge Construction and Maintenance Branch
• Kevin Pruski, P.E. 512-416-2306
• Leon Flournoy, P.E. 512-416-2493
• Lianxiang Du, P.E. 512-416-2341
• Aaron Garza, P.E. 512-416-2586
Successful Implementation of Steel Coating and Bridge Rehab Projects 10/11/17 44
Aaron Garza, P.E.
TxDOT Bridge Division
C&M Branch
Office: 512-416-2586