    Topics

    Project Overview Review Work Plan Substation Equipment Testing

    Power Circuit Breakers

    Power Transformers

    Capacitors

  • 8/12/2019 Substation Commissioning Procedures.pdf

    3/65

    Project Overview Reviewing the Work Plan

    Planning and Co-ordinating the WorkPlan Communicating Verifying

    Testing

    Troubleshooting, Re-verifying, Re-testing

    Completing Project Documentation

  • 8/12/2019 Substation Commissioning Procedures.pdf

    4/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    5/65

    Review the Work

    Plan

    Review the Work

    Plan

    Identify whats happening Who will be involved? Identify Responsibilities

    Review Project Documentation

    Develop Work Sequence

    Identify whats happening Who will be involved? Identify Responsibilities

    Review Project Documentation

    Develop Work Sequence

  • 8/12/2019 Substation Commissioning Procedures.pdf

    6/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    7/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    8/65

    Power Circuit Breakers

  • 8/12/2019 Substation Commissioning Procedures.pdf

    9/65

    Power Circuit Breaker Guidelines

    Test CTs

    Measure Coils & Megger

    Wiring & Jumpers

    Physical OrientationVerify Prints

    Record Nameplate

    Data

  • 8/12/2019 Substation Commissioning Procedures.pdf

    10/65

    Testing CTs

    Ratio, Polarity, & Burden

    Open Circuit Excitation

    Buzz & Megger Cables

    Terminate Hardwired Shorts on Spares

    Verify CT circuits only grounded @ one point

    Verify Shorting Bar is GROUNDED

  • 8/12/2019 Substation Commissioning Procedures.pdf

    11/65

    Power Circuit Breaker Guidelines

    Gas Fill & Measure

    Test CTs

    Measure Coils & Megger

    Wiring & Jumpers

    Physical OrientationVerify Prints

    Record Nameplate

    Data

  • 8/12/2019 Substation Commissioning Procedures.pdf

    12/65

    SF6 Parameters

  • 8/12/2019 Substation Commissioning Procedures.pdf

    13/65

    Power Circuit Breaker Guidelines

    Wiring Checks

    Check Timing

    Gas Fill & Measure

    Test CTs

    Measure Coils & Megger

    Wiring & Jumpers

    Physical OrientationVerify Prints

    Record Nameplate

    Data

  • 8/12/2019 Substation Commissioning Procedures.pdf

    14/65

    Purpose:

    Method:

    Analysis

    :

    Breaker Timing

    Verifies Breaker Contacts are Opening

    & Closing within acceptable time limits

    Measure Tripping & Closing Times

    Contact Velocities & Inter-pole Spread

  • 8/12/2019 Substation Commissioning Procedures.pdf

    15/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    16/65

    Time (ms)

    Time & Travel for Close (Contact Velocity)

    Distance

    36 mm/ 14 ms =2.57 m/s

  • 8/12/2019 Substation Commissioning Procedures.pdf

    17/65

    Breaker Timing Test

    PlanTrip (Both Trip Coils)

    Close w/ X Coil Included

    Reclose using each Trip Coil

    Trip-Free using each Trip Coil

    Close w/ X Coil Excluded

  • 8/12/2019 Substation Commissioning Procedures.pdf

    18/65

    Breaker Timing

    Start w/ a Close Shot TC1 Reclose

    Trip & Trip Free on

    TC1App note 7 close

    (Move leads to TC2)

    App note 7 reclose

    w/TC2 connected

    Trip & Trip Free onTC2

    PCB Open PCB Closed

    All done with only 8 operations

  • 8/12/2019 Substation Commissioning Procedures.pdf

    19/65

    Power Circuit Breaker Guidelines

    Wiring Checks

    Energy Storage

    Checks

    Primary Contact

    Resistance

    Check Timing

    Gas Fill & Measure (after 24

    hrs)

    Test CTs

    Measure Coils & Hand Megger

    Wiring & Jumpers

    Physical OrientationVerify Prints

    Record Nameplate

    Data

  • 8/12/2019 Substation Commissioning Procedures.pdf

    20/65

    Energy Storage

    SystemsSpring Pressure Rundown Checks

    Spring Discharge

    Overnight Sag

    Motor Start/Stop

    Low Spring AlarmOperation Block

  • 8/12/2019 Substation Commissioning Procedures.pdf

    21/65

    Energy Storage

    Systems

    Temperature

    Compensated

    SF6 Purity & Moisture

    Gas Density Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    22/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    23/65

    Power Circuit Breaker Guidelines

    Wiring Checks

    Final Moisture

    Accessory and Alarm

    Checks

    Operational Checks /

    Load Overall

    Power Factor

    Energy Storage

    Primary Contact

    Resistance

    Check Timing

    Gas Fill & Measure

    Test CTs

    Measure Coils & Megger

    Wiring & Jumpers

    Physical OrientationVerify Prints

    Record Nameplate

    Data

    Final Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    24/65

    Final Checks

    Trip Checks - Local & Remote

    Alarms & Indications - Local & Remote - SCADA

    CT Final Checks

    Bridge & Dummy Load PT Circuits

    Gas Pressures

    Ground Switches Open / All Relays in Service

    Hi-Pot w/ System Voltage

    Close PCB & Pick-up Load

  • 8/12/2019 Substation Commissioning Procedures.pdf

    25/65

    QuickTime and aH.264 decompressor

    are needed to see this picture.

  • 8/12/2019 Substation Commissioning Procedures.pdf

    26/65

    PCB Final Checks

    Trip Checks - Local and Remote

    Alarms - Local & Remote - SCADA

    CT Final Checks

    Bridge & Dummy Load PT Circuits

    Gas Pressures

    Ground Switches Open / All Relays in Service

    Hi-Pot w/ System Voltage

    In Service Checks

    Close PCB & Pick-up Load

  • 8/12/2019 Substation Commissioning Procedures.pdf

    27/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    28/65

    Power Transformers

  • 8/12/2019 Substation Commissioning Procedures.pdf

    29/65

    Transformer Testing Guidelines

    Oil Processing / Sample

    Test CTs

    Hand Meggering

    Wiring & Jumpers

    Physical Orientation

    Auxiliary Components

    Record Nameplate

    Data

    Insulation Power Factor

  • 8/12/2019 Substation Commissioning Procedures.pdf

    30/65

    Insulation Power Factor

  • 8/12/2019 Substation Commissioning Procedures.pdf

    31/65

    Insulation Power Factor

    Capacitive Current Leakage Current

    Capacitance representsability to store energy

    when voltage is applied

    Dissipated energy andheating from applied

    voltage across insulation

    Measuring Dielectric Loss

  • 8/12/2019 Substation Commissioning Procedures.pdf

    32/65

    Insulation Power Factor

    Here it is Ratio of Dielectric Losses to Total Power supplied,

    or ratio of leakage current to total current.Example: Total Power = 460 mVA with 3.3 mW : Calculated % PF = 0.72

    % Power Factor in general: Ratio of Watts to Total

    Power

  • 8/12/2019 Substation Commissioning Procedures.pdf

    33/65

    Insulation Power Factor Grounded Specimen Test (Ground)

  • 8/12/2019 Substation Commissioning Procedures.pdf

    34/65

    Grounded Specimen Test w/ LV guarded out (Guard)

    Insulation Power Factor

  • 8/12/2019 Substation Commissioning Procedures.pdf

    35/65

    Un-grounded Specimen Test (UST)

    Insulation Power Factor

  • 8/12/2019 Substation Commissioning Procedures.pdf

    36/65

    Ground, Guard, & UST

    Insulation Power Factor

  • 8/12/2019 Substation Commissioning Procedures.pdf

    37/65

    Ground

  • 8/12/2019 Substation Commissioning Procedures.pdf

    38/65

    Guard

  • 8/12/2019 Substation Commissioning Procedures.pdf

    39/65

    UST

  • 8/12/2019 Substation Commissioning Procedures.pdf

    40/65

    Ground

  • 8/12/2019 Substation Commissioning Procedures.pdf

    41/65

    Guard + UST

  • 8/12/2019 Substation Commissioning Procedures.pdf

    42/65

    Excitation Current

  • 8/12/2019 Substation Commissioning Procedures.pdf

    43/65

    Excitation Current

  • 8/12/2019 Substation Commissioning Procedures.pdf

    44/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    45/65

    Bushings

    Bushing

  • 8/12/2019 Substation Commissioning Procedures.pdf

    46/65

    Bushing

    s

    Higher Voltages have potential taps w/ C2 > C1. Check Nameplate before

    applying voltages. Megger Bushing and its tap if no PF test set is

    available.

  • 8/12/2019 Substation Commissioning Procedures.pdf

    47/65

    Transformer Testing Guidelines

    Insulation Power Factor

    Winding Ratio, Polarity

    Oil Processing/ Sample

    Test CTs

    Hand Meggering

    Wiring & Jumpers

    Physical Orientation

    Auxiliary Components

    Record Nameplate

    Data

  • 8/12/2019 Substation Commissioning Procedures.pdf

    48/65

    Winding Ratio, Polarity

    Purpose:Checks Turns Ratio & Polarity on all tap

    connections

    Method: TTR Test Set continually through all taps.

    Analysis

    :

    Measured Ratio and Nameplate should match

    very closely (0.2%)

    Measured Ratio will be slightly lower than

    calculated due to slight losses in TTR test set.

    Shorted turns & high contact resistance indicated

    by high excitation current. Ratio error greater

    than 0.2% will be easily noted.

  • 8/12/2019 Substation Commissioning Procedures.pdf

    49/65

    Transformer Testing Guidelines

    Insulation Power Factor

    Winding Ratio, Polarity

    Oil Processing/ Sample

    Test CTs

    Hand Meggering

    Wiring & Jumpers

    Physical Orientation

    Auxiliary Components

    Record Nameplate

    Data

    Impedance

    Measuring Impedance

  • 8/12/2019 Substation Commissioning Procedures.pdf

    50/65

    g p

    Purpose:

    Method:

    Analysis

    :

    Detect shipping damage & basis for future tests

    Compare with Nameplate at Nominal Taps

    Useful for determining core and coil shifting,

    loose or high resistance connections

    Measuring Impedance

  • 8/12/2019 Substation Commissioning Procedures.pdf

    51/65

    g p

    Measuring Impedance

  • 8/12/2019 Substation Commissioning Procedures.pdf

    52/65

    g p

    In General:

    3 Phase wye-wye or

    wye-delta

    3 Phase delta-delta

    Zero-sequence

    T f T ti G id li

  • 8/12/2019 Substation Commissioning Procedures.pdf

    53/65

    Transformer Testing Guidelines

    Insulation Power Factor

    Winding Ratio, Polarity

    Oil Processing/ Sample

    Test CTs

    Hand Meggering

    Wiring & Jumpers

    Physical Orientation

    Auxiliary Components

    Record Nameplate

    Data

    Impedance

    Calibrate Temperature

  • 8/12/2019 Substation Commissioning Procedures.pdf

    54/65

    T f T ti G id li

  • 8/12/2019 Substation Commissioning Procedures.pdf

    55/65

    Transformer Testing Guidelines

    Insulation Power Factor

    Winding Ratio, Polarity

    Oil Processing/ Sample

    Test CTs

    Hand Meggering

    Wiring & Jumpers

    Physical Orientation

    Auxiliary Components

    Record Nameplate

    Data

    Impedance

    Calibrate Temperature

    Bump Fans & Pumps

    Bushing Pot Devices

    DC Winding Resistance

    Megger Core Ground &Windings

    Trip Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    56/65

  • 8/12/2019 Substation Commissioning Procedures.pdf

    57/65

    Capacitors

    esting Capacitors (Impedance)Start with Nameplate rating on

    200 KVAR @ 22800 V

  • 8/12/2019 Substation Commissioning Procedures.pdf

    58/65

    Sta t t a ep ate at g o

    Can:

    200 KVAR @ 22800 V

    I = kVAR / kV

    I = 200 / 22.8 = 8.77 A

    Xc (per can) = I / jw(C)

    Xc (per can) = 22800 / 8.77 = 2600 Ohms

    C = 1 / 377 (Xc)

    C = 1 / 377 (2600) = 1.02 microF

    Each Can is then rated @ 1.02 microF

    Q (kVar)= V I sin (theta)

    = V / I

    Testing Capacitors (Contd)

  • 8/12/2019 Substation Commissioning Procedures.pdf

    59/65

    C (meas) = I (meas) / V (meas) * 377

    Number of Cells in Test?

    100.58 0.859 22.6

    100.44 0.867 22.8

    100.56 0.860 22.6

    Vmeas Imeas Cmeas

    with V (meas) @ 100V, measure I

    22

    1.02 * 22 = 22.4 microF Cap. per layer

    Build Data Sheet

    22.4 0.2 0.89

    22.4 0.4 1.79

    22.4 0.2 0.89

    Ccalc d %d

  • 8/12/2019 Substation Commissioning Procedures.pdf

    60/65

    Rack Wiring

    Wiring Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    61/65

    Compare Schematics w/ Wiring Prints

    Buzz point to point

    Check Diodes

    Contact Makeups

    Test Switches

    Terminal Blocks

    Jumpers

    Wiring Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    62/65

    Relay

    In Service Checks

  • 8/12/2019 Substation Commissioning Procedures.pdf

    63/65

    In Service Checks Pre-determine the measurements.

  • 8/12/2019 Substation Commissioning Procedures.pdf

    64/65

    Cutout your TRIPS Magnitude and polarity of each current

    and voltage (phase angle and rotation) Look for quantities where you do and

    dont expect them to be.

    Open CTs & Shorted CTs

    Wrong Ratios

    Neutral Connections

    Proper Potentials

  • 8/12/2019 Substation Commissioning Procedures.pdf