Subsea Equipment QualificationMeet the all new API RP 17Q

Matt Green

Page 2: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C2

Background

• API RP 17Q First Edition (2010) – Standardized Documentation for Qualification.

• API RP 17N Second Edition – Annex E & Annex F on Technology Qualification

• In 2015, task group 17Q stood up by API SC17 to create a new RP on qualification

• API RP 17Q 2nd Edition issued May 2018 – Subsea Equipment Qualification

• Other qualification processes – DNV A203 (focus on new tech only), NASA/DoD, individual company practices

Page 3: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C3

Basis of 17Q

• Governing process flow chart

Page 4: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C4

Basis of 17Q

• Governing process flow chart

• Technology Maturity Assessment (TRL/TRC)o R&D – Early phase to evaluate and define requirementso Qualification – SQP / TQPo Proven Technology – Ready for end user qualification

• Applicability (section 4.2)

Page 5: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C5

Technology Maturity Assessment (TRL/TRC)

Page 6: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C6

Technology Maturity Assessment (TRL/TRC)

Previous TRLs (17N) Current TRLs (17Q)

Development Stage Completed:

TRL Development Stage:

Unproven Concept 0 Basic Research

Proven Concept 1 Concept Development

Validated Concept 2 Concept Demonstration

Prototype Tested 3 Prototype Development

Environment Tested 4 Product Validation

System Tested 5 System Integration Testing

System Installed 6 System Installation and Commissioning

Field Proven 7 System Operation

Technical Risk Categorization (TRC) – process still defined in API RP 17N

Technology Readiness Level (TRL) Defintions

Page 7: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C7

Select Qualification Program

Page 8: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C8

Select Qualification Program• R&D – Research and Development

• SQP – Standard Qualification Program

• TQP – Technology Qualification Program

Page 9: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C

Standard Qualification Program (SQP)

• Definition: Qualification program that uses qualification activities prescribed within existing standards applicable to the technology

• Allows a qualifier to perform qualification per existing industry standard procedure (i.e. API 6A Annex F)

• Recommends a qualifier to perform Q-FMECA

9

Page 10: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C

Technology Qualification Program (TQP)

• Definition: Qualification program that utilizes Q-FMECA to identify qualification activities necessary to qualify the technology in line with the identified goals and requirements.

• Requires Q-FMECA to inform qualification plan specific for the product.

• Q-FMECA: tool to identify and prioritize qualification activities.o System Breakdowno Function and Requirementso Failure Idenficationo Criticality Assessmento Risk Assessmento Qualification Activities10

Page 11: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C11

Supplier vs End User Roles

Page 12: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C

Supporting Content in 17Q

• Types of qualification activities (physical testing, analysis, etc)

• Residual Risk and Uncertainty

• Qualification Assurance and Report

• End User Qualification – TRL 5 thru 7

• Example of statistical analysis of data to verify acceptance vs requirements

• Examples of TRL analyses

12

Page 13: Subsea Equipment Qualification - MCEDD 2015

© M C E D e e p w a t e r D e v e l o p m e n t a n d G u l f Q u e s t L L C

Request for Feedback and Input

• Focus on continuous improvement until next review cycle

• Request users of the document to provide feedback directly to me for consideration in the next revision of the document

o Quality of contento Scopeo Etc.

Matt Green

Subsea Engineer

713-909-8812

[email protected]