1
The information contained herein is the exclusive property of the Water Corporation and the respective copyright owners. It is subject to ongoing review and should be viewed in conjunction with the associated materials. No part of this production should be copied, modified, reproduced or published in any form other than that intended by the author. Thomsons Second Reservoir Jandakot Groundwater Expansion SDOOL Duplication Nambeelup Treatment Plant West Murray WWPS Pinjarra WWPS Indicative West Pinjarra WWPS Indicative Barragup WWPS Keralup South WWPS Port Kennedy Treatment Plant Byford Tank Mundijong Reservoir Medina Tank Tamworth Hill Second Reservoir Karnup Tank Nambeelup Tank North Mandurah Second Tank Morrell Tank Caddadup Tank Proposed Peel Reuse Corridor Westfield Treatment Plant Canns Rd Tank Canning Trunk Main Duplication South Dandalup Dam Conjurunup Dam North Dandalup Dam Serpentine Dam Wungong Dam Canning Dam Victoria Dam MANDURAH 83 56 68 65 69 20 24 22 9 19 18 16 14 8 23 12 95 35 35 79 82 80 58 37 54 36 72 66 69 68 72 72 63 57 12 65 71 51 16 97 95 46 49 47 36 92 55 60 92 17 11 68 67 74 53 35 94 20 16 70 21 73 13 96 10 Coordinate System: GDA 1994 MGA Zone 50 Vertical Datum: AHD 0 2 4 6 8 10 Kilometres LEGEND Bore Pump Station Tank/Reservoir Treatment Plant Indicative Water Main Indicative Wastewater Main Indicative Treated Wastewater Potential Treatment Plant 1:400,000 at A1 PERTH Wanneroo Mandurah AUTHOR: FLETTN0 File: S:\active\SpatialSystems\Projects\R1061_PerthPeel\mxd\StrategicAssessmentPerthPeelRegionsPreferred_A4_S.mxd GROUP: IPB - Spatial Systems DATE: 2/12/2015 DRAFT FOR PUBLIC COMMENT Figure 24: Proposed water and wastewater infrastructure – South Metropolitan and Peel

Subiaco Ocean Outfall Duplication Forrestfield Reservoir ......WWPS Keralup South WWPS Port Kennedy Treatment Plant Byford Tank Mundijong Reservoir Medina Tank Tamworth Hill Second

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • The information contained herein is the exclusive property of the Water Corporation and the respective copyright owners. It is subject to ongoing review and should be viewed in conjunction with the associated materials. No part of this production should be copied, modified, reproduced or published in any form other than that intended by the author.

    Thomsons Second Reservoir

    Jandakot GroundwaterExpansion

    SDOOL Duplication

    NambeelupTreatment Plant

    West Murray WWPS

    Pinjarra WWPSIndicative WestPinjarra WWPS

    IndicativeBarragupWWPS

    Keralup SouthWWPS

    Port KennedyTreatment Plant

    Byford Tank

    Mundijong Reservoir

    Medina Tank

    Tamworth Hill Second Reservoir

    Karnup Tank

    Nambeelup TankNorth MandurahSecond Tank

    Morrell TankCaddadupTank

    Proposed Peel Reuse Corridor

    Westfield Treatment Plant

    Canns Rd Tank

    Canning Trunk Main DuplicationForrestfield ReservoirSubiacoOcean OutfallDuplication

    South Dandalup Dam

    Conjurunup Dam

    North Dandalup Dam

    Serpentine Dam

    Wungong Dam

    Canning Dam

    Victoria Dam

    MANDURAH83

    56 68

    6569

    2024

    22

    9

    19 18

    16

    14

    823

    12

    95

    35 35

    79

    82

    80

    58

    37

    54

    36

    72

    66

    69

    68

    72

    72

    63

    57

    12

    65

    7151

    16

    97

    95

    46

    49

    47

    36

    92

    55

    60

    92

    17

    11

    68

    67

    74

    53

    35

    94

    20

    16

    70 21

    73

    13

    96

    10

    Coordinate System: GDA 1994 MGA Zone 50 Vertical Datum: AHD

    0 2 4 6 8 10Kilometres

    LEGENDBore

    Pump Station

    Tank/Reservoir

    Treatment PlantIndicative Water MainIndicative Wastewater MainIndicative Treated WastewaterPotential Treatment Plant

    1:400,000 at A1

    PERTHWanneroo

    Mandurah

    AUTH

    OR: FL

    ETTN0

    File: S:\active\SpatialSystems\Projects\R1061_PerthPeel\mxd\StrategicAssessmentPerthPeelRegionsPreferred_A4_S.mxd

    GROU

    P: IPB

    - Spatia

    l System

    sDA

    TE: 2/

    12/2015

    DRAFT FOR PUBLIC COMMENT

    Figure 24: Proposed water and wastewater infrastructure – South Metropolitan and Peel