Study of 5 Year Plans
ByManoj Bharadwaj
Fortress Financial Services ltd.Mumbai
8/14/2019 Study of 11th 5 Year Plan (2007-12)
2/34
8/14/2019 Study of 11th 5 Year Plan (2007-12)
3/34
Railways 10 th 5YP:Financial Review of Tenth Plan
38,163
46,545
60,600
27,600
33,000
Total
Gross Budgetary Support
Internal and Extra BudgetaryResources
Freight Traffic
Estimation of the freight traffic during 10 th five year plan was624 Million Tonnes of originating traffic and 396 Billion TonneKm of transportation output .
84,708
0 20,000 40,000 60,000 80,000 100,000
Original Outlay (in Rs. Crore) Outlay achieved (in Rs. Crore)
8/14/2019 Study of 11th 5 Year Plan (2007-12)
4/34
Freight Performance during Tenth Plan
Year Originatingloading
(Million Ton)
Annual GrowthRate
Freight Output(Billion
NTKM)
Annual GrowthRate
2001-02 492.5 - 333.23
2002-03 518.7 5.32% 353.19 5.60%
2003-04 557.4 7.36% 381.24 7.94%
2004-05 602.1 8.02% 411.28 7.88%
2005-06 666.5 10.70% 441.76 7.41%
2006-07 726.0 8.93% 476.77 7.92%
verage growrate
. .
0
100
200
300
400
500
600700
800
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07
OL (Million Ton)
0
100
200
300
400
500600
2001-02 2002-03 2003-04 2004-05 2005-06 2006-07
FO (Billion NTKM)
8/14/2019 Study of 11th 5 Year Plan (2007-12)
5/34
0
100
200
300
400
500
600
700
800
2001-02
2006-07
Traffic Growth of Different Commodities
2001-02 492.5
2006-07 726
Incrementalloading
233.5
CAGR 8.07%
Cargo Handled (in milliontonnes)
Coal , 229.69
Ore to SteelPlants , 39.35
Ore - Export, 15.72
Cement , 44.04
POL , 35.62
Foodgrains ,32.82
Fertilizers , 27.2
Iron & Steel ,14.5 Others ,
53.56
Coal , 310
Ore to SteelPlants , 62
Ore - Export ,52
Cement ,65
POL , 33
Foodgrains , 46
Fertilizers , 36
Iron & Steel , 19 Others , 103
2001-02 2006-07
8/14/2019 Study of 11th 5 Year Plan (2007-12)
6/34
Targets and achievements
Tenth Plan target At the end of Tenth
plan
Percentage of
completionNew Lines (kms) 1310 945 72.13%
Gauge Conversion(kms)*
4000 4432 110.8%
Doubling (kms) 1575 1363 86.53%
Track Renewals (kms) 23000 24053 104.57%
Railway Electrification 1800 1809 100.5%(kms)Wagons 65000 86619 133.26%
Coaches 9160 10722 117.05%
EMUs (no.s) 1965 869 44.22%
MEMU / DEMU (no.s) 750 610 81.33%
Diesel Locomotives(no.s)
444 607 136.71%
Electric Locomotives(no.s)
343 524 152.76%
8/14/2019 Study of 11th 5 Year Plan (2007-12)
7/34
Reason for achievement
Improved asset utilization has played a major role in theperformance
Decision to use the carrying capacity of the wagonsoptimally by increasing the loadability of the wagons onselected routes up to 15 per cent
The realignment of tariff to the competitive conditions inthe market and incentives for loading in the lean seasonand the empty flow direction.
Improvements in commodities:
Major increases were seen in coal, iron ore for export andsteel plants, cement and other commodities (which includecontainers).
8/14/2019 Study of 11th 5 Year Plan (2007-12)
8/34
Outlook for the Eleventh planPlan Outlay
The total outlay for the 11 th five year plan works out to Rs. 251000 crore. Nearly 3 times jump in allocation from the previous plan
Financing for the 11 th Five Year Plan Split Up (Rs. Crore)
(Rs. Crore)(a)Capitalfrom GeneralExchequer ,
80,300
(a)Contribution for SRSF ,
1,200(a)DieselCess for
Safety Fund ,4,500
(b)InternalResources ,
90,000
(c)ExtraBudgetary
Resources ,75,000
(a) BudgetarySupport
86000
(b) InternalResources 90,000
(c) Extra BudgetaryResources
75,000
8/14/2019 Study of 11th 5 Year Plan (2007-12)
9/34
Forecasts of TrafficYear Originating
loading(million tonnes)
Freight Output(BTMKs)
2006-07 748 497
2007-08 801 532
2008-09 858 570
2009-10 918 610
2010-11 984 653
Assumes Annual Growthrate of for Originating
loading 7.11% and 7.12%for Freight Output
*
Assumes GDP growth of 8%, Rail TransportElasticity of 0.87
0
200
400
600
800
1000
1200
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
Traffic Forecast
Mtonnes
BTMKs
2011-12 1055 701
8/14/2019 Study of 11th 5 Year Plan (2007-12)
10/34
Commodity-wise Projection for the Terminal Year
Originating Loading (in million tonnes)
200
400
600
800
1000
1200
2006-07
2011-12
1 Coal-Total
2 Iron Ore- Steel Plants
3 Iron Ore - Exports
4 POL
5 Fertilizer
6 Cement
7 Finished steel
8 Food grains
9 Others including containers
10 Grand Total
Revenue NTKMs (in Rupee billion)
0
1 2 3 4 5 6 7 8 9 10
0
100
200
300
400
500600
700
800
1 2 3 4 5 6 7 8 9 10
2006-07
2011-12
Yield per million ton (YPMT) will beat an average of Rs. 62.67 crore
from the present level of Rs. 59.8crore. It is assumed that YPMT willincrease gradually in the range of
2.2% to 3.8% every year.
8/14/2019 Study of 11th 5 Year Plan (2007-12)
11/34
New Line Projects12%
Freight Terminals2%
OtherTrafficFacilityworks
3%Logistic Park
1%
Railway Electrification4%
Metropolitan Projects6%
Other Measures forEnhancing Capacity
3%
Running Of 25 Tones AxleLoad On Iron Ore Routes
3%
Running Of 23/24 CoachLength Trains
1%
Capacity Enhancement Spread of Funds
Gauge Conversion24%
Doubling25%
Traffic Facility Works
11%Mega Terminals atMetropolitan cities
2%
Terminals at State Capitalsand important tourists
places1%
Separators/Flyovers/Bye-
pass lines2%
Total Funds allocated:Rs. 77,050 crore
8/14/2019 Study of 11th 5 Year Plan (2007-12)
12/34
New Policy Initiatives
Work on Dedicated Freight Corridors on the Eastern and Western routes havebeen initiated.
Container Policy Liberalization
Wagon Investment Scheme
Rail-side Warehousing Scheme
Rail Vikas Nigam Limited (RVNL )
It was set up as a special purpose vehicle to execute the bankable projects forstrengthening of Golden Quadrilateral and Port / Hinterland Connectivity under theNational Rail Vikas Yojana (NRVY) .
Liberalisation of Siding Rules
Terminal Incentive Scheme and Freight Incentive Schemes
8/14/2019 Study of 11th 5 Year Plan (2007-12)
13/34
Roadways Review of 10th Plan
41232.94
20892
32278.67
9092.9
Gross Budgetary Support
Internal and Extra Budgetary Resource
Financial Review of Tenth Plan
Physical Achievement:The Tenth Plan envisaged the top priority in completion of:
GQ Phase I of NS- EW Corridor
62124.94
.
0 20000 40000 60000
Total
Outlay Achieved (Rs. Crore) Initial Outlay (Rs. Crore)
8/14/2019 Study of 11th 5 Year Plan (2007-12)
14/34
Progress of the National Highways Development ProjectThe overall progress of NHDP as on February, 2007 is as under:
NHDPComponent
TotalLength
CompletedFour Lane
Under Implementation Balance foraward of civilworksLength
(km)No. of contracts
GQ 5846 5540 306 35 -
NS-EW 7300 1080 5150 146 908
Portconnectivity
380 145 214 7 21
Other NHs 945 287 638 16 20
NHDP IIIA 4035 30 1404 22 2566
NHDP-V 6500 148 2 6352
Total 25006 7082 7860 228 9867
8/14/2019 Study of 11th 5 Year Plan (2007-12)
15/34
Historical Growth of National Highways
01000020000300004000050000600007000080000
Total length in Kms
Pre-LiberalizationAverage Growth of
NH during each 5 YPis 4.34%
Number of
kilometers added12 249 km.
0250050007500
10000125001500017500200002250025000
Length added in KmsPost-LiberalizationAverage Growth of
NH during each 5 YPis 24.08%
Number of kilometers added
39,901 km.
8/14/2019 Study of 11th 5 Year Plan (2007-12)
16/34
Outlook for 11 th Five Year PlanAvailability of Funds for 11 th Five Year Plan: (Rs. Crore)
Cess 36,589
ExternalAssistance
4,454
Borrowingsby NHAI
Share of privatesector87,735
Total : Rs. 1,73,501crore
About 4 times jump in fundallocation from the
The target for new addition of length in NH network in 11th Five Year Plan wouldbe about 7000km .
A road vision 2021 was prepared in the Ministry, which proposes a total NationalHighway network of about 80,000 km by the end of the year 2021.
41,615
Surplus fromthe user fee
3,108
previous plan
8/14/2019 Study of 11th 5 Year Plan (2007-12)
17/34
S. No. Name of Project Likely Cost (in Rs.Crore)
1. Completion of GQ and EW-NScorridors
52,434
2. 4 -laning of 11,113 km under NHDPPhase-III
72,454
3. 2-laning with paved shoulders of 20,000 km of National
27,800
Projects undertaken by NHAI:
Highways under NHDP Phase-IV4. 6-laning of selected stretches of
National Highways underNHDP Phase-V
41,210
5. Development of 1000 km of expressways under NHDPPhase-VI
16,680
6. Construction of ring roads, flyoversand bypasses on selected stretchesunder NHDP Phase-VII.
16,680
Total 2,27,258
8/14/2019 Study of 11th 5 Year Plan (2007-12)
18/34
Targets:
NHDP Component Target for CompletionCompletion of GQ March, 2007 *
Completion of NS-EW Corridors,Port Connectivity & otherprojects under NHDP-Phase-I&II
December, 2009
Completion of NHDP-Phase-III December, 2013
Completion of NHDP-Phase-V December, 2012
Completion of NHDP-Phase-VI December, 2015
Completion of NHDP-Phase-VII December, 2015
8/14/2019 Study of 11th 5 Year Plan (2007-12)
19/34
Current Status of the projects:Corridors Total Length
(in km)LengthCompleted(in km)
Length Underimplementation(in km)
Balance foraward(in km)
GoldenQuadrilateral
5846 5713 133 ----
North-South &
East-West
7142 3291 3030 821
Out of a total length of 6283 kms under implementation, 4/6 laning has been completed for apartial length of 2130 kms.
PortConnectivity
380 206 168 06
NHDP Phase-III 12,109 659 1816 9624
NHDP Phase-V 6500 77 953 5470
Total 32939 10705 6283 15951
8/14/2019 Study of 11th 5 Year Plan (2007-12)
20/34
Agencies taking up development work:The development and maintenance of National Highways are implemented
on agency basis.
1. The Government of States / Union Territories (PWDs of State / UTs)2. The National Highways Authority of India (NHAI)3. Border Roads Organisation (BRO)
Agency Length of National Highwaysunder the respective agencies
*As on Feb 2007
The Government of States /Union Territories (PWDs of State / UTs)
43,705 km
The National Highways
Authority of India (NHAI)
16,117 km
Border Roads Organisation(BRO)
5,512 km
Total 65334 km
8/14/2019 Study of 11th 5 Year Plan (2007-12)
21/34
State Roads and Major District Roads
State Highways (SHs) and Major District Roads (MDRs) constitute the secondarysystem of road transportation in the country.
State Highways (SHs) Major District Roads (MDRs)
Provide linkages with theNational Highways, districtheadquarters of the state andimportant towns, tourist
centres and minor ports.
Runs within the districtconnecting areas of production with markets,connecting the rural areas to
the district headquarters andto State Highways and
These roads also carry medium to heavy traffic. It is assessed that the secondarysystem carries about 40 % of the total road traffic, although they constitute onlyabout 13 % of the total road length.
National Highways.
Their total length stands atabout 131,699 km.
Their length is estimated ataround 467,763 km.
8/14/2019 Study of 11th 5 Year Plan (2007-12)
22/34
Deficiencies in the Present SystemA total amount of Rs. 8,000 to 10,000 crore per annum is being made availableagainst the requirement of at least Rs.16,000 crore per annum.
The result is, there are several deficiencies in the existing SHs and MDRs as:
Inadequate width of carriageway in relation to traffic demand
Weak pavement and bridges
Congested stretches of SHs and MDRs passing through cities/towns
and mountainous regionMissing links and bridges
Several railway level crossings crying for replacement with ROB/RUB.
A broad assessment shows that over 50 % of SHs and MDRs network has poorriding quality.Losses due to poor condition of these roads would be around Rs. 6000 croreper annum besides their premature failure resulting in huge rehabilitation andreconstruction costs implying infusion of avoidable plan funds at acceleratedintervals.
8/14/2019 Study of 11th 5 Year Plan (2007-12)
23/34
The total replacement cost of the existing SH and MDR network is broadlyassessed to be as under: (in Rs. Crore)
Source: Road Development Plan Vision: 2021, of the Ministry of Shipping, Road Transport & Highways, published by the IRC. Cost based on 2000-01 Prices)
Constraints Faced:
State Highways 1,50,000
Major District Roads 1,00,000
Total 2,50,000
Lack of financesSpreading resources thinlyControl on pre-construction activitiesWeak management by contractors
8/14/2019 Study of 11th 5 Year Plan (2007-12)
24/34
Formation of Core Network It identifies major arterial routes covering national highways and those state
highways/major district roads which are either already experiencing high volumes
of traffic or have such potential in the light of industrial and other growthstrategies by both the public and the private sector.
The Core network should have a corridor concept and it should be possible toreach from one end of the State to the other at an average speed of 70-80 km perhour.
The objective should be that a commercial vehicle can cover 500 to 600 km on
such a network in one day., - ,
pavements and pavements with good riding quality, bypasses and bridges
Core network length for all
states
71500 km
Financial Outlay covering allstates
Rs. 80,000 crore
8/14/2019 Study of 11th 5 Year Plan (2007-12)
25/34
Highway Maintenance:The requirement of funds as per the norms and fund provided during the last fiveyears are indicated below: -
0
500
1000
1500
2000
2500
3000
Requirement as per norms (in Rs.Crore)
Amount Provided (in Rs. Crore)
Fund Requirement for maintenanceIt is estimated that the fund requirement for maintenance of National Highwaysduring the 11th Plan period would be Rs. 11,400 crore.
Finance Commissions RecommendationsThe Finance Commission decided to provide an annual central grant of Rs.3,750crore over the period 2006-10 for the country as a whole.This amount is in addition to the normal expenditure, which the states areexpected to incur on maintenance of roads and bridges.
2002-2003 2003-2004 2004-2005 2005-2006 2006-2007
8/14/2019 Study of 11th 5 Year Plan (2007-12)
26/34
DEVELOPMENT OF ROADS IN THE NORTH-EASTERN REGION The share of road transport would be well over 90% in the total movement by
surface transport in the Region.
The total road network now stands at 102,000 km out of which 7% are NationalHighways comprising the Primary road system, 20% are State Highways and MajorDistrict Roads comprising the Secondary road system and rest are Rural Roadsproviding links to villages.
Road Network in NORTH-EASTERN RegionState National
HighwaysStateHighways
MajorDistrictRoads
Good Fair Poor
Arunachal Pradesh 392 119 4045 - 4.5 95.5
Assam 2836 1474 6280 12.8 57.3 29.9Manipur 959 675 964 4.7 35.2 60.1Meghalaya 810 653 2712 27.0 42.3 30.7
Mizoram 927 181 1176 - 29.5 70.5Nagaland 494 637 669 12.4 45.3 42.3
Sikkim 62 186 464 NA NA NATripura 400 - 454 - 64.4 35.6Total for NE states 6,880 3925 16,764 10.7 40.9 48.4
8/14/2019 Study of 11th 5 Year Plan (2007-12)
27/34
Special Accelerated Road Development Programme in the North-EasternRegion (SARDP-NE)
Objective: To provide connectivity to all the 85 District Headquarters of the NE Region. Covers 7616 kms of National Highways, State Highways and GS (General Staff)
roads
To connect all State capital with improved/upgraded National Highways. To improve connectivity to the neighbouring countries.
The programme is to be implemented in two phases:
Phase A Phase B
It covers 17 roads with an aggregatelength of 1310 km .
Estimated cost is Rs. 4618 crore
The target for completion of roads underthis Phase is year 2008-09
It comprises 83 roads with an aggregatelength of 6306 km .
Time-frame, cost estimates, sources of funds and the implementation agenciesare, yet to be decided.
8/14/2019 Study of 11th 5 Year Plan (2007-12)
28/34
National Expressways
Target: 15,766 km.Phasing of expressway: 2012, 2017, 2022Project Cost estimation: >> Rs.2, 50,000 crore.Plan for Phase I: 3,530 km (Report from Yahoo News 9 th Dec 09)Estimated Cost for Phase I: Rs. 20,000 crore.The Ministry of Road Transport and Highways has identified 11 stretches in 12 states in thecountry for setting up high-speed six- to eight-lane expressways in the country in the first
phase of its plan.
HimachalPradesh
MadhyaPradesh
Uttar Pradesh Karnataka
Rajasthan Tamil Nadu AndhraPradesh
Maharashtra
Gujarat Karnataka Kerala Goa
8/14/2019 Study of 11th 5 Year Plan (2007-12)
29/34
Ports - Review of 10 th Five Year Plan
Target:
Aggregate capacity of 12 major airports to hit 508.6 MTPA byend of 10 th 5 YP as against 343.95 MTPA by the end of 9 th 5 YP
Finance Outlay: Total plan outlay: Rs. 5418.29 crore Gross budgetary support: Rs. 972 crore Internal and external resource generation: Rs. 4446.29
8/14/2019 Study of 11th 5 Year Plan (2007-12)
30/34
050
100150200250300350
400450500
2002-03
2003-04
2004-05
2005-06
2006-07
Major Ports (in million tonnes)
Year
CargoHandled
(in milliontonnes) Growth
2002-03 313.55
2003-04 344.8 9.97%
2004-05 383.75 11.30%
2005-06 423.57 10.38%
2006-07 465.7 9.95%
020406080
100
120140160180
2002-03
2003-04
2004-05
2005-06
2006-07
Minor Ports (in million tonnes)
Year
CargoHandled
(in milliontonnes) Growth
2002-03 108.3
2003-04 120.84 11.58%
2004-05 137.87 14.09%
2005-06 151.14 9.63%
2006-07 170 12.48%
8/14/2019 Study of 11th 5 Year Plan (2007-12)
31/34
0
100
200
300
400
500
600
Traffic Handled (in milliontonnes)
Capacity (in million tonnes)
Capacity Creation and Utilization at Major Ports
Average CapacityUtilization is about
91.65%
Average Growth intraffic is 9.33%
0
100
200
300
400
500
600
700
2000-01 2001-02 2002-03 2003-04 2004-05 2005-06
Major Ports
Minor Ports
Year Overall Traffic
2000-01 367.83
2001-02 383.97
2002-03 421.87
2003-04 465.64
2004-05 521.62
2005-06 574.71
Comparison of Traffic at Major and Minor Ports
8/14/2019 Study of 11th 5 Year Plan (2007-12)
32/34
Private Sector Participation in Major Ports:Schemes estimated to be about Rs. 11,257 crore were identified
No. of Schemes Cost (Rs.Crore) Capacity Addition (milliontonnes)
8 SchemesCompleted
1775 44.4
6 Schemesawarded
3818 45.5
er a or n a ves:
Maritime Policy:Seeks to combine vision and strategy for the sector through harmonious and coordinateddevelopment of maritime assets like:
a. Portsb. Shippingc. Inland water transport system
d. Ship buildinge. Ship repair industries
After firming up the revised draft and its clearance by COS, it has been placed before the
cabinet for approval
8/14/2019 Study of 11th 5 Year Plan (2007-12)
33/34
8/14/2019 Study of 11th 5 Year Plan (2007-12)
34/34
Outlook 11 th Five Year Plan
InternalResources ,14502.08
GrossBudgetarysupport ,
5547.76
PrivateSector ,
36868.24
Availability of funds Split Up (Rs. Crore)
Total : Rs. 68,972.16crore
Drafted with the expectation that GDP growth rate will be in the range to 8%-9%during the 11 th five year plan.
Projections for 2012:
ExtraBudgetaryResource ,12054.08
Major ports 800 MT 1001.8 MT
Minor ports 300 MT 345.19 MT
Projected Traffic Projected Capacity