Structural vibration problem in power station (Yallourn) Annoying low frequency vibration: In Chem Lab, glassware would vibrate across bench, crash to floor! Control room shake - disturbed operators!

Structural vibration absorber PPt

Embed Size (px)

Citation preview

Page 1: Structural vibration absorber PPt

Structural vibration problem in power station (Yallourn)

Annoying low frequency vibration:

In Chem Lab, glassware would vibrate across bench, crash to floor!

Control room shake - disturbed operators!

Page 2: Structural vibration absorber PPt

Steel structure 79m tall

Page 3: Structural vibration absorber PPt

Chem Lab and control room on this level

Page 4: Structural vibration absorber PPt

Vibration would come and go over 4 minutes

Frequency found

Page 5: Structural vibration absorber PPt

Where from and Why?

Read that natural frequency (i.e.

resonance) of steel structures typically

6- 10 Hz

Initiating force? Coal mills rotate at 8Hz…

Much of structure is invisible to all but civil

engrs!

Page 6: Structural vibration absorber PPt
Page 7: Structural vibration absorber PPt
Page 8: Structural vibration absorber PPt
Page 9: Structural vibration absorber PPt
Page 10: Structural vibration absorber PPt

Two vibration velocity transducers were installed on adjacent mills. Output connected To 2-beam CRO

Page 11: Structural vibration absorber PPt

Vibrations both in-phase: high resulting

vibration

Page 12: Structural vibration absorber PPt

• 2 minutes later, vibrations were anti-phase: resulting vibration low.

Page 13: Structural vibration absorber PPt

2 minutes later : Vibrations both in-

phase: high resulting vibration

Page 14: Structural vibration absorber PPt

Know cause, how to fix?

Balance mills in field

Reduce exciting

force

Page 15: Structural vibration absorber PPt

Reduce response

Page 16: Structural vibration absorber PPt

Stiffening the structure

•Can be easy and cheap to experiment

Page 17: Structural vibration absorber PPt

•Adding mass (300kg) to tune out resonance in vertical pump motor system

Adding mass

Page 18: Structural vibration absorber PPt

Changing mass or stiffening not suitable here

Vibration absorber?

… convert a system to get two natural frequencies – one above, one below the original

New frequencies must be away from an exciting frequency.

Page 19: Structural vibration absorber PPt

•Primary system

•Absorber mass

•Spring

•Absorber mass and spring are tuned to natural frequency of primary system

m

kf

Page 20: Structural vibration absorber PPt

• Calculation method in vibration textbooks

• Absorber mass usually 5% - 25% of primary mass – not realistic here

• Started with experiment in one area

• It WORKED! Vibration amplitude of floor was reduced to much less than problem level

Page 21: Structural vibration absorber PPt

• Action repeated at selected parts of structure

• Success: absorbers set up in centre of several floor beams under control room.

Page 22: Structural vibration absorber PPt

•Compression springs

•Any mass will do – scrap mill liners

used

Page 23: Structural vibration absorber PPt

Problem solved

• Absorbers have been in service for some years without any further problems

Page 24: Structural vibration absorber PPt

New designs

• New plant extension had completely different steelwork structure

• Mills were to be variable speed, so harder to ensure that vibration problem could be avoided

• So, new mills were mounted on isolating spring supports (specialist supplier) and used later at Loy Yang.

Page 25: Structural vibration absorber PPt

Sometimes the problem is unusual and

needs deeper investigation