28
Strategic Planning for Course Management Systems California State University October 9, 2006

Strategic Planning for Course Management Systems California State University October 9, 2006

Embed Size (px)

Citation preview

Strategic Planning for

Course Management Systems

California State University

October 9, 2006

CSU Chico Case Study

• Chico Academic Technologies Profile

• LMS Selection Process

• The Change to Enterprise LMS

• Project Schedule, Planning & Teams

• Faculty Training

• Issues and Challenges

• Resources

Calif. State University, Chico• 90 miles north of Sacramento• 14,550 FTE / 15,600 Students• 913 Faculty• Serving 12 counties in NE California • 30-year history in distance education• 1995 Technology and Learning Program (TLP)• 1998 started with WebCT 1.3 • Chico is one of the original 14 WebCT Institutes• Instructional Designers design training• Rubric for Online Instruction

Chico’s WebCT 4.1 Status

• 96% of students access WebCT

• 32% of course sections (active/engaged)

• 68% of faculty using WebCT

• WebCT 4.1 Server: – SUN V880 - 4 processors, Solaris 8– 350GB Hardware RAID

• System & Course back-ups nightly

Estimated WebCT Usage

2000

4000

6000

8000

10000

12000

14000

Spring2003

Spring2004

Spring2005

Faculty

Students

CourseSections

14,727 Students

1,547 Sections

760 Faculty

Spring2006

15000

WebCT Integration• Portal/LDAP

– uPortal channel links to current term courses– Link to MyWebCT to link to other courses– LDAP supports direct “back-door” access to WebCT

• Student Information System– 2003 SCT SIS+ “Connected Learning Solution”– Course shell for every course section– Adds and Drops “semi-real-time”– Moved to PeopleSoft Fall 2005

• Library– Course shell: generic link to Library resources

Next Generation LMS

• Available 24x7

• Fault Tolerant

• Integrated with other campus systems

• Expandable

• Today’s technology (no perl, relational db)

• Must do migration from WebCT 4.1

• “Modern” features

Chico IT Strategic Planning

• Target 2000 --> Beyond 2000 -->

• Aligning with the Future

• http://www.csuchico.edu/inf/

• These plans included the LMS

• We were changing ERP systems

• The LMS was going to move with them

• Latch on to change and ride the tail

LMS II Selection Process• CIO charged a campus committee• Committee Demographics• Review Chico State’s Priorities

– Teaching and Learning– Academic Program Assessment– Support and Sustainability– Enterprise Integration– Institutional Partnership

• LMS Needs Analysis and Rubrics

Pass/Fail Rubric

Best Fit Rubric

Vista Enterprise Wide (VEW) DVD

• Changing the Learning Management System

• Moving it to an Enterprise Application

Old ArchitectureOld Architecture

WebCT CE

LDAP

Network Back-upsuPortal

www

Student InformationSystem

Data

Users

Auth

ATEC“Control”

Computing NetworkingWeb ServicesDBAsApplications

Vista ArchitectureVista Architecture

Vista Development& Training

Vista Production

Change Management• Academic Technologies

– Vista hotfixes, service packs and upgrades

• Computing Services– OS upgrades and patches

• Security and Networking– Host firewall issues

• DBAs– Oracle configuration, monitoring,

management and upgrades

Enterprise Planning (Communication!)

• Kick-Off meetings (technical and campus)

– Informed IT Team• Establish ownership & collaboration

– Informed campus• Set expectations & future vision

• Project Planning Teams

• Project Planning Meetings

Project ManagementBill EvansProject ManagementBill Evans

Vista Project Teams (Rev 3/06)

California State University, Chico

User Services

DBAsApplication Development

Vista Technical Mgmt LeadD. McElrobertsVista Technical Mgmt LeadD. McElroberts

NetworkingATEC

Project ManagementProject Management

B Evans

P Weddington

L Post

D McElroberts

D Partington

K Fernandes

Implementation CommitteeImplementation Committee

F- B Evans

J Kennedy

T Somma

K Batt

S Hillaire

T – D Partington

B Groendyke

Systems Team HW/SW/AppSystems Team HW/SW/App

B Evans

L Sederberg

K Fernandes

L Sederberg

J Ringel

B Kissinger

D Kuechel

F – B Evans

C Araya

T Somma

T – D McElroberts

P Berry

Technical Integration and Testing

Technical Integration and Testing

F-L Sederberg

C Araya

J Nowotny

T- B Evans

B EvansC Franquet

Functional Testing TeamFunctional Testing Team

T – C Franquet

L Sederberg

Faculty Training & Support

Faculty Training & Support

C Franquet

T- C Araya

F - L Sederberg

B Evans

J Nowotny

Content MigrationContent Migration

Application & System Security

Application & System Security

T Somma

T-D Partington

F- B Evans

Student Training & Support

Student Training & Support

Esposto

L Sederberg

M Ferris

C Franquet

T Somma

B Banks

T – J Nowotny

S Blackstone

J Ringel

P Weddington C Araya

Application AdministrationApplication Administration

B Evans

T Somma

B Evans

L Sederberg

L Gardiner

C Guenter

R Esposto

B Banks

CommunicationsCommunications

L Sederberg

V Breeden

B OppyJ Bracey

R Esposto

J Irving

Vista Project DirectorKathy FernandesVista Project DirectorKathy Fernandes

S Hillaire

B Groendyke A MoxA Mox

D Abbott

A Graham

D Abbott

Vista Project Instructional Documentary

Vista Project Instructional Documentary

K Fernandes

D Carter

L Sederberg

B EvansC Araya

P DiFalcoC Franquet

C FranquetJ NowotnyS Kodai

S Kodai

S Kodai

J Musselman

M Owens

M Spiess

Faculty

PeopleSoft

Info Security

Project Scheduling & TrackingProject Scheduling & TrackingChico Project Vista Production Deployment Timeline Rev. 7/6/06

Vista Production Milestones 3 10 17 24 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29

System Security Plan

Service Levels

Catastrophic Recovery Plan

Faculty Training

Summer Pilot Classes (5/22-8/16)

Course Migrations (automated) Course Migrations

Fall 2006 PeopleSoft Loads

Vista Health Check C

System Freeze C

Fall Classes Begin (8/21) Fall Classes

Upgrade to Oracle 10G?

Vista Integration and Test 3 10 17 24 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29

PS Integration Plan/Dev/Test C FLoad Balance Plan/Dev/Test C FLoad Test (app & server-Plan/Dev/Test) C FValidate Failure & Recovery Processes C FWebCT CE SSO to Vista Prod C FuPortal Integration (SSO - validation) V FCAS? (SSO-validation) V? FFunctional Test Plan/Dev/Test C F

SymbolsLS, LF = Load Summer, Fall data from PeopleSoftC = Completion V = ValidationP1, P2, P3 = Phase 1-3

Aug-06 Sep-06Jul-06

Aug-06 Sep-06Jul-06 Dec-06

Jul-06 Aug-06 Sep-06 Oct-06

Dec-06

Oct-06

Oct-06

Jan-07

Jan-07

Jan-07

Nov-06

Nov-06

Nov-06

Dec-06

Targets and Milestones• 2005

– Fall – Installation & Train the Trainers– Fall/Winter – Develop Training for Faculty

• 2006– Winter – Train Fac. & Develop Pilot Courses– Spring – Run Pilot Courses; Integration

– Full Training Series; Train Faculty – Summer – Migrate courses; Test integration– Fall – Half courses running in Vista

• 2007– Spring – All courses in Vista– Summer – Clean-up & wrap up

LMS Transition by Department

• More fun to learn with people you know

• Less confusion for students

• Easier management of change

• Vista is a better department tool– Group decisions/communication

– Sharing resources

– Program assessment goals

Training Options

• “Transition to Vista” migration module– 2-1/2 hours, experience with WebCT CE

required

• Foundation series– Vista 101 through 105 (beginners welcome)

• Intermediate modules – List of electives by topic

Faculty: Why Training?

• Faculty decisions to be made– Migration methods to choose from

– Migrate one course or more?

– Consultations

Faculty Training Aids

• Coffee and cookies

• Graphics for Vista tools

• Posters

• Hats for Build, Teach & Student tabs

• T-Shirts

Training with PropsTraining with Props

Chico trainers teach Vista tabs with hats:

Build = Construction hat

Teach = Mortar board

Student View = Chico ball cap

Issues & Challenges

• Getting Buy-in/Ownership– Started with selection process– System maintenance

• Cost factors: Buy or build? – Training? Services?

• Getting others plans – Strategic Plans– Project Plans

Resource Links

• Chico’s IT Strategic Planswww.csuchico.edu/inf/

• Chico’s VEW Web sitewww.csuchico.edu/tlp/vew/

• Rubric for Online Instruction

www.csuchico.edu/celt/roi/

Questions?