19
Presented by: The Southern African Institute for Environmental Assessment Strategic Environmental Assessment for the Benguela Large Marine Ecosystem SAIEA January 2013

Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

  • Upload
    others

  • View
    3

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Presented by:

The Southern African Institute for Environmental Assessment

Strategic Environmental

Assessment for the Benguela

Large Marine Ecosystem

SAIEA

January 2013

Page 2: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

This presentation

• Background (BCLME and BCC)

• Purpose of the SEA

• Scoping process thusfar

• Drivers of impacts on the BCLME

• Potential impact of the SEA

Page 3: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Characteristics

of the BCLME

• Complex, highly variable

ecosystem

• Very vulnerable to

external and internal

stresses

• One of the richest

marine ecosystems on

earth

• Important to local and

national economies

Page 4: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Benguela Current Commission • Established in 2007 to promote integrated

management, sustainable development and protection

of the BCLME

• Provides a vehicle for the countries to introduce an

ecosystem approach to management of the BCLME.

• Focused on:

– management of shared fish stocks,

– assessment and monitoring of the physical environment,

– establishment of an ecosystem information system, and

– cooperatively manage biodiversity & ecosystem health.

Page 5: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Participating Ministries

Angola Namibia South Africa

Agriculture, Rural

Development and

Fisheries

Petroleum

Transport

Fisheries and

Marine Resources

Mines and Energy

Environment and

Tourism

Water and

Environmental

Affairs

Agriculture,

Forestry and

Fisheries

Works and

Transport

Works and

Transport Environment Minerals Resources

Page 6: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Background to the SEA

• The Benguela Current Commission is

concerned about the BCLME, due to

cumulative impacts of many kinds of

development in the three Member States

• BCC has hired SAIEA to conduct the

Scoping Phase of the SEA

• Scoping Report summarises key threats

and concerns, and provides Terms of

Reference for the full SEA

• BCC will commission the SEA.

Page 7: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and
Page 8: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

SEA scoping

• Initial understanding of drivers, pressures, and response options (basic scenarios)

• Understand relevant strategic frameworks (vision, laws) rapidy assess alignment – i.e. opportunities/ constraints

• Initial public consultation – Identify key I&APs, preliminary understanding of their issues, concerns and expectations

• Identify linkages to be studied in more detail in the SEA

• Identification of possible risks and/or fatal flaws

• Clarify scope of work for SEA (geographic boundaries, time horizons, budget, methodology, reporting, sequencing, etc)

• Identify expertise needed on the SEA Team

Page 9: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers: Petroleum exploration &

production

Page 10: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Seabed mining

Page 11: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Industrialisation

Page 12: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Terrestrial mining

Page 13: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Shipping, Ports and Trade

Page 14: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Fishing

Page 15: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Catchment land-use

Page 16: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key drivers – Coastal towns & resorts

Page 17: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Key external driver – Climate Change

Page 18: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

SEA and SEMP inputs and expected

pathways to influence PPP & Projects

Page 19: Strategic Environmental Assessment for the Benguela Large ... SEA...Benguela Current Commission •Established in 2007 to promote integrated management, sustainable development and

Thank you www.saiea.com

[email protected]