2
PLAN VIEW SCALE 1 : 30 PROFILE VIEW SCALE 1 : 30 S V C M S - 7 5 . i d w SHEET: REV: 1 OF 2 3/26/2021 XX/XX/XXXX MODIFIED: CREATED: PART NUMBER: DRAWN BY: MODEL: PROJECT NAME 521 DUNN CIRCLE, SPARKS, NV 89431 www.jensenwaterresources.com (855) 468-5600 SVCMS-75 T. Handke 2018 Jensen Precast - All rights reserved. All materials appearing as Jensen Precast documents and the like are proprietary work product and are protected under U.S. copyright and other laws. Unless in conjunction with business conducted with Jensen Precast, any use of Jensen Precast work product without express, written consent is prohibited, and recipient is prohibited from distributing any and all work product to non-approved third parties under penalty of civil action. CITY, STATE DISCLAIMERS, INCLUDING BUT NOT LIMITED TO : 1.) All elevations have been provided by others, and have not been verified by Jensen Precast. Contractor to verify all dimensions and elevations in field prior to installation. 2.) These layout drawings are intended to show overall system design only. All concrete component thicknesses, dimensions, and joint orientations may vary across Jensen Precast's manufacturing facilities. Contractor to confirm these dimensions and orientations prior to installation. 3.) System design criteria has been provided to Jensen Precast. Others are responsible for verification that system meets intended application. 4.) Foundation, subgrade, and backfill to be designed by others. SVCMS-75 COALESCING MEDIA PACK PROCESS TRUE OIL/WATER SEPARATION SUBGRADE EL.: XXX.XX' BASE EL.: XXX.XX' INV. EL.: XXX.XX' RIM EL.: XXX.XX' INV. EL.: XXX.XX' JUNCTION STRUCTURE TYPICAL OFFLINE SYSTEM CONFIGURATION FLOW DIVERSION / BYPASS STRUCTURE MEAN OIL DROPLET SIZE 130-ȝm INFLUENT OIL CONCENTRATION 200-mg/L SPECIFIC GRAVITY OF OIL DROPLETS 0.85 TEMPERATURE OF OPERATION 60F OIL DROPLET DISTRIBUTION LOG-NORMAL DISTRIBUTION WITH STANDARD DEVIATION 2.0 QTY. COMPONENT DESCRIPTION MATERIAL PROVIDER RESPONSIBLE INSTALLER 1 REMOVABLE COALESCING MEDIA-PACK ASSEMBLY JENSEN JENSEN 1 FIXED FRAMEWORK JENSEN JENSEN 2 XX" INLET & OUTLET PIPE AND FITTINGS JENSEN CONTRACTOR 1 SS LIFTING HARNESS FOR COALESCING ASSEMBLY JENSEN CONTRACTOR 2 22" x 48" OIL & GREASE SORBENT MATS OR PADS JENSEN CONTRACTOR 1 24" CAST IRON FRAME AND COVER JENSEN CONTRACTOR 1 48" x 48" ACCESS HATCH JENSEN CONTRACTOR AS RQD. 24" GRADE RINGS & 48" x 48" ACCESS RISER JENSEN CONTRACTOR TBD* 10'-6" TBD* 5'-0" REMOVABLE COALESCING MEDIA-PACK ASSEMBLY XX" INLET PIPE FIXED FRAMEWORK OPTIONAL OUTLET CONFIGURATION OPTIONAL OIL LEVEL SENSOR XX" OUTLET PIPE 24" CAST IRON FRAME & COVER OPTIONAL INLET CONFIGURATION REMOVABLE COALESCING MEDIA-PACK ASSEMBLY FIXED FRAMEWORK 4'-8" VARIES 4'-8" VARIES XX" INLET PIPE XX" OUTLET PIPE ACCESS RISER PROVIDED BY JENSEN OPTIONAL OIL LEVEL SENSOR HATCH TO BE CAST INTO FIELD POURED CONCRETE BY CONTRACTOR 48" x 48" ACCESS HATCH (OTHER HATCHES AVAILABLE) GRADE RINGS & GROUT PACK AS REQUIRED 24" CAST IRON FRAME & COVER STORMVAULT COALESCING MEDIA-PACK SEPARATOR (SVCMS) MODEL: SVCMS-75 (75-GPM TREATMENT UNIT) SYSTEM AND TREATMENT FLOW DESIGN: COALESCING MEDIA-PACK TREATMENT PERFORMANCE NOTES: 1. THE COALESCING MEDIA PACK SYSTEM IS EFFECTIVE IN REDUCING OIL CONCENTRATION IN THE EFFLUENT FLOW DOWN TO 15 MG/L.. 2. THE STORMVAULT COALESCING MEDIA PACK IS MANUFACTURED USING POLYPROPYLENE, A HIGHLY OLEOPHILIC MATERIAL. COALESCING MEDIA-PACK DESIGN ASSUMPTIONS: GENERAL NOTES: 1. SOME INTERNAL COMPONENTS NOT SHOWN FOR CLARITY 2. SMALL UNITS COME WITH INTERNALS, REMOVABLE COALESCING ASSEMBLIES, FRAMEWORK & BAFFLES PRE-INSTALLED. FOR LARGER UNITS, JENSEN FIELD CREW WILL INSTALL THESE INTERNAL COMPONENTS IN THE FIELD AFTER PRECAST IS SET. 3. PANEL DETAILS AND PANEL WIRING DRAWINGS READILY AVAILABLE FOR UNITS ORDERED WITH OPTIONAL OIL LEVEL ALARM SENSOR SYSTEM. CONSTRUCTION NOTES: 1. ALL DIMENSIONS ARE IN FRACTIONAL INCHES. 2. CONTRACTOR TO VERIFY ALL DIMENSIONS OF ALL PRECAST PIECES IN FIELD. 3. VERIFY DIMENSION AND CONDITION OF REMOVABLE ALUMINUM FRAMEWORK AND MEDIA-PACKS ASSEMBLY BEFORE INSTALLATION. 4. VERIFY SUBBASE/SUBGRADE ELEVATION BEFORE PLACING PRECAST COMPONENTS OR BACKFILLING. 5. APPLY BUTYL MASTIC AND/OR GROUT TO SEAL JOINTS OF STRUCTURE. 6. APPLY LOAD TO MASTIC SEAL IN JOINTS OF VAULT TO COMPRESS SEALANT IF NECESSARY. UNIT MUST BE WATER TIGHT, HOLDING WATER UP TO FLOWLINE INVERT (MINIMUM). 7. CONTRACTOR TO GROUT SEAL INLET AND DISCHARGE PIPES TO VAULT/MANHOLE WALL IF NO BOOT CONNECTION SPECIFIED. 8. BLOCK AND/OR GROUT PACK BENEATH FRAMES AND COVERS TO MATCH FINISHED GRADE. 9. COUPLING IF REQUIRED FOR PVC TO HDPE/RCP PIPES TO BE PROVIDED BY CONTRACTOR. MATERIALS: 1. PRECAST VAULT MATERIALS AND MANUFACTURING METHODS SHALL CONFORM TO ASTM, C-857, C-858 AND AASHTO SPECIFICATIONS. MATERIAL LIST - PROVIDED WITH UNIT: (*) REGIONAL MANUFACTURING DIFFERENCE: THESE ARE TEMPLATE DRAWINGS. JOINTS, WALL, TOP AND BOTTOM SLAB THICKNESS VARY ACROSS JENSEN'S REGIONAL MANUFACTURING FACILITIES AND ALSO FOR SITE SPECIFIC LOADING CONDITIONS. CONFIRM FINAL THICKNESS AND PIPING CONFIGURATION PER CONSTRUCTION SUBMITTAL DRAWINGS. ADJUST FINAL DIMENSIONS TO EXTERIOR PIPE INVERT AND SUBGRADE ELEVATION PER REGIONAL DIFFERENCES. VARIES OIL & GREASE SORBENT MATS 48" x 48" CLEAR OPENING HATCH (OTHER HATCHES AVAILABLE) WATER QUALITY TREATMENT FLOW (WQTF) 75-gpm (0.17-cfs) TARGET EFFLUENT CONCENTRATION 15-mg/L TARGET MINIMUM OIL DROPLET SIZE TO BE REMOVED 48.0-ʅm (MICRONS) PROJECTED COALESCING MEDIA-PACK PLATE SURFACE AREA 510-ftϸ OIL SPILL CAPACITY 182-gal SEDIMENT STORAGE CAPACITY 48-ftϹ OFFLINE CONFIGURATION: FOR TYPICAL STORMWATER APPLICATIONS, AN OFFLINE CONFIGURATION IS REQUIRED TO BYPASS HIGHER FLOW EVENTS. THIS IS ACHIEVED BY INSTALLING A DIVERSION AND A JUNCTION STRUCTURE. DRAWINGS FOR JENSEN DIVERSION / BYPASS STRUCTURE AND JENSEN JUNCTION STRUCTURE ARE READILY AVAILABLE. VISIT OUR WEBSITE AT https://www.jensenprecast.com/water-resources/ OR CONTACT US DIRECTLY AT (855) 468-5600 OR [email protected]

STORMVAULT COALESCING MEDIA-PACK SEPARATOR …

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

PLAN VIEW

SCALE 1 : 30

PROFILE VIEW

SCALE 1 : 30

SVCM

S-75.idw

SHEET:

REV:

1 OF 2

3/26/2021 XX/XX/XXXX

MODIFIED:CREATED:

PART NUMBER: DRAWN BY:

MODEL:

PROJECT NAME

521 DUNN CIRCLE, SPARKS, NV 89431

www.jensenwaterresources.com

(855) 468-5600

SVCMS-75

T. Handke

©2018 Jensen Precast - All rights reserved.

All materials appearing as Jensen Precast documents and the like are

proprietary work product and are protected under

U.S. copyright and other laws.

Unless in conjunction with business conducted with Jensen Precast, any

use of Jensen Precast work product without express, written consent is

prohibited, and recipient is prohibited from distributing any and all work

product to non-approved third parties under penalty of civil action.

CITY, STATE

DISCLAIMERS, INCLUDING BUT NOT LIMITED TO:

1.) All elevations have been provided by others, and have not been verified by Jensen Precast. Contractor to verify all dimensions and

elevations in field prior to installation.

2.) These layout drawings are intended to show overall system design only. All concrete component thicknesses, dimensions, and joint

orientations may vary across Jensen Precast's manufacturing facilities. Contractor to confirm these dimensions and orientations prior to

installation.

3.) System design criteria has been provided to Jensen Precast. Others are responsible for verification that system meets intended application.

4.) Foundation, subgrade, and backfill to be designed by others.

SVCMS-75COALESCING MEDIA PACK PROCESS

TRUE OIL/WATER SEPARATION

SUBGRADE EL.: XXX.XX'

BASE EL.: XXX.XX'

INV. EL.: XXX.XX'

RIM EL.: XXX.XX'

INV. EL.: XXX.XX'

JUNCTION

STRUCTURE

TYPICAL OFFLINE SYSTEM

CONFIGURATION

FLOW

DIVERSION / BYPASS

STRUCTURE

MEAN OIL DROPLET SIZE

130-μm

INFLUENT OIL CONCENTRATION

200-mg/L

SPECIFIC GRAVITY OF OIL DROPLETS 0.85

TEMPERATURE OF OPERATION 60°F

OIL DROPLET DISTRIBUTION

LOG-NORMAL DISTRIBUTION

WITH STANDARD DEVIATION 2.0

QTY. COMPONENT DESCRIPTION

MATERIAL

PROVIDER

RESPONSIBLE

INSTALLER

1 REMOVABLE COALESCING MEDIA-PACK ASSEMBLY JENSEN JENSEN

1 FIXED FRAMEWORK JENSEN JENSEN

2 XX"Ø INLET & OUTLET PIPE AND FITTINGS JENSEN CONTRACTOR

1 SS LIFTING HARNESS FOR COALESCING ASSEMBLY JENSEN CONTRACTOR

2 22" x 48" OIL & GREASE SORBENT MATS OR PADS JENSEN CONTRACTOR

1 24"Ø CAST IRON FRAME AND COVER JENSEN CONTRACTOR

1 48" x 48" ACCESS HATCH JENSEN CONTRACTOR

AS RQD. 24"Ø GRADE RINGS & 48" x 48" ACCESS RISER JENSEN CONTRACTOR

TBD*

10'-6"

TBD*

5'-0"

REMOVABLE COALESCING MEDIA-PACK ASSEMBLY

XX"Ø INLET PIPE

FIXED FRAMEWORK

OPTIONAL OUTLET CONFIGURATION

OPTIONAL OIL LEVEL SENSOR

XX"Ø OUTLET PIPE

24"Ø CAST IRON

FRAME & COVER

OPTIONAL INLET CONFIGURATION

REMOVABLE COALESCING MEDIA-PACK ASSEMBLY

FIXED FRAMEWORK

4'-8"±

VARIES

4'-8"±

VARIES

XX"Ø INLET PIPE

XX"Ø OUTLET PIPE

ACCESS RISER PROVIDED BY JENSEN

OPTIONAL OIL LEVEL SENSOR

HATCH TO BE CAST INTO FIELD

POURED CONCRETE BY CONTRACTOR

48" x 48" ACCESS HATCH

(OTHER HATCHES AVAILABLE)

GRADE RINGS &

GROUT PACK AS REQUIRED

24"Ø CAST IRON

FRAME & COVER

STORMVAULT COALESCING MEDIA-PACK SEPARATOR (SVCMS)

MODEL: SVCMS-75 (75-GPM TREATMENT UNIT)

SYSTEM AND TREATMENT FLOW DESIGN:

COALESCING MEDIA-PACK TREATMENT PERFORMANCE NOTES:1. THE COALESCING MEDIA PACK SYSTEM IS EFFECTIVE IN REDUCING OIL CONCENTRATION IN THE EFFLUENT FLOW DOWN TO 15 MG/L..2. THE STORMVAULT COALESCING MEDIA PACK IS MANUFACTURED USING POLYPROPYLENE, A HIGHLY OLEOPHILIC MATERIAL.

COALESCING MEDIA-PACK DESIGN ASSUMPTIONS:

GENERAL NOTES:1. SOME INTERNAL COMPONENTS NOT SHOWN FOR CLARITY2. SMALL UNITS COME WITH INTERNALS, REMOVABLE COALESCING ASSEMBLIES, FRAMEWORK & BAFFLES PRE-INSTALLED.

FOR LARGER UNITS, JENSEN FIELD CREW WILL INSTALL THESE INTERNAL COMPONENTS IN THE FIELD AFTER PRECAST IS SET. 3. PANEL DETAILS AND PANEL WIRING DRAWINGS READILY AVAILABLE FOR UNITS ORDERED WITH OPTIONAL OIL LEVEL ALARM SENSOR SYSTEM.

CONSTRUCTION NOTES: 1. ALL DIMENSIONS ARE IN FRACTIONAL INCHES.2. CONTRACTOR TO VERIFY ALL DIMENSIONS OF ALL PRECAST PIECES IN FIELD.3. VERIFY DIMENSION AND CONDITION OF REMOVABLE ALUMINUM FRAMEWORK AND MEDIA-PACKS ASSEMBLY BEFORE INSTALLATION. 4. VERIFY SUBBASE/SUBGRADE ELEVATION BEFORE PLACING PRECAST COMPONENTS OR BACKFILLING.5. APPLY BUTYL MASTIC AND/OR GROUT TO SEAL JOINTS OF STRUCTURE.6. APPLY LOAD TO MASTIC SEAL IN JOINTS OF VAULT TO COMPRESS SEALANT IF NECESSARY. UNIT MUST BE WATER TIGHT, HOLDING WATER UP

TO FLOWLINE INVERT (MINIMUM).7. CONTRACTOR TO GROUT SEAL INLET AND DISCHARGE PIPES TO VAULT/MANHOLE WALL IF NO BOOT CONNECTION SPECIFIED.8. BLOCK AND/OR GROUT PACK BENEATH FRAMES AND COVERS TO MATCH FINISHED GRADE.9. COUPLING IF REQUIRED FOR PVC TO HDPE/RCP PIPES TO BE PROVIDED BY CONTRACTOR.

MATERIALS: 1. PRECAST VAULT MATERIALS AND MANUFACTURING METHODS SHALL CONFORM TO ASTM, C-857, C-858 AND AASHTO SPECIFICATIONS.

MATERIAL LIST - PROVIDED WITH UNIT: (*) REGIONAL MANUFACTURING DIFFERENCE:THESE ARE TEMPLATE DRAWINGS. JOINTS, WALL, TOP AND BOTTOM SLAB THICKNESS VARY ACROSS JENSEN'S REGIONAL MANUFACTURING FACILITIES AND ALSO FOR SITE SPECIFIC LOADING CONDITIONS. CONFIRM FINAL THICKNESS AND PIPING CONFIGURATION PER CONSTRUCTION SUBMITTAL DRAWINGS. ADJUST FINAL DIMENSIONS TO EXTERIOR PIPE INVERT AND SUBGRADE ELEVATION PER REGIONAL DIFFERENCES.

VARIES

OIL & GREASE SORBENT MATS

48" x 48" CLEAR OPENING HATCH

(OTHER HATCHES AVAILABLE)

WATER QUALITY TREATMENT FLOW (WQTF) 75-gpm (0.17-cfs)

TARGET EFFLUENT CONCENTRATION 15-mg/L

TARGET MINIMUM OIL DROPLET SIZE TO BE REMOVED 48.0-μm (MICRONS)

PROJECTED COALESCING MEDIA-PACK PLATE SURFACE AREA 510-ft²

OIL SPILL CAPACITY 182-gal

SEDIMENT STORAGE CAPACITY 48-ft³

OFFLINE CONFIGURATION:FOR TYPICAL STORMWATER APPLICATIONS, AN OFFLINE CONFIGURATION IS REQUIRED TO BYPASS HIGHER FLOW EVENTS. THIS IS ACHIEVED BY INSTALLING A DIVERSION AND A JUNCTION STRUCTURE. DRAWINGS FOR JENSEN DIVERSION / BYPASS STRUCTURE AND JENSEN JUNCTION STRUCTURE ARE READILY AVAILABLE. VISIT OUR WEBSITE AT https://www.jensenprecast.com/water-resources/ OR CONTACT US DIRECTLY AT (855) 468-5600 OR [email protected]

PLAN VIEW

SCALE: 1 : 25

PROFILE VIEW

SCALE: 1 : 25

ISOMETRIC VIEW w/ SECTION

SCALE: 1 : 25

SVCM

S-75.idw

SHEET:

REV:

2 OF 2

3/26/2021 XX/XX/XXXX

MODIFIED:CREATED:

PART NUMBER: DRAWN BY:

MODEL:

PROJECT NAME

521 DUNN CIRCLE, SPARKS, NV 89431

www.jensenwaterresources.com

(855) 468-5600

SVCMS-75

T. Handke

©2018 Jensen Precast - All rights reserved.

All materials appearing as Jensen Precast documents and the like are

proprietary work product and are protected under

U.S. copyright and other laws.

Unless in conjunction with business conducted with Jensen Precast, any

use of Jensen Precast work product without express, written consent is

prohibited, and recipient is prohibited from distributing any and all work

product to non-approved third parties under penalty of civil action.

3D ISOMETRIC

DISCLAIMERS, INCLUDING BUT NOT LIMITED TO:

1.) All elevations have been provided by others, and have not been verified by Jensen Precast. Contractor to verify all dimensions and

elevations in field prior to installation.

2.) These layout drawings are intended to show overall system design only. All concrete component thicknesses, dimensions, and joint

orientations may vary across Jensen Precast's manufacturing facilities. Contractor to confirm these dimensions and orientations prior to

installation.

3.) System design criteria has been provided to Jensen Precast. Others are responsible for verification that system meets intended application.

4.) Foundation, subgrade, and backfill to be designed by others.

SVCMS-75COALESCING MEDIA PACK PROCESS

TRUE OIL/WATER SEPARATION

STORMVAULT COALESCING MEDIA-PACK SEPARATOR (SVCMS)

MODEL: SVCMS-75

75-GPM TREATMENT UNIT

[COALESCING OIL/WATER SEPARATOR (LIQUID/LIQUID SEPARATION)]

UNIQUE DESIGN FEATURES FOR SUSTAINING LONG TERM PERFORMANCE AND OPERATION:

JENSEN'S SVCMS SYSTEM DESIGN INCLUDES A REMOVABLE COALESCING PACK ASSEMBLY FOR EASY REMOVAL AND REPLACEMENT

FOR CLEANING. ADDITIONALLY, THE SEPARATED OILS AND SETTLED SOLIDS ARE NOT STORED WITHIN THE MEDIA-PACKS, ELIMINATING

PERFORMANCE DEGRADATION THAT RESULT FROM POLLUTANT BUILD UP WITHIN THE MEDIAPACK.

COALESCING MEDIA-PACK SEPARATOR TREATMENT PERFORMANCE NOTES AND SIZING GUIDELINES:

THIS STORMVAULT COALESCING MEDIA-PACK TREATMENT PROCESS IS A TRUE LIQUID FROM A LIQUID SEPARATOR, SEPARATING AND

CAPTURING OIL AND OTHER PETROLEUM HYDROCARBONS FROM STORMWATER RUNOFF AND INDUSTRIAL PROCESS WATERS.

THIS TREATMENT PROCESS IS TYPICALLY DESIGNED TO REDUCE EFFLUENT OIL CONCENTRATIONS AND TOTAL SUSPENDED SOLIDS (TSS)

DOWN TO 15-MG/L OR LESS TO ACHIEVE TARGET EFFLUENT WATER QUALITY (WQ) GOALS FOR STORMWATER OR INDUSTRIAL

PROCESS FLOWS AS ECONOMICALLY AS POSSIBLE.