3
©Stephen Kingham SIP-H323 WG Meeting 09:00-12:40 on August 30th, 2007, Xi’An, China Member Status Update (70min) http://Download.ipv6.club.tw/AP AN/ CERNET, CN USM, MY LEARN, LK UniNET, TH TWAREN, TW Working Group Name and Charter (10min) WG Projects in the Future (10min) SIP Peering between members WG Chair Election (10min) Chair: Quincy Wu [email protected] Co-Chair: Nimal Ratnayake [email protected])

©Stephen Kingham SIP-H323 WG Meeting 09:00-12:40 on August 30th, 2007, Xi’An, China Member Status Update (70min) –CERNET,

Embed Size (px)

Citation preview

Page 1: ©Stephen Kingham SIP-H323 WG Meeting 09:00-12:40 on August 30th, 2007, Xi’An, China Member Status Update (70min)  –CERNET,

©Stephen Kingham

SIP-H323 WG Meeting

• 09:00-12:40 on August 30th, 2007, Xi’An, China

• Member Status Update (70min) http://Download.ipv6.club.tw/APAN/

– CERNET, CN– USM, MY– LEARN, LK– UniNET, TH– TWAREN, TW

• Working Group Name and Charter (10min)

• WG Projects in the Future (10min)– SIP Peering between members

• WG Chair Election (10min)– Chair: Quincy Wu

[email protected]– Co-Chair: Nimal Ratnayake

[email protected])

Page 2: ©Stephen Kingham SIP-H323 WG Meeting 09:00-12:40 on August 30th, 2007, Xi’An, China Member Status Update (70min)  –CERNET,

©Stephen Kingham

Review Some Goals of SIP-H323 WG

• Assist in Development of SIP in APAN Members– More people are interested in SIP. For example, in Network

Research Workshop on Aug. 27:• The design, comparison and current status of TWAREN

voicemail systems download• A Scalable Multi-Server Cluster VoIP System download• Design and Implementation: Large-scale IPv6 Multimedia

Communication System based on SIP download • Tutorials to build SIP servers, identify and involve local organisations at

the APAN Meetings– 2004.7 Cairns– 2005.1 Bangkok– 2005.8 Taipei– 2006.1 Tokyo

• Co-ordinate SIP Peering between Members and Internationally

Page 3: ©Stephen Kingham SIP-H323 WG Meeting 09:00-12:40 on August 30th, 2007, Xi’An, China Member Status Update (70min)  –CERNET,

©Stephen Kingham

WG Project: International Peering

• Many members have deployed domestic SIP services, and are showing strong interest in extending international connection.

• Audio, Video, Presence, and Instant Messages.• Committed Participants in Phase 1 (2007.9-2008.1)

– Nimal (LEARN-LK)– Hewu Li (CERNET-CN)– Sinchai (CNR-TH)– Yang (TWAREN-TW)– CJ (ASTI)– CW Tan (USM-MY)– James (AARNet-AU)

• A hands-on workshop may be held before the Hawaii meeting.– Administrators will meet together and configure their servers.– Coordination and information collection will be conducted before that.

Possible trouble-shooting may be needed during the workshop.– A formal announcement will be made by the end of the Hawaii meeting.